CN212296366U - Vertical shaft concrete cement discharging system - Google Patents
Vertical shaft concrete cement discharging system Download PDFInfo
- Publication number
- CN212296366U CN212296366U CN202020642043.0U CN202020642043U CN212296366U CN 212296366 U CN212296366 U CN 212296366U CN 202020642043 U CN202020642043 U CN 202020642043U CN 212296366 U CN212296366 U CN 212296366U
- Authority
- CN
- China
- Prior art keywords
- concrete
- chute
- ash
- vertical shaft
- stirrer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
Abstract
The concrete ash discharging system for the vertical shaft comprises a stirrer and a bottom-discharge bucket, wherein a storage chute is arranged at a feed opening of the stirrer, a self-flow ash discharging groove and a rotary chute are arranged between the storage chute and the bottom-discharge bucket, and an ash blocking plate driven by an air cylinder and controlled by a pneumatic hydraulic valve is arranged on the self-flow ash discharging groove. Compared with the prior art, the utility model discloses very big improvement concreting blanking speed, every mould pouring time shortens to 6~6.5 hours by prior art's 8~9 hours, very big reduction single cycle time, the effectual efficiency of construction that has improved. The consumption of equipment materials and the time for overhauling and maintaining can be avoided. The concrete pouring construction quality can be effectively improved, and the concrete pouring construction method is suitable for C30-CF 90 common concrete and steel fiber high-grade concrete. The degree of mechanized operation is high, intensity of labour is little, and artifical input is few, effectively reduce cost.
Description
Technical Field
The utility model relates to a grey system under vertical pit shaft concrete.
Background
At present, the domestic vertical shaft concrete construction is mainly a bottom-dump bucket, and the defects of the bottom-dump bucket are that the time for waiting for stirring and discharging ash is long, the single-feed circulation progress is slow, the concrete construction quality is low, and the construction cost is high. Particularly, the construction method has the defects that the construction method adopts CF 90-grade high-strength concrete, has large concrete pouring amount and high quality requirement in vertical shaft construction with inner and outer wall thicknesses (2.4 m), and is particularly outstanding. Therefore, the technical problem to be solved at present is to design a high-efficiency, convenient and quick concrete cement discharging system for a vertical shaft, which has the advantages of high single-feed circulation progress, high concrete construction quality and low construction cost and can ensure safe production.
Disclosure of Invention
The utility model aims to solve the technical problem that a technical ability guarantees that the single advance circulation progress is fast, concrete construction high quality, construction cost are low, can guarantee again that high efficiency, convenient and fast's of safety in production vertical shaft concrete goes down grey system, is the technical problem that needs to solve at present.
The technical proposal of the utility model for solving the technical problem is that:
the concrete ash discharging system for the vertical shaft comprises a stirrer and a bottom-discharge bucket, wherein a storage chute is arranged at a feed opening of the stirrer, a self-flow ash discharging groove and a rotary chute are arranged between the storage chute and the bottom-discharge bucket, and an ash blocking plate driven by an air cylinder and controlled by a pneumatic hydraulic valve is arranged on the self-flow ash discharging groove. The combination of the storage chute and the gravity flow type ash chute can store concrete and slide ash, ensures that the bucket can be filled immediately after the bottom-discharge bucket is lifted, saves the time for waiting for stirring the concrete, and improves the construction efficiency. The self-flow ash chute and the rotary chute can directly discharge ash into the bottom-discharge bucket, thereby simplifying the construction procedure. Can freely switch between two well-buckets through rotatory chute device to realize quick convenient ash discharging mode.
As an optimized proposal of the utility model, the mixer also comprises a batching and feeding system which is composed of a sand batching hopper, a stone batching hopper, a hopper track and a hopper.
As an optimized proposal of the utility model, the two mixers are symmetrically arranged relative to the storage chute. The stirrer is a JS1000 type stirrer.
Compared with the prior art, the utility model discloses very big improvement concreting blanking speed, every mould pouring time shortens to 6~6.5 hours by prior art's 8~9 hours, very big reduction single cycle time, the effectual efficiency of construction that has improved. The consumption of equipment materials and the time for overhauling and maintaining can be avoided. The concrete pouring construction quality can be effectively improved, and the concrete pouring construction method is suitable for C30-CF 90 common concrete and steel fiber high-grade concrete. The degree of mechanized operation is high, intensity of labour is little, and artifical input is few, effectively reduce cost.
Drawings
FIG. 1 is a schematic top plan view of a well head of the concrete mixing system and conveyor;
FIG. 2 is a side view of a wellhead of the concrete mixing system and the conveyor;
in the figure: 1, JS1000 type agitator; 2. a storage chute; 3. a self-flowing ash chute; 4. a pneumatic hydraulic valve; 5, an ash blocking plate; 6, rotating the chute; 7, bottom-dump bucket; 8. a sand and stone batching hopper; a hopper track; 10, a hopper; a chute platform.
Detailed Description
As shown in the figure, the vertical shaft concrete ash discharging system comprises a stirrer 1 and a bottom-dump bucket 7, wherein a storage chute 2 is arranged at a feed opening of the stirrer 1, a self-flow ash chute 3 and a rotary chute 6 are arranged between the storage chute 2 and the bottom-dump bucket 7, and an ash blocking plate 5 driven by an air cylinder and controlled by a pneumatic hydraulic valve 4 is arranged on the self-flow ash chute 3.
The mixer 1 also comprises a batching and feeding system consisting of a sand and stone batching hopper 8, a hopper track 9 and a hopper 10.
The two stirring machines 1 are symmetrically arranged relative to the material storage chute 2.
Manufacturing a concrete storage chute:
the storage chute is made of a pattern steel plate with the thickness of 5mm, is integrally welded in a seamless mode and is welded at the bottom of a feeding hole of the stirring machine. The concrete material of 1 time of stirring can be stored to 2 in the storage chute after reforming transform, 1 also can store the concrete material of 1 time of stirring in the mixer, after bottom discharge formula well-bucket 7 fell the well head, at first unload to well-bucket 7 with 2 concrete in the storage chute in, unload to well-bucket 7 with the concrete of 1 in two mixers in proper order again, direct disposable well-bucket that fills up, the time of waiting to stir 1 time has been reduced, the time of 1 time of stirring (including the material loading) generally is 5 minutes, 26 well-buckets of concrete need to be pour to a section height of the vice vertical shaft pit shaft in new huge Dong, 130 minutes can be practiced thrift to concrete so every section height poured, the regular cycle progress is 25 moulds every month, just so can save 54.2 hours every month, the effectual efficiency of construction that has improved.
Manufacturing a self-flowing ash chute:
the gravity flow ash chute 3 is formed by bending a 5mm steel plate into a U shape and welding, and the lower part of the gravity flow ash chute is provided with a pneumatic hydraulic ash blocking valve 4. The ash chute 3 is installed and connected to the bottom of the storage tank 2 of the feed opening of the stirrer, and the gradient of the ash chute 3 is determined according to the distance from the installation height of the stirrer 1 to the wellhead bottom-dump bucket 7 (the height of the originally designed stirring station is 4m, and the height of the improved stirring station is 6.3 m). The bottom-dump bucket 7 falls on the well cover door, and the gravity flow type ash chute 3 utilizes the fall gradient between the stirring station and the bucket, thereby generating the autonomous fluidity and rapidly conveying the stirred concrete to the bottom-dump bucket 7. After the bucket is full, a stirring driver opens a pneumatic hydraulic valve 4 to open a switch to drop an ash baffle 5, so that ash is prevented from flowing.
Manufacturing a rotary chute:
the lower part of the gravity flow ash chute 3 is provided with a rotary chute 6 device which can freely switch between the two lifting buckets for loading, and is simple, convenient and quick.
Claims (3)
1. The concrete ash discharging system for the vertical shaft comprises a stirrer (1) and a bottom-discharge bucket (7), and is characterized in that a storage chute (2) is arranged at a feed opening of the stirrer (1), a self-flowing ash chute (3) and a rotating chute (6) are arranged between the storage chute (2) and the bottom-discharge bucket (7), and an ash blocking plate (5) driven by an air cylinder and controlled by a pneumatic hydraulic valve (4) is arranged on the self-flowing ash chute (3).
2. A vertical shaft concrete mortar discharging system according to claim 1, characterized in that said mixer (1) further comprises a batching and feeding system consisting of a sand and stone batching hopper (8), a hopper track (9) and a hopper (10).
3. A vertical shaft concrete mortar discharging system according to claim 2, characterized in that there are two mixers (1), and that the two mixers (1) are arranged symmetrically with respect to the storage chute (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020642043.0U CN212296366U (en) | 2020-04-25 | 2020-04-25 | Vertical shaft concrete cement discharging system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020642043.0U CN212296366U (en) | 2020-04-25 | 2020-04-25 | Vertical shaft concrete cement discharging system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212296366U true CN212296366U (en) | 2021-01-05 |
Family
ID=73964723
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020642043.0U Expired - Fee Related CN212296366U (en) | 2020-04-25 | 2020-04-25 | Vertical shaft concrete cement discharging system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212296366U (en) |
-
2020
- 2020-04-25 CN CN202020642043.0U patent/CN212296366U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212096911U (en) | Feeding device for concrete mixer | |
CN208441867U (en) | Concrete for lining trolley enters mould tripper | |
CN212296366U (en) | Vertical shaft concrete cement discharging system | |
CN104354220A (en) | Vertical automatic foam cement grouting machine | |
CN106799790B (en) | A kind of water conservancy concrete central mix plant | |
CN111502670A (en) | Vertical shaft concrete cement discharging system | |
CN204322239U (en) | A kind of vertical-foaming cement automatic grouting machine | |
CN210477358U (en) | Double-horizontal-shaft cement mixer | |
CN209556385U (en) | Concrete placement funnel of supplementary unloading | |
CN214644647U (en) | Pouring mold for corundum self-flow preparation | |
CN209469015U (en) | A kind of architectural engineering is with pouring device | |
CN214513998U (en) | Electrolytic aluminum anode ladle building device | |
CN210589937U (en) | Concrete raw material loading attachment | |
CN211135508U (en) | Molten steel tank edge pouring structure | |
CN218342480U (en) | Building mixture agitating unit | |
CN217582146U (en) | Combined material conveying device of patching machine | |
CN210210916U (en) | Height-adjustable discharge hopper | |
CN207348859U (en) | A kind of interior shaft concrete conveyance pours device | |
CN211762482U (en) | Water-cement ratio blending device for production of corrosion-resistant concrete pipe pile | |
CN220593595U (en) | Stabilized soil stirring equipment | |
CN211221412U (en) | Grouting material stirring construction tool is established to T roof beam | |
CN213359420U (en) | Concrete conveying device | |
CN214515194U (en) | Coarse material returning device of slag micro powder pulverizing system | |
CN214871623U (en) | Recycled concrete solidification prevention temporary storage device | |
CN215549708U (en) | Premixing mortar agitating unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210105 |
|
CF01 | Termination of patent right due to non-payment of annual fee |