CN212251498U - Novel pre-buried multi-functional PVC pipe stagnant water connects - Google Patents
Novel pre-buried multi-functional PVC pipe stagnant water connects Download PDFInfo
- Publication number
- CN212251498U CN212251498U CN202021064170.3U CN202021064170U CN212251498U CN 212251498 U CN212251498 U CN 212251498U CN 202021064170 U CN202021064170 U CN 202021064170U CN 212251498 U CN212251498 U CN 212251498U
- Authority
- CN
- China
- Prior art keywords
- pvc pipe
- straight joint
- concrete floor
- pvc
- pipe straight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 32
- 239000004744 fabric Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 15
- 238000000034 method Methods 0.000 abstract description 15
- 230000008569 process Effects 0.000 abstract description 6
- 229910001335 Galvanized steel Inorganic materials 0.000 abstract description 3
- 239000008397 galvanized steel Substances 0.000 abstract description 3
- 238000009434 installation Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 239000002390 adhesive tape Substances 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a novel pre-buried multifunctional PVC pipe water stop joint, which comprises a PVC pipe straight joint, a PVC water stop ring, a fixing hole and a fixing nail; the lower part of the PVC pipe straight joint is embedded in the concrete floor slab, and the upper part of the PVC pipe straight joint extends out of the upper part of the concrete floor slab; the PVC water stop ring is fixed on the outer side surface of the lower part of the PVC pipe straight joint and is embedded in the concrete floor slab; the fixing holes are a plurality of threaded holes which are symmetrically and vertically arranged on the outer side surface of the lower end interface of the PVC pipe straight joint; the fixing screw is connected in the fixing hole in a threaded manner and used for fixing the PVC pipe straight joint on the template at the lower part of the concrete floor before the concrete floor is not poured. Compare with current reservation entrance to a cave method, the utility model discloses guaranteed construction quality for the construction progress has guaranteed the operation requirement of engineering, and compares with galvanized steel pipe sleeve pipe technique, the utility model discloses practiced thrift the cost, reduced construction process for the construction progress has guaranteed the engineering quality.
Description
Technical Field
The utility model belongs to the technical field of the installation of building water and electricity, concretely relates to novel pre-buried multi-functional PVC pipe stagnant water connects.
Background
At present, two traditional methods for carrying out drain pipe board penetrating construction on a concrete floor slab are mainly used, the first method for reserving the hole is to keep a reserved hole at the position where the drain pipe board penetrates, and after the drain pipe is installed in the later period, the hole is hung and plugged by fine aggregate concrete or waterproof mortar, so that water leakage is easily caused, the use requirements of a house cannot be met, and meanwhile, the reputation of an enterprise is adversely affected. The second method for pre-embedding galvanized steel pipes basically solves the hidden trouble of water leakage, but has the disadvantages of high construction difficulty, high construction cost and low construction safety.
SUMMERY OF THE UTILITY MODEL
To the problem, the utility model aims to provide a can effectively guarantee construction quality for the novel pre-buried multi-functional PVC pipe stagnant water of construction progress connects. The specific technical scheme is as follows:
a novel pre-buried multifunctional PVC pipe water stop joint comprises a PVC pipe straight joint, a PVC water stop ring, a fixing hole and a fixing nail; the lower part of the PVC pipe straight joint is embedded in the concrete floor slab, and the upper part of the PVC pipe straight joint extends out of the upper part of the concrete floor slab; the upper end interface of the PVC pipe straight joint is detachably sealed by cloth or a film or a cover, and the lower end interface of the PVC pipe straight joint extends out of the lower surface of the concrete floor; the PVC water stop ring is fixed on the outer side surface of the lower part of the PVC pipe straight joint and is embedded in the concrete floor slab; the fixing holes are a plurality of threaded holes which are symmetrically and vertically arranged on the outer side surface of the lower end interface of the PVC pipe straight joint; the fixing screw is connected in the fixing hole in a threaded manner and used for fixing the PVC pipe straight joint on the template at the lower part of the concrete floor before the concrete floor is not poured.
Furthermore, the number of the fixing holes is two (symmetrically arranged on the outer side surface of the lower end interface of the PVC pipe straight joint), and the number of the corresponding fixing nails is also two.
Furthermore, the upper end interface of the PVC pipe straight joint is 100mm higher than the plate surface of the concrete floor slab.
Further, the wall thickness of the PVC pipe straight joint is 4.2 mm.
Furthermore, the diameter of the PVC water stop ring is equal to the diameter of the direct joint of the PVC pipe plus 100mm, and the thickness of the PVC water stop ring is 4.2 mm.
The utility model has the advantages that:
compare with current reservation entrance to a cave method, the utility model discloses guaranteed construction quality for the construction progress has guaranteed the operation requirement of engineering, and compares with galvanized steel pipe sleeve pipe technique, the utility model discloses practiced thrift the cost, reduced construction process for the construction progress has guaranteed the engineering quality.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a top view of a novel pre-buried multifunctional PVC pipe water stop joint of the present invention;
FIG. 2 is a vertical cross-sectional view taken along A-A of FIG. 1;
FIG. 3 is a horizontal sectional view taken along the line B-B in FIG. 1;
shown in the figure: the concrete floor comprises 1-PVC pipe straight joint, 2-PVC water stop ring, 3-fixing hole, 4-fixing nail, 5-upper end interface, 6-lower end interface and 7-concrete floor.
Detailed Description
The following description is provided for illustrative purposes, and other advantages and features of the present invention will become apparent to those skilled in the art from the following detailed description.
It should be understood that the drawings of the present application are only used to match the contents disclosed in the specification, so as to be known and read by those skilled in the art, and not to limit the practical limitations of the present invention, so that the present application does not have any technical significance, and any modification of the structure, change of the ratio relationship, or adjustment of the size should still fall within the scope of the present application without affecting the function and the achievable purpose of the present application. Meanwhile, the terms such as "upper", "lower", "left", "right", "middle", and the like used in the present specification are for convenience of description, and are not intended to limit the scope of the present invention, and changes or adjustments of the relative relationship thereof may be considered as the scope of the present invention without substantial changes in the technical content.
Example (b):
a novel pre-buried multi-functional PVC pipe stagnant water connects, includes PVC pipe straight joint 1, PVC stagnant water ring 2, fixed orifices 3, staple 4. The lower part of the PVC pipe straight joint 1 is embedded in the concrete floor 7, the upper part of the PVC pipe straight joint extends out of the upper part of the surface of the concrete floor 7, the PVC pipe straight joint 1 is processed by a factory mould, the inner diameter of the PVC pipe straight joint 1 is consistent with the outer diameter of a designed drain pipe, and the upper end interface 5 of the PVC pipe straight joint 1 is 100mm higher than the surface of the concrete floor 7, namely, the length of the PVC pipe straight joint 1 is = the thickness of the concrete floor 7 plus the extension of the PVC pipe straight joint 1 on the upper part of the concrete floor 7 by 100mm, so that the PVC pipe is convenient to bond, the bonding quality of the PVC pipe is; the pipe wall thickness of the PVC pipe straight joint 1 is 4.2mm, so that the quality of the PVC pipe straight joint 1 is ensured, and the PVC pipe straight joint 1 is prevented from being damaged in the concrete pouring process; the upper end interface 5 of the PVC pipe straight joint 1 is detachably plugged by cloth or a film or a cover (in the embodiment, the transparent adhesive tape is used for plugging), and the lower end interface 6 of the PVC pipe straight joint 11 extends out of the lower surface of the concrete floor 7. PVC seal ring 2 is fixed on the lateral surface of 1 lower part of PVC pipe straight joint and pre-buried in concrete floor 7 (PVC seal ring 2 is fixed on the position that 1 lower part lateral surface of PVC pipe straight joint is located concrete floor 7 middle part) for bury stagnant water in concrete floor 7 underground, PVC seal ring 2 diameter equals PVC pipe straight joint 1 diameter plus 100mm, PVC seal ring 2 thickness 4.2mm, in order to ensure when the concrete vibrates, be difficult for destroying PVC seal ring 2. The fixing holes 3 are two symmetrical and vertical threaded holes formed in the outer side surface of a lower end interface of the PVC pipe straight joint 1 (the outer side surface of a lower end interface 6 of the PVC pipe straight joint 1 is provided with two symmetrical anchoring points, each anchoring point is provided with one fixing hole 3 for fixing the PVC pipe straight joint 1, the position of the PVC pipe straight joint 1 is calibrated before fixing, and the axis deviation is not larger than 2 mm), so that the PVC pipe straight joint 1 is fixed on a template, the error of the PVC pipe straight joint 1 on a vertical axis is ensured to be within an allowable range, and the later-stage PVC pipe installation is ensured to be easy to connect, free of deviation, water-tight, reasonable in stress and guaranteed in quality. The fixing nail is connected in the fixing hole 3 through threads 4 and used for fixing the PVC pipe straight joint 1 (lower part) on the template at the lower part of the concrete floor 7 before the concrete floor 7 is not poured.
Before the concrete floor 7 is poured, after the formwork of the concrete floor 7 is erected, the position of the PVC pipe is located according to the axis, and the PVC pipe straight joint 1 is fixed on the formwork through the fixing nail 4. Will before steel reinforcement will pre-buried multi-functional PVC pipe stagnant water connects buried underground, buries PVC pipe straight joint 1 underground when underground, must pinpoint PVC pipe straight joint 1 position (adopt fixed orifices 3 and staple 4 location fixed) to guarantee to hang down straightness, the 1 axis deviation of PVC pipe straight joint must not be greater than 2mm on same root riser. When steel bars are bound, the PVC pipe straight joint 1 and the steel bar mesh are firmly bound, and the upper end interface 5 of the PVC pipe straight joint 1 is sealed by transparent adhesive tapes to prevent pollution and damage. The reinforcing mesh cannot be trampled when concrete is poured, so that the concrete protective layer of the reinforcing mesh meets the requirement and the reinforcing mesh does not move or deform; meanwhile, the PVC pipe straight joint 1 is ensured to be accurately and vertically positioned and the axis deviation meets the requirements. After concrete pouring is finished, the direct joint 1 of the PVC pipe must be protected in the subsequent construction process, and the direct joint cannot be stained or damaged. When the water pipe installation engineering is carried out, the plate penetrating installation work of the water pipe can be completed only by coating glue on the PVC pipe and connecting the PVC pipe in the PVC pipe straight joint 1.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The protection scope of the present invention is not limited to the technical solution disclosed in the specific embodiment, and all the modifications, equivalent replacements, improvements, etc. made by the technical entity of the present invention to the above embodiments all fall into the protection scope of the present invention.
Claims (5)
1. The utility model provides a novel pre-buried multi-functional PVC pipe stagnant water connects which characterized in that: comprises a PVC pipe straight joint, a PVC water stop ring, a fixing hole and a fixing nail; the lower part of the PVC pipe straight joint is embedded in the concrete floor slab, and the upper part of the PVC pipe straight joint extends out of the upper part of the concrete floor slab; the upper end interface of the PVC pipe straight joint is detachably sealed by cloth or a film or a cover, and the lower end interface of the PVC pipe straight joint extends out of the lower surface of the concrete floor; the PVC water stop ring is fixed on the outer side surface of the lower part of the PVC pipe straight joint and is embedded in the concrete floor slab; the fixing holes are a plurality of threaded holes which are symmetrically and vertically arranged on the outer side surface of the lower end interface of the PVC pipe straight joint; the fixing screw is connected in the fixing hole in a threaded manner and used for fixing the PVC pipe straight joint on the template at the lower part of the concrete floor before the concrete floor is not poured.
2. The novel pre-buried multi-functional PVC pipe stagnant water connects of claim 1, its characterized in that: the number of the fixing holes is two, and the number of the corresponding fixing nails is also two.
3. The novel pre-buried multi-functional PVC pipe stagnant water connects of claim 1, its characterized in that: the upper end interface of the PVC pipe straight joint is 100mm higher than the plate surface of the concrete floor.
4. The novel pre-buried multi-functional PVC pipe stagnant water connects of claim 1, its characterized in that: the pipe wall thickness of the PVC pipe straight joint is 4.2 mm.
5. The novel pre-buried multifunctional PVC pipe water stop joint of any one of claims 1-4, characterized in that: the diameter of the PVC water stop ring is equal to the diameter of the direct joint of the PVC pipe plus 100mm, and the thickness of the PVC water stop ring is 4.2 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021064170.3U CN212251498U (en) | 2020-06-11 | 2020-06-11 | Novel pre-buried multi-functional PVC pipe stagnant water connects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021064170.3U CN212251498U (en) | 2020-06-11 | 2020-06-11 | Novel pre-buried multi-functional PVC pipe stagnant water connects |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212251498U true CN212251498U (en) | 2020-12-29 |
Family
ID=73986758
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021064170.3U Expired - Fee Related CN212251498U (en) | 2020-06-11 | 2020-06-11 | Novel pre-buried multi-functional PVC pipe stagnant water connects |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212251498U (en) |
-
2020
- 2020-06-11 CN CN202021064170.3U patent/CN212251498U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104060629B (en) | The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo | |
CN103410332A (en) | Concrete hollow block reinforced wall construction technology | |
CN102116061A (en) | Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure | |
CN104863274B (en) | Building dilatation joint waterproof structure | |
CN102644382B (en) | Mounting technology of large-module wall | |
CN112411901B (en) | Waterproof and heat-insulating construction process for roof deformation joint | |
CN106121231A (en) | A kind of skyscraper interts cross construction method | |
CN110805212A (en) | Construction method for roof flashing | |
CN203924116U (en) | Portable side wall formwork jumbo | |
CN113202222A (en) | Construction method for assembled type superposed beam slab | |
CN207194619U (en) | A kind of assembled regeneration concrete enclosure wall | |
CN216042637U (en) | Embedded part for electric embedded pipe | |
CN102912945A (en) | Roof compound seepage-proofing steam exhausting hole detail treatment technology | |
CN100507173C (en) | Pre-closed structure of post-settlement pouring belt and construction method thereof | |
CN212251498U (en) | Novel pre-buried multi-functional PVC pipe stagnant water connects | |
CN110067311A (en) | The connection structure and method of new-old concrete component junction | |
CN111779895A (en) | Novel pre-buried multifunctional PVC pipe water-stop joint and installation method thereof | |
CN206916767U (en) | A kind of prefabricated assembled elevator basis | |
CN211816675U (en) | Downpipe waterproof casing structure for kitchen and bathroom | |
CN211421610U (en) | Constructional column steel bar connection structure | |
CN114319454A (en) | Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam | |
CN111750179A (en) | Novel pre-buried PVC pipe water-stop joint and use method thereof | |
CN111287369A (en) | Rapid construction process of glass curtain wall | |
CN113136927A (en) | Construction method of modular toilet | |
CN208685813U (en) | A kind of plug-in parapet connecting node construction of clear-water concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201229 |