CN216405146U - Bridge top pushes away interim mound structure suitable for in deep soft soil stratum - Google Patents

Bridge top pushes away interim mound structure suitable for in deep soft soil stratum Download PDF

Info

Publication number
CN216405146U
CN216405146U CN202122606095.XU CN202122606095U CN216405146U CN 216405146 U CN216405146 U CN 216405146U CN 202122606095 U CN202122606095 U CN 202122606095U CN 216405146 U CN216405146 U CN 216405146U
Authority
CN
China
Prior art keywords
pushing
pile
temporary pier
soft soil
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122606095.XU
Other languages
Chinese (zh)
Inventor
闵玉
陈友生
黄赓宇
周咏凯
强永林
王小祎
陈星州
丁玮虹
辜锦涛
倪虎
李保君
潘俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Road and Bridge (Group) Co Ltd
SICHUAN ROAD AND BRIDGE HUADONG CONSTRUCTION CO Ltd
Original Assignee
Sichuan Road and Bridge (Group) Co Ltd
SICHUAN ROAD AND BRIDGE HUADONG CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Road and Bridge (Group) Co Ltd, SICHUAN ROAD AND BRIDGE HUADONG CONSTRUCTION CO Ltd filed Critical Sichuan Road and Bridge (Group) Co Ltd
Priority to CN202122606095.XU priority Critical patent/CN216405146U/en
Application granted granted Critical
Publication of CN216405146U publication Critical patent/CN216405146U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a bridge pushing temporary pier structure suitable for deep soft soil stratum, which is characterized in that a pushing pile is arranged on the top of a bridge pushing temporary pier; the bridge pushing temporary pier structure suitable for the deep soft soil stratum is divided into 3 parts, the lower part is a prestressed precast tubular pile, the middle part is a reinforced concrete bearing platform, and the upper part is a steel pipe pile and a steel pad beam; the prestressed precast tubular pile and the steel pipe pile are connected by the reinforced concrete bearing platform, and the reinforced concrete bearing platform needs to be completely or partially buried under the ground. This patent has good atress characteristic, adopts prestressing force precast tubular pile as the basis, provides vertical bearing capacity. The upper part adopts a steel pipe pile and profile steel to form a pushing platform for placing pushing equipment; the steel material can resist larger horizontal force and deformation in the horizontal direction. The middle part adopts a reinforced concrete bearing platform to connect the upper part and the lower part to form a whole. The temporary pier structure solves the problems of large bearing capacity, small settlement and convenient construction and dismantling of the temporary pier required in a deep soft soil stratum, and saves the construction cost.

Description

Bridge top pushes away interim mound structure suitable for in deep soft soil stratum
Technical Field
The utility model relates to the field of bridge incremental launching construction, in particular to a bridge incremental launching temporary pier structure suitable for deep soft soil strata.
Background
When the bridge is subjected to incremental launching construction, a certain number of temporary piers are required to be arranged, and walking jacks are placed on the temporary piers and used as fulcrums of the bridge in an incremental launching stage to meet the requirement of incremental launching stress of the bridge. The vertical stress of the temporary pier is often larger, less is hundreds of tons, and larger is thousands of tons, and excessive settlement cannot occur under the vertical load. Meanwhile, the temporary pier also needs to have certain horizontal bearing capacity and horizontal deformation resistance.
When the temporary piers are built in a deep soft soil stratum, if a gravity type foundation is adopted to expand the foundation, the foundation is difficult to meet the bearing capacity requirement, and the construction cost is high, so that the pile foundation is preferred. The pile foundation mainly comprises three forms of steel pipes, reinforced concrete piles or prefabricated pipe piles. The steel pipe pile has the advantages of convenient and quick construction, large horizontal bearing capacity and strong deformation resistance. However, for the pile with overlarge vertical bearing capacity, the steel pipe pile is difficult to be inserted and driven to the designed depth, so that the requirement on the bearing capacity is difficult to meet. If the steel pipe pile is inserted and driven too deeply, the later-stage pulling-out is difficult, so that the material loss is large, and the construction cost is increased.
The reinforced concrete pile or the precast tubular pile has the advantages of large vertical bearing capacity and small horizontal bearing capacity and small capacity of resisting horizontal deformation as a temporary pier foundation. When the temporary pier foundation needs to be too much higher than the ground or is in a soft soil stratum, the reinforced concrete pile and the precast tubular pile are not suitable any more.
SUMMERY OF THE UTILITY MODEL
Therefore, in order to solve the above-mentioned defects, the utility model provides a bridge pushing temporary pier structure suitable for a deep soft soil stratum. When the bridge is subjected to incremental launching construction, a certain number of temporary piers are required to be arranged, and walking jacks are placed on the temporary piers and used as fulcrums of the bridge in an incremental launching stage to meet the requirement of incremental launching stress of the bridge. The vertical stress of the temporary pier is often larger, less is hundreds of tons, and larger is thousands of tons, and excessive settlement cannot occur under the vertical load. Meanwhile, the temporary pier also needs to have certain horizontal bearing capacity and horizontal deformation resistance. This patent provides a top of adaptation deep soft soil layer pushes away interim mound structural style, adopts prestressing force precast tubular pile as the basis, provides vertical bearing capacity. The upper part adopts steel pipe pile, shaped steel to constitute and pushes away the platform for place the pushing away equipment, resist horizontal force, great horizontal force and the deformation of horizontal direction can be resisted to steel. The middle part adopts a reinforced concrete bearing platform to connect the upper part and the lower part to form a whole. The temporary pier structure solves the problems of large bearing capacity, small settlement and convenient construction and dismantling of the temporary pier required in a deep soft soil stratum, and saves the construction cost.
The utility model is realized in such a way that a bridge pushing temporary pier structure suitable for a deep soft soil stratum is constructed, and the structure is characterized in that; the bridge pushing temporary pier structure suitable for the deep soft soil stratum is divided into 3 parts, the lower part is a prestressed precast tubular pile, the middle part is a reinforced concrete bearing platform, and the upper part is a steel pipe pile and a steel pad beam; the prestressed precast tubular pile and the steel pipe pile are connected by the reinforced concrete bearing platform, and the reinforced concrete bearing platform needs to be completely or partially buried under the ground.
The bridge pushing temporary pier structure suitable for the deep soft soil stratum is characterized in that a pushing pile is arranged on the top of the bridge pushing temporary pier; the upper part of the structure adopts a steel pipe pile and profile steel to form a pushing platform for placing pushing equipment; the steel can resist larger horizontal force and deformation in the horizontal direction; the middle part adopts a reinforced concrete bearing platform to connect the upper part and the lower part to form a whole.
The bridge pushing temporary pier structure suitable for the deep soft soil stratum is characterized in that a pushing pile is arranged on the top of the bridge pushing temporary pier; and a cushion block is arranged on the profile steel cushion beam.
The bridge pushing temporary pier structure suitable for the deep soft soil stratum is characterized in that a pushing pile is arranged on the top of the bridge pushing temporary pier; the construction process comprises the following steps: inserting and driving a prestressed precast tubular pile (PHC tubular pile) → welding anchoring steel bars at the head of the tubular pile → installing cushion cap steel bars → installing steel pipe embedded parts → pouring cushion cap concrete → installing steel pipes and profile steel distribution beams and cushion beams.
The utility model has the following advantages: the utility model provides a bridge incremental launching temporary pier structure suitable for a deep soft soil stratum; when the bridge is subjected to incremental launching construction, a certain number of temporary piers are required to be arranged, and walking jacks are placed on the temporary piers and used as fulcrums of the bridge in an incremental launching stage to meet the requirement of incremental launching stress of the bridge. The vertical stress of the temporary pier is often larger, less is hundreds of tons, and larger is thousands of tons, and excessive settlement cannot occur under the vertical load. Meanwhile, the temporary pier also needs to have certain horizontal bearing capacity and horizontal deformation resistance. This patent provides a top of adaptation deep soft soil layer pushes away interim mound structural style, adopts prestressing force precast tubular pile as the basis, provides vertical bearing capacity. The upper part adopts steel pipe pile, shaped steel to constitute and pushes away the platform for place the pushing away equipment, resist horizontal force, great horizontal force and the deformation of horizontal direction can be resisted to steel. The middle part adopts a reinforced concrete bearing platform to connect the upper part and the lower part to form a whole. The temporary pier structure solves the problems of large bearing capacity, small settlement and convenient construction and dismantling of the temporary pier required in a deep soft soil stratum, and saves the construction cost.
This patent has good atress characteristic. The prestressed precast tubular pile is used as a foundation to provide vertical bearing capacity. The upper part adopts a steel pipe pile and profile steel to form a pushing platform for placing pushing equipment; the steel material can resist larger horizontal force and deformation in the horizontal direction. The middle part adopts a reinforced concrete bearing platform to connect the upper part and the lower part to form a whole. The temporary pier structure solves the problems of large bearing capacity, small settlement and convenient construction and dismantling of the temporary pier required in a deep soft soil stratum, and saves the construction cost.
Drawings
Fig. 1 is a longitudinal arrangement view of temporary piers;
FIG. 2 is a schematic cross-sectional view at A in FIG. 1;
FIG. 3 is a schematic cross-sectional view at B in FIG. 1;
fig. 4 is a view of a temporary pier connection configuration.
Wherein: the prestressed precast tubular pile comprises a prestressed precast tubular pile 1, a reinforced concrete bearing platform 2 in the middle, a steel pipe pile 3 on the upper part, a cushion block 4, pushing equipment 5, a tubular pile head welding anchoring steel bar 6 and a steel pipe embedded part 7.
Detailed Description
The present invention will be described in detail with reference to fig. 1 to 4, and the technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The utility model provides a bridge pushing temporary pier structure suitable for deep soft soil strata by improvement, as shown in figures 1-4, which can be implemented as follows; the bridge pushing temporary pier structure suitable for the deep soft soil stratum is divided into 3 parts, the lower part is a prestressed precast tubular pile 1, the middle part is a reinforced concrete bearing platform 2, and the upper part is a steel pipe pile 3 and a steel pad beam; the prestressed precast tubular pile 1 and the steel pipe pile are connected by the reinforced concrete bearing platform 2, and the reinforced concrete bearing platform 2 needs to be completely or partially buried under the ground.
When in implementation; the upper part of the structure adopts a steel pipe pile and profile steel to form a pushing platform for placing pushing equipment 5; the steel can resist larger horizontal force and deformation in the horizontal direction; the middle part adopts a reinforced concrete bearing platform 2 to connect the upper part and the lower part to form a whole.
When in implementation; and a cushion block 4 is arranged on the profile steel cushion beam.
When in implementation; the construction process comprises the following steps: inserting and driving a prestressed precast tubular pile (PHC tubular pile) → welding anchoring steel bars 6 on a tubular pile head → installing cushion cap steel bars → installing steel pipe embedded parts 7 → pouring cushion cap concrete → installing steel pipes and profile steel distribution beams and cushion beams.
The advantage and the beneficial effect of this patent do: this patent has good atress characteristic. The prestressed precast tubular pile is used as a foundation to provide vertical bearing capacity. The upper part adopts a steel pipe pile and profile steel to form a pushing platform for placing pushing equipment; the steel material can resist larger horizontal force and deformation in the horizontal direction. The middle part adopts a reinforced concrete bearing platform to connect the upper part and the lower part to form a whole. The temporary pier structure solves the problems of large bearing capacity, small settlement and convenient construction and dismantling of the temporary pier required in a deep soft soil stratum, and saves the construction cost.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (3)

1. A bridge pushing temporary pier structure suitable for deep soft soil stratum is characterized in that a bridge pushing temporary pier structure is provided;
the bridge pushing temporary pier structure suitable for the deep soft soil stratum is divided into 3 parts, the lower part is a prestressed precast tubular pile (1), the middle part is a reinforced concrete bearing platform (2), and the upper part is a steel pipe pile (3) and a profile steel pad beam; the prestressed precast tubular pile (1) and the steel pipe pile are connected by the reinforced concrete bearing platform (2), and the reinforced concrete bearing platform (2) needs to be completely or partially buried under the ground.
2. The bridge pushing temporary pier structure suitable for deep soft soil formations according to claim 1, wherein the bridge pushing temporary pier structure comprises a bridge pushing pile and a bridge pushing pile; the upper part of the structure adopts a steel pipe pile and profile steel to form a pushing platform for placing pushing equipment (5); the steel can resist horizontal force and horizontal deformation; the middle part adopts a reinforced concrete bearing platform (2) to connect the upper part and the lower part to form a whole.
3. The bridge pushing temporary pier structure suitable for deep soft soil formations according to claim 1, wherein the bridge pushing temporary pier structure comprises a bridge pushing pile and a bridge pushing pile; the steel backing beam is provided with a cushion block (4).
CN202122606095.XU 2021-10-28 2021-10-28 Bridge top pushes away interim mound structure suitable for in deep soft soil stratum Active CN216405146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122606095.XU CN216405146U (en) 2021-10-28 2021-10-28 Bridge top pushes away interim mound structure suitable for in deep soft soil stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122606095.XU CN216405146U (en) 2021-10-28 2021-10-28 Bridge top pushes away interim mound structure suitable for in deep soft soil stratum

Publications (1)

Publication Number Publication Date
CN216405146U true CN216405146U (en) 2022-04-29

Family

ID=81299298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122606095.XU Active CN216405146U (en) 2021-10-28 2021-10-28 Bridge top pushes away interim mound structure suitable for in deep soft soil stratum

Country Status (1)

Country Link
CN (1) CN216405146U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319143A (en) * 2021-10-28 2022-04-12 四川路桥华东建设有限责任公司 Bridge top pushes away interim mound structure suitable for in deep soft soil stratum

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319143A (en) * 2021-10-28 2022-04-12 四川路桥华东建设有限责任公司 Bridge top pushes away interim mound structure suitable for in deep soft soil stratum

Similar Documents

Publication Publication Date Title
CN107142856B (en) Abutment reconstruction method, abutment reconstruction pier and jacking reconstruction bridge
CN114319143A (en) Bridge top pushes away interim mound structure suitable for in deep soft soil stratum
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN100513695C (en) Repair and reinforcement system of existing structure using reaction force of pressurizing means and method thereof
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN111535161B (en) Slope terrain pier deformation repairing structure and method
CN114703868A (en) Anchor-pull support and foundation pit construction method by utilizing shallow foundation pit in large-height-difference pit
CN108385693B (en) Equal-generation anchor bolt supporting method and system for staged basement supporting
CN113668524A (en) PSB finish rolling deformed steel bar-based expanded head anti-floating anchor rod prestress application method
CN115717368B (en) Bridge abutment correction reinforcing structure and construction method thereof
CN111058463A (en) Rock steep slope high cantilever slope-collecting reinforcing structure and construction method
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN112195928B (en) Pile plate composite structure for foundation pit support
CN212294677U (en) End type prestressed inclined pile
CN220377341U (en) Pile cap type large-diameter inclined single pile foundation arch base structure
CN220450839U (en) Assembled prestressed high-strength concrete anti-slip tubular pile
CN219653491U (en) Steel construction abutment suitable for steel trestle
CN106223344A (en) A kind of ground line piled anchor framework foundation pit supporting method
CN102235017B (en) Lateral force resisting method for soft soil foundation building
CN213390202U (en) A combined polygonal tubular structure fan foundation
CN216973419U (en) Supporting structure for preventing large-area continuous collapse of foundation pit enclosure
CN212742557U (en) Cement mixing pile enclosure wall-profile steel cantilever type combined support
CN209854736U (en) Supporting structure for emergency rescue and reinforcement of foundation pit
CN212405174U (en) Supporting structure and building of soft rock foundation pit at lower part of upper soil layer
CN212926083U (en) Cement-soil enclosure wall-precast pile cantilever type combined support