CN212316829U - Movable assembled revetment pier construction scaffold - Google Patents

Movable assembled revetment pier construction scaffold Download PDF

Info

Publication number
CN212316829U
CN212316829U CN202022067311.3U CN202022067311U CN212316829U CN 212316829 U CN212316829 U CN 212316829U CN 202022067311 U CN202022067311 U CN 202022067311U CN 212316829 U CN212316829 U CN 212316829U
Authority
CN
China
Prior art keywords
scaffold
guardrail
construction
cantilever beam
pier construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022067311.3U
Other languages
Chinese (zh)
Inventor
蒋昌盛
张坤球
高雪山
彭望
罗辉
蒋敏
冯云
谭晓节
黎君君
王伟
谭海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Road Construction Engineering Group Co Ltd
Original Assignee
Guangxi Road Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Road Construction Engineering Group Co Ltd filed Critical Guangxi Road Construction Engineering Group Co Ltd
Priority to CN202022067311.3U priority Critical patent/CN212316829U/en
Application granted granted Critical
Publication of CN212316829U publication Critical patent/CN212316829U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

Remove assembled revetment mound construction scaffold frame, the pile foundation top is the cushion cap, and the both sides border department of cushion cap sets up the track, and the equipartition sets up the cantilever beam of taking the walking wheel on the track, and the cantilever beam portion of encorbelmenting stretches out the cushion cap outside, connects the scaffold frame on the both sides cantilever beam respectively and upwards extends, fixes the running-board on the scaffold frame. The utility model discloses in the construction of river course shore protection, can realize carrying out the construction of pier stud in succession fast, avoid the process of repeated building scaffold, have and shorten the engineering progress greatly, it is convenient to be under construction, saves construction cost's advantage.

Description

Movable assembled revetment pier construction scaffold
Technical Field
The utility model relates to a river levee revetment construction technical field specifically is a remove assembled revetment mound construction scaffold frame.
Background
The revetment is an engineering measure of artificial reinforcement on the original coast bank slope, and is used for defending against the invasion and the elutriation of waves and water currents and the action of underground water and maintaining the stability of a bank line. The outside is acted by waves and water flow, and the inside is also acted by soil pressure and underground water pressure. Vertical hard revetment is a common form of revetment, and a wall structure of the vertical hard revetment can resist scouring attack of water waves, provide reliable bearing capacity and maintain safe use of the whole revetment. And can also build the requirement that people can be hydrophilic in a close range on the bank, so the method is widely applied to the environment of the city along the river. During construction, a pile foundation erected at the edge of a water bank is used as a foundation, a bearing platform and a pier stud are arranged above the pile foundation, finally, a crown beam is connected above the pier stud in series, and a retaining plate is laid on the inner side of the pier stud and used for blocking landslide of soil on the bank side.
The bank protection building construction is a construction project operation with long time consumption, great difficulty and high danger degree, and particularly when the concrete of the upright concrete pier column is cast, a full framing scaffold is usually required to be built beside a river bank until the full framing scaffold is above the top of the pier column, then a welded steel reinforcement framework is arranged and tied up, a template and the like are installed, finally the concrete is cast, and the construction of the pier column is completed after the template is solidified and removed for maintenance; after the pouring construction of the pier stud of one section of revetment is completed, the scaffold needs to be dismantled and transported to the next section of revetment construction site, the scaffold is built again, and the construction is repeated. The whole construction efficiency of the revetment is low, and the revetment is time-consuming and labor-consuming.
Disclosure of Invention
The utility model provides a remove assembled revetment mound construction scaffold frame, in the construction of river course revetment, can realize carrying out the construction of pier stud in succession fast, avoids the process of repeated building scaffold frame, has the engineering progress that shortens greatly, and it is convenient to construct, saves construction cost's advantage.
The technical scheme is realized by the following steps:
remove assembled revetment mound construction scaffold frame, the pile foundation top is the cushion cap, and the both sides border department of cushion cap sets up the track, and the equipartition sets up the cantilever beam of taking the walking wheel on the track, and the cantilever beam portion of encorbelmenting stretches out the cushion cap outside, connects the scaffold frame on the both sides cantilever beam respectively and upwards extends, fixes the running-board on the scaffold frame. The scaffold on two sides, which is built by taking the cantilever beams as a foundation, provides construction operation space around the pier studs for constructors, and has the same effect as that of the traditional full hall scaffold; the cantilever beam can rely on the walking wheel of bottom installation to move on the track, and the track just can be laid after pile foundation and cushion cap construction are accomplished, lays length and can be the full length of cushion cap, when needs location cantilever beam position, can adopt the wedge piece with walking wheel rigidity.
The scaffold comprises a plurality of layers, each layer is provided with a pedal, the inner side of each pedal is provided with a connecting frame guardrail, and the outer side of each pedal is provided with a cross bracing guardrail. The pedal provides a foundation for the constructors to walk on the scaffold, the connecting frame guardrail and the cross brace guardrail can provide safety protection for the constructors, and the connecting frame and the cross brace are used as the supplement of the scaffold, so that the integrity and the connection rigidity of the scaffold are improved; the pedal is made of aluminum alloy section bars, and the surface of the pedal is provided with anti-skid lines, so that the pedal has the advantages of light weight, high strength and skid resistance.
The middle part between the cantilever beams at the two sides is provided with a pull rod for connection, and the pull rod is of a detachable structure; a pedal can be laid between two adjacent pull rods. The pull rod plays a role of connecting scaffold structures at two sides, so that the scaffolds at two sides are connected into a whole; the pull rod is pulled down under scaffold walking moving state, prevents that it from interfering with the pier stud collision of pouring, and the pull rod is installed under scaffold fixed construction state.
The top parts of the cantilever beams on the two sides are provided with truss connections, each truss is provided with two connecting rods, and the lower part of each truss is a detachable connecting rod; and a foot board can be laid between two adjacent trusses. The truss also plays the effect of connecting both sides scaffold structure, and the level of lower part connecting rod is higher than pier stud top, and under scaffold walking removal state, pull down it, can realize the removal of scaffold, under the fixed construction state of scaffold, install the lower part connecting rod, increase the structural strength of truss.
The two cantilever beams are used as a group, and a connecting frame guardrail and a cross brace guardrail are arranged between the two cantilever beams and connected with each other; each group of cantilever beams are connected with each other through a scaffold and a cross brace guardrail. The end parts of the two cantilever beams are connected, the cantilever beams, the connecting frame guardrails and the cross bracing guardrails form a frame structure, the structural stability is better, and structural instability and deformation are prevented.
The cantilever beam is trapezoidal, the upper bottom edge of the trapezoid is arranged on the inner side, the lower bottom edge of the trapezoid is arranged on the outer side, and a plurality of lightening holes are formed in the middle of the trapezoid. The shape of the trapezoidal inclined upward cantilever beam can realize effective support of the cantilever beam on the scaffold, prevent the cantilever beam from bending and deforming, and has the technical characteristics of light weight and high strength.
The connecting frame guardrail consists of a V-shaped connecting frame and a guard plate; has the double functions of protection and reinforcement.
The cross bracing guardrail consists of an X-shaped connecting frame and a guard plate; has the double functions of protection and reinforcement.
The construction method of the scaffold for the construction of the movable assembled type revetment pier comprises the following steps:
(1) pouring pile foundations and bearing platforms on the river bank side, and paving tracks on the edges of two sides of the bearing platforms respectively after the maintenance of the bearing platforms is finished;
(2) arranging a plurality of cantilever beams with walking wheels on a track, positioning the walking wheels on the track by using wedge blocks, then upwards building a scaffold on the cantilever beams until the height of the cantilever beams is higher than the height of a preset pier stud, connecting the scaffolds on two sides by using a truss at the top of the scaffold, connecting the scaffolds on two sides by using a connecting rod in the middle of the scaffold, and then installing a pedal plate, a connecting frame guardrail and a bridging guardrail;
(3) constructors can construct and install the reinforcement cage and the pouring template of the pier stud by means of the scaffold, and concrete pouring is carried out on the pier stud;
(4) after the pier stud is poured and the form removal maintenance is completed, the detachable connecting rod of the truss, the pedal plate related to the truss, the pull rod in the middle and the pedal plate related to the pull rod are removed;
(5) removing the wedge blocks on the track, moving the whole scaffold to the forward direction of the construction progress until the scaffold reaches the position where the pier stud needs to be newly poured, stopping placing the wedge blocks for positioning, and installing the detachable connecting rods and the pull rods of the truss and the relevant pedals of the detachable connecting rods and the pull rods;
(6) and (5) repeating the operations in the steps (2) to (5) until all the pier studs on one side of the river bank are finished, and then carrying out subsequent installation construction of the crown beam and the retaining plate.
The invention has the prominent substantive characteristics and remarkable progress that:
1. the utility model can replace the traditional method of putting up full framing scaffold in the concrete pouring construction of the revetment pier column of the river bank, realize the rapid construction of a large number of revetment piers along the side length of the river bank, facilitate the flow operation of subsections, improve the construction efficiency, save a large amount of effort and time of constructors and save a large amount of construction cost;
2. the utility model discloses scaffold frame walking removes conveniently, and truss lower part connecting rod and pull rod adopt bolted connection mode to connect, use the appurtenance can accomplish the dismantlement installation, and the dismouting is convenient.
3. The utility model discloses overall structure is firm reliable, and safeguard measure is complete, and constructor can be on the scaffold platform the multi-angle diversified pier stud position of being under construction, safe and reliable.
4. The utility model discloses also can be used to the revetment mound construction of inland river or open sea, the range of application is extensive.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention (in a fixed construction state);
FIG. 2 is a schematic view of a cantilever beam unit connection structure;
FIG. 3 is a schematic structural view of a truss unit;
fig. 4 is a schematic view of the structure of the main view direction of the present invention (in a fixed construction state);
FIG. 5 is an enlarged view of the structure at I in FIG. 4;
FIG. 6 is a schematic side view of the structure of the present invention;
fig. 7 is a schematic view of the structure in the top view direction of the present invention (in a fixed construction state);
fig. 8 is a schematic view of the overall structure of the present invention (moving state);
fig. 9 is a schematic view of the structure of the main viewing direction (moving state) of the present invention;
fig. 10 is a schematic view of the structure in the top view direction (moving state) of the present invention;
FIG. 11 is a schematic view of the structure in the front view direction of example 2 (in a fixed construction state);
FIG. 12 is a schematic structural diagram after the completion of bank protection;
the serial numbers and component names in the figures are: 1. a pile foundation; 2. a bearing platform; 3. pier studs; 4. a crown beam; 5. a soil guard plate; 6. a track; 7. a traveling wheel; 8. a cantilever beam; 81. a connecting frame guardrail; 82. a cross brace guardrail; 9. a scaffold; 91. a pull rod; 92. a truss; 921. a detachable connecting rod; 93. a foot pedal.
Detailed Description
Example 1
Remove assembled revetment mound construction scaffold frame, pile foundation 1 is the single row, and 1 top of pile foundation is cushion cap 2, and the both sides border department of cushion cap 2 sets up track 6, and the equipartition sets up the cantilever beam 8 of taking walking wheel 7 on the track 6, and the portion of encorbelmenting of cantilever beam 8 stretches out the cushion cap 2 outside, connects scaffold frame 9 respectively on the both sides cantilever beam 8 and upwards extends, fixes running-board 93 on the scaffold frame 9.
The scaffold 9 is composed of multiple layers, each layer is provided with a pedal 93, the inner side of the pedal 93 is provided with a connecting frame guardrail 81, and the outer side of the pedal 93 is provided with a cross bracing guardrail 82.
The middle part between the cantilever beams 8 at the two sides is provided with a pull rod 91 for connection, and the pull rod 91 is of a detachable structure; a pedal 93 can be laid between two adjacent pull rods 91.
The top parts of the cantilever beams 8 on the two sides are provided with trusses 92 for connection, the trusses 92 are provided with two connecting rods, and the lower parts of the trusses 92 are provided with detachable connecting rods 921; a foot board 93 can be laid between two adjacent trusses 92.
The two cantilever beams 8 are used as a group, and a connecting frame guardrail 81 and a cross brace guardrail 82 are arranged between the two cantilever beams 8 and connected with each other; the cantilever beams 8 are connected with each other through a scaffold 9 and a cross brace 82.
The cantilever beam 8 is trapezoidal, the upper bottom edge of the trapezoid is arranged on the inner side, the lower bottom edge of the trapezoid is arranged on the outer side, and a plurality of lightening holes are formed in the middle of the trapezoid.
The connecting frame guard rail 81 is composed of a V-shaped connecting frame and a guard plate.
The cross brace guard 82 is comprised of an X-shaped attachment frame and a guard plate.
The construction method of the scaffold for the construction of the movable assembled type revetment pier comprises the following steps:
(1) pouring pile foundations and bearing platforms on the river bank side, and paving tracks on the edges of two sides of the bearing platforms respectively after the maintenance of the bearing platforms is finished;
(2) arranging a plurality of cantilever beams with walking wheels on a track, positioning the walking wheels on the track by using wedge blocks, then upwards building a scaffold on the cantilever beams until the height of the cantilever beams is higher than the height of a preset pier stud, connecting the scaffolds on two sides by using a truss at the top of the scaffold, connecting the scaffolds on two sides by using a connecting rod in the middle of the scaffold, and then installing a pedal plate, a connecting frame guardrail and a bridging guardrail;
(3) constructors can construct and install the reinforcement cage and the pouring template of the pier stud by means of the scaffold, and concrete pouring is carried out on the pier stud;
(4) after the pier stud is poured and the form removal maintenance is completed, the detachable connecting rod of the truss, the pedal plate related to the truss, the pull rod in the middle and the pedal plate related to the pull rod are removed;
(5) removing the wedge blocks on the track, moving the whole scaffold to the forward direction of the construction progress until the scaffold reaches the position where the pier stud needs to be newly poured, stopping placing the wedge blocks for positioning, and installing the detachable connecting rods and the pull rods of the truss and the relevant pedals of the detachable connecting rods and the pull rods;
(6) and (5) repeating the operations in the steps (2) to (5) until all the pier studs on one side of the river bank are finished, and then carrying out subsequent installation construction of the crown beam and the retaining plate.
Example 2
The difference from the embodiment 1 is that the pile foundation is double-row, and the rest structure is the same as that of the embodiment 1.

Claims (8)

1. Remove assembled shore protection mound construction scaffold frame, its characterized in that: pile foundation (1) top is cushion cap (2), and the both sides border department of cushion cap (2) sets up track (6), and the equipartition sets up cantilever beam (8) of taking walking wheel (7) on track (6), and cantilever beam (8) portion of encorbelmenting stretches out the cushion cap (2) outside, connects scaffold frame (9) respectively on both sides cantilever beam (8) and upwards extends, fixes running-board (93) on scaffold frame (9).
2. The mobile assembly type revetment pier construction scaffold of claim 1, wherein: the scaffold (9) is formed into a plurality of layers, each layer is provided with a pedal (93), the inner side of each pedal (93) is provided with a connecting frame guardrail (81), and the outer side of each pedal is provided with a cross bracing guardrail (82).
3. The mobile assembly type revetment pier construction scaffold of claim 1, wherein: the middle parts of the cantilever beams (8) at the two sides are connected by a pull rod (91), and the pull rod (91) is of a detachable structure; a pedal (93) can be laid between two adjacent pull rods (91).
4. The mobile assembly type revetment pier construction scaffold of claim 1, wherein: the top parts of the cantilever beams (8) at the two sides are provided with trusses (92) for connection, the trusses (92) are provided with two connecting rods, and the lower parts of the trusses are provided with detachable connecting rods (921); a foot board (93) can be laid between two adjacent trusses (92).
5. The mobile assembly type revetment pier construction scaffold of claim 1, wherein: the two cantilever beams (8) are used as a group, and a connecting frame guardrail (81) and a cross brace guardrail (82) are arranged between the two cantilever beams (8) and connected with each other; the cantilever beams (8) are connected with each other through a scaffold (9) and a cross brace guardrail (82).
6. The mobile assembly type revetment pier construction scaffold of claim 1, wherein: the cantilever beam (8) is trapezoidal, the upper bottom edge of the trapezoid is arranged on the inner side, the lower bottom edge of the trapezoid is arranged on the outer side, and a plurality of lightening holes are formed in the middle of the trapezoid.
7. The mobile assembly type revetment pier construction scaffold of claim 2, wherein: the connecting frame guardrail (81) is composed of a V-shaped connecting frame and a guard plate.
8. The mobile assembly type revetment pier construction scaffold of claim 2, wherein: the cross bracing guardrail (82) is composed of an X-shaped connecting frame and a guard plate.
CN202022067311.3U 2020-09-21 2020-09-21 Movable assembled revetment pier construction scaffold Active CN212316829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022067311.3U CN212316829U (en) 2020-09-21 2020-09-21 Movable assembled revetment pier construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022067311.3U CN212316829U (en) 2020-09-21 2020-09-21 Movable assembled revetment pier construction scaffold

Publications (1)

Publication Number Publication Date
CN212316829U true CN212316829U (en) 2021-01-08

Family

ID=74016883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022067311.3U Active CN212316829U (en) 2020-09-21 2020-09-21 Movable assembled revetment pier construction scaffold

Country Status (1)

Country Link
CN (1) CN212316829U (en)

Similar Documents

Publication Publication Date Title
CN108755377B (en) Construction method of deepwater non-covering layer steel trestle
CN109356169B (en) Foundation pit row pile supporting system and construction method thereof
JP2009228300A (en) Construction method of enlarging space under girder of river bridge
CN112267369A (en) Non-span upright post steel trestle structure, pushing installation device and construction method
CN112482202A (en) Pull rod type multipurpose steel trestle bridge abutment and construction method thereof
CN109594581B (en) River-crossing pipeline structure and installation method thereof
CN112049011B (en) Reverse construction method for large-span prestressed cast-in-place bridge
CN112323627A (en) Frame type construction system and construction method in existing railway temporary bridge construction
CN212316829U (en) Movable assembled revetment pier construction scaffold
CN111155411A (en) Cast-in-place arch bridge combined support structure and construction method thereof
CN109778700B (en) Cast-in-place trough beam three-point sliding pushing construction method for crossing existing road
CN217078829U (en) Position structure of bridge pile foundation and subway tunnel
CN113293708B (en) Method for mounting and dismounting through type steel pipe pile foundation of underwater cast-in-place beam support
CN114108642B (en) Parallel construction method for ramp bridge and underground complex structure
CN111979977A (en) Movable assembly type revetment pier construction scaffold and construction method thereof
CN210712576U (en) Multi-hoop truss supporting bailey bracket for cast-in-situ large-span box girder
CN108330996B (en) Slurry pond cofferdam and construction method
CN111996899A (en) Method for building large-span channel in artificial landscape mountain
CN217298608U (en) Assembled steel trestle
CN220598174U (en) Construction structure of safety ladder cage of underwater pier continuous rigid frame bridge
CN215104688U (en) Viaduct strides parallel bridge buttress full assembled support in ground
CN211973137U (en) System for transversely pushing existing bridge to enable new bridge to be in place and fall beam
CN219732023U (en) Fender pile and steel diagonal bracing fender structure
CN215562480U (en) A platform structure for construction of coastal precast tubular pile
CN211772745U (en) Cast-in-place arched bridge sectional shelf structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant