CN212357943U - Prefabricated double-arch bridge middle connecting node structure - Google Patents

Prefabricated double-arch bridge middle connecting node structure Download PDF

Info

Publication number
CN212357943U
CN212357943U CN202020508001.8U CN202020508001U CN212357943U CN 212357943 U CN212357943 U CN 212357943U CN 202020508001 U CN202020508001 U CN 202020508001U CN 212357943 U CN212357943 U CN 212357943U
Authority
CN
China
Prior art keywords
arch bridge
bridge
steel plate
connecting steel
shaped connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020508001.8U
Other languages
Chinese (zh)
Inventor
姚雪妃
李梅秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020508001.8U priority Critical patent/CN212357943U/en
Application granted granted Critical
Publication of CN212357943U publication Critical patent/CN212357943U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a prefabricated double arch bridge middle connecting node structure, which comprises a first arch bridge, a second arch bridge, a pier, a seam, a U-shaped connecting steel plate, a chemical anchor bolt, a V-shaped structure and a caulking paste layer; the first arch bridge and the second arch bridge are both prefabricated by reinforced concrete, and the end parts of the first arch bridge and the second arch bridge are arranged on the top surface of the bridge pier; a seam is reserved between the first arch bridge and the second arch bridge on the bridge pier; a U-shaped connecting steel plate is arranged between the bottom surfaces of the end parts of the first arch bridge and the second arch bridge and the top surface of the pier, and the notch of the U-shaped connecting steel plate is upward; the middle edge of the U-shaped connecting steel plate is fixed on the top surface of the bridge pier through two chemical anchor bolts, and two side edges of the U-shaped connecting steel plate are respectively fixed on the outer side surfaces of the end parts of the first arch bridge and the second arch bridge through the chemical anchor bolts; a V-shaped structure is arranged at the joint of the U-shaped connecting steel plate; the utility model relates to a rationally, the structure is firm, and the deformation that adaptable arch bridge takes place.

Description

Prefabricated double-arch bridge middle connecting node structure
Technical Field
The utility model relates to a landscape bridge field especially relates to a prefabricated double arch bridge middle part connected node structure.
Background
Along with the improvement of living standard of people, gardens are the excellent place that people had a rest and play, also develop fast, and the arch bridge is one of the common facility in landscape, and traditional arch bridge adopts cast-in-place construction, but need build the template, tie up the reinforcing bar and maintain, and this makes the engineering time longer undoubtedly, therefore prefabricated arch bridge begins to implement, but the arch bridge node is still undefined, leads to having no reliable technical reference during the construction, consequently easily causes a series of problems, such as the steadiness of structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect with not enough, provide a prefabricated two arch bridge middle part connected node structure, this prefabricated two arch bridge middle part connected node structural design is reasonable, and the structure is firm, and the deformation that adaptable arch bridge takes place.
In order to achieve the above object, the utility model adopts the following technical scheme: a prefabricated double-arch bridge middle connecting node structure comprises a first arch bridge, a second arch bridge, bridge piers, seams, U-shaped connecting steel plates, chemical anchor bolts, a V-shaped structure and a caulking paste layer; the first arch bridge and the second arch bridge are both prefabricated by reinforced concrete, and the end parts of the first arch bridge and the second arch bridge are arranged on the top surface of the bridge pier; a seam is reserved between the first arch bridge and the second arch bridge on the bridge pier; a U-shaped connecting steel plate is arranged between the bottom surfaces of the end parts of the first arch bridge and the second arch bridge and the top surface of the pier, and the notch of the U-shaped connecting steel plate is upward; the middle edge of the U-shaped connecting steel plate is fixed on the top surface of the bridge pier through two chemical anchor bolts, and two side edges of the U-shaped connecting steel plate are respectively fixed on the outer side surfaces of the end parts of the first arch bridge and the second arch bridge through the chemical anchor bolts; a V-shaped structure is arranged at the joint of the U-shaped connecting steel plate; and the joints are filled with caulking paste layers.
Preferably, the width of the seam is 30-50 mm.
The utility model has the advantages that: this prefabricated two arch bridge middle part connected node structural design is reasonable, and the structure is firm, has water-proof effects, and the deformation that adaptable arch bridge takes place.
Drawings
Fig. 1 is a schematic structural diagram of a middle connecting node of a prefabricated double arch bridge.
Wherein: 1 is first arched bridge, 2 is the second arched bridge, 3 is the pier, 4 are the seam, 5 are U type connecting steel plate, 6 are chemical crab-bolt, 7 are V type structure, 8 are the caulking cream layer.
Detailed Description
The present invention will be described in further detail with reference to fig. 1.
As shown in fig. 1, a prefabricated double arch bridge middle connecting node structure comprises a first arch bridge 1, a second arch bridge 2, a pier 3, a seam 4, a U-shaped connecting steel plate 5, a chemical anchor bolt 6, a V-shaped structure 7 and a caulking paste layer 8; the first arch bridge 1 and the second arch bridge 2 are both prefabricated by reinforced concrete, and the end parts of the first arch bridge 1 and the second arch bridge 2 are arranged on the top surface of the pier 3; a seam 4 is reserved between the first arch bridge 1 and the second arch bridge 2 on the bridge pier 3; a U-shaped connecting steel plate 5 is arranged between the bottom surfaces of the end parts of the first arch bridge 1 and the second arch bridge 2 and the top surface of the pier 3, and the notch of the U-shaped connecting steel plate 5 faces upwards; the middle edge of the U-shaped connecting steel plate 5 is fixed on the top surface of the pier 3 through two chemical anchor bolts 6, and two side edges of the U-shaped connecting steel plate 5 are respectively fixed on the outer side surfaces of the end parts of the first arch bridge 1 and the second arch bridge 2 through the chemical anchor bolts 6; a V-shaped structure 7 is arranged at the joint 4 of the U-shaped connecting steel plate 5; the joint 4 is filled with a layer of caulking compound 8.
In specific implementation, the width of the seam 4 is 30-50 mm.

Claims (2)

1. The utility model provides a prefabricated two arch bridge middle part connected node structure which characterized in that: the bridge comprises a first arch bridge, a second arch bridge, bridge piers, seams, U-shaped connecting steel plates, chemical anchor bolts, a V-shaped structure and a caulking paste layer; the first arch bridge and the second arch bridge are both prefabricated by reinforced concrete, and the end parts of the first arch bridge and the second arch bridge are arranged on the top surface of the bridge pier; a seam is reserved between the first arch bridge and the second arch bridge on the bridge pier; a U-shaped connecting steel plate is arranged between the bottom surfaces of the end parts of the first arch bridge and the second arch bridge and the top surface of the pier, and the notch of the U-shaped connecting steel plate is upward; the middle edge of the U-shaped connecting steel plate is fixed on the top surface of the bridge pier through two chemical anchor bolts, and two side edges of the U-shaped connecting steel plate are respectively fixed on the outer side surfaces of the end parts of the first arch bridge and the second arch bridge through the chemical anchor bolts; a V-shaped structure is arranged at the joint of the U-shaped connecting steel plate; and the joints are filled with caulking paste layers.
2. A prefabricated double arch bridge middle connection node structure according to claim 1, wherein: the width of the seam is 30-50 mm.
CN202020508001.8U 2020-04-08 2020-04-08 Prefabricated double-arch bridge middle connecting node structure Expired - Fee Related CN212357943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020508001.8U CN212357943U (en) 2020-04-08 2020-04-08 Prefabricated double-arch bridge middle connecting node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020508001.8U CN212357943U (en) 2020-04-08 2020-04-08 Prefabricated double-arch bridge middle connecting node structure

Publications (1)

Publication Number Publication Date
CN212357943U true CN212357943U (en) 2021-01-15

Family

ID=74138827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020508001.8U Expired - Fee Related CN212357943U (en) 2020-04-08 2020-04-08 Prefabricated double-arch bridge middle connecting node structure

Country Status (1)

Country Link
CN (1) CN212357943U (en)

Similar Documents

Publication Publication Date Title
CN104153287B (en) There is the section assembling concrete frame bridge pier system and method for self-resetting capability
CN206189455U (en) Piping lane
CN108660921A (en) Orthotropic steel-ultra-high performance concrete bridge deck structure and its construction method
CN110453584A (en) A kind of Steel-concrete Combined Beam Structures using weather-proof Wavelike steel webplate
CN208201914U (en) One kind is faced forever in conjunction with covered back-digging structure
CN210342375U (en) Concrete laminated slab
CN201254731Y (en) Steel cross beam type dismountable stupa base
CN106869008A (en) The composite bridge prefabricated bridge of dry type connection and its dry type connection method
CN212357943U (en) Prefabricated double-arch bridge middle connecting node structure
CN106481006A (en) Assembly concrete beam slab tongue and groove method of attachment
CN103924581A (en) Underground continuous wall with prefabricated concrete-filled steel tube composite structure and method for constructing underground continuous wall
CN106906749B (en) The construction method of full assembled steel-concrete combined structure box beam
CN205741871U (en) There is the prestressed reinforced concrete box beam of double limb corrugated steel web
CN110735492A (en) Connecting structure of prestressed hollow composite slabs and construction method thereof
CN209178916U (en) A kind of assembled pile foundation wharfs component
CN212077588U (en) Prefabricated arch bridge node structure
CN206941372U (en) Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap
CN109778891A (en) A method of the enhancing back cover bond stress based on offshore steel taper pile basis
CN110820795B (en) Double-deck corrugated steel plate concrete combination retaining wall
CN209723230U (en) The connecting node of steel plate combined shear wall and not equal higher baselines
CN110284520A (en) A kind of Long span closure frame plate of dry and wet Hybrid connections-column assembly system
CN206942186U (en) Embedded prestressing force assembling frame reinforces the structure of former framework
CN207121992U (en) A kind of assembled Special-Shaped Column concrete frame structure
CN1049466C (en) Sleeve welding pile joint
CN218175730U (en) Novel high-pile wharf structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210115

CF01 Termination of patent right due to non-payment of annual fee