CN207348859U CN201721370233.6U CN201721370233U CN207348859U CN 207348859 U CN207348859 U CN 207348859U CN 201721370233 U CN201721370233 U CN 201721370233U CN 207348859 U CN207348859 U CN 207348859U
Authority
CN
China
Prior art keywords
hanging scaffold
accumulator
hole
isosceles triangle
big
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721370233.6U
Other languages
Chinese (zh)
Inventor
臧培刚
刘晓亭
樊联峰
马宏强
陈君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 1 Construction Co Ltd
Original Assignee
China Coal No 1 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 1 Construction Co Ltd filed Critical China Coal No 1 Construction Co Ltd
Priority to CN201721370233.6U priority Critical patent/CN207348859U/en
Application granted granted Critical
Publication of CN207348859U publication Critical patent/CN207348859U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of interior shaft concrete conveyance to pour device,Mainly by concrete mixer,Accumulator,Movable chute,Hopper,Upper strata hanging scaffold,Lower floor's hanging scaffold and steel compile hose composition,Accumulator described in it is square,Accumulator bottom sets inclined-plane,Accumulator lower part side sets rectangle discharge port,The solidifying native mixer of accumulator top side connection,Rectangle discharge port connection movable chute one end that accumulator lower part side is set,The movable chute other end connects hopper,Hopper connects upper strata hanging scaffold,Upper strata hanging scaffold is disc,The centrally disposed small sircle hole of upper strata hanging scaffold,Small sircle hole side sets hanging scaffold entrance big hole,The utility model pours plant modification by being sent to delivered downhole material,Greatly improve casting concrete speed,By every mould pour the time 7 ~ 8 it is small when foreshorten to 4.5 ~ 5 it is small when,Greatly reduce single into circulation time,Effectively raise construction efficiency,And security risk can be reduced,Improve construction quality.

Description

A kind of interior shaft concrete conveyance pours device
Technical field
It the utility model is related to a kind of concrete conveyance and pour a kind of concrete conveyance in device, more particularly to interior shaft Pour device.
Background technology
Blind vertical is different from traditional bright vertical, and during bright shaft construction, equipment is arranged in ground, therefore lectotype selection, System design has a set of complete auxiliary plan of maturation, and when lifting is lifted using double hook or three hooks, thus personnel up and down and Material is limited from lifting factor up and down;And blind shaft construction is limited by underground space, therefore the design for production system of constructing, The type selecting of equipment, the blind shaft of vertical well for being optimized to, in order to restrict the key factor of manufacturing schedule, construct at present of arrangement and method for construction are big It is more all to use single-hoisting system, therefore will be restricted when material is transferred by single lifting, lowering velocity is slow, construction time length, Concrete conveyance was after being stirred by mixer, manually to push away in trolley to template in the past, such craft cement goes out to stir in template Mix that machine speed is slow, what mixer waited concrete goes out the machine time, greatly reduces construction efficiency, concrete travel time length, Influence construction quality.
The content of the invention
In order to make up the foot of the prior art, solve concrete and manually pushed away in trolley to template in underground narrow space, cement Go out that mixer speed is slow, what mixer waited concrete goes out the machine time, greatly reduces construction efficiency, concrete travel time It is long, and the problem of influence construction quality, there is provided a kind of interior shaft concrete conveyance pours device.
The technical scheme in the invention for solving the technical problem is:
A kind of interior shaft concrete conveyance pours device, mainly by concrete mixer, accumulator, movable chute, material feeding Bucket, upper strata hanging scaffold, conveying steel pipe, lower floor's hanging scaffold and steel compile hose composition, and the accumulator described in it is square, accumulator bottom Inclined-plane is set, and accumulator lower part side sets rectangle discharge port, and accumulator top side, which connects, coagulates native mixer, under accumulator Rectangle discharge port connection movable chute one end that portion side is set, movable chute other end connection hopper, hopper connection Upper strata hanging scaffold, upper strata hanging scaffold are disc, and the centrally disposed small sircle hole of upper strata hanging scaffold, small sircle hole side sets hanging scaffold entrance great circle Hole, small sircle hole opposite side set three circular holes of isosceles triangle, three circular hole top of isosceles triangle connection hopper lower part, isosceles triangle three Circular hole lower part connects three conveying steel pipes respectively, and three conveying steel pipes are separated into downwards big isosceles triangle, and three conveying steel pipes are downward The one end for being separated into big isosceles triangle connects big isosceles triangle circular hole on lower floor's hanging scaffold respectively, and lower floor's hanging scaffold is also disc, center Small sircle hole is set, small sircle hole side sets hanging scaffold entrance big hole, and small sircle hole opposite side sets big three circular holes of isosceles triangle, under The big three circular hole lower parts of isosceles triangle of layer hanging scaffold connect three steel and compile hose one end respectively, and three steel are compiled the hose other end and connected respectively In template.
The beneficial effects of the utility model are:
1st, the utility model greatly improves casting concrete speed by pouring the transformation of device to delivered downhole material Degree, by every mould pour the time 7 ~ 8 it is small when foreshorten to 4.5 ~ 5 it is small when, greatly reduce single into circulation time, effectively raise Construction efficiency, and security risk can be reduced, improve construction quality.
Brief description of the drawings
Fig. 1 pours schematic device for the utility model concrete conveyance.
Fig. 2 is the utility model hopper top view.
Embodiment
In Fig. 1 Fig. 2, a kind of interior shaft concrete conveyance pours device, mainly by concrete mixer 1, accumulator 2, work Dynamic chute 3, hopper 4, upper strata hanging scaffold 5, conveying steel pipe 6, lower floor's hanging scaffold 7 and steel are compiled hose 8 and are formed, the accumulator 2 described in it To be square, 2 bottom of accumulator sets inclined-plane, and 2 lower part side of accumulator sets rectangle discharge port, and 2 top side of accumulator connects Solidifying native mixer 1 is connect, the rectangle discharge port that 2 lower part side of accumulator is set connects 3 one end of movable chute, and movable chute 3 is another One end connects hopper 4, and hopper 4 connects upper strata hanging scaffold 5, and upper strata hanging scaffold 5 is disc, 5 centrally disposed roundlet of upper strata hanging scaffold Hole, small sircle hole side set hanging scaffold entrance big hole, and small sircle hole opposite side sets three circular holes of isosceles triangle, three circles of isosceles triangle Hole top connection hopper 4 lower part, three circular hole lower parts of isosceles triangle connect three conveying steel pipes 6 respectively, three conveying steel pipes 6 to Under be separated into big isosceles triangle, three conveying steel pipes 6 be separated into downwards big isosceles triangle one end connect respectively it is big on lower floor's hanging scaffold 7 Isosceles triangle circular hole, lower floor's hanging scaffold 7 are also disc, centrally disposed small sircle hole, and small sircle hole side sets hanging scaffold entrance big hole, Small sircle hole opposite side sets big three circular holes of isosceles triangle, and three circular hole lower parts of the big isosceles triangle of lower floor's hanging scaffold 7 connect three steel respectively 8 one end of hose is compiled, three steel are compiled 8 other end of hose and connected respectively in template.
The concrete material once stirred can be stored in the accumulator that the utility model is set, can in the accumulator of setting Mixer is emptied in time, the mixer enable successively works, and reduces mixer and waits discharging time, bottom discharge bucket After falling on mixer mouth, mixer is directly disposably filled, the setting of accumulator reduces the time for waiting stirring discharging, once The stirring discharging stand-by period is 5 minutes, and as one section height of main shaft needs 20 mixer of casting concrete, so each section is high Casting concrete can be saved 100 minutes, effectively raise construction efficiency.Concrete after stirring can enter template immediately It is interior, it is ensured that construction quality.
Concreting flow
After concrete mixer 1 is stirred once, mixer gate is opened, concrete is discharged into accumulator 2, at this moment, one Aspect concrete mixer 1 empties, and after bottom discharge bucket falls on mixer mouth, directly disposably fills mixer and carries out next time Stirring, on the other hand puts down movable chute 3, concrete enters hopper 4, and and then concrete passes through three circles of isosceles triangle respectively Hole flows into three conveying steel pipes 6 and three steel compile hose 8, and concrete is flowed into template after compiling hose 8 by three steel respectively, After being stirred for the second time after five minutes, mixer gate is opened, concrete is discharged into accumulator 2, at this moment, the stirring of one side concrete Machine 1 empties again, after bottom discharge bucket falls on mixer mouth again, directly disposably fills mixer and is stirred next time, Repeatedly one section height of completion is circulated with this to pour.

Claims (1)

1. a kind of interior shaft concrete conveyance pours device, mainly by concrete mixer(1), accumulator(2), movable chute (3), hopper(4), upper strata hanging scaffold(5), conveying steel pipe(6), lower floor's hanging scaffold(7)And steel compiles hose(8)Composition, its feature exist In:The accumulator(2)To be square, accumulator(2)Bottom sets inclined-plane, accumulator(2)Lower part side sets rectangle to go out Material mouth, accumulator(2)The solidifying native mixer of top side connection(1), accumulator(2)The rectangle discharge port that lower part side is set connects Connect movable chute(3)One end, movable chute(3)The other end connects hopper(4), hopper(4)Connect upper strata hanging scaffold(5), on Layer hanging scaffold(5)For disc, upper strata hanging scaffold(5)Centrally disposed small sircle hole, small sircle hole side sets hanging scaffold entrance big hole, small Circular hole opposite side sets three circular holes of isosceles triangle, three circular hole top connection hoppers of isosceles triangle(4)Lower part, three circles of isosceles triangle Hole lower part connects three conveying steel pipes respectively(6), three conveying steel pipes(6)Big isosceles triangle, three conveying steel pipes are separated into downwards (6)The one end for being separated into big isosceles triangle downwards connects lower floor's hanging scaffold respectively(7)On big isosceles triangle circular hole, lower floor's hanging scaffold(7) For disc, centrally disposed small sircle hole, small sircle hole side sets hanging scaffold entrance big hole, and small sircle hole opposite side sets big product word Three circular holes of shape, lower floor's hanging scaffold(7)Big three circular hole lower parts of isosceles triangle connect three steel and compile hose respectively(8)One end, three steel Compile hose(8)The other end is connected in template respectively.
CN201721370233.6U 2017-10-24 2017-10-24 A kind of interior shaft concrete conveyance pours device Expired - Fee Related CN207348859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721370233.6U CN207348859U (en) 2017-10-24 2017-10-24 A kind of interior shaft concrete conveyance pours device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721370233.6U CN207348859U (en) 2017-10-24 2017-10-24 A kind of interior shaft concrete conveyance pours device

Publications (1)

Publication Number Publication Date
CN207348859U true CN207348859U (en) 2018-05-11

Family

ID=62356224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721370233.6U Expired - Fee Related CN207348859U (en) 2017-10-24 2017-10-24 A kind of interior shaft concrete conveyance pours device

Country Status (1)

Country Link
CN (1) CN207348859U (en)

Similar Documents

Publication Publication Date Title
CN106499410A (en) Tunnel-liner side wall concrete is by window placement layer by layer method
CN108756890A (en) A kind of sliding mode system being in the milk for vertical shaft concreting and rock mass
CN206874291U (en) One kind two serves as a contrast chute and enters modular system by window
CN207348859U (en) A kind of interior shaft concrete conveyance pours device
CN106799790B (en) A kind of water conservancy concrete central mix plant
CN106498935B (en) A kind of bored pile underwater concrete casting method
CN208168376U (en) Concatemer silo concreting tripper
CN202882929U (en) Vertical shaft mortar distributing system
CN205840345U (en) A kind of embedded type tower crane funnel
CN107190738A (en) A kind of underwater concreting stake machine
CN210134950U (en) Movable tunnel crown arch concrete pouring device
CN104511972B (en) A kind of automatic mixing conveyer device
CN204322295U (en) A kind of automatic mixing conveying device
CN206264131U (en) A kind of high tenacity cement industry goods of furniture for display rather than for use production equipment
CN208933913U (en) Whole revetment wall form mobile device
CN208529385U (en) For making the concrete dosing system of cement tile idiosome
CN212296366U (en) Vertical shaft concrete cement discharging system
CN207014552U (en) A kind of brick burden agitator
CN105544561B (en) The construction method of friction pile breast wall concrete Quick pouring
CN205637600U (en) High fall concrete grouting machine
CN204668889U (en) Lateral sulcus cable trough rmc monomer and lateral sulcus cable trough combining structure
CN206186104U (en) Dedicated mobile trucd mixer of production light weight wallboard
CN218880865U (en) Reverse construction method shaft integration formwork
CN202500140U (en) Simple concrete conical water blocking plug device
CN109025306A (en) Concreting buffering vertical slip cylinder in civil construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180511