CN212201380U - Shear force wall plastic film maintenance fixing device - Google Patents

Shear force wall plastic film maintenance fixing device Download PDF

Info

Publication number
CN212201380U
CN212201380U CN202020583760.0U CN202020583760U CN212201380U CN 212201380 U CN212201380 U CN 212201380U CN 202020583760 U CN202020583760 U CN 202020583760U CN 212201380 U CN212201380 U CN 212201380U
Authority
CN
China
Prior art keywords
wall body
plastic film
shear wall
screw
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020583760.0U
Other languages
Chinese (zh)
Inventor
罗炎雄
朱峰
罗捷旋
罗晓坤
叶忠良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN ZHONGBANG (GROUP) CONSTRUCTION CONTRACT CO Ltd
Original Assignee
SHENZHEN ZHONGBANG (GROUP) CONSTRUCTION CONTRACT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ZHONGBANG (GROUP) CONSTRUCTION CONTRACT CO Ltd filed Critical SHENZHEN ZHONGBANG (GROUP) CONSTRUCTION CONTRACT CO Ltd
Priority to CN202020583760.0U priority Critical patent/CN212201380U/en
Application granted granted Critical
Publication of CN212201380U publication Critical patent/CN212201380U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a plastic film maintenance fixing device for a shear wall, which comprises an L-shaped shear wall body, the outer side of the shear wall body is wrapped with a plastic film, the upper end and the lower end of the shear wall body are both provided with a plurality of screw holes, the upper end surface and the lower end surface of the shear wall body are provided with template strips at the height of the screw hole, the template strips are provided with through holes corresponding to the screw hole, the screw hole is internally threaded with a screw, one end of the screw passes through the perforation and is connected with a butterfly buckle, the utility model makes full use of the original hole of the wall body and the materials used by the on-site waste wood battens, and the materials can be turned to the upper standard layer for continuous use after the maintenance is finished, meanwhile, the butterfly buckle and the wall-penetrating screw rod can be conveniently adjusted up and down, the application range is wide, the butterfly buckle and the wall-penetrating screw rod are convenient to install and remove, the butterfly buckle and the wall-penetrating screw rod can be repeatedly used, and the butterfly buckle and the wall-penetrating screw rod are worth of being widely popularized.

Description

Shear force wall plastic film maintenance fixing device
Technical Field
The utility model relates to a shear force wall technical field, in particular to shear force wall plastic film maintenance fixing device.
Background
After concrete is tamped, the column, the shear wall and the beam slab structure are watered and maintained according to the standard requirements, the floor slab concrete is generally watered and maintained in a moisture-preserving manner, and the long-limb shear wall structure is a vertical structure, so that hydration heat is easy to be insufficient if the long-limb shear wall structure is difficult to maintain (cannot store water vertically) in a conventional watering manner compared with the floor slab. Therefore adopt the upper shed to tear open mould area mould retaining semi-closed natural curing many times, generally require seven days, nevertheless can cause the cost to increase like this, because vertical component generally the second day or just can tear apart the day, three days can not influence, seven days will cause the unable turnover use that makes progress of next floor's template. If the maintenance is carried out by adopting the health-preserving liquid, the cost is too high, and the quality of the market health-preserving liquid is uneven, so that the strength growth of the concrete is damaged by counterfeit products.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a shear force wall plastic film maintenance fixing device can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a shear force wall plastic film maintenance fixing device, is including the shear force wall body that is L shape, the outside parcel of shear force wall body has plastic film, a plurality of screw rod hole has all been seted up at the upper and lower both ends of shear force wall body, the upper and lower end surface of shear force wall body in screw rod hole height department is equipped with the template strip, correspond on the template strip the perforation has been seted up to screw rod hole department, screw rod hole female connection has the screw rod, the one end of screw rod is passed the perforation threaded connection has the butterfly to detain.
Preferably, the distance between two adjacent screw holes is m.
Preferably, the formwork strip has a width of 20cm and a thickness of 1.8cm, and is made of a wood strip.
Compared with the prior art, the utility model discloses following beneficial effect has: the shear wall plastic film maintenance fixing device wraps the whole shear wall body by using the plastic film after the shear wall template is removed, the method comprises the steps of arranging a through long template strip with the width of cm and the thickness of cm at the top and the bottom of a front screw hole of a shear wall body respectively for fixing a plastic film, perforating the template strip at the screw hole, fixing the template strip on the concrete shear wall body at intervals of m by using a screw and a butterfly buckle, forming the plastic film, the template strip and the screw into a whole, maintaining the concrete when the concrete is cast, loosening the upper opening screw and the template strip, watering a water pipe deeply into the surface of the shear wall body, locking the screw again after the whole wall body is soaked with water, watering twice every day in the first three days, laminating, storing the water, maintaining the concrete, watering once every day for sealing maintenance, and continuously watering and maintaining no less than days, so that the shear wall can be maintained in a wet state all the time.
The utility model discloses the original entrance to a cave of make full use of wall body and the material that on-the-spot useless timber stuff used simultaneously all can turn to the standard layer in the higher authority and continue to use after the maintenance is accomplished, can make things convenient for the butterfly to detain simultaneously and wear the upper and lower regulation of wall screw rod, and application scope is wide, and the installation is demolishd conveniently, can be reuse many times, is worth wideling popularize.
Drawings
Fig. 1 is a schematic view of an installation structure of a formwork strip of a shear wall plastic film maintenance fixing device of the present invention;
fig. 2 is a schematic structural view of a shear wall body of the shear wall plastic film maintenance fixing device of the present invention;
fig. 3 is the overall structure diagram of the shear wall plastic film maintenance fixing device of the present invention.
In the figure: 1. a shear wall; 2. a plastic film; 3. a screw hole; 4. a template strip; 5. a screw; 6. a butterfly buckle.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-3, a shear wall plastic film maintenance fixing device comprises an L-shaped shear wall body 1, plastic films 2 are wrapped on the outer side of the shear wall body 1, a plurality of screw holes 3 are formed in the upper end and the lower end of the shear wall body 1, formwork strips 4 are arranged on the upper end surface and the lower end surface of the shear wall body 1 at the height of the screw holes 3, through holes are formed in the formwork strips 4 corresponding to the screw holes 3, screws 5 are connected with the screw holes 3 in a threaded manner, and butterfly buckles 6 are connected with one ends of the screws 5 through the through holes in a threaded manner.
In this embodiment, it is preferable that the distance between two adjacent screw holes 3 is 1.5 m.
In the present embodiment, the molding board strip 4 is preferably 20cm wide and 1.8cm thick, and is made of wood strips.
It should be noted that, the utility model relates to a shear wall plastic film maintenance fixing device, when using, through wrapping up whole shear wall body 1 with plastic film 2 after the shear wall template is demolishd, the top of shear wall body, the height of preceding screw hole 3 in bottom sets up one wide 20cm, 1.8cm thick through length template strip 4 is used for fixing plastic film 2, template strip 4 perforates in screw hole 3, fix template strip 4 on concrete shear wall body 1 with screw rod 5 and butterfly buckle 6 every 1.5m, form plastic film 2, template strip 4 and screw rod 5 into a whole, concrete placement finishes 