CN212270684U - Clamp for mounting bridge deck - Google Patents

Clamp for mounting bridge deck Download PDF

Info

Publication number
CN212270684U
CN212270684U CN201922253471.4U CN201922253471U CN212270684U CN 212270684 U CN212270684 U CN 212270684U CN 201922253471 U CN201922253471 U CN 201922253471U CN 212270684 U CN212270684 U CN 212270684U
Authority
CN
China
Prior art keywords
decking
bolt
steel
bridge deck
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922253471.4U
Other languages
Chinese (zh)
Inventor
孙有竹
李虹余
彭帅
伏浩浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xingtu Bridge Special Equipment Manufacturing Co ltd
Original Assignee
Zhejiang Xingtu Bridge Special Equipment Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xingtu Bridge Special Equipment Manufacturing Co ltd filed Critical Zhejiang Xingtu Bridge Special Equipment Manufacturing Co ltd
Priority to CN201922253471.4U priority Critical patent/CN212270684U/en
Application granted granted Critical
Publication of CN212270684U publication Critical patent/CN212270684U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A anchor clamps for decking installation, its be used for the connection between decking and the I-steel, the I-steel includes pterygoid lamina and web, including shear pin, bolt, nut, rectangle spring and spring uide bushing, the last pterygoid lamina of I-steel is equipped with the locating hole of location decking, the shear pin sets up in the locating hole, the decking includes frame and panel, the panel lid closes at the frame and both are fixed continuous, the bolt sets up on the connecting plate between two adjacent frames, the connecting plate is supported by the frame, the bolt passes connecting plate, shear pin, rectangle spring, spring uide bushing back in proper order and nut threaded connection, screws up the bolt and makes decking and I-steel fixed mutually.

Description

Clamp for mounting bridge deck
Technical Field
The utility model relates to a bridge construction technical field especially relates to an anchor clamps for decking installation.
Background
The deck slab, also known as a roadway slab, is a load-bearing structure that directly bears the wheel pressure of the vehicle. It is generally structurally integrally connected to the ribs and diaphragms of the main beam, so that it is capable of transmitting the vehicle load to the main beam, and also of forming part of the main beam cross-section, and ensuring the overall function of the main beam. However, the prior art has the problems of complex structure, infirm and the like when the bridge deck is installed, and the surface of the bridge deck is not provided with anti-skid materials, so that the friction force of a vehicle is insufficient, and the use condition is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's not enough and provide a simple structure, the firm and antiskid decking installation's of installation anchor clamps.
The utility model discloses a technical scheme be an anchor clamps for decking installation, it is used for the connection between decking and the I-steel, the I-steel includes pterygoid lamina and web, including anti-shear pin, bolt, nut, rectangle spring and spring uide bushing, the last pterygoid lamina of I-steel is equipped with the locating hole of location decking, anti-shear pin sets up in the locating hole, the decking includes frame and panel, the panel lid closes at frame and both fixed links to each other, the bolt sets up on the connecting plate between double-phase adjacent frame, the connecting plate is supported by the frame, the bolt passes connecting plate, anti-shear pin, rectangle spring, spring uide bushing back and nut threaded connection in proper order, screws up the bolt and makes decking and I-steel fixed mutually.
The web of I-steel is equipped with the butt joint hole, the butt joint hole of adjacent web passes through fixed plate fixed connection.
The utility model discloses still include hole for hoist, hole for hoist closing cap, the hole for hoist sets up on the panel of decking, bolt and nut set up under the hole for hoist, it is downthehole that hole for hoist closing cap embedding hole for hoist.
The surface of the plate of the bridge deck is coated with an anti-skid material.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. the utility model discloses bridge floor surface scribbles anti-skidding material, increases the frictional force of vehicle and decking.
2. The utility model discloses the fixed of decking and I-steel contains the shear pin, and the shear pin has increased shear resistance.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a partial enlarged view of the portion a of the present invention.
Fig. 3 is a schematic structural diagram of the i-steel of the present invention.
Detailed Description
The invention will be further explained by the embodiments with reference to the drawings.
As shown in fig. 1-3, the utility model discloses its connection that is used for between decking 2 and I-steel 1, I-steel 1 includes pterygoid lamina 11 and web 13, including shear pin 3, bolt 5, nut 6, rectangular spring 7 and spring uide bushing 8, I-steel 1's last pterygoid lamina 11 is equipped with the locating hole 111 of location decking 2, shear pin 3 sets up in locating hole 111, decking 2 includes frame 21 and panel 22, panel 22 lid closes at frame 21 and both are fixed continuous, bolt 5 sets up on connecting plate 211 between double-phase adjacent frame 21, connecting plate 211 is supported by frame 21, bolt 5 passes connecting plate 211, shear pin 3, rectangular spring 7, spring uide bushing 8 back and nut 6 threaded connection in proper order, screws up bolt 5 and makes decking 2 and I-steel 1 fixed mutually. In the embodiment, the non-shear pin 3 is adopted, the shear resistance of the shear pin 3 is increased, the rectangular spring 7 is a heavy rectangular spring and plays a role in damping and preventing looseness, and the spring guide sleeve 8 is used for conveniently sleeving the rectangular spring 7 to avoid dislocation of the rectangular spring 7.
In this embodiment, the web 13 of the i-beam 1 is provided with a butt hole 131, and the butt holes 131 of the adjacent webs 13 are fixedly connected through the fixing plate 4.
The embodiment further comprises a hoisting hole 9 and a hoisting hole sealing cover, wherein the hoisting hole 9 is arranged on the plate 22 of the bridge deck 2, the bolt 5 and the nut 6 are arranged under the hoisting hole 9, and the hoisting hole sealing cover is embedded into the hoisting hole 9. The effect of the hoisting hole cover in this embodiment is to seal the hoisting hole 9 so that the bridge deck 2 is flat. The hoisting holes 9 serve to facilitate the passage of the bolts 5 through the connection plate 211.
The surface of the plate 22 of the bridge deck 2 according to the present embodiment is coated with a non-slip material. Preferably, the adhesive steel plate antiskid material is methyl methacrylate of Beijing Hengyu indium materials, Inc. The anti-slip material increases the friction between the vehicle and the deck slab.

Claims (4)

1. A anchor clamps for decking installation, it is used for being connected between decking (2) and I-steel (1), I-steel (1) includes pterygoid lamina (11) and web (13), its characterized in that, including shear-resistant round pin (3), bolt (5), nut (6), rectangular spring (7) and spring uide bushing (8), last pterygoid lamina (11) of I-steel (1) are equipped with locating hole (111) of location decking (2), shear-resistant round pin (3) set up in locating hole (111), decking (2) include frame (21) and panel (22), panel (22) cover closes frame (21) and both fixed links to each other, bolt (5) set up on connecting plate (211) between two adjacent frames (21), connecting plate (211) are supported by frame (21), bolt (5) pass connecting plate (211) in proper order, The anti-shear pin (3), the rectangular spring (7) and the spring guide sleeve (8) are connected with the nut (6) through threads, and the bolt (5) is screwed down to fix the bridge deck (2) and the I-shaped steel (1).
2. The clamp for installation of a bridge deck according to claim 1, wherein the webs (13) of the i-beams (1) are provided with butt-joint holes (131), and the butt-joint holes (131) of the adjacent webs (13) are fixedly connected through the fixing plate (4).
3. The clamp for mounting the bridge deck according to claim 1, further comprising a hoisting hole (9) and a hoisting hole sealing cover, wherein the hoisting hole (9) is arranged on the plate (22) of the bridge deck (2), the bolt (5) and the nut (6) are arranged right below the hoisting hole (9), and the hoisting hole sealing cover is embedded into the hole of the hoisting hole (9).
4. A clamp for bridge deck installation according to claim 1, wherein the surface of the plate (22) of the bridge deck (2) is coated with a non-slip material.
CN201922253471.4U 2019-12-16 2019-12-16 Clamp for mounting bridge deck Active CN212270684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922253471.4U CN212270684U (en) 2019-12-16 2019-12-16 Clamp for mounting bridge deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922253471.4U CN212270684U (en) 2019-12-16 2019-12-16 Clamp for mounting bridge deck

Publications (1)

Publication Number Publication Date
CN212270684U true CN212270684U (en) 2021-01-01

Family

ID=73872185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922253471.4U Active CN212270684U (en) 2019-12-16 2019-12-16 Clamp for mounting bridge deck

Country Status (1)

Country Link
CN (1) CN212270684U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115595035A (en) * 2022-10-31 2023-01-13 浙江兴土桥梁专用装备制造有限公司(Cn) Road surface anti-skid coating

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115595035A (en) * 2022-10-31 2023-01-13 浙江兴土桥梁专用装备制造有限公司(Cn) Road surface anti-skid coating

Similar Documents

Publication Publication Date Title
CN108532474B (en) Overturn-preventing reinforcing device and installation method for single-column pier bridge
CN212270684U (en) Clamp for mounting bridge deck
CN104233962A (en) Method for reinforcing and strengthening main cable of suspension bridge
JP4368811B2 (en) Steel floor slab reinforcement device and reinforcement method for existing bridge
CN101403253A (en) Self-falling type anchorage of suspension cantilever beam laying end for construction
CN2799708Y (en) Prestressed steel-structured portal rigid frame
CN107217593A (en) A kind of main push-towing rope for the main saddle of suspension bridge is layered anti-skid construction
CN210561481U (en) High-strength pile-plate type roadbed connecting component
CN206887767U (en) A kind of main push-towing rope for the main saddle of suspension bridge is layered anti-skid construction
CN204738400U (en) A connected node that is used for increasing equipment that hangs under concrete beam having
CN208899348U (en) A kind of rack platform using cushion cap bearing diagonal
CN201310186Y (en) Cantilever beam shelve end self-release anchor device for construction
CN206570695U (en) A kind of high antiskid suspension bridge saddle
CN211499776U (en) Transversely pre-buried fixed creeping formwork support body auxiliary stay structure
CN201132937Y (en) Wing bracket
CN220100357U (en) Detachable connecting hanging piece for steel beam
KR101146650B1 (en) Locking device for cover plates
KR200441296Y1 (en) Anchor Bolt Device for Crane Rail and Crane Rail System
CN107476563B (en) Drawknot attaches board support
CN206645717U (en) A kind of novel crane girder
CN209911146U (en) Curve fretting fatigue test device
CN114991026B (en) Old bridge simply supported variable continuous reinforcement structure and reinforcement method
CN220746578U (en) A passageway bridge for municipal facilities
CN204095498U (en) A kind of lifting lug of exhaust system assembly
CN219567323U (en) Portal crane track supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant