CN211850700U - Wall construction work platform - Google Patents
Wall construction work platform Download PDFInfo
- Publication number
- CN211850700U CN211850700U CN202020200766.5U CN202020200766U CN211850700U CN 211850700 U CN211850700 U CN 211850700U CN 202020200766 U CN202020200766 U CN 202020200766U CN 211850700 U CN211850700 U CN 211850700U
- Authority
- CN
- China
- Prior art keywords
- platform
- frame
- material conveying
- driving motor
- liftable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a wall construction work platform belongs to the building engineering field, including frame construction, liftable work platform, liftable fortune material platform and driving motor. The frame structure comprises an operation frame and a material conveying frame, and lifting beams are arranged at the tops of the operation frame and the material conveying frame. The liftable operation platform is detachably connected in the operation frame and can move up and down along the operation frame. The liftable material transporting platform is detachably connected in the material transporting frame and can move up and down along the material transporting frame. The driving motor is arranged on the lifting beam and comprises an operation platform driving motor and a material conveying platform driving motor, and the output ends of the operation platform driving motor and the material conveying platform driving motor are respectively connected with a steel wire rope for drawing the lifting operation platform and the lifting material conveying platform to move up and down. The platform can realize that materials such as building blocks, mortar and the like are conveyed to a high-place masonry platform at one time, effectively improves masonry efficiency and masonry quality, belongs to the field of delicate construction of building engineering, and is a green building construction technology.
Description
Technical Field
The utility model relates to a building engineering field specifically is a wall body construction work platform.
Background
In the construction of building engineering, a large number of masonry walls need to be constructed. In traditional masonry structure construction, need to build by laying bricks or stones the workman and set up the scaffold and carry out the operation of building by laying bricks or stones, need that a workman will be building blocks, building materials such as mortar, place the scaffold of shovel on building by laying bricks or stones in the construction, another workman stands and builds by laying bricks or stones on the scaffold of eminence. The traditional masonry construction operation can be carried out by matching two or more workers on one hand. On the other hand, materials such as building blocks, mortar and the like need to be transferred to the scaffold from the transport trolley. The method has the problems of one or more material transferring links, large labor requirement, certain personnel waste and the like. The construction cost is high to a great extent, and the economic benefit of the project is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a wall body construction work platform to there is once more material transportation link even in solving traditional masonry structure construction, needs a large amount of manual works, has the extravagant scheduling problem of certain personnel. And the construction cost is high to a great extent, and the economic benefit of the project is influenced.
In order to solve the technical problem, the utility model provides a wall body construction work platform, include:
the frame structure comprises an operation frame and a material conveying frame, wherein the tops of the operation frame and the material conveying frame are provided with lifting beams;
the lifting operation platform is detachably connected in the operation frame and can move up and down along the operation frame;
the lifting material conveying platform is detachably connected in the material conveying frame and can move up and down along the material conveying frame;
the driving motor is arranged on the lifting beam and comprises a working platform driving motor arranged at the top of the lifting working platform and a material conveying platform driving motor arranged at the top of the lifting material conveying platform, and the output ends of the working platform driving motor and the material conveying platform driving motor are respectively connected with a steel wire rope for drawing the lifting working platform and the lifting material conveying platform to move up and down.
Preferably, the operation frame and the material conveying frame both comprise upright posts and cross beams connected between the upright posts, and the operation frame and the material conveying frame share part of the upright posts.
Preferably, the inner side of the upright post of the material conveying frame is fixedly connected with a rail groove, and the end part of the liftable material conveying platform is connected with a pulley matched with the rail groove.
Preferably, the upright columns of the operation frame are vertically provided with bolt holes at intervals, and the end part of the liftable operation platform is provided with a bolt pin matched with the bolt holes.
Preferably, the work frame and the material conveying frame further comprise X-shaped inclined supports connected between the upright posts.
Preferably, the bottom of the frame structure is provided with pulleys.
Compared with the prior art, the utility model discloses a characteristics and beneficial effect do: the utility model discloses an operation platform is through setting up operation platform and fortune material platform simultaneously in frame construction to set up two driving motor at the frame construction top, be used for driving operation platform and fortune material platform respectively along frame construction up-and-down motion, thereby realize that once of materials such as building block, mortar transports the platform department of building by laying bricks or stones of eminence, then accomplish by building by laying bricks or stones the workman, effectively improve and build efficiency by laying bricks or stones and build the quality by laying bricks or stones, realize building by laying bricks or stones the high-efficient of engineering operation.
Drawings
Fig. 1 is a schematic structural diagram of a wall construction work platform.
The attached drawings are marked as follows: the device comprises a frame structure 1, an operation frame 11, a material conveying frame 12, a lifting beam 13, a lifting operation platform 2, a lifting material conveying platform 3, a driving motor 4, a driving motor 41, an operation platform driving motor 42, a material conveying platform driving motor and a pulley 5.
Detailed Description
In order to make the technical means, innovative features, objectives and functions realized by the present invention easy to understand, the present invention will be further described below.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1, the wall construction work platform comprises a frame structure 1, a liftable work platform 2, a liftable material conveying platform 3 and a driving motor 4.
The frame structure 1 comprises a working frame 11 and a material conveying frame 12, and a lifting beam 13 is arranged at the top of the working frame 11 and the material conveying frame 12. The operation frame 11 and the material conveying frame 12 both comprise upright posts and cross beams connected between the upright posts, and the operation frame 11 and the material conveying frame 12 share part of the upright posts, so that materials are saved, and meanwhile, the masonry worker is guaranteed to conveniently reach the materials. The work frame 11 and the material handling frame 12 also comprise diagonal braces in the form of an X connected between the uprights. Track grooves are fixedly connected to the inner sides of the vertical columns of the material conveying frame 12, and details are not shown in the figure. The uprights of the work frame 11 are provided with bolt eyes, not shown in detail, vertically spaced apart. The bottom of frame construction 1 is equipped with pulley 5, conveniently removes wall construction work platform to next operation point.
The liftable work platform 2 is detachably connected in the work frame 11 and can move up and down along the work frame 11. The end part of the liftable operating platform 2 is provided with a bolt pin matched with the bolt eye. The liftable material conveying platform 3 is detachably connected in the material conveying frame 12 and can move up and down along the material conveying frame 12. The end part of the liftable material conveying platform 3 is connected with a pulley matched with the track groove.
The driving motor 4 is arranged on the lifting beam 13 and comprises a working platform driving motor 41 arranged on the top of the lifting working platform 2 and a material conveying platform driving motor 42 arranged on the top of the lifting material conveying platform 3, and the output ends of the working platform driving motor 41 and the material conveying platform driving motor 42 are respectively connected with a steel wire rope for drawing the lifting working platform 2 and the lifting material conveying platform 3 to move up and down.
The above embodiments are merely illustrative of the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the spirit of the present invention should fall within the protection scope defined by the claims.
Claims (6)
1. The utility model provides a wall construction work platform which characterized in that includes:
the frame structure (1) comprises an operation frame (11) and a material conveying frame (12), wherein lifting beams (13) are arranged at the tops of the operation frame (11) and the material conveying frame (12);
the lifting operation platform (2) is detachably connected in the operation frame (11) and can move up and down along the operation frame (11);
the lifting material conveying platform (3) is detachably connected in the material conveying frame (12) and can move up and down along the material conveying frame (12);
driving motor (4), set up on handling roof beam (13), including setting up operation platform driving motor (41) and the fortune material platform driving motor (42) of setting at liftable fortune material platform (3) top at liftable operation platform (2) top, the output of operation platform driving motor (41) and fortune material platform driving motor (42) is connected with respectively and pulls liftable operation platform (2) and liftable fortune material platform (3) up-and-down motion's wire rope.
2. The wall construction work platform of claim 1, wherein: the operation frame (11) and the material conveying frame (12) comprise upright posts and cross beams connected between the upright posts, and the operation frame (11) and the material conveying frame (12) share part of the upright posts.
3. The wall construction work platform of claim 2, wherein: the inner sides of the upright columns of the material conveying frame (12) are fixedly connected with rail grooves, and the end parts of the liftable material conveying platform (3) are connected with pulleys matched with the rail grooves.
4. The wall construction work platform of claim 2, wherein: the vertical columns of the operation frame (11) are provided with bolt holes at intervals along the vertical direction, and bolt pins matched with the bolt holes are arranged at the end parts of the liftable operation platform (2).
5. The wall construction work platform of claim 2, wherein: the operation frame (11) and the material conveying frame (12) further comprise X-shaped inclined supports connected between the upright posts.
6. The wall construction work platform of claim 1, wherein: and pulleys (5) are arranged at the bottom of the frame structure (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020200766.5U CN211850700U (en) | 2020-02-24 | 2020-02-24 | Wall construction work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020200766.5U CN211850700U (en) | 2020-02-24 | 2020-02-24 | Wall construction work platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211850700U true CN211850700U (en) | 2020-11-03 |
Family
ID=73248350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020200766.5U Active CN211850700U (en) | 2020-02-24 | 2020-02-24 | Wall construction work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211850700U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114293752A (en) * | 2022-01-10 | 2022-04-08 | 成都建工装饰装修有限公司 | Scaffold structure for street lifting transformation and erection method |
-
2020
- 2020-02-24 CN CN202020200766.5U patent/CN211850700U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114293752A (en) * | 2022-01-10 | 2022-04-08 | 成都建工装饰装修有限公司 | Scaffold structure for street lifting transformation and erection method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211850700U (en) | Wall construction work platform | |
CN213297194U (en) | Vertical transport system | |
CN204606561U (en) | A kind of prefabricated panel pallet | |
CN216196428U (en) | Novel ingate operation construction platform | |
CN108483190B (en) | Intelligent aluminum alloy template material conveying device and operation method thereof | |
CN108423566A (en) | The repeatable mobile transport combination unit utilized | |
CN209760046U (en) | Transport support and transport device | |
CN210192757U (en) | Sanitary ceramic tunnel kiln loading and unloading kiln system | |
CN215666644U (en) | A operation ladder for installing factory building outer wall material | |
CN206987341U (en) | A kind of construction frame | |
CN217376979U (en) | New jersey guardrail horizontal type prefabrication method steel reinforcement framework integral hoisting device | |
CN214653052U (en) | Mobilizable regularization lifting device | |
CN219752399U (en) | Quick galvanization tool | |
CN218754748U (en) | Transport device for demolishing materials of ancient buildings | |
CN216740605U (en) | Safety work protection platform for construction | |
CN216997288U (en) | Combined type air-entraining block suspension cage with protective cover | |
CN214141429U (en) | Portable lifting installation equipment for electromechanical pipelines of constructional engineering | |
CN219344183U (en) | Turnover type light finished product processing shed | |
CN216190426U (en) | Prefabricated square column steel reinforcement cage lifting device | |
CN215803319U (en) | Template is handling device for supporting material | |
CN216549517U (en) | Automatic turning device of wallboard | |
CN220432076U (en) | Conveyer of large-scale steel construction feed bin top cap construction | |
CN209958788U (en) | Attached lifting scaffold material platform | |
CN215592405U (en) | Tool type gantry lifting equipment | |
CN217808381U (en) | Movable portal frame assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |