CN212336731U - Supporting device for small-clear-distance double-beam lateral formwork - Google Patents

Supporting device for small-clear-distance double-beam lateral formwork Download PDF

Info

Publication number
CN212336731U
CN212336731U CN202020571665.9U CN202020571665U CN212336731U CN 212336731 U CN212336731 U CN 212336731U CN 202020571665 U CN202020571665 U CN 202020571665U CN 212336731 U CN212336731 U CN 212336731U
Authority
CN
China
Prior art keywords
supporting plate
backup pad
adjusting screw
supporting
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020571665.9U
Other languages
Chinese (zh)
Inventor
李晓亮
王万洲
张涛
乔涛
李一鸣
黄妮妮
霍丽娜
朱丽娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCEGC No 9 Construction Engineering Group Co Ltd
Original Assignee
SCEGC No 9 Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCEGC No 9 Construction Engineering Group Co Ltd filed Critical SCEGC No 9 Construction Engineering Group Co Ltd
Priority to CN202020571665.9U priority Critical patent/CN212336731U/en
Application granted granted Critical
Publication of CN212336731U publication Critical patent/CN212336731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a strutting arrangement for be used for little clean apart from two roof beam side direction templates, including a plurality of length direction equipartitions along two roof beams supporting mechanism between the lateral surface of two side direction templates of two roof beams, a plurality of supporting mechanism's structure is the same all, supporting mechanism includes parallel first backup pad and the second backup pad of laying, be provided with a plurality of adjusting screw between first backup pad and the second backup pad, adjusting nut is installed to adjusting screw on the last adjusting screw, be provided with a plurality of thread bush on the medial surface of first backup pad, it passes the hole to have seted up a plurality of adjusting screw in the second backup pad, be provided with the guide bar between first backup pad and the second backup pad. The utility model discloses simple structure is convenient for realize the installation and the dismantlement of supporting mechanism between two side direction templates, under a plurality of supporting mechanism's combined action, can realize the support to two side direction templates to can guarantee the interval between two side direction templates.

Description

Supporting device for small-clear-distance double-beam lateral formwork
Technical Field
The utility model belongs to the technical field of construction formwork engineering, concretely relates to a strutting arrangement for be used for little clean apart from two roof beam side direction templates.
Background
The template engineering is an important component of concrete structure construction. In the cast-in-place concrete structural engineering, the construction cost of the template engineering is usually 20-30% of the construction cost of the concrete structural engineering and 30-40% of the construction amount, and the construction technology of the template engineering has important influences on improving the engineering quality, accelerating the construction progress, reducing the engineering cost and realizing civilized construction. The double beam means that two beams are arranged at the same position. The two overlapped beams are spatially combined into one, but the respective steel bar threads are independently configured. The small clear distance double beams refer to double beams with an expansion joint of 100-300 mm in size range, namely the size range of the space between the outer side surfaces of two lateral templates of the small clear distance double beams is 100-300 mm, in the construction process of template engineering of the small clear distance double beams, because an operator cannot enter the expansion joint to support and fix the lateral templates, the lateral templates at the expansion joint have the phenomena of high supporting difficulty and deformation, and the problem of insufficient strength of the formed concrete easily occurs. Therefore, a support device for a small-clearance double-beam lateral formwork, which can guarantee the engineering quality, should be provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that not enough among the above-mentioned prior art is directed against, provide a strutting arrangement for little clean apart from two roof beam side direction templates, its simple structure, reasonable in design, easy and simple to handle is convenient for realize the installation and the dismantlement of supporting mechanism between two side direction templates, under a plurality of supporting mechanism's combined action, can realize the support to two side direction templates to can guarantee the interval between two side direction templates, facilitate promotion and application.
In order to solve the technical problem, the utility model discloses a technical scheme is: a strutting arrangement that is used for little clear distance two roof beam side direction templates which characterized in that: the supporting mechanism is characterized by comprising a plurality of supporting mechanisms which are uniformly distributed between the outer side surfaces of two lateral templates of the double beams along the length direction of the double beams, the supporting mechanisms are identical in structure and comprise a first supporting plate and a second supporting plate which are arranged in parallel, a plurality of adjusting screws are arranged between the first supporting plate and the second supporting plate, adjusting nuts are installed on the adjusting screws, a plurality of thread sleeves are arranged on the inner side surface of the first supporting plate, a plurality of adjusting screw penetrating holes are formed in the second supporting plate, the number of the adjusting screws, the number of the thread sleeves and the number of the adjusting screw penetrating holes are equal and are in one-to-one correspondence, one end of each adjusting screw is in threaded connection with the thread sleeves, the other end of each adjusting screw penetrates through the corresponding adjusting screw penetrating hole, and the length of each adjusting screw ranges from 100mm to 300mm, and a guide rod is arranged between the first supporting plate and the second supporting plate.
The support device for the small-clear-distance double-beam lateral formwork is characterized in that: first backup pad and second backup pad are the rectangle backup pad, and are a plurality of the thread bush is two and arranges on the medial surface of first backup pad.
The support device for the small-clear-distance double-beam lateral formwork is characterized in that: one end of the guide rod is fixedly arranged on the first supporting plate, and the other end of the guide rod penetrates through the second supporting plate.
Compared with the prior art, the utility model has the following advantage:
1. the utility model discloses an equipartition a plurality of supporting mechanism between the lateral surface of two side direction templates of two roof beams, and a plurality of supporting mechanism's structure is all the same, supporting mechanism includes first backup pad and second backup pad, first backup pad and second backup pad are laid in parallel, through set up a plurality of adjusting screw between first backup pad and second backup pad, and install adjusting nut on adjusting screw, when the in-service use, tightly push up adjusting nut's terminal surface on the medial surface of second backup pad, when the adjusting nut is twisted to anticlockwise, adjusting nut can promote the second backup pad to move to the side of keeping away from first backup pad, thereby realize the purpose of increase interval between first backup pad and the second backup pad; when screwing adjusting nut clockwise, adjusting nut's terminal surface can keep away from the medial surface of second backup pad gradually, the manual second backup pad that promotes, can make the second backup pad remove to one side that is close to first backup pad, thereby realize reducing the purpose of interval between first backup pad and the second backup pad, and is simple and convenient to operate, be convenient for realize the installation and the dismantlement of supporting mechanism between two side direction templates, under a plurality of supporting mechanism's combined action, can realize the support to two side direction templates, thereby can guarantee the interval between two side direction templates, and the facilitate promotion is used.
2. The utility model discloses a set up a plurality of thread sleeves on the medial surface of first backup pad, set up a plurality of adjusting screw and pass the hole in the second backup pad, adjusting screw's quantity, the quantity that the quantity and the adjusting screw that the thread sleeve passed the hole all equal, and the one-to-one, in the time of practical use, adjusting screw's one end and thread sleeve threaded connection, adjusting screw's the other end passes adjusting screw and passes the hole, under a plurality of adjusting screw's combined action, can guarantee the stationarity that the second backup pad removed, and can guarantee the depth of parallelism between first backup pad and the second backup pad, excellent in use effect.
3. The utility model discloses a value range of adjusting screw length is 100mm ~ 300mm, is the interval between the lateral surface of two side direction templates of two roof beams in order to adapt to little clean distance, and easy operation can reduce intensity of labour.
4. The utility model has the advantages of simple structure and reasonable design, low in manufacturing cost, facilitate promotion is used.
To sum up, the utility model has the advantages of simple structure and reasonable design, it is easy and simple to handle, be convenient for realize the installation and the dismantlement of supporting mechanism between two side direction templates, under a plurality of supporting mechanism's combined action, can realize the support to two side direction templates to can guarantee the interval between two side direction templates, the facilitate promotion is used.
The present invention will be described in further detail with reference to the accompanying drawings and examples.
Drawings
Fig. 1 is a schematic view of the usage state of the present invention.
Fig. 2 is a sectional view a-a of fig. 1.
Fig. 3 is a schematic view of the connection relationship between the first supporting plate, the threaded sleeve and the guide rod of the present invention.
Description of reference numerals:
1 — a first support plate; 1-thread sleeve; 2 — a second support plate;
3, adjusting a screw rod; 3-1-adjusting nut; 4, a guide rod;
5, a lateral template; and 6, positioning a plate.
Detailed Description
As shown in fig. 1, 2 and 3, the present invention comprises a plurality of supporting mechanisms uniformly distributed along the length direction of the double beam between the outer side surfaces of the two lateral formworks 5 of the double beam, the structure of the plurality of supporting mechanisms is the same, the supporting mechanism comprises a first supporting plate 1 and a second supporting plate 2 which are arranged in parallel, a plurality of adjusting screws 3 are arranged between the first supporting plate 1 and the second supporting plate 2, adjusting nuts 3-1 are mounted on the adjusting screws 3, a plurality of thread sleeves 1-1 are arranged on the inner side surface of the first supporting plate 1, a plurality of adjusting screw passing holes are arranged on the second supporting plate 2, the number of the adjusting screws 3, the number of the thread sleeves 1-1 and the number of the adjusting screw passing holes are equal and are in one-to-one correspondence, one end of the adjusting screw 3 is in threaded connection with the thread sleeves 1-1, the other end of the adjusting screw rod 3 penetrates through the adjusting screw rod penetrating hole, the length of the adjusting screw rod 3 ranges from 100mm to 300mm, and a guide rod 4 is arranged between the first supporting plate 1 and the second supporting plate 2.
In the embodiment, a plurality of supporting mechanisms are uniformly distributed between the outer side surfaces of the two lateral formworks 5 of the double beams along the length direction of the double beams, the structures of the plurality of supporting mechanisms are the same, the supporting mechanisms comprise a first supporting plate 1 and a second supporting plate 2, the first supporting plate 1 and the second supporting plate 2 are arranged in parallel, by providing a plurality of adjusting screws 3 between the first support plate 1 and the second support plate 2, an adjusting nut 3-1 is arranged on the adjusting screw rod 3, when in actual use, the end surface of the adjusting nut 3-1 is tightly pressed against the inner side surface of the second supporting plate 2, when the adjusting nut 3-1 is screwed anticlockwise, the adjusting nut 3-1 can push the second supporting plate 2 to move to the side far away from the first supporting plate 1, so that the aim of increasing the distance between the first supporting plate 1 and the second supporting plate 2 is fulfilled; when the adjusting nut 3-1 is screwed clockwise, the end face of the adjusting nut 3-1 can be gradually far away from the inner side face of the second supporting plate 2, the second supporting plate 2 is manually pushed, the second supporting plate 2 can be moved to one side close to the first supporting plate 1, and therefore the purpose of reducing the distance between the first supporting plate 1 and the second supporting plate 2 is achieved, the operation is simple and convenient, the installation and the disassembly of the supporting mechanisms between the outer side faces of the two lateral templates 5 are convenient to achieve, the supporting of the two lateral templates 5 can be achieved under the combined action of the supporting mechanisms, the distance between the outer side faces of the two lateral templates 5 can be guaranteed, and the popularization and the application are convenient.
