CN212225304U
CN212225304U CN202020433714.2U CN202020433714U CN212225304U CN 212225304 U CN212225304 U CN 212225304U CN 202020433714 U CN202020433714 U CN 202020433714U CN 212225304 U CN212225304 U CN 212225304U
Authority
CN
China
Prior art keywords
pressure
pumping
extraction
gas
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020433714.2U
Other languages
Chinese (zh)
Inventor
王公达
程志恒
何学秋
杨鑫
邱黎明
高涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongan Institute Of Safety Engineering
University of Science and Technology Beijing USTB
North China Institute of Science and Technology
Original Assignee
Zhongan Institute Of Safety Engineering
University of Science and Technology Beijing USTB
North China Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongan Institute Of Safety Engineering, University of Science and Technology Beijing USTB, North China Institute of Science and Technology filed Critical Zhongan Institute Of Safety Engineering
Priority to CN202020433714.2U priority Critical patent/CN212225304U/en
Application granted granted Critical
Publication of CN212225304U publication Critical patent/CN212225304U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jet Pumps And Other Pumps (AREA)

Abstract

The utility model provides an integrated gas drainage system is taken out to circulating pressure of unit, include: the device comprises a gas supercharging device, a high-pressure gas storage regulation and control device, a pressure pumping collecting pipe and a plurality of pressure pumping units distributed in a coal seam; each pressure and suction unit comprises: each pressure pumping unit is correspondingly provided with two pressure pumping collecting pipes which are respectively connected with a main pumping pipeline and a high-pressure gas storage regulation and control device; the high-pressure gas storage regulation and control device is connected with the gas supercharging device; and the gas supercharging device is connected with an underground compressed air pipeline. The hysteresis effect of improving the gas extraction efficiency by using the pressure injection air is utilized to perform circulating pressure injection-extraction on different pressure extraction units of the coal seam, so that the gas extraction efficiency is improved, the use efficiency of high-pressure gas and the gas extraction concentration are improved, and the gas extraction effect is more uniform.

Description

Unit circulating type pressure pumping integrated gas extraction system
Technical Field
The utility model belongs to the technical field of the relevant technique of colliery gas intensive drainage and specifically relates to a unit circulation formula is pressed and is taken out integration gas drainage system, mainly is applicable to the colliery that needs promote to take out and take out efficiency.
Background
The extraction drill hole can go deep into the coal seam, the gas pressure in the drill hole is kept in a lower state under the action of extraction negative pressure, a certain pressure gradient difference is formed between the gas pressure and the coal body around the drill hole, free gas in the inter-block cracks is promoted to flow to the extraction drill hole, adsorbed gas is desorbed, and the free gas in the cracks is supplemented. Because the relationship between the coal seam gas pressure and the coal seam gas content conforms to the typical langmuir type, the coal seam gas content in the low-pressure stage is still high, and the safety recovery of the coal face is threatened. However, with the gradual reduction of the gas pressure of the coal seam, the gas pressure gradient between the extracted coal body and the extraction drill hole is greatly reduced, so that the 'gas flow driving force' is insufficient, and the extraction quantity in the later extraction period is quickly attenuated.
At present, the pressure-pumping integrated technology is also called as a displacement technology, other gas higher than the gas pressure of a coal seam is injected into the coal seam through one part of drill holes, one part of drill holes are pumped, gas flowing power is increased between the pressure-injection drill holes and the pumped drill holes, the pressure gradient of mixed gas in cracks is improved, so that the gas migration in the cracks is driven, and meanwhile, the desorption and the diffusion of adsorbed gas are promoted by utilizing the competitive adsorption effect of the injected gas. The pressure pumping integrated technology is a gas rapid pumping technology with a very promising prospect, and the field application mode of the pressure pumping integrated technology is paid attention by a plurality of researchers. The prior art (ZL201410443825.0) provides a system and a method for displacing high-pressure coal seam gas by low-pressure and medium-pressure air, wherein the low-pressure air in a pressure air system is injected into a small hole to displace coal gas between a roadway loosening ring and a sealing section of an extraction hole, and the medium-pressure air is injected into a gas injection hole to displace the coal gas farther than the sealing section of the gas injection hole. The prior art (ZL201910765263.4) discloses a safe coal bed gas displacement and extraction method based on a carbon dioxide phase change fracturing device, carbon dioxide gas or liquid with the pressure of normal pressure to 10MPa is injected into a carbon dioxide fracturing device through a large-flow medium-low pressure injection mechanism, and gas displacement and extraction are carried out simultaneously until extraction is finished. The prior art (ZL201811549209.8) discloses a method for extracting coal seam gas by water injection and gas injection alternating displacement, which comprises the steps of performing water injection and gas injection in an alternating drilling mode in a circulating and alternating mode, fracturing coal bodies by water injection, opening a gas channel blocked by water in the front by gas injection, and improving the gas desorption efficiency.
The patent and other related researches are beneficial to the development of pressure pumping integrated engineering application under a coal mine, but the issued patents and technical methods all adopt the concept of continuous pressure injection, and the continuous pressure injection process has three obvious disadvantages:
(1) the capacity of devices such as underground compressed air and pressurization is limited, the air source of underground pressure pumping integrated engineering is relatively limited, and the consumption of the air source is large due to continuous pressure injection, so that the technology is difficult to service large-area coal seams;
(2) gas continuously injected for a long time finally flows to the extraction drill hole through the injection drill hole, so that the gas extraction concentration is continuously reduced, the gas is a precious clean energy, and the economic value of the gas is rapidly reduced when the gas concentration is lower than 5%;
(3) the constant arrangement of the pressure injection hole and the extraction hole always enables the gas content of the coal body on the periphery of the pressure injection hole to be very low, the gas content of the coal body on the periphery of the extraction hole is maintained at a higher level, and the extraction effect of pressure injection extraction is not uniform.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information constitutes prior art already known to a person skilled in the art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a unit circulation type is pressed and is taken out integration gas and take out system utilizes the hysteresis effect of pressure injection air promotion gas extraction efficiency, carries out circulating pressure injection-extraction to the different pressure extraction units in coal seam to when promoting gas extraction efficiency, promote high-pressure gas availability factor and gas extraction concentration, and make gas extraction effect more even.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
in a first aspect, the unit circulating type pressure pumping integrated gas extraction system comprises: the device comprises a gas supercharging device, a high-pressure gas storage regulation and control device, a pressure pumping collecting pipe and a plurality of pressure pumping units distributed in a coal seam; each pressure and suction unit comprises: the device comprises a first pressure-pumping subunit and a second pressure-pumping subunit, wherein the drill holes of the first pressure-pumping subunit and the drill holes of the second pressure-pumping subunit are alternately arranged; each pressure pumping unit is correspondingly provided with two pressure pumping collecting pipes, one pressure pumping collecting pipe is connected with the drill holes of all the first pressure pumping sub-units of the pressure pumping unit corresponding to the pressure pumping collecting pipe, and the other pressure pumping collecting pipe is connected with the drill holes of all the second pressure pumping sub-units of the pressure pumping unit corresponding to the pressure pumping collecting pipe; the pressure pumping collecting pipe is respectively connected with the pumping main pipeline and the high-pressure gas storage regulation and control device; the high-pressure gas storage regulation and control device is connected with the gas supercharging device; and the gas supercharging device is connected with an underground compressed air pipeline.
As a further technical solution, the pumping manifold includes: the system comprises a collecting pipe main body, an extraction system connecting port, a pressure injection system connecting port and a plurality of extraction drill hole connecting ports; the main body of the collecting pipe is provided with an extraction system connecting port which is connected with a high-pressure ball valve and a multifunctional parameter instrument, and the multifunctional parameter instrument is connected with an extraction main pipeline through a high-pressure rubber pipe; the manifold body is provided with a pressure injection system connector which is connected with a high-pressure ball valve; and the plurality of extraction drill hole connecting ports are respectively and correspondingly connected to the drill hole of the first pressure pumping sub unit and the drill hole of the second pressure pumping sub unit.
As a further technical solution, the high pressure gas storage regulation and control device comprises: the high-pressure gas storage tank is connected with a gas supercharging device through a high-pressure rubber tube, an outlet of the high-pressure gas storage tank is connected with the pressure reducing valve, the pressure reducing valve is connected with a flowmeter, and the flowmeter is connected with a pressure injection system connecting port of a pressure pumping collecting pipe through the high-pressure rubber tube; and a pressure relief valve is arranged at a pressure relief opening of the high-pressure air storage tank.
In a second aspect, the utility model provides a method of integrated gas drainage is taken out to circulating pressure of unit, adopts the circulating pressure of unit take out integrated gas drainage system, include following step:
s1, dividing the coal seam into N pressure pumping units, wherein each pressure pumping unit comprises: the device comprises a first pressure-pumping subunit and a second pressure-pumping subunit, wherein the drill holes of the first pressure-pumping subunit and the drill holes of the second pressure-pumping subunit are alternately arranged;
s2, calculating the standard-reaching extraction quantity Q of each extraction unit according to the original gas content of the coal seam, the extracted standard-reaching gas content and the coal seam condition parametersN is up to standard
S3, connecting the unit circulating type pressure pumping integrated gas extraction system, starting a gas supercharging device, and increasing the pressure of the high-pressure gas storage tank to 15 MPa;
s4, adjusting the pressure pumping collecting pipe, and performing pressure injection on the drill hole of the first pressure pumping sub-unit of the 1 st pressure pumping unit, wherein the pressure injection flow rate is qmaxAnd 1.2, extracting the drill holes of the second pressure pumping sub units of all the pressure pumping units, and when the extraction concentration alpha of the second pressure pumping sub unit of the 1 st pressure pumping unit is reduced to 20 percent of that before pressure pumpingStopping extraction and injection, and then executing step S5;
s5, calculating the extraction standard reaching condition of the 2 nd pressure extraction unit, including:
if the extraction quantity Q of the 2 nd pressure extraction unit2<Q2 reach standardAdjusting the pressure pumping collecting pipe, and injecting air into the drilled hole of the first pressure pumping subunit of the 2 nd pressure pumping unit at a pressure injection flow rate of qmax1.2, extracting the drill holes of the second pressure pumping sub-units of all the pressure pumping units; when the extraction concentration alpha of the second pressure extraction sub-unit of the 2 nd pressure extraction unit is reduced to 20% of that before pressure extraction, stopping extraction and pressure injection, and then executing the step S6;
if the extraction quantity Q of the 2 nd pressure extraction unit2>Q2 reach standardIf the extraction of the 2 nd pressure extraction unit reaches the standard, stopping extraction and pressure injection, and then executing the step S6;
s6, calculating the next extraction standard reaching situation of the pressure pumping unit in sequence, wherein the calculation comprises the following steps:
if the extraction amount of the pressure pumping unit does not reach the standard, the pressure pumping collecting pipe is adjusted, and air is injected into the drill hole of the first pressure pumping sub-unit of the pressure pumping unit, wherein the injection flow rate is qmax1.2, extracting the drill holes of the second pressure pumping sub-units of all the pressure pumping units; when the extraction concentration alpha of the second pressure extraction sub-unit of the pressure extraction unit is reduced to 20% of that before pressure extraction, stopping extraction and pressure injection;
if the extraction amount of the pressure extraction unit reaches the standard, stopping extraction and pressure injection;
sequentially until the injection of the first pressure extraction subunit of the pressure extraction unit which does not reach the standard is finished, and then executing the step S7;
as a further technical scheme, calculating the extraction standard reaching condition of the 1 st pressure extraction unit comprises:
if Q1<Q1 up to standardAdjusting the pressure pumping collecting pipe, and injecting air into the drilled hole of the second pressure pumping subunit of the 1 st pressure pumping unit with the injection flow rate of qmaxAnd 1.2, extracting the drill holes of the first pressure pumping sub units of all the pressure pumping units, and when the extraction concentration of the first pressure pumping sub unit of the 1 st pressure pumping unit is reduced to the original concentrationWhen the circulation pressure pumping is 20 percent, stopping pumping and pressure injection, and then executing the step S8;
as a further technical scheme, the method for calculating the extraction standard reaching condition of the next pressure pumping unit in sequence comprises the following steps:
if the extraction amount of the pressure pumping unit does not reach the standard, the pressure pumping collecting pipe is adjusted, and air is injected into the drill hole of the second pressure pumping sub-unit of the pressure pumping unit, wherein the injection flow rate is qmax1.2, extracting the drill holes of the first pressure pumping sub-units of all the pressure pumping units; when the extraction concentration alpha of the first pressure extraction sub-unit of the pressure extraction unit is reduced to 20% of that before pressure extraction, stopping extraction and pressure injection;
if the extraction amount of the pressure extraction unit reaches the standard, stopping extraction and pressure injection;
sequentially until the injection of the second pressure extraction subunit of the pressure extraction unit which does not reach the standard is finished, and then executing the step S9;
s9, calculating the extraction standard reaching condition of the 1 st pressure extraction unit, including:
if Q1<Q1 up to standardThen, step S4 is executed;
if Q1>Q1 up to standardThen, step S5 is executed;
and S10, repeating the steps S4 to S9 until all the pressure extraction units reach the extraction standard.
As a further technical solution, in step S1, the coal seam is divided into N pressure-pumping units, and the number N of the pressure-pumping units satisfies the following calculation formula:
Figure BDA0002431631650000061
in the formula, M is the total number of extraction drill holes of one stope face, qmaxThe flow rate is the rated standard condition output flow rate of the supercharging device, q is the flow rate required by effective pressure pumping of the drill hole with unit length, and L is the average length of a single pumping drill hole and 1.2 is a redundancy coefficient through laboratory measurement.
As a further technical scheme, the standard-reaching extraction quantity Q of each pressure extraction unitN is upSign boardThe following calculation formula is satisfied:
Qn is up to standard=(w0-wReach the standard)(L-H1-H2+2R)(l-h1-h2+R)mγ
In the formula, w0The original gas content of the coal in the pressure pumping unit is obtained; w is aReach the standardPre-pumping the coal in the pressure pumping unit to reach the gas content; l is the strike length of the evaluation unit coal seam; l is the average inclined length of the coal bed in the control range of the evaluation unit; h1、H2Pre-discharging equivalent width for the gas of the roadways at two ends of the trend direction of the evaluation unit, wherein if no roadway exists, the equivalent width is 0; h is1、h2Pre-discharging equivalent width for evaluating the gas of the roadways at the two ends of the unit inclination direction, and if no roadway exists, the equivalent width is zero; m is the average coal seam thickness of the evaluation unit; γ is the density of the evaluation unit coal.
Adopt above-mentioned technical scheme, the utility model discloses following beneficial effect has:
compared with the prior art, the utility model fully considers the practical situation that the crack around the actual borehole develops unevenly, and the pressure injection operation is difficult to control by adopting constant pressure, and the pressure injection is carried out by adopting constant flow; the utility model discloses utilized the pressure notes air to the hysteresis effect that gas drainage effect promoted, adopt intermittent type pressure notes and subregion pressure notes theory, will take out the working face and divide into different pressure and take out the unit, take out and take out with pure the pressure notes in turn to single pressure and take out the unit, each pressure that presses that takes out the unit still can maintain the promotion of longer time after taking out the effect, also give coal body gas with abundant desorption time simultaneously, the utilization efficiency of limited high-pressure air source has been ensured, the concentration of taking out is promoted, make the pressure take out the integration technique can the large-scale popularization and application; the utility model discloses still considered the drainage inhomogeneities that invariable pressure notes hole and drainage hole arrangement lead to simultaneously, press every to take out the unit and divide into 2 subunits, every subunit is pressed in the circulation in turn and is taken out in the difference, has ensured to take out and has taken out effect homogeneity.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a diagram of measured data of a hysteresis effect of extraction quantity increase after air injection.
Fig. 2 is a schematic view of a sub-unit circulating type air injection and air extraction integrated system.
Fig. 3 is a front view of the high pressure gas storage regulating device.
Fig. 4 is an elevation view of a pumping manifold.
FIG. 5 is a top view of the pumping manifold.
Fig. 6 is a schematic diagram of the periodic alternate injection of the pumping unit N.
FIG. 7 is a flow chart of the integrated process of unit circulation type air injection and air extraction.
In fig. 2: the system comprises a coal seam 1, a stop extraction line 2, a pressure extraction unit 3, a first pressure extraction subunit 4, a second pressure extraction subunit 5, a main extraction pipeline 6, an underground compressed air pipeline 7, a gas supercharging device 8, a high-pressure gas storage regulation and control device 9, a high-pressure rubber pipe 10 and a pressure extraction collecting pipe 11.
In fig. 3, 901 is an inlet of the high-pressure gas tank, 902 is an outlet of the high-pressure gas tank, 903 is a pressure reducing valve, 904 is a flow meter, and 905 is a relief valve.
In fig. 4, 1101 is a manifold main body, 1102 is an extraction system connection port, 1103 is a high-pressure ball valve, 1104 is a multi-function parameter instrument, and 1105 is an injection system connection port.
In fig. 5, reference numeral 1106 denotes an extraction borehole connection port.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings. It is to be understood that the description of the embodiments herein is for purposes of illustration and explanation only and is not intended to limit the invention.
Example one
Referring to fig. 1 to 7, the present embodiment provides a unit circulation type pressure-pumping integrated gas extraction system, including: the system comprises a gas supercharging device 8, a high-pressure gas storage regulation and control device 9, a pressure pumping collecting pipe 11 and a plurality of pressure pumping units 3 distributed in a coal seam 1;
each pressure drawing unit 3 comprises: a first pressure-pumping subunit 4 and a second pressure-pumping subunit 5, wherein the drill holes of the first pressure-pumping subunit 4 and the drill holes of the second pressure-pumping subunit 5 are alternately arranged.
Each pressure pumping unit 3 is correspondingly provided with two pressure pumping collecting pipes 11, wherein one pressure pumping collecting pipe 11 is connected with the drill holes of all the first pressure pumping sub-units 4 of the pressure pumping unit 3 corresponding to the pressure pumping collecting pipe 11, and the other pressure pumping collecting pipe 11 is connected with the drill holes of all the second pressure pumping sub-units 5 of the pressure pumping unit 3 corresponding to the pressure pumping collecting pipe 11. The pressure pumping collecting pipe 11 is respectively connected with the pumping main pipeline 6 and the high-pressure gas storage regulation and control device 9; the high-pressure gas storage regulation and control device 9 is connected with the gas supercharging device 8; the gas supercharging device 8 is connected with the underground compressed air pipeline 7.
In this embodiment, as a further technical solution, the pressure pumping manifold 11 includes: the system comprises a collecting pipe main body 1101, an extraction system connecting port 1102, a pressure injection system connecting port 1105 and a plurality of extraction drill hole connecting ports 1106; the collecting pipe main body 1101 is provided with an extraction system connecting port 1102, the extraction system connecting port 1102 is connected with a high-pressure ball valve 1103 and a multifunctional parameter instrument 1104, and the multifunctional parameter instrument 1104 is connected with an extraction main pipeline 6 through a high-pressure rubber pipe; the manifold main body 1101 is provided with a pressure injection system connecting port 1105, and the pressure injection system connecting port 1105 is connected with a high-pressure ball valve 1103; the plurality of extraction drill hole connecting ports are respectively and correspondingly connected to the drill hole of the first pressure pumping sub unit 4 and the drill hole of the second pressure pumping sub unit 5.
As a further technical solution, the high-pressure gas storage regulation and control device 9 includes: the high-pressure gas storage tank is characterized by comprising a high-pressure gas storage tank, a pressure relief valve 905, a pressure reducing valve 903 and a flow meter 904, wherein an inlet 901 of the high-pressure gas storage tank is connected with a gas supercharging device 8 through a high-pressure rubber pipe, an outlet 902 of the high-pressure gas storage tank is connected with the pressure reducing valve 903, the pressure reducing valve 903 is connected with the flow meter 904, and the flow meter 904 is connected with a pressure injection system connecting port 1105 of a pressure pumping collecting pipe; a pressure relief valve 905 is arranged at a pressure relief opening of the high-pressure air storage tank.
Therefore, the actual situation that the cracks around the actual underground drill hole are not uniformly developed and the pressure injection operation is difficult to control by adopting the constant pressure is fully considered, and the pressure injection is carried out by adopting the constant flow; the utility model discloses utilized the pressure notes air to the hysteresis effect that gas drainage effect promoted, adopt intermittent type pressure notes and subregion pressure notes theory, will take out the working face and divide into different pressure and take out unit 3, press to take out unit 3 to single and carry out alternate pressure notes and take out with pure, each pressure is taken out the promotion that unit 3 was taken out and still can maintain longer time and is taken out the effect after taking out the end, also give coal body gas with abundant desorption time simultaneously, the utilization efficiency of limited high-pressure air source has been ensured, the concentration of taking out is promoted, make the pressure take out integration technique can the large-scale popularization and application; the utility model discloses still considered simultaneously invariable pressure notes hole and the drainage hole arrange the drainage inhomogeneities that lead to, press every to take out unit 3 and divide into 2 subunits, every subunit is pressed in the circulation in turn and is taken out in the difference, has ensured to take out and has taken out effect homogeneity.
Example two
The embodiment further provides a unit circulation type pressure pumping integrated gas extraction method on the basis of the first embodiment, and the method comprises the following steps:
and S1, dividing the coal bed into N pressure pumping units 3. The number of cells N is calculated by the following formula:
Figure BDA0002431631650000101
in the formula, M is the total number of extraction drill holes of one stope face, qmaxThe flow rate is the rated standard condition output flow rate of the supercharging device, q is the flow rate required by effective pressure pumping of a drill hole with unit length (1m), L is the average length of a single pumping drill hole through laboratory measurement, and 1.2 is a redundancy coefficient.
S2, calculating the standard-reaching extraction quantity Q of each extraction unit according to the original gas content of the coal seam, the extracted standard-reaching gas content and the coal seam condition parametersN is up to standard. The extraction quantity Q reaching the standard of each pressure extraction unit 3N is up to standardBy calculating as follows:
Qn is up to standard=(w0-wReach the standard)(L-H1-H2+2R)(l-h1-h2+R)mγ
Wherein, w0The original gas content of the coal in the pressure pumping unit 3 is shown; w is aReach the standardPre-pumping the coal in the pressure pumping unit 3 to reach the gas content; coal with L as evaluation unitThe layer run length; l is the average inclined length of the coal bed in the control range of the evaluation unit; h1、H2Pre-discharging equivalent width for the gas of the roadways at two ends of the trend direction of the evaluation unit, wherein if no roadway exists, the equivalent width is 0; h is1、h2Pre-discharging equivalent width for the gas of the roadways at the two ends of the evaluation unit inclination direction, if no roadway exists, the equivalent width is zero, and m is the average coal seam thickness of the evaluation unit; γ is the density of the evaluation unit coal.
S3, as shown in fig. 2, connecting the downhole compressed air pipeline 7 with the gas supercharging device 8, connecting the gas supercharging device 8 with the high-pressure gas storage regulation and control device 9 through the high-pressure rubber pipe 10, connecting the high-pressure gas storage regulation and control device 9 with the pressure pumping manifold 11, connecting the pressure pumping manifold 11 with the corresponding drill hole of the first pressure pumping sub-unit 4 or the second pressure pumping sub-unit 5, and connecting the pressure pumping manifold 11 with the main extraction pipeline 6. As shown in fig. 3, the pressure reducing valve 903 on the high-pressure gas storage regulating device 9 is closed, the gas pressurizing device 8 is opened, and the pressure of the high-pressure gas storage tank is increased to 15 MPa.
S4, as shown in fig. 4 and 5, closing the connection port 1102 of the extraction system connected to the first pressure-extraction subunit 4 (subunit r) of the 1 st pressure-extraction unit 3 (pressure-extraction unit 3 one), opening the connection port 1105 of the pressure-injection system, adjusting the high-pressure gas pressure-reducing valve 903 on the high-pressure gas storage regulation and control device 9, observing the reading of the flowmeter 904, and adjusting the gas injection flow rate to QmaxAnd 1.2, performing air pressure injection on the drill hole of the first pressure pumping subunit 4 of the 1 st pressure pumping unit 3. And opening the extraction system connecting port 1102 of the pressure extraction collecting pipe 11 connected with other pressure extraction sub-units, closing the pressure injection system, and extracting other pressure extraction sub-units. Accumulated extraction quantity Q through multifunctional parameter instrument 1104 on pressure extraction collecting pipe 11NAnd monitoring the extraction concentration alpha in real time.
The pressure reducing valve 903 on the high-pressure gas storage regulating device 9 is adjusted to maintain the pressure injection flow at QmaxAnd 1.2, observing the reading of the multifunctional parameter instrument 1104, and stopping the 1 st circulation pressure injection of the 1 st pressure extraction unit 3 when the mixed extraction concentration alpha of the second pressure extraction subunit 5 (subunit II) of the 1 st pressure extraction unit 3 is reduced to 20% of that before pressure extraction.
S5, arranging in sequence from the side of the mining stop line 2Calculating the extraction standard reaching condition of the 2 nd pressure extraction unit 3 (the second pressure extraction unit 3), and if Q is up to standard2<Q2 reach standardThe connected pressure suction manifold 11 is adjusted to perform pressure injection on the drill hole of the first pressure suction subunit 4 of the pressure suction unit 3, and the pressure injection flow rate is qmaxAnd 1.2, extracting the drill holes of all other pressure extraction sub-units, wherein the extraction effect is monitored by a multifunctional parameter instrument 1104 on the pressure extraction collecting pipe 11.
If Q2>Q2 reach standardAnd if so, the extraction of the pressure extraction unit 3 reaches the standard, stopping extraction and pressure injection, calculating the extraction standard reaching condition of the next pressure extraction unit 3 in sequence, and performing pressure injection on the drill hole of the first pressure extraction subunit 4 of the unit which does not extract the standard.
And S6, repeating the steps 4 and 5, and completing the pressure injection of the first pressure pumping sub-units 4 of all the pressure pumping units 3 which do not extract the gas to reach the standard.
S7, calculating the extraction standard reaching condition of the 1 st pressure extraction unit 3, and if Q is up to standard1<Q1 up to standardAdjusting the pressure pumping collecting pipe 11, and injecting air into the drilled hole of the second pressure pumping sub-unit 5 of the 1 st pressure pumping unit 3, wherein the injection flow rate is QmaxAnd 1.2, extracting the drill holes of all the other unqualified pressure extraction units 3. When the extraction concentration of the first pressure extraction sub-unit 4 of the first pressure extraction unit 3 is reduced to 20% of that before the pressure extraction in the cycle, the 2 nd cycle pressure injection of the 1 st pressure extraction unit 3 is stopped, and the cycle alternate pressure injection process of each pressure extraction unit 3 is shown in fig. 6.
And S8, calculating the extraction standard-reaching condition of the next pressure extraction unit 3 in sequence, and performing pressure injection on the second pressure extraction sub-unit 5 of the unit which does not extract the standard-reaching condition.
And S9, repeating the steps 7 and 8, and completing the pressure injection of the second pressure pumping sub-units 5 of all the pressure pumping units 3 which do not extract the water to reach the standard.
And S10, repeating the steps 4-9 until all the pressure extraction units 3 reach the extraction standard, wherein the whole pressure injection integrated process is shown in FIG. 7.
In conclusion, the utility model fully considers the practical situation that the crack around the actual borehole develops unevenly, and the constant pressure is adopted to control the pressure injection operation difficulty, and the constant flow is adopted to perform the pressure injection; the utility model discloses utilized the pressure notes air to the hysteresis effect (as shown in fig. 1) that the gas drainage effect promoted, adopted intermittent type pressure notes and subregion pressure notes theory, will take out the working face and divide into different pressure and take out unit 3, press to take out unit 3 to single and carry out alternate pressure notes and take out and adopt simply, each pressure is taken out the promotion that unit 3 was taken out and still can maintain the long time after the pressure is taken out and is taken out the effect, also give the coal body gas with abundant desorption time simultaneously, the utilization efficiency of limited high-pressure air supply has been ensured, the concentration of taking out has been promoted, make the pressure take out the integration technique can the large-scale popularization and application; the utility model discloses still considered simultaneously invariable pressure notes hole and the drainage hole arrange the drainage inhomogeneities that lead to, press every to take out unit 3 and divide into 2 subunits, every subunit is pressed in the circulation in turn and is taken out in the difference, has ensured to take out and has taken out effect homogeneity.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (3)

1. Unit circulating type pressure pumping integrated gas extraction system is characterized by comprising: the device comprises a gas supercharging device, a high-pressure gas storage regulation and control device, a pressure pumping collecting pipe and a plurality of pressure pumping units distributed in a coal seam;
each pressure and suction unit comprises: the device comprises a first pressure-pumping subunit and a second pressure-pumping subunit, wherein the drill holes of the first pressure-pumping subunit and the drill holes of the second pressure-pumping subunit are alternately arranged; each pressure pumping unit is correspondingly provided with two pressure pumping collecting pipes, one pressure pumping collecting pipe is connected with the drill holes of all the first pressure pumping sub-units of the pressure pumping unit corresponding to the pressure pumping collecting pipe, and the other pressure pumping collecting pipe is connected with the drill holes of all the second pressure pumping sub-units of the pressure pumping unit corresponding to the pressure pumping collecting pipe; the pressure pumping collecting pipe is respectively connected with the pumping main pipeline and the high-pressure gas storage regulation and control device; the high-pressure gas storage regulation and control device is connected with the gas supercharging device; and the gas supercharging device is connected with an underground compressed air pipeline.
2. The unit circulation type pressure-pumping integrated gas extraction system according to claim 1, wherein the pressure-pumping manifold comprises: the system comprises a collecting pipe main body, an extraction system connecting port, a pressure injection system connecting port and a plurality of extraction drill hole connecting ports; the main body of the collecting pipe is provided with an extraction system connecting port which is connected with a high-pressure ball valve and a multifunctional parameter instrument, and the multifunctional parameter instrument is connected with an extraction main pipeline through a high-pressure rubber pipe; the manifold body is provided with a pressure injection system connector which is connected with a high-pressure ball valve; and the plurality of extraction drill hole connecting ports are respectively and correspondingly connected to the drill hole of the first pressure pumping sub unit and the drill hole of the second pressure pumping sub unit.
3. The unit circulation type pressure pumping integrated gas extraction system according to claim 1, wherein the high-pressure gas storage regulation and control device comprises: the high-pressure gas storage tank is connected with a gas supercharging device through a high-pressure rubber tube, an outlet of the high-pressure gas storage tank is connected with the pressure reducing valve, the pressure reducing valve is connected with a flowmeter, and the flowmeter is connected with a pressure injection system connecting port of a pressure pumping collecting pipe through the high-pressure rubber tube; and a pressure relief valve is arranged at a pressure relief opening of the high-pressure air storage tank.
CN202020433714.2U 2020-03-30 2020-03-30 Unit circulating type pressure pumping integrated gas extraction system Active CN212225304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020433714.2U CN212225304U (en) 2020-03-30 2020-03-30 Unit circulating type pressure pumping integrated gas extraction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020433714.2U CN212225304U (en) 2020-03-30 2020-03-30 Unit circulating type pressure pumping integrated gas extraction system

Publications (1)

Publication Number Publication Date
CN212225304U true CN212225304U (en) 2020-12-25

Family

ID=73905913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020433714.2U Active CN212225304U (en) 2020-03-30 2020-03-30 Unit circulating type pressure pumping integrated gas extraction system

Country Status (1)

Country Link
CN (1) CN212225304U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502740A (en) * 2020-03-30 2020-08-07 北京科技大学 Unit circulating type pressure pumping integrated gas extraction system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502740A (en) * 2020-03-30 2020-08-07 北京科技大学 Unit circulating type pressure pumping integrated gas extraction system and method
CN111502740B (en) * 2020-03-30 2024-06-04 北京科技大学 Unit circulation type pressure pumping integrated gas extraction system and method

Similar Documents

Publication Publication Date Title
WO2013056597A1 (en) Gas extraction method and device with alternating extraction and injection
CN109505565B (en) Method for extracting coal seam gas by water injection and gas injection alternating displacement
CN202064905U (en) Gas lift liquid drainage device of vehicle-mounted natural gas compressor
CN105422164B (en) Hydrofracturing is anti-reflection to aid in coal seam efficient water injection method and apparatus
CN102031949B (en) Gas lift method of combined ball plug for drainage and gas production of oil and gas well
CN111706321A (en) Coal bed gas multilayer commingled production experimental apparatus
CN110005393A (en) A kind of underground coal mine waterpower sand fracturing system and fracturing process
CN102913274B (en) System for increasing yield of gas excavation borehole and method thereof
CN212225304U (en) Unit circulating type pressure pumping integrated gas extraction system
CN203531877U (en) Underground coal mine fracturing connecting device
CN205036295U (en) Full well section self-suction type reverse circulation gas drilling system
CN111827997B (en) Exploitation method for improving recovery ratio of low-pressure tight oil reservoir
CN111948099B (en) Testing device and method for evaluating backflow opportunity of fracturing fluid based on hydration
CN205036331U (en) Reverse circulation gas drilling tool combined structure
CN111502740B (en) Unit circulation type pressure pumping integrated gas extraction system and method
CN201521316U (en) Coal bed down hole water draining, extracting and discharging device
CN102352747A (en) Pressure-control injection yield-increasing method for coal-bed gas well
CN113653531B (en) Method for dredging low-permeability roof water
CN207485391U (en) Gas drilling pit shaft drain Monitoring and control system
CN204646189U (en) A kind of high-pressure spray formula associated gas reclaimer
CN111894525B (en) Device and method for composite integrated drainage and mining of unconventional gas reservoir platform
CN208224040U (en) It is a kind of to utilize supercritical CO2The pilot system of anti-reflection Oil in Super-low Permeability densification shale
CN117605533A (en) Intermittent expansion regulation and control method for gas storage of L-shaped solution cavity gas storage of communication well
CN103233711B (en) Anchor formula drilling well umbrella ditch gravity compound gas cap drive oil production method
CN212656821U (en) Coal bed gas multilayer commingled production experimental apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant