CN212216922U - A transfer cart and conveyor for processing of prefabricated box girder roof reinforcing bar - Google Patents

A transfer cart and conveyor for processing of prefabricated box girder roof reinforcing bar Download PDF

Info

Publication number
CN212216922U
CN212216922U CN202020223483.2U CN202020223483U CN212216922U CN 212216922 U CN212216922 U CN 212216922U CN 202020223483 U CN202020223483 U CN 202020223483U CN 212216922 U CN212216922 U CN 212216922U
Authority
CN
China
Prior art keywords
top plate
support frame
frame
inverted
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020223483.2U
Other languages
Chinese (zh)
Inventor
杨文平
杨龙龙
刘光正
常新乾
张彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Civil Aviation Airport Construction Engineering Co Ltd
Original Assignee
Civil Aviation Airport Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Civil Aviation Airport Construction Engineering Co Ltd filed Critical Civil Aviation Airport Construction Engineering Co Ltd
Priority to CN202020223483.2U priority Critical patent/CN212216922U/en
Application granted granted Critical
Publication of CN212216922U publication Critical patent/CN212216922U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a transfer cart for processing precast box girder roof steel bars, which comprises a first transfer seat and a second transfer seat, wherein the inner end of the first transfer seat is connected with a first standing platform, the inner end of the second transfer seat is connected with a second standing platform, a first main support frame is connected between the first transfer seat and the second transfer seat, the upper end of the first main support frame is provided with a first roof, and a material placing frame is arranged on the first roof; the rear end of the first main support frame is connected with a second secondary support frame, a second top plate is arranged on the second secondary support frame, a material storage frame is arranged on the second top plate, the front end of the second secondary support frame is connected with the second secondary support frame through a plurality of first inclined pipes which are parallel to each other, and a power-assisted pulley assembly is arranged between every two adjacent first inclined pipes. The conveying device is used for distributing and conveying the steel bars of the top plate of the prefabricated box girder, and is simple and novel in structure, good in conveying capacity and safe and convenient to use. The utility model discloses still disclose a conveyor for prefabricated case roof beam roof reinforcing bar, the device transports the convenience.

Description

A transfer cart and conveyor for processing of prefabricated box girder roof reinforcing bar
Technical Field
The utility model relates to an engineering machine tool field, concretely relates to transfer cart for processing of prefabricated box girder roof reinforcing bar.
Background
At present box girder roof plate reinforcing bar material is mainly regarded as artifical cloth in the construction of prefabricated box girder, and the efficiency of construction is low, and it is more to drop into the manual work, and the construction is also inconvenient, and workman high in labor strength, the construction progress is slow, and workman's construction mood falls to lack enthusiasm to increase construction cost expense. The box girder roof plate reinforcing bars are generally rectangular reinforcing rings,
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a transfer cart for processing of prefabricated case roof beam roof reinforcing bar, this conveyor are used for the cloth and the fortune material of prefabricated case roof beam roof reinforcing bar, and the structure is simpler novel, and the fortune material ability is good, convenience safe in utilization.
The utility model discloses a realize above-mentioned purpose, the technical solution who adopts is:
a transfer cart for processing precast box girder top plate steel bars comprises a first moving seat and a second moving seat, wherein the inner end of the first moving seat is connected with a first standing platform, the inner end of the second moving seat is connected with a second standing platform, a first main support frame is connected between the first moving seat and the second moving seat, a first top plate is arranged at the upper end of the first main support frame, and a material placing frame is arranged on the first top plate; the rear end of the first main support frame is connected with a second secondary support frame, a second top plate is arranged on the second secondary support frame, a material storage frame is arranged on the second top plate, the front end of the second secondary support frame is connected with the second secondary support frame through a plurality of first inclined pipes which are parallel to each other, and a power-assisted pulley assembly is arranged between every two adjacent first inclined pipes.
Preferably, the first movable base comprises a first walking beam, the first walking beam comprises a first inverted U-shaped plate, a first driving wheel and a first driven wheel are connected in the first inverted U-shaped plate, a first driving motor connected with the first driving wheel is arranged at the inner end of the first inverted U-shaped plate, and the first driving motor is located below the first standing platform.
Preferably, the second moving seat comprises a second moving beam, the second moving beam comprises a second inverted U-shaped plate, a second driving wheel and a second driven wheel are connected in the second inverted U-shaped plate, a second driving motor connected with the second driving wheel is arranged at the inner end of the second inverted U-shaped plate, and the second driving motor is located below the second standing platform;
the first main support frame is connected with a motor control box, the circuit output end of the motor control box is connected with the first driving motor and the second driving motor through electric wires, and the circuit access end of the motor control box is connected with an alternating current power supply through electric wires.
Preferably, first main support frame includes that first preceding inverted U-shaped frame and first back inverted U-shaped frame, behind first preceding inverted U-shaped frame and the first back inverted U-shaped frame parallel arrangement each other through a plurality of first indulge prop union coupling.
Preferably, the first top plate is rectangular plate-shaped, a plurality of first top plate counter bores are formed in the first top plate, and the first top plate is connected with the first front inverted U-shaped frame, the first rear inverted U-shaped frame and the first longitudinal support pipe through screws in the first top plate counter bores.
Preferably, the second secondary support frame comprises a left tripod and a right tripod, and both the left tripod and the right tripod are right-angled tripods; the lower part of the left tripod and the lower part of the right tripod are fixedly connected with the upper part of the first main support frame, and the left tripod and the right tripod are connected through a plurality of first cross brace pipes.
Preferably, the second top plate is rectangular plate-shaped, a second top plate counter bore is formed in the second top plate, and the second top plate is connected with the left tripod, the right tripod and the first cross brace pipe through screws in the second top plate counter bore.
Preferably, one end of the first inclined pipe is connected with the first cross brace pipe, and the other end of the first inclined pipe is connected with the first main support frame; the power-assisted pulley assembly comprises a power-assisted pulley, and the power-assisted pulley is connected with the side wall of the first inclined pipe through a pulley rotating shaft; the upper end of the power-assisted pulley is higher than the inclined end surface of the first inclined pipe.
Preferably, the discharging frame comprises a plurality of discharging support rods which are arranged in parallel, and the discharging support rods are welded on the first top plate; the material storage rack comprises a plurality of material storage supporting rods which are arranged in parallel, the material storage supporting rods are welded on the second top plate, and the material storage supporting rods are strip-shaped rods with concave upper end faces and concave middle portions.
Another object of the utility model is to provide a transport device for prefabricated box girder roof reinforcing bar.
The utility model discloses a realize above-mentioned purpose, the technical solution who adopts is:
the utility model provides a conveyor for prefabricated box girder roof reinforcing bar, includes tractor and above-mentioned transfer cart, the rear end of transfer cart is connected with the traction frame, the front end or the rear end of transfer cart are connected with and pull the link, and the tractor colludes through pulling on the traction frame and pulls the link and be connected.
The utility model has the advantages that:
above-mentioned during normal use for prefabricating case roof beam reinforcing bar, the transfer cart is placed in the outside of prefabricating case roof beam processing strut, and the U-shaped frame of falling after the first before can passing of prefabricating case roof beam processing strut this moment. And (3) placing the rectangular annular roof steel bars on the material placing frame and the material storing frame of the transfer cart by using a common crane or a gantry crane. The electronic box is connected with an alternating current power supply through an electric wire, and the worker controls the transfer cart to walk through the electronic box. The utility model provides a transfer cart can set up the direction recess when using on prefabricated box girder processing strut both sides place, the straight bar groove of direction recess, the action wheel of transfer cart and can go in the direction recess from the driving wheel to guarantee the straightness of walking.
When the top plate reinforcing steel bars are machined, the transfer cart normally and slowly walks, two workers stand on the first standing platform and the second standing platform respectively, and then the two workers place the top plate reinforcing steel bars on the prefabricated box girder machining support frame together. When the top plate reinforcing steel bars on the material placing frame are emptied, a plurality of top plate reinforcing steel bars on the material storing frame can be pulled down to the material placing frame to work. The utility model provides a transfer cart has not only improved the convenience of workman's blowing to simple structure, the fortune material ability is stronger. After the work of transfer cart between this processing is accomplished, the accessible tractor pulls out outside the workshop, goes to accomplish the processing of the prefabricated box girder of next building site. The utility model provides a tractor can longer time use, has avoided the waste of resource.
Drawings
In order to clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic diagram of the overall structure of a transfer cart for processing steel bars of a top plate of a precast box girder.
Fig. 2 is a schematic view of a connection structure of the first main bracket and the second secondary bracket.
Detailed Description
The utility model provides a transfer cart for processing of precast box roof beam roof reinforcing bar, for making the utility model discloses a purpose, technical scheme and effect are clearer, more clear and definite, it is following right the utility model discloses further detailed description. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The present invention will be described in detail with reference to the accompanying drawings:
example 1
Combine fig. 1 and fig. 2, a transfer cart for processing of precast box girder roof reinforcing bar, includes that first removal seat 1 and second remove seat 2, and the inner of first removal seat 1 even has first platform 101 of standing, and the inner of second removal seat 2 even has second platform 201 of standing.
Even have first main support frame 3 between first removal seat 1 and the second removal seat 2, the upper end of first main support frame 3 is equipped with first roof 4, is provided with blowing frame 41 on the first roof 4. The rear end of the first main supporting frame 3 is connected with a second main supporting frame 5, a second top plate 6 is arranged on the second main supporting frame 5, a material storage frame 61 is arranged on the second top plate 6, the front end of the second main supporting frame 5 is connected with the first main supporting frame 3 through a plurality of first inclined pipes 62 which are parallel to each other, and a power-assisted pulley assembly 63 is arranged between every two adjacent first inclined pipes 62.
The first moving seat 1 comprises a first moving beam, the first moving beam comprises a first inverted U-shaped plate 11, a first driving wheel 12 and a first driven wheel 13 are connected in the first inverted U-shaped plate, a first driving motor 14 connected with the first driving wheel 12 is arranged at the inner end of the first inverted U-shaped plate 11, and the first driving motor 14 is located below the first standing platform 101.
The second moving seat 2 includes a second moving beam, the second moving beam includes a second inverted U-shaped plate 21, a second driving wheel and a second driven wheel are connected in the second inverted U-shaped plate 21, a second driving motor 22 connected with the second driving wheel is provided at the inner end of the second inverted U-shaped plate 21, and the second driving motor 22 is located below the second standing platform 201.
The first main support frame 3 is connected with a motor control box 7, the circuit output end of the motor control box 7 is connected with the first driving motor 14 and the second driving motor 22 through electric wires, and the circuit input end of the motor control box 7 is connected with an alternating current power supply through electric wires.
First main bracket 3 includes first preceding inverted U-shaped frame 31 and first back inverted U-shaped frame 32, and after first preceding inverted U-shaped frame 31 and first back inverted U-shaped frame 32 set up parallel to each other, first preceding inverted U-shaped frame 31 and first back inverted U-shaped frame 32 are connected through a plurality of first vertical stay pipes 33 between.
The first top plate 4 is in a rectangular plate shape, a plurality of first top plate counter bores are formed in the first top plate 4, and the first top plate 4 is connected with the first front inverted U-shaped frame 31, the first rear inverted U-shaped frame 32 and the first longitudinal support pipe 33 through screws in the first top plate counter bores.
The second secondary support frame 5 comprises a left tripod 51 and a right tripod 52, and the left tripod 51 and the right tripod 52 are both right-angle tripods; the lower part of the left tripod 51 and the lower part of the right tripod 52 are both fixedly connected with the upper part of the first main support frame 3, and the left tripod 51 and the right tripod 52 are connected through a plurality of first cross supporting tubes 53.
The second top plate 6 is in a rectangular plate shape, a second top plate counter bore is formed in the second top plate 6, and the second top plate 6 is connected with the left tripod 51, the right tripod 52 and the first cross supporting pipe 53 through screws in the second top plate counter bore.
One end of the first inclined pipe 62 is connected to the first cross brace pipe 53, and the other end of the first inclined pipe 62 is connected to the first main frame 3. The power-assisted pulley assembly 63 comprises a power-assisted pulley 64, and the power-assisted pulley 64 is connected with the side wall of the first inclined pipe 62 through a pulley rotating shaft; the upper end of the booster pulley 64 is higher than the inclined end surface of the first inclined tube 62.
The discharging frame 41 comprises a plurality of discharging support rods 411 which are arranged in parallel, the discharging support rods 411 are welded on the first top plate, and the discharging support rods 41 are long-strip-shaped rods which are low in front and high in back.
The material storage frame 61 includes a plurality of material storage support rods 611 arranged in parallel, the material storage support rods 611 are welded on the second top plate 6, and the material storage support rods 611 are long-strip-shaped rods with a high front part and a low rear part.
Example 2
With reference to fig. 1, a conveyor for prefabricated box girder roof reinforcing bar, includes tractor and above-mentioned transfer cart, the rear end of tractor is connected with the traction frame, the front end or the rear end of transfer cart are connected with and pull link 8, and the tractor colludes through pulling on the traction frame and pulls the link and be connected. The traction suspension loop 8 in this embodiment is connected to the first front inverted U-shaped frame 31.
Example 3
Above-mentioned during normal use for prefabricated case roof beam reinforcing bar, the transfer cart is placed in the outside of prefabricated case roof beam processing strut, and the prefabricated case roof beam processing strut can pass first preceding inverted U-shaped frame 31 and first back inverted U-shaped frame 32 this moment. Rectangular ring-shaped roof reinforcing steel bars are placed on the material placing frame 41 and the material storage frame 61 of the transfer cart by using a common crane or a gantry crane. The electronic box is connected with an alternating current power supply through an electric wire, and the worker controls the transfer cart to walk through the electronic box. The utility model provides a transfer cart can set up the direction recess when using on prefabricated box girder processing strut both sides place, the straight bar groove of direction recess, the action wheel of transfer cart and can go in the direction recess from the driving wheel to guarantee the straightness of walking.
When the top plate reinforcing steel bars are machined, the transfer cart normally and slowly walks, two workers stand on the first standing platform 101 and the second standing platform respectively, and then the two workers place the top plate reinforcing steel bars on the prefabricated box girder machining support frame together. When the top plate reinforcing steel bars on the material placing frame 41 are emptied, a plurality of top plate reinforcing steel bars on the material storing frame 61 can be pulled down to the material placing frame 41 to work. The utility model provides a transfer cart has not only improved the convenience of workman's blowing to simple structure, the fortune material ability is stronger. After the work of transfer cart between this processing is accomplished, the accessible tractor pulls out outside the workshop, goes to accomplish the processing of the prefabricated box girder of next building site. The utility model provides a tractor can longer time use, has avoided the waste of resource.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
The parts not mentioned in the utility model can be realized by adopting or using the prior art for reference.
Of course, the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and the changes, modifications, additions or substitutions made by those skilled in the art within the scope of the present invention should also belong to the protection scope of the present invention.

Claims (10)

1. A transfer cart for processing precast box girder top plate steel bars is characterized by comprising a first transfer seat and a second transfer seat, wherein the inner end of the first transfer seat is connected with a first standing platform, the inner end of the second transfer seat is connected with a second standing platform, a first main support frame is connected between the first transfer seat and the second transfer seat, a first top plate is arranged at the upper end of the first main support frame, and a material placing frame is arranged on the first top plate; the rear end of the first main support frame is connected with a second secondary support frame, a second top plate is arranged on the second secondary support frame, a material storage frame is arranged on the second top plate, the front end of the second secondary support frame is connected with the second secondary support frame through a plurality of first inclined pipes which are parallel to each other, and a power-assisted pulley assembly is arranged between every two adjacent first inclined pipes.
2. The transport cart for processing the steel bars of the top plate of the precast box girder according to claim 1, wherein the first moving base comprises a first walking beam, the first walking beam comprises a first inverted U-shaped plate, a first driving wheel and a first driven wheel are connected in the first inverted U-shaped plate, a first driving motor connected with the first driving wheel is arranged at the inner end of the first inverted U-shaped plate, and the first driving motor is located below the first standing platform.
3. The conveying vehicle for processing the steel bars of the top plate of the precast box girder as recited in claim 2, wherein the second moving seat comprises a second walking beam, the second walking beam comprises a second inverted U-shaped plate, a second driving wheel and a second driven wheel are connected in the second inverted U-shaped plate, a second driving motor connected with the second driving wheel is arranged at the inner end of the second inverted U-shaped plate, and the second driving motor is located below the second standing platform;
the first main support frame is connected with a motor control box, the circuit output end of the motor control box is connected with the first driving motor and the second driving motor through electric wires, and the circuit access end of the motor control box is connected with an alternating current power supply through electric wires.
4. The transport cart for precast box girder top slab rebar machining according to claim 1, wherein the first main support frame comprises a first front inverted U-shaped frame and a first rear inverted U-shaped frame, and the first front inverted U-shaped frame and the first rear inverted U-shaped frame are connected by a plurality of first longitudinal support pipes after being arranged in parallel with each other.
5. The transport cart for processing the steel bars of the top plate of the precast box girder according to claim 4, wherein the first top plate is rectangular plate-shaped, a plurality of first top plate counter bores are formed in the first top plate, and the first top plate is connected with the first front inverted U-shaped frame, the first rear inverted U-shaped frame and the first longitudinal support pipe through screws in the first top plate counter bores.
6. The transfer cart for precast box girder top plate rebar machining according to claim 1, wherein the second secondary strut comprises a left tripod and a right tripod, both of which are right-angled tripods; the lower part of the left tripod and the lower part of the right tripod are fixedly connected with the upper part of the first main support frame, and the left tripod and the right tripod are connected through a plurality of first cross brace pipes.
7. The transport cart for processing the steel bars of the top plate of the precast box girder according to claim 6, wherein the second top plate is rectangular plate-shaped, a counter bore of the second top plate is formed in the second top plate, and the second top plate is connected with the left tripod, the right tripod and the first cross brace pipe through screws in the counter bore of the second top plate.
8. The transport cart for processing the steel bars of the top plate of the precast box girder according to claim 7, wherein one end of the first inclined pipe is connected with the first cross brace pipe, and the other end of the first inclined pipe is connected with the first main support frame; the power-assisted pulley assembly comprises a power-assisted pulley, and the power-assisted pulley is connected with the side wall of the first inclined pipe through a pulley rotating shaft; the upper end of the power-assisted pulley is higher than the inclined end surface of the first inclined pipe.
9. The transfer cart for processing the steel bars of the top plate of the precast box girder according to claim 1, wherein the discharging rack comprises a plurality of discharging support rods arranged in parallel with each other, and the discharging support rods are welded on the first top plate; the material storage rack comprises a plurality of material storage supporting rods which are arranged in parallel, the material storage supporting rods are welded on the second top plate, and the material storage supporting rods are strip-shaped rods with concave upper end faces and concave middle portions.
10. A conveying device for steel bars of a top plate of a prefabricated box girder, which is characterized by comprising a tractor and the conveying vehicle as claimed in any one of claims 1 to 9, wherein the rear end of the conveying vehicle is connected with a traction frame, the front end or the rear end of the conveying vehicle is connected with a traction hanging ring, and the tractor is connected with the traction hanging ring through a traction hook on the traction frame.
CN202020223483.2U 2020-02-28 2020-02-28 A transfer cart and conveyor for processing of prefabricated box girder roof reinforcing bar Expired - Fee Related CN212216922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020223483.2U CN212216922U (en) 2020-02-28 2020-02-28 A transfer cart and conveyor for processing of prefabricated box girder roof reinforcing bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020223483.2U CN212216922U (en) 2020-02-28 2020-02-28 A transfer cart and conveyor for processing of prefabricated box girder roof reinforcing bar

Publications (1)

Publication Number Publication Date
CN212216922U true CN212216922U (en) 2020-12-25

Family

ID=73913493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020223483.2U Expired - Fee Related CN212216922U (en) 2020-02-28 2020-02-28 A transfer cart and conveyor for processing of prefabricated box girder roof reinforcing bar

Country Status (1)

Country Link
CN (1) CN212216922U (en)

Similar Documents

Publication Publication Date Title
CN211850700U (en) Wall construction work platform
CN212216922U (en) A transfer cart and conveyor for processing of prefabricated box girder roof reinforcing bar
JP2894226B2 (en) Bridge construction method
CN212406747U (en) Integral movable formwork for tunnel auxiliary structure center ditch cast-in-place cover plate construction
CN210738053U (en) Turnover operation platform suitable for elevator counterweight installation
CN211173007U (en) Novel tripod of encorbelmenting
CN214110929U (en) Connect material chute and concrete feeding system
CN213893292U (en) Platform is deposited to portable reinforcing bar
CN214116314U (en) Steel box girder moving overhanging construction platform
CN214692858U (en) Floor transportation frock
CN211368839U (en) Auxiliary device for transporting steel reinforcement cage of excavator
CN110883936A (en) A processing transportation equipment for prefabricating case roof beam framework of steel reinforcement
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN111472783A (en) Shield tunneling machine split initial lengthened pipeline extending device and application method
CN221658195U (en) Moving device for moving welding tool
CN211842532U (en) A processing transportation equipment for prefabricating case roof beam framework of steel reinforcement
CN211844459U (en) Frame rod type municipal road and bridge construction concrete precast slab transportation device
CN108442343A (en) A kind of standard module combined support device
CN213173755U (en) Beam column type support steel-pipe pile pothook
CN216101759U (en) Auxiliary device for whole transfer of travelling crane
CN215168171U (en) Reinforcing steel bar conveying device
CN220412590U (en) Anchor plate hoisting and transferring tool
CN218370541U (en) Pile foundation steel reinforcement cage conveyer
CN216239666U (en) Eccentric hoist system of inserted lift scaffold
CN220926077U (en) Hoisting device for pipeline welding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201225

CF01 Termination of patent right due to non-payment of annual fee