In this embodiment, through set up a plurality of thread bush 1-1 on the medial surface of first backup pad 1, set up a plurality of adjusting screw and pass the hole on second backup pad 2, adjusting screw 3's quantity, thread bush 1-1's quantity with adjusting screw passes the quantity that the hole all equals, and the one-to-one, during the in-service use, adjusting screw 3's one end with thread bush 1-1 threaded connection, adjusting screw 3's the other end passes adjusting screw and passes the hole, under a plurality of adjusting screw 3's combined action, can guarantee the stationarity that second backup pad 2 removed to can guarantee the depth of parallelism between first backup pad 1 and the second backup pad 2, excellent in use effect.
During the in-service use, when the size of the expansion joint of two roof beams was greater than 300mm, operating personnel just can get into the expansion joint and carry out the installation to the stay bolt, and the installation technique to the stay bolt is the conventional technology of template engineering, has the construction cost low, and requires low advantage to operating personnel's technical merit, consequently, in order to adapt to the interval between the lateral surface of two side direction templates 5 of little clear distance two roof beams, the value range of the length of this strutting arrangement's adjusting screw 3 is 100mm ~ 300 mm.
In this embodiment, a guide rod 4 is provided between the first support plate 1 and the second support plate 2, and functions as: install between the lateral surface of two side direction templates 5 during supporting mechanism, guide bar 4 can regard as the connecting piece that is used for connecting first backup pad 1 and second backup pad 2 to use, by guide bar 4 as the support piece that bears the dead weight of first backup pad 1 and the dead weight of second backup pad 2, can reduce the pressure that a plurality of adjusting screw 3 received in radial direction, be convenient for revolve wrong the twisting of adjusting screw 3, simultaneously, when utilizing adjusting screw 3 to adjust the interval between first backup pad 1 and the second backup pad 2, guide bar 4 can regard as the guide to use, excellent in use effect.
As shown in fig. 1 and 3, in this embodiment, the first support plate 1 and the second support plate 2 are both rectangular support plates, and the plurality of thread bushings 1-1 are arranged on the inner side surface of the first support plate 1 in two rows.
In this embodiment, the thread sleeves 1-1 are arranged on the inner side surface of the first support plate 1 in two rows, and the purpose is as follows: the manual a plurality of adjusting screw 3 of twisting of operating personnel of being convenient for, the phenomenon that adjusting screw 3 is difficult to twist because operating space is not enough to appear, because the length direction equipartition of a plurality of supporting mechanism along two roof beams, consequently, has sufficient operating space between two adjacent supporting mechanism.
As shown in fig. 2 and 3, in the present embodiment, one end of the guide rod 4 is fixedly mounted on the first support plate 1, and the other end of the guide rod 4 passes through the second support plate 2.
As shown in fig. 1 and 2, in practical use, after the installation of the basic formwork of the double beam is completed, the positioning work of the installation positions of the plurality of supporting mechanisms needs to be performed on the top surface of the lateral formwork 5 along the length direction of the double beam, and the specific operation process is as follows: measuring by using a steel tape, so that the distance between two adjacent supporting mechanisms is 1m, marking the mounting positions of the supporting mechanisms in a mode of nailing a plurality of positioning plates 6, wherein two ends of each positioning plate 6 are respectively nailed on the top surfaces of the two lateral formworks 5, and two ends of each positioning plate 6 are respectively flush with the inner side surfaces of the two lateral formworks 5; and then, according to the nailing positions of the positioning plates 6, a plurality of supporting mechanisms are installed, the installation methods of the supporting mechanisms are the same, and the installation method of any supporting mechanism comprises the following steps: firstly, manually and clockwise screwing a plurality of adjusting nuts 3-1 to ensure that the distance between the outer side surfaces of the first supporting plate 1 and the second supporting plate 2 is smaller than the distance between the outer side surfaces of the two lateral templates 5; secondly, simultaneously extending the first support plate 1 and the second support plate 2 between the outer side surfaces of the two lateral formworks 5, so that the same end surfaces of the first support plate 1 and the second support plate 2 are tightly attached to the positioning plate 6, and one end of the guide rod 4 is overlapped on the top surface of any one of the lateral formworks 5; then, a plurality of adjusting nuts 3-1 are manually screwed anticlockwise, the second supporting plate 2 is pushed by the plurality of adjusting nuts 3-1 to move towards one side far away from the first supporting plate 1, so that the outer side surfaces of the first supporting plate 1 and the second supporting plate 2 are respectively attached to the outer side surfaces of the two lateral templates 5, and the device is convenient to operate, low in labor intensity and convenient to popularize and apply.
The above, only be the utility model discloses a preferred embodiment, it is not right the utility model discloses do any restriction, all according to the utility model discloses the technical entity all still belongs to any simple modification, change and the equivalent structure change of doing above embodiment the utility model discloses technical scheme's within the scope of protection.

Claims (3)

1. A strutting arrangement that is used for little clear distance two roof beam side direction templates which characterized in that: the supporting mechanism is uniformly distributed between the outer side faces of two lateral templates (5) of the double beams along the length direction of the double beams, the structure of the supporting mechanism is uniform, the supporting mechanism comprises a first supporting plate (1) and a second supporting plate (2) which are arranged in parallel, a plurality of adjusting screws (3) are arranged between the first supporting plate (1) and the second supporting plate (2), adjusting nuts (3-1) are installed on the adjusting screws (3), a plurality of thread sleeves (1-1) are arranged on the inner side face of the first supporting plate (1), a plurality of adjusting screw penetrating holes are formed in the second supporting plate (2), the number of the adjusting screws (3), the number of the thread sleeves (1-1) and the number of the adjusting screw penetrating holes are equal and are in one-to-one correspondence, one end of each adjusting screw (3) is in threaded connection with the thread sleeves (1-1), the other end of adjusting screw (3) passes adjusting screw passes the hole, the value range of the length of adjusting screw (3) is 100mm ~ 300mm, first backup pad (1) with be provided with guide bar (4) between second backup pad (2).
2. A support device for a small clearance double beam lateral formwork in accordance with claim 1 wherein: the first supporting plate (1) and the second supporting plate (2) are rectangular supporting plates, and the thread sleeves (1-1) are arranged on the inner side face of the first supporting plate (1) in two rows.
3. A support device for a small-clearance double-beam lateral formwork according to claim 1 or 2, wherein: one end of the guide rod (4) is fixedly arranged on the first supporting plate (1), and the other end of the guide rod (4) penetrates through the second supporting plate (2).
CN202020571665.9U 2020-04-16 2020-04-16 Supporting device for small-clear-distance double-beam lateral formwork Active CN212336731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020571665.9U CN212336731U (en) 2020-04-16 2020-04-16 Supporting device for small-clear-distance double-beam lateral formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020571665.9U CN212336731U (en) 2020-04-16 2020-04-16 Supporting device for small-clear-distance double-beam lateral formwork

Publications (1)

Publication Number Publication Date
CN212336731U true CN212336731U (en) 2021-01-12

Family

ID=74073380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020571665.9U Active CN212336731U (en) 2020-04-16 2020-04-16 Supporting device for small-clear-distance double-beam lateral formwork

Country Status (1)

Country Link
CN (1) CN212336731U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585730A (en) * 2021-08-13 2021-11-02 中国建筑第五工程局有限公司 Template structure used between columns
CN113958124A (en) * 2021-11-10 2022-01-21 中冶建工集团有限公司 Small-spacing double-beam formwork reinforcing device and construction method thereof
CN115110760A (en) * 2022-06-23 2022-09-27 中国五冶集团有限公司 Template for pouring filter beam of filter tank and construction process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585730A (en) * 2021-08-13 2021-11-02 中国建筑第五工程局有限公司 Template structure used between columns
CN113958124A (en) * 2021-11-10 2022-01-21 中冶建工集团有限公司 Small-spacing double-beam formwork reinforcing device and construction method thereof
CN113958124B (en) * 2021-11-10 2023-01-06 中冶建工集团有限公司 Small-spacing double-beam formwork reinforcing device and construction method thereof
CN115110760A (en) * 2022-06-23 2022-09-27 中国五冶集团有限公司 Template for pouring filter beam of filter tank and construction process

Similar Documents

Publication Publication Date Title
CN212336731U (en) Supporting device for small-clear-distance double-beam lateral formwork
CN108638323B (en) T-beam prefabrication construction steel bar binding rack and binding method
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN103225396B (en) Beam frame type construction template system
CN104818845A (en) Column formwork fastening method and clamping frame thereof
CN102489801A (en) Adjusting electrospark electrode guiding device
CN215717195U (en) Bolt reinforcing structure is exempted from to wear by super large cross-section shaped steel concrete column template
CN214942706U (en) Prestressed carbon fiber plate tensioning external member
CN214575152U (en) External control type distance frame for positioning frame column reinforcing steel bars
CN201202276Y (en) Beam side panels fixture
CN109098439B (en) Adjustable prefabricated space node pouring template
CN217203445U (en) Municipal works road and bridge crack restoration fixed knot constructs
CN215407413U (en) Template anchor clamps of building engineering construction usefulness
CN215566378U (en) Wind-powered electricity generation mixes tower prefabricated tower section of thick bamboo festival connection structure
CN219973915U (en) Clamping and jacking device for fixing scattered spliced floor templates
CN219622362U (en) Supporting tool for post-cast strip or floor slab back roof
CN217104616U (en) Found quick formwork fixture device of rimstone back
CN212767625U (en) Detachable supporting rod for steel box girder transportation
CN215671150U (en) Concrete one-time forming ground elevation control tool
CN219839970U (en) Quick press-release device for box girder plug templates
CN216340897U (en) Tool for improving forming quality of arc-shaped component
CN217812376U (en) Steel form locking device
CN213477695U (en) Steel sheet location mounting structure
CN220336463U (en) Aluminum square buckle template fixing and connecting structure
CN219931416U (en) Detachable reinforcing steel bar positioning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant