CN212299003U - A excessive second combustion chamber for msw incineration system - Google Patents

A excessive second combustion chamber for msw incineration system Download PDF

Info

Publication number
CN212299003U
CN212299003U CN202021608480.7U CN202021608480U CN212299003U CN 212299003 U CN212299003 U CN 212299003U CN 202021608480 U CN202021608480 U CN 202021608480U CN 212299003 U CN212299003 U CN 212299003U
Authority
CN
China
Prior art keywords
combustion chamber
hearth
flue gas
combustion
flue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021608480.7U
Other languages
Chinese (zh)
Inventor
王翱翔
张伟
申娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tibet Renze Environmental Technology Co ltd
Original Assignee
Ruili Hengze Environmental Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruili Hengze Environmental Technology Co ltd filed Critical Ruili Hengze Environmental Technology Co ltd
Priority to CN202021608480.7U priority Critical patent/CN212299003U/en
Application granted granted Critical
Publication of CN212299003U publication Critical patent/CN212299003U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Incineration Of Waste (AREA)

Abstract

A excessive secondary combustion chamber for a waste incineration system relates to the technical field of waste incineration. It comprises a furnace chamber of a second combustion chamber which is arranged between the second combustion chamber and an incinerator; the flue gas inlet flue is arranged at one end of the hearth of the second transition combustion chamber and is used for connecting the incinerator; the smoke outlet flue is arranged at the other end of the hearth of the second transition combustion chamber and is used for connecting the second combustion chamber; the combustor is assembled on one side, close to the flue gas inlet flue, of the hearth of the second combustion chamber; and a combustion-supporting air spray pipe is assembled at the periphery of the flue gas inlet flue. By adopting the technical scheme, the second combustion chamber is rapidly heated to above 850 ℃, so that energy and time in the heating process of the second combustion chamber are saved, and the purpose of improving the heat energy utilization rate is facilitated.

Description

A excessive second combustion chamber for msw incineration system
Technical Field
The utility model relates to a msw incineration technical field, concretely relates to excessive second combustion chamber for msw incineration system.
Background
At present, the medical waste is treated by adopting an incineration process, which is a popular and efficient method, the traditional operation is that the medical waste is put into an incinerator while the incinerator is ignited when the incinerator is started, the medical waste is pyrolyzed and combusted to generate combustible smoke, at the moment, the temperature of the whole system is lower, although a combustor arranged in a secondary combustion chamber is ignited to participate in combustion supporting, the integral temperature of the secondary combustion chamber is far below the combustion temperature of the combustible smoke, so most of combustible substances in the smoke are not combusted, tar and carbon black are captured by a bag-type dust collector, the service life of a bag can be influenced by the substances, and the hidden danger of bag ignition can be caused; and a large amount of harmful gas is discharged to the atmosphere, thus seriously polluting the air.
The latest "pollution control standards for medical waste disposal" stipulates that the input of medical waste is permitted only when the temperature of the secondary chamber reaches above 850 ℃, and the system must be brought to a normal operating state within 4 hours after the input of medical waste. However, the secondary combustion chamber with huge volume has high heat storage and heat dissipation capacity, and the secondary combustion chamber is heated by adopting the auxiliary burner usually for dozens of hours to heat the temperature of the secondary combustion chamber to above 850 ℃, so that energy and time are wasted.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a not enough to prior art exists, the utility model aims at providing a two combustion chambers of transition for msw incineration system realizes with two combustion chambers rapid heating up to more than 850 ℃ to save the energy and the time of two combustion chambers intensification in-process, be favorable to improving heat utilization rate's purpose simultaneously.
The above technical purpose of the present invention can be achieved by the following technical solutions: an excess secondary combustion chamber for a waste incineration system, comprising: a second combustion chamber hearth arranged between the second combustion chamber and the incinerator; the flue gas inlet flue is arranged at one end of the hearth of the second transition combustion chamber and is used for connecting the incinerator; the smoke outlet flue is arranged at the other end of the hearth of the second transition combustion chamber and is used for connecting the second combustion chamber; the combustor is assembled on one side, close to the flue gas inlet flue, of the hearth of the second combustion chamber; and a combustion-supporting air spray pipe is assembled at the periphery of the flue gas inlet flue.
The utility model discloses a further setting, excessive second combustion chamber furnace includes metal casing and locates the flame retardant coating of metal casing inner wall.
In the further arrangement of the utility model, the second combustion chamber comprises a second combustion chamber hearth; and the combustion-supporting air distribution component is assembled at the periphery of the hearth of the second combustion chamber.
The utility model discloses a further setting, excessive second combustion chamber furnace's volume is not more than second combustion chamber furnace volume's ten minutes.
After the technical scheme is adopted, the utility model discloses beneficial effect does:
1. the utility model discloses in, through setting up the combustor in excessive two combustion chamber furnace one side, and then will excessively two combustion chamber furnace heats to more than 850 ℃, recycle the heat energy that combustor auxiliary fuel burns and produce to and the coaction of the heat energy that combustible flue gas produced when excessively burning in two combustion chamber furnace, with two combustion chambers rapid heating up to more than 850 ℃, thereby save two combustion chamber intensification in-process energy and time, be favorable to improving heat utilization rate simultaneously.
2. The utility model discloses in, only need adopt the combustor will excessively two combustion chambers furnace heat to more than 850 ℃ when using can, the heat energy that produces when combustor auxiliary fuel burning and the combined action of the heat energy that combustible flue gas produced when excessively two combustion chambers furnace internal combustion heat with two combustion chambers rapid heating up to more than 850 ℃, close the combustor, open combustion-supporting air distribution subassembly on the two combustion chambers again and introduce the overgrate air, combustible flue gas and the overgrate air intensive mixing of capacity, in two combustion chambers internal combustion, burn out, realize stable production in ensureing 4 hours.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a front view of the present invention;
fig. 2 is a right side view of the present invention;
fig. 3 is a top view of the present invention;
fig. 4 is a schematic view of the connection relationship of the present invention.
Description of reference numerals: 01. a second combustion chamber; 02. an incinerator; 1. a second excessive combustion chamber hearth; 11. a flue gas inlet flue; 12. a flue gas outlet flue; 13. a burner; 14. a combustion air nozzle; 15. a metal housing; 16. a refractory layer; 011. a second combustion chamber hearth; 012. combustion-supporting air distribution subassembly.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment as required without making a contribution, but all the embodiments are protected by the patent law within the scope of the claims of the present invention.
The present embodiment relates to an excessive secondary combustion chamber for a waste incineration system, as shown in fig. 1 to 4, comprising: a second combustion chamber hearth 1 arranged between the second combustion chamber 01 and the incinerator 02; a flue gas inlet flue 11 which is arranged at one end of the hearth 1 of the second combustion chamber and is used for connecting the incinerator 02; a flue gas outlet flue 12 which is arranged at the other end of the hearth of the second combustion chamber 01 and is used for connecting the second combustion chamber 01; the combustor 13 is assembled on one side of the hearth 1 of the second combustion chamber, which is close to the flue gas inlet flue 11; the periphery of the flue gas inlet flue 11 is fitted with combustion air lances 14.
When the device is used, combustible flue gas enters the excess secondary combustion chamber hearth 1 from the incinerator 02 through the flue gas inlet flue 11, and the combustor 13 can quickly heat the excess secondary combustion chamber hearth 1 to above 850 ℃, so that the combustible flue gas is combusted and burned out in the excess secondary combustion chamber hearth 1, and more heat energy is released. The heat energy released by the combustion of the combustible flue gas in the hearth 1 of the secondary combustion chamber and the heat energy generated by the combustion of the auxiliary fuel of the combustor 13 are utilized, so that the temperature of the secondary combustion chamber 01 is rapidly increased to above 850 ℃, the stable production can be realized within 4 hours, and the regulation of the medical waste treatment and disposal pollution control standard can be further met.
In this embodiment, the combustion-supporting air nozzle 14 is made of high-temperature-resistant metal, and is distributed on the outer wall of the flue gas inlet flue 11 uniformly in a proper amount, the transition second combustion chamber furnace 1 includes a metal casing 15 and a fire-resistant layer 16 arranged on the inner wall of the metal casing 15, and the second combustion chamber 01 includes a second combustion chamber furnace 011; and a combustion-supporting air distribution component 012 which is assembled at the periphery of the second combustion chamber hearth 011. Wherein, the volume of the transition second combustion chamber hearth 1 is not more than one tenth of the 011 volume of the second combustion chamber hearth. The fire-resistant layer 16 is a good heat accumulator, so the heat generated by the burner 13 can quickly heat the over-burning chamber 1 of the second combustion chamber to above 850 ℃.
Based on the above excessive secondary combustion chamber for the waste incineration system, the embodiment also relates to a use method of the excessive secondary combustion chamber for the waste incineration system, which includes:
s1, starting the burner 13 to heat the hearth of the second combustion chamber to above 850 ℃;
s2, adding a proper amount of medical waste into the incinerator 02 and igniting;
s3, pyrolyzing and burning the medical waste in the incinerator 02, mixing the generated combustible flue gas with the combustion-supporting air sprayed by the combustion-supporting air spray pipe 14 in the flue gas inlet flue 11, and then entering the furnace 1 of the second overfire chamber;
s4, the combustible flue gas mixed with sufficient combustion-supporting air enters the hearth 1 of the secondary combustion chamber with the temperature of more than 850 ℃ to start burning and burn out, more heat energy is released, the generated high-temperature flue gas flows to the secondary combustion chamber 01 from the flue gas outlet flue 12, and meanwhile, the heat energy is transferred to the secondary combustion chamber 01;
s5, heating the secondary combustion chamber 01 to above 850 ℃ under the combined action of heat energy generated by the combustion of the auxiliary fuel of the combustor 13 and heat energy generated by the combustion of combustible flue gas in the hearth 1 of the secondary combustion chamber;
s6, closing the burner 13 and the combustion air nozzle 14, adding more medical waste into the incinerator 02, generating more combustible smoke, simultaneously opening the combustion air distribution assembly 012 on the secondary combustion chamber 01 to introduce secondary air, fully mixing the combustible smoke with sufficient secondary air, and burning in the secondary combustion chamber 01 to ensure stable production within 4 hours.
The working principle of the utility model is as follows: in the embodiment, the combustor 13 is arranged on one side of the furnace 1 of the excessive secondary combustion chamber, so that the furnace 1 of the excessive secondary combustion chamber is heated to a temperature higher than 850 ℃, heat energy generated by combustion of auxiliary fuel of the combustor 13 is recycled, and the heat energy generated by combustion of combustible flue gas in the furnace of the excessive secondary combustion chamber 01 is utilized to quickly heat the secondary combustion chamber 01 to a temperature higher than 850 ℃, then the combustor 13 can be closed, and the combustion-supporting air distribution assembly 012 on the secondary combustion chamber 01 is opened, so that more combustible flue gas generated can be combusted and burned out in the secondary combustion chamber 01, and stable production can be realized within 4 hours. Thereby saving energy and time in the temperature rising process of the second combustion chamber 01 and being beneficial to improving the heat energy utilization rate.
The above description is only for the purpose of illustration and not limitation, and other modifications or equivalent replacements made by those skilled in the art to the technical solution of the present invention should be covered by the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solution of the present invention.

Claims (4)

1. An excess secondary combustion chamber for a waste incineration system, comprising: a second combustion chamber hearth (1) which is arranged between the second combustion chamber (01) and the incinerator (02);
a flue gas inlet flue (11) which is arranged at one end of the furnace chamber (1) of the second transition combustion chamber and is used for connecting the incinerator (02);
a flue gas outlet flue (12) which is arranged at the other end of the transition second combustion chamber hearth (1) and is used for connecting a second combustion chamber (01); and the number of the first and second groups,
a combustor (13) which is assembled on one side of the transition second combustion chamber hearth (1) close to the flue gas inlet flue (11);
and a combustion-supporting air spray pipe (14) is assembled on the periphery of the flue gas inlet flue (11).
2. A secondary excess combustion chamber for a waste incineration system according to claim 1, characterized in that the secondary excess combustion chamber hearth (1) comprises a metal outer shell (15) and a refractory layer (16) provided on the inner wall of the metal outer shell (15).
3. A secondary overfire chamber for a waste incineration system as in claim 1, wherein said secondary chamber (01) comprises a secondary chamber furnace (011); and a combustion-supporting air distribution component (012) assembled on the periphery of the second combustion chamber hearth (011).
4. A secondary excess combustion chamber for a waste incineration system according to claim 3, characterised in that the volume of the secondary excess combustion chamber furnace (1) is not more than one tenth of the volume of the secondary combustion chamber furnace (011).
CN202021608480.7U 2020-08-05 2020-08-05 A excessive second combustion chamber for msw incineration system Active CN212299003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021608480.7U CN212299003U (en) 2020-08-05 2020-08-05 A excessive second combustion chamber for msw incineration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021608480.7U CN212299003U (en) 2020-08-05 2020-08-05 A excessive second combustion chamber for msw incineration system

Publications (1)

Publication Number Publication Date
CN212299003U true CN212299003U (en) 2021-01-05

Family

ID=73937950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021608480.7U Active CN212299003U (en) 2020-08-05 2020-08-05 A excessive second combustion chamber for msw incineration system

Country Status (1)

Country Link
CN (1) CN212299003U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111765472A (en) * 2020-08-05 2020-10-13 瑞丽市恒泽环境技术有限公司 Excessive secondary combustion chamber for waste incineration system and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111765472A (en) * 2020-08-05 2020-10-13 瑞丽市恒泽环境技术有限公司 Excessive secondary combustion chamber for waste incineration system and use method thereof

Similar Documents

Publication Publication Date Title
CN100498067C (en) Incinerator for thermal decomposition of waste fuel
CN104748125B (en) Pyrolysis volatile matter combustion system
CN212299003U (en) A excessive second combustion chamber for msw incineration system
CN212252644U (en) Energy-saving waste gas treatment device
CN201992665U (en) Electrical heating incineration type medical treatment waste incinerator
CN111765472B (en) Using method of transition secondary combustion chamber for garbage incineration system
CN105115312A (en) Method for utilizing kiln flue gas to perform secondary mixed combustion
CN212273985U (en) Self-preheating low-nitrogen combustor
CN201262470Y (en) Boiler for transformation from coal into gas
CN108361716A (en) A kind of three industrial wastes mixed combustion furnace
CN2926843Y (en) Oil-enhanced combustion trigger of coal powder boiler
CN212408677U (en) Secondary combustion chamber for incineration disposal of hazardous waste
CN210601653U (en) Waste heat recovery system for VOC waste gas incineration
CN209605154U (en) A kind of low heat value gas combustion burner
CN106051777A (en) Porous medium combustion device for garbage pyrolysis
CN216897292U (en) Novel energy-saving environment-friendly burner
CN201225756Y (en) Spherical briquette boiler
CN201310924Y (en) Gas-making compound combustion vertical-type furnace
CN220506722U (en) Flue gas reflux type organic solid waste pyrolysis gasification system
CN215209265U (en) Combustion chamber and biomass gasification system comprising same
CN201028532Y (en) Waste fuel thermal decomposition and gasification incinerating furnace
CN2541734Y (en) Three-purpose heater using shaped coal, fuel and gas
CN217714932U (en) Novel garbage pyrolysis gasification equipment
CN201083389Y (en) Solid waste combustion system
CN217274148U (en) Cold air heating structure of garbage incinerator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 1118, 11th Floor, Economic Development Building, Zone A, Changdu Economic Development Zone, Tibet Autonomous Region, 854000

Patentee after: Tibet Renze Environmental Technology Co.,Ltd.

Address before: No. 2505, 25 / F, building a, chaodu international, 153 nongmo Road, Ruili City, Dehong Dai and Jingpo Autonomous Prefecture, Yunnan Province, 678400

Patentee before: Ruili Hengze Environmental Technology Co.,Ltd.

CP03 Change of name, title or address
EE01 Entry into force of recordation of patent licensing contract

Assignee: Huizhou Hanyang Environmental Technology Service Co.,Ltd.

Assignor: Tibet Renze Environmental Technology Co.,Ltd.

Contract record no.: X2024980002154

Denomination of utility model: A Transition Secondary Combustion Chamber for Garbage Incineration Systems

Granted publication date: 20210105

License type: Common License

Record date: 20240221

EE01 Entry into force of recordation of patent licensing contract