CN212295285U CN202021411404.7U CN202021411404U CN212295285U CN 212295285 U CN212295285 U CN 212295285U CN 202021411404 U CN202021411404 U CN 202021411404U CN 212295285 U CN212295285 U CN 212295285U
Authority
CN
China
Prior art keywords
plate
clamping
connecting plate
plates
ceiling tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021411404.7U
Other languages
Chinese (zh)
Inventor
张尧弟
邱锦昱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Longsheng Industry Co ltd
Original Assignee
Shanghai Longsheng Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Longsheng Industry Co ltd filed Critical Shanghai Longsheng Industry Co ltd
Priority to CN202021411404.7U priority Critical patent/CN212295285U/en
Application granted granted Critical
Publication of CN212295285U publication Critical patent/CN212295285U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a false keel structure for furred ceiling board installation, includes a backup pad, and backup pad top interval or parallel arrangement have a cardboard, and the backup pad is through a first connection structure and cardboard fixed connection, and the top interval of cardboard or parallel arrangement have a link plate, and the cardboard is through a second connection structure and link plate fixed connection, and first connection structure constitutes the draw-in groove that distributes in first connection structure side with backup pad and cardboard. Compared with the prior art, the utility model, its effect is positive and obvious. The utility model discloses a false keel structure for furred ceiling board installation passes through the draw-in groove fixed with the furred ceiling board, and the rethread link plate is fixed with the main joist, and simple to operate has improved the reliability of connecting, has reduced the risk that the furred ceiling board that leads to because the furred ceiling board is too heavy widely falls.

Description

A false keel structure for furred ceiling board installation
Technical Field
The utility model relates to a building field especially relates to furred ceiling installation technique, is specifically a false keel structure for furred ceiling installation particularly.
Background
With the continuous change of the concept of home decoration, suspended ceilings are gradually accepted and accepted by the public and become one of the components in modern home decoration. Among the prior art, the marginal joint of furred ceiling is in the triangular keel, and the triangular keel passes through the connecting piece to be fixed on the main joist, main joist again with ceiling fixed connection, but, when the furred ceiling board adopted heavier honeycomb panel, can reduce its connection reliability, have the risk that the furred ceiling board falls.
Disclosure of Invention
An object of the utility model is to provide a false keel structure for furred ceiling board installation, this kind of false keel structure for furred ceiling board installation lead to its unreliable technical problem of connection when the furred ceiling board adopts heavier honeycomb panel among the prior art to solve.
The utility model discloses a false keel structure for furred ceiling board installation, including a backup pad, backup pad top interval or parallel arrangement have a cardboard, and the backup pad is through a first connection structure and cardboard fixed connection, and the top interval of cardboard or parallel arrangement have a link plate, and the cardboard is through a second connection structure and link plate fixed connection, and first connection structure constitutes the draw-in groove that distributes to the side of first connection structure with backup pad and cardboard.
Preferably, the first connecting structure comprises a first connecting plate, the lower end of the first connecting plate is connected with the supporting plate, and the upper end of the first connecting plate is connected with the clamping plate.
Preferably, the second connecting structure comprises a second connecting plate, the lower end of the second connecting plate is connected with the clamping plate, and the upper end of the second connecting plate is connected with the hanging piece connecting structure.
Preferably, the second connecting structure comprises two second connecting plates, the lower ends of the two second connecting plates are connected with the clamping plate, and the upper ends of the two second connecting plates are connected with the hanging piece connecting structure.
Preferably, two second connecting plates form an included angle, and extension lines in the length direction intersect below the clamping plate.
Preferably, the hanging piece connecting structure comprises two hanging plates, and the upper ends of the two second connecting plates are respectively connected with the two hanging plates.
Preferably, the hanging piece connecting structure comprises a transverse plate, two sides of the transverse plate are respectively connected with a vertical plate, and the upper sides of the two vertical plates are both connected with a hanging piece clamping plate.
Preferably, two sides of the clamping plate are respectively provided with a first extending plate bending upwards, two sides of the upper plane of the supporting plate are respectively provided with a convex strip, and two sides of the supporting plate are respectively provided with a second extending plate bending upwards.
Preferably, the support plate comprises a left support plate and a right support plate, and the clamping plate comprises a left clamping plate and a right clamping plate; the first connecting structure comprises a first left connecting plate and a first right connecting plate, the lower end of the first left connecting plate is connected with the right side of the left supporting plate, the upper end of the first left connecting plate is connected with the right side of the left clamping plate, the lower end of the first right connecting plate is connected with the left side of the right supporting plate, and the upper end of the first right connecting plate is connected with the left side of the right clamping plate; the second connecting structure comprises a second left connecting plate and a second right connecting plate, the lower end of the second left connecting plate is connected with the right side of the left clamping plate, the lower end of the second right connecting plate is connected with the left side of the right clamping plate, and the upper ends of the second left connecting plate and the second right connecting plate are connected with the hanging piece connecting structure.
Preferably, a first functional groove with a downward opening is formed between the first left connecting plate, the first right connecting plate, the second left connecting plate, the second right connecting plate and the hanging part connecting structure, and clamping strips are respectively arranged on two side walls of the first functional groove.
Preferably, hang a connection structure include left link plate and right link plate, the upper end and the left link plate of the left connecting plate of second be connected, the upper end and the right link plate of the right connecting plate of second are connected, first left connecting plate and first right connecting plate between be connected with the function board, function board downside parallel arrangement have two at least baffles, all constitute a second function groove that opens to the downside between two arbitrary baffles.
Compared with the prior art, the utility model, its effect is positive and obvious. The utility model discloses a false keel structure for furred ceiling board installation passes through the draw-in groove fixed with the furred ceiling board, and rethread hangs a connection structure and is fixed with the main joist, and simple to operate has improved the reliability of connecting, has reduced the risk that the furred ceiling board that leads to because the furred ceiling board is too heavy widely falls.
Drawings
Fig. 1 is a first structural schematic diagram of a false keel structure for installing a ceiling board according to the present invention.
Fig. 2 is a first installation schematic diagram of the false keel structure for installing the ceiling board of the present invention.
Fig. 3 is a second schematic structural view of the false keel structure for installing the ceiling tile of the present invention.
Fig. 4 is a second schematic structural view of the false keel structure for installing the ceiling board according to the present invention.
Fig. 5 is a third structural schematic view of the false keel structure for installing the ceiling board according to the present invention.
Fig. 6 is a third structural schematic view of the false keel structure for installing the ceiling board of the present invention.
Fig. 7 is a fourth schematic structural view of the false keel structure for installing the ceiling tile according to the present invention.
Fig. 8 is a fourth schematic structural view of the false keel structure for installing the ceiling tile according to the present invention.
Fig. 9 is a fifth structural schematic view of a false keel structure for installing a ceiling board according to the present invention.
Fig. 10 is a sixth structural schematic view of a false keel structure for installing a ceiling board according to the present invention.
Fig. 11 is a sixth structural schematic view of a false keel structure for installing a ceiling board according to the present invention.
Fig. 12 is a seventh structural schematic view of a false keel structure for installing a ceiling board according to the present invention.
Fig. 13 is a seventh structural schematic view of a false keel structure for installing a ceiling board according to the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments, but the present invention is not limited to this embodiment, and the protection scope of the present invention should be included in all similar structures and similar variations thereof.
Example 1
As shown in fig. 1, a false keel structure for installing a ceiling board comprises a supporting plate 7, wherein a clamping plate 5 is arranged above the supporting plate 7 at an interval or in parallel, the supporting plate 7 is fixedly connected with the clamping plate 5 through a first connecting structure, a hanging part connecting structure 3 is arranged above the clamping plate 5 at an interval or in parallel, the clamping plate 5 is connected with the hanging part connecting structure 3 through a second connecting structure, and the first connecting structure, the supporting plate 7 and the clamping plate 5 form clamping grooves 12 respectively distributed on the side surfaces of the first connecting structure.
The first connecting structure comprises a first connecting plate 6, the lower end of the first connecting plate 6 is connected with the supporting plate 7, and the upper end of the first connecting plate 6 is connected with the clamping plate 5.
The second connecting structure comprises a second connecting plate 4, the lower end of the second connecting plate 4 is connected with the clamping plate 5, and the upper end of the second connecting plate 4 is connected with the hanging piece connecting structure 3.
Preferably, two sides of the clamping plate 5 are respectively provided with a first extending plate 15 bent upwards, two sides of the upper plane of the supporting plate 7 are respectively provided with a convex strip 14, and two sides of the supporting plate 7 are respectively provided with a second extending plate 13 bent upwards.
The working principle of the embodiment is as follows: during installation, as shown in fig. 2, the locking groove 12 on one side is inserted into the ceiling plate 1 on one side, the hanging piece connecting structure 3 is fixed with the main keel through the hanging piece, and the ceiling plate 1 on the other side is inserted into the locking groove 12 on the other side. The first extension plate 15 bent upward may serve as a guide when the ceiling tile 1 is inserted into the catching groove 12. The raised strips 14 on the support plate 7 can increase the friction force between the ceiling board 1 and the support plate 7, prevent the ceiling board 1 from slipping out of the slots 12, and the second extending plate 13 bent upwards can keep the ceiling board 1 horizontal after being inserted into the slots 12.
Example 2
As shown in fig. 3, a cross keel structure for installing a ceiling board 1 is different from that of embodiment 1 in that the second connecting structure comprises two second connecting plates 4, the lower ends of the two second connecting plates 4 are both connected with a clamping plate 5, and the upper ends of the two second connecting plates 4 are both connected with a hanger connecting structure 3.
The working principle of the embodiment is as follows: during installation, as shown in fig. 4, the locking groove 12 on one side is inserted into the ceiling plate 1 on one side, the hanging piece connecting structure 3 is fixed with the main keel through the hanging piece, and the ceiling plate 1 on the other side is inserted into the locking groove 12 on the other side. In this embodiment, two second connecting plates 4 are connected between the clamping plate 5 and the hanging piece connecting structure 3, so that the connection strength and reliability of the clamping plate 5 and the hanging piece connecting structure 3 can be enhanced.
Example 3
As shown in fig. 5, a cross keel structure for installing a ceiling tile 1 is different from the embodiment 2 in that two second connecting plates 4 are arranged at an included angle and the extension lines in the length direction intersect below a clamping plate 5.
The working principle of the embodiment is as follows: during installation, as shown in fig. 6, the locking groove 12 on one side is inserted into the ceiling plate 1 on one side, the hanging piece connecting structure 3 is fixed with the main keel through the hanging piece, and the ceiling plate 1 on the other side is inserted into the locking groove 12 on the other side. Two second connecting plates 4 are connected between the clamping plate 5 and the hanging part connecting structure 3, so that the connecting strength and reliability of the clamping plate 5 and the hanging part connecting structure 3 can be enhanced.
Example 4
As shown in fig. 7, a cross keel structure for installing a ceiling board 1 is different from embodiment 2 in that the hanger connecting structure 3 includes two hanging boards 33, and the upper ends of two second connecting boards 4 are respectively connected with the two hanging boards 33.
The working principle of the embodiment is as follows: during installation, as shown in fig. 8, the clamping groove 12 on one side is inserted into the ceiling plate 1 on one side, the hanging piece is provided with two mounting grooves 2, the two hanging plates 33 are respectively clamped with the two mounting grooves 2, the hanging piece is fixed with the main keel, and the ceiling plate 1 on the other side is inserted into the clamping groove 12 on the other side. In this embodiment, two link plates 33 are connected with two mounting grooves 2 of connecting piece respectively, have strengthened hanging piece connection structure 3 and the joint strength and the reliability of hanging.
Example 5
As shown in fig. 9, a cross keel structure for installing a ceiling board 1 is different from embodiment 2 in that the hanging piece connecting structure 3 includes a transverse plate 18, two sides of the transverse plate are respectively connected with an upright plate 19, and the upper sides of the two upright plates are both connected with a hanging piece clamping plate 20.
The working principle of the embodiment is as follows: during installation, the clamping groove 12 on one side is inserted into the ceiling plate 1 on one side, the lower side of the hanging piece is connected with the clamping plate, the clamping plate of the hanging piece is inserted into the groove formed by the transverse plate 18, the vertical plate 19 and the hanging piece clamping plate 20, the connection strength and reliability of the hanging piece connecting structure 3 and the hanging piece are enhanced, the hanging piece is fixed with the main keel, and the ceiling plate 1 on the other side is inserted into the clamping groove 12 on the other side.
Example 6
As shown in fig. 10, a false keel structure for installing a ceiling tile comprises a supporting plate 7, wherein a clamping plate 5 is arranged above the supporting plate 7 at an interval or in parallel, the supporting plate 7 is fixedly connected with the clamping plate 5 through a first connecting structure, a hanging part connecting structure 3 is arranged above the clamping plate 5 at an interval or in parallel, the clamping plate 5 is connected with the hanging part connecting structure 3 through a second connecting structure, and the first connecting structure, the supporting plate 7 and the clamping plate 5 form clamping grooves 12 respectively distributed on the side surfaces of the first connecting structure.
The supporting plate 7 comprises a left supporting plate 71 and a right supporting plate 72, and the clamping plate 5 comprises a left clamping plate 51 and a right clamping plate 52; the first connecting structure comprises a first left connecting plate 61 and a first right connecting plate 62, the lower end of the first left connecting plate 61 is connected with the right side of the left supporting plate 71, the upper end of the first left connecting plate 61 is connected with the right side of the left clamping plate 51, the lower end of the first right connecting plate 62 is connected with the left side of the right supporting plate 72, and the upper end of the first right connecting plate 62 is connected with the left side of the right clamping plate 52; the second connecting structure comprises a second left connecting plate 41 and a second right connecting plate 42, the lower end of the second left connecting plate 41 is connected with the right side of the left clamping plate 51, the lower end of the second right connecting plate 42 is connected with the left side of the right clamping plate 52, and the upper ends of the second left connecting plate 41 and the second right connecting plate 42 are connected with the hanger connecting structure 3.
A first functional groove 11 with a downward opening is formed between the first left connecting plate 61, the first right connecting plate 62, the second left connecting plate 41, the second right connecting plate 42 and the hanger connecting structure 3, and two side walls of the first functional groove 11 are respectively provided with a clamping strip 16.
The working principle of the embodiment is as follows: during installation, as shown in fig. 11, the locking groove 12 on one side is inserted into the ceiling plate 1 on one side, the hanging piece connecting structure 3 is fixed with the main keel through the hanging piece, and the ceiling plate 1 on the other side is inserted into the locking groove 12 on the other side. An element 17 with functions of illumination, air outlet, air inlet, filtration, purification, negative ions and the like can be arranged in the first functional groove 11, and the clamping strip 16 is used for fixing the element 17 and the functional groove.
Example 7
As shown in fig. 12, a furring channel structure for installing a ceiling board 1, which is different from embodiment 5, in that the hanging piece connecting structure 3 includes a left hanging board 31 and a right hanging board 32, the upper end of the second left connecting board 41 is connected to the left hanging board 31, the upper end of the second right connecting board 42 is connected to the right hanging board 32, a function board 8 is connected between the first left connecting board 61 and the first right connecting board 62, at least two partition boards 9 are arranged in parallel on the lower side of the function board 8, and a second function slot 10 with a downward opening is formed between any two partition boards 9.
The working principle of the embodiment is as follows: during installation, as shown in fig. 13, the clamping groove 12 on one side is inserted into the ceiling plate 1 on one side, the connecting piece is provided with two mounting grooves 2, the left hanging plate 31 and the right hanging plate 32 are respectively clamped with the two mounting grooves 2, and the connecting piece is fixed with the main keel. Elements with functions of illumination, air outlet, air inlet, filtration, purification, negative ions and the like can be arranged in the second functional tank 10.

Claims (11)

1. A false keel structure for the installation of furred ceiling board which characterized in that: the clamping device comprises a supporting plate (7), wherein clamping plates (5) are arranged above the supporting plate (7) at intervals or in parallel, the supporting plate (7) is fixedly connected with the clamping plates (5) through a first connecting structure, hanging part connecting structures (3) are arranged above the clamping plates (5) at intervals or in parallel, the clamping plates (5) are connected with the hanging part connecting structures (3) through a second connecting structure, and the first connecting structures, the supporting plate (7) and the clamping plates (5) form clamping grooves (12) which are respectively distributed on the side faces of the first connecting structures.
2. A cross runner structure for ceiling tile installation as set forth in claim 1, wherein: the first connecting structure comprises a first connecting plate (6), the lower end of the first connecting plate (6) is connected with the supporting plate (7), and the upper end of the first connecting plate (6) is connected with the clamping plate (5).
3. A cross runner structure for ceiling tile installation as set forth in claim 2, wherein: the second connecting structure comprises a second connecting plate (4), the lower end of the second connecting plate (4) is connected with the clamping plate (5), and the upper end of the second connecting plate (4) is connected with the hanging piece connecting structure (3).
4. A cross runner structure for ceiling tile installation as set forth in claim 2, wherein: the second connecting structure comprises two second connecting plates (4), the lower ends of the two second connecting plates (4) are connected with the clamping plate (5), and the upper ends of the two second connecting plates (4) are connected with the hanging piece connecting structure (3).
5. A cross runner structure for ceiling tile installation according to claim 4, wherein: the two second connecting plates (4) form an included angle, and extension lines in the length direction are intersected below the clamping plate (5).
6. A cross runner structure for ceiling tile installation according to claim 4, wherein: the hanging piece connecting structure (3) comprises two hanging plates (33), and the upper ends of the two second connecting plates (4) are respectively connected with the two hanging plates (33).
7. A cross runner structure for ceiling tile installation as set forth in claim 1, wherein: the hanging piece connecting structure (3) comprises a transverse plate (18), two sides of the transverse plate are respectively connected with a vertical plate (19), and the upper sides of the two vertical plates are both connected with a hanging piece clamping plate (20).
8. A furring channel structure for the installation of a ceiling tile, according to any one of claims 3 to 7, wherein: the clamping plate (5) is provided with a first extending plate (15) which is bent upwards on two sides, the supporting plate (7) is provided with a convex strip (14) on two sides of the upper plane, and the supporting plate (7) is provided with a second extending plate (13) which is bent upwards on two sides.
9. A cross runner structure for ceiling tile installation as set forth in claim 1, wherein: the supporting plate (7) comprises a left supporting plate (71) and a right supporting plate (72), and the clamping plate (5) comprises a left clamping plate (51) and a right clamping plate (52); the first connecting structure comprises a first left connecting plate (61) and a first right connecting plate (62), the lower end of the first left connecting plate (61) is connected with the right side of the left supporting plate (71), the upper end of the first left connecting plate (61) is connected with the right side of the left clamping plate (51), the lower end of the first right connecting plate (62) is connected with the left side of the right supporting plate (72), and the upper end of the first right connecting plate (62) is connected with the left side of the right clamping plate (52); the second connecting structure comprises a second left connecting plate (41) and a second right connecting plate (42), the lower end of the second left connecting plate (41) is connected with the right side of the left clamping plate (51), the lower end of the second right connecting plate (42) is connected with the left side of the right clamping plate (52), and the upper ends of the second left connecting plate (41) and the second right connecting plate (42) are connected with the hanging piece connecting structure (3).
10. A cross runner structure for ceiling tile installation as set forth in claim 9, wherein: the first left connecting plate (61), the first right connecting plate (62), the second left connecting plate (41), the second right connecting plate (42) and the hanging piece connecting structure (3) form a first functional groove (11) with a downward opening, and clamping strips (16) are respectively arranged on two side walls of the first functional groove (11).
11. A cross runner structure for ceiling tile installation as set forth in claim 9, wherein: hang a connection structure (3) including left link plate (31) and right link plate (32), the upper end and left link plate (31) of the left connecting plate of second (41) be connected, the upper end and right link plate (32) of the right connecting plate of second (42) are connected, first left connecting plate (61) and first right connecting plate (62) between be connected with function board (8), function board (8) downside parallel arrangement have two at least baffles (9), all constitute a second function groove (10) that open side down between two arbitrary baffles (9).
CN202021411404.7U 2020-07-17 2020-07-17 A false keel structure for furred ceiling board installation Active CN212295285U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021411404.7U CN212295285U (en) 2020-07-17 2020-07-17 A false keel structure for furred ceiling board installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021411404.7U CN212295285U (en) 2020-07-17 2020-07-17 A false keel structure for furred ceiling board installation

Publications (1)

Publication Number Publication Date
CN212295285U true CN212295285U (en) 2021-01-05

Family

ID=73935462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021411404.7U Active CN212295285U (en) 2020-07-17 2020-07-17 A false keel structure for furred ceiling board installation

Country Status (1)

Country Link
CN (1) CN212295285U (en)

Similar Documents

Publication Publication Date Title
CN107268866B (en) Combined type grade-falling suspended ceiling and installation method
CN207003781U (en) A kind of Integral ceiling
CN111663705A (en) Mounting structure and method for composite board ceiling
CN112049310A (en) Ceiling connecting component and mounting method
CN111962746A (en) I-shaped part for connecting adjacent panels and installation method
CN212295285U (en) A false keel structure for furred ceiling board installation
CN113431250A (en) Independent dismounting ceiling assembly, ceiling structure and mounting method thereof
CN113356454A (en) Hanging component of ceiling, ceiling structure and mounting method of ceiling structure
CN212295273U (en) Mounting structure of composite sheet furred ceiling
CN215888927U (en) Suspended ceiling structure in small space
CN215888795U (en) Assembled ceiling hanger structure
CN212427744U (en) Mineral wool board furred ceiling mounting structure
CN114592638A (en) Hanging structure of split type assembly type ceiling
CN212295290U (en) Auxiliary keel hanging piece
CN210342403U (en) Assembled aluminum plate ceiling structure
CN211923178U (en) Indoor integrated ceiling of building
CN210798028U (en) Strip-shaped suspended ceiling
CN201704839U (en) Practical novel ceiling system for corridor passageway
CN212534770U (en) Vertical line for hook type ceiling
CN215167078U (en) Clamping formula furred ceiling mounting structure
CN113431251B (en) Machining method of suspended ceiling assembly and clamping groove component
CN212836200U (en) Independent ceiling structure
CN212836199U (en) Novel independent ceiling structure
CN212358807U (en) Mounting structure of furred ceiling
CN212295268U (en) Ceiling system without connection with wall surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Auxiliary keel structure for ceiling plate installation

Effective date of registration: 20211130

Granted publication date: 20210105

Pledgee: Bank of Communications Ltd. Shanghai Xuhui sub branch

Pledgor: SHANGHAI LONGSHENG INDUSTRY Co.,Ltd.

Registration number: Y2021310000114