CN212357943U - Prefabricated double-arch bridge middle connecting node structure - Google Patents
Prefabricated double-arch bridge middle connecting node structure Download PDFInfo
- Publication number
- CN212357943U CN212357943U CN202020508001.8U CN202020508001U CN212357943U CN 212357943 U CN212357943 U CN 212357943U CN 202020508001 U CN202020508001 U CN 202020508001U CN 212357943 U CN212357943 U CN 212357943U
- Authority
- CN
- China
- Prior art keywords
- arch bridge
- bridge
- steel plate
- connecting steel
- shaped connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 25
- 239000010959 steel Substances 0.000 claims abstract description 25
- 239000000126 substance Substances 0.000 claims abstract description 13
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 1
- 239000006071 cream Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a prefabricated double arch bridge middle connecting node structure, which comprises a first arch bridge, a second arch bridge, a pier, a seam, a U-shaped connecting steel plate, a chemical anchor bolt, a V-shaped structure and a caulking paste layer; the first arch bridge and the second arch bridge are both prefabricated by reinforced concrete, and the end parts of the first arch bridge and the second arch bridge are arranged on the top surface of the bridge pier; a seam is reserved between the first arch bridge and the second arch bridge on the bridge pier; a U-shaped connecting steel plate is arranged between the bottom surfaces of the end parts of the first arch bridge and the second arch bridge and the top surface of the pier, and the notch of the U-shaped connecting steel plate is upward; the middle edge of the U-shaped connecting steel plate is fixed on the top surface of the bridge pier through two chemical anchor bolts, and two side edges of the U-shaped connecting steel plate are respectively fixed on the outer side surfaces of the end parts of the first arch bridge and the second arch bridge through the chemical anchor bolts; a V-shaped structure is arranged at the joint of the U-shaped connecting steel plate; the utility model relates to a rationally, the structure is firm, and the deformation that adaptable arch bridge takes place.
Description
Technical Field
The utility model relates to a landscape bridge field especially relates to a prefabricated double arch bridge middle part connected node structure.
Background
Along with the improvement of living standard of people, gardens are the excellent place that people had a rest and play, also develop fast, and the arch bridge is one of the common facility in landscape, and traditional arch bridge adopts cast-in-place construction, but need build the template, tie up the reinforcing bar and maintain, and this makes the engineering time longer undoubtedly, therefore prefabricated arch bridge begins to implement, but the arch bridge node is still undefined, leads to having no reliable technical reference during the construction, consequently easily causes a series of problems, such as the steadiness of structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect with not enough, provide a prefabricated two arch bridge middle part connected node structure, this prefabricated two arch bridge middle part connected node structural design is reasonable, and the structure is firm, and the deformation that adaptable arch bridge takes place.
In order to achieve the above object, the utility model adopts the following technical scheme: a prefabricated double-arch bridge middle connecting node structure comprises a first arch bridge, a second arch bridge, bridge piers, seams, U-shaped connecting steel plates, chemical anchor bolts, a V-shaped structure and a caulking paste layer; the first arch bridge and the second arch bridge are both prefabricated by reinforced concrete, and the end parts of the first arch bridge and the second arch bridge are arranged on the top surface of the bridge pier; a seam is reserved between the first arch bridge and the second arch bridge on the bridge pier; a U-shaped connecting steel plate is arranged between the bottom surfaces of the end parts of the first arch bridge and the second arch bridge and the top surface of the pier, and the notch of the U-shaped connecting steel plate is upward; the middle edge of the U-shaped connecting steel plate is fixed on the top surface of the bridge pier through two chemical anchor bolts, and two side edges of the U-shaped connecting steel plate are respectively fixed on the outer side surfaces of the end parts of the first arch bridge and the second arch bridge through the chemical anchor bolts; a V-shaped structure is arranged at the joint of the U-shaped connecting steel plate; and the joints are filled with caulking paste layers.
Preferably, the width of the seam is 30-50 mm.
The utility model has the advantages that: this prefabricated two arch bridge middle part connected node structural design is reasonable, and the structure is firm, has water-proof effects, and the deformation that adaptable arch bridge takes place.
Drawings
Fig. 1 is a schematic structural diagram of a middle connecting node of a prefabricated double arch bridge.
Wherein: 1 is first arched bridge, 2 is the second arched bridge, 3 is the pier, 4 are the seam, 5 are U type connecting steel plate, 6 are chemical crab-bolt, 7 are V type structure, 8 are the caulking cream layer.
Detailed Description
The present invention will be described in further detail with reference to fig. 1.
As shown in fig. 1, a prefabricated double arch bridge middle connecting node structure comprises a first arch bridge 1, a second arch bridge 2, a pier 3, a seam 4, a U-shaped connecting steel plate 5, a chemical anchor bolt 6, a V-shaped structure 7 and a caulking paste layer 8; the first arch bridge 1 and the second arch bridge 2 are both prefabricated by reinforced concrete, and the end parts of the first arch bridge 1 and the second arch bridge 2 are arranged on the top surface of the pier 3; a seam 4 is reserved between the first arch bridge 1 and the second arch bridge 2 on the bridge pier 3; a U-shaped connecting steel plate 5 is arranged between the bottom surfaces of the end parts of the first arch bridge 1 and the second arch bridge 2 and the top surface of the pier 3, and the notch of the U-shaped connecting steel plate 5 faces upwards; the middle edge of the U-shaped connecting steel plate 5 is fixed on the top surface of the pier 3 through two chemical anchor bolts 6, and two side edges of the U-shaped connecting steel plate 5 are respectively fixed on the outer side surfaces of the end parts of the first arch bridge 1 and the second arch bridge 2 through the chemical anchor bolts 6; a V-shaped structure 7 is arranged at the joint 4 of the U-shaped connecting steel plate 5; the joint 4 is filled with a layer of caulking compound 8.
In specific implementation, the width of the seam 4 is 30-50 mm.
Claims (2)
1. The utility model provides a prefabricated two arch bridge middle part connected node structure which characterized in that: the bridge comprises a first arch bridge, a second arch bridge, bridge piers, seams, U-shaped connecting steel plates, chemical anchor bolts, a V-shaped structure and a caulking paste layer; the first arch bridge and the second arch bridge are both prefabricated by reinforced concrete, and the end parts of the first arch bridge and the second arch bridge are arranged on the top surface of the bridge pier; a seam is reserved between the first arch bridge and the second arch bridge on the bridge pier; a U-shaped connecting steel plate is arranged between the bottom surfaces of the end parts of the first arch bridge and the second arch bridge and the top surface of the pier, and the notch of the U-shaped connecting steel plate is upward; the middle edge of the U-shaped connecting steel plate is fixed on the top surface of the bridge pier through two chemical anchor bolts, and two side edges of the U-shaped connecting steel plate are respectively fixed on the outer side surfaces of the end parts of the first arch bridge and the second arch bridge through the chemical anchor bolts; a V-shaped structure is arranged at the joint of the U-shaped connecting steel plate; and the joints are filled with caulking paste layers.
2. A prefabricated double arch bridge middle connection node structure according to claim 1, wherein: the width of the seam is 30-50 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020508001.8U CN212357943U (en) | 2020-04-08 | 2020-04-08 | Prefabricated double-arch bridge middle connecting node structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020508001.8U CN212357943U (en) | 2020-04-08 | 2020-04-08 | Prefabricated double-arch bridge middle connecting node structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212357943U true CN212357943U (en) | 2021-01-15 |
Family
ID=74138827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020508001.8U Expired - Fee Related CN212357943U (en) | 2020-04-08 | 2020-04-08 | Prefabricated double-arch bridge middle connecting node structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212357943U (en) |
-
2020
- 2020-04-08 CN CN202020508001.8U patent/CN212357943U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104153287B (en) | There is the section assembling concrete frame bridge pier system and method for self-resetting capability | |
CN206189455U (en) | Piping lane | |
CN108660921A (en) | Orthotropic steel-ultra-high performance concrete bridge deck structure and its construction method | |
CN110453584A (en) | A kind of Steel-concrete Combined Beam Structures using weather-proof Wavelike steel webplate | |
CN208201914U (en) | One kind is faced forever in conjunction with covered back-digging structure | |
CN210342375U (en) | Concrete laminated slab | |
CN201254731Y (en) | Steel cross beam type dismountable stupa base | |
CN106869008A (en) | The composite bridge prefabricated bridge of dry type connection and its dry type connection method | |
CN212357943U (en) | Prefabricated double-arch bridge middle connecting node structure | |
CN106481006A (en) | Assembly concrete beam slab tongue and groove method of attachment | |
CN103924581A (en) | Underground continuous wall with prefabricated concrete-filled steel tube composite structure and method for constructing underground continuous wall | |
CN106906749B (en) | The construction method of full assembled steel-concrete combined structure box beam | |
CN205741871U (en) | There is the prestressed reinforced concrete box beam of double limb corrugated steel web | |
CN110735492A (en) | Connecting structure of prestressed hollow composite slabs and construction method thereof | |
CN209178916U (en) | A kind of assembled pile foundation wharfs component | |
CN212077588U (en) | Prefabricated arch bridge node structure | |
CN206941372U (en) | Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap | |
CN109778891A (en) | A method of the enhancing back cover bond stress based on offshore steel taper pile basis | |
CN110820795B (en) | Double-deck corrugated steel plate concrete combination retaining wall | |
CN209723230U (en) | The connecting node of steel plate combined shear wall and not equal higher baselines | |
CN110284520A (en) | A kind of Long span closure frame plate of dry and wet Hybrid connections-column assembly system | |
CN206942186U (en) | Embedded prestressing force assembling frame reinforces the structure of former framework | |
CN207121992U (en) | A kind of assembled Special-Shaped Column concrete frame structure | |
CN1049466C (en) | Sleeve welding pile joint | |
CN218175730U (en) | Novel high-pile wharf structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210115 |
|
CF01 | Termination of patent right due to non-payment of annual fee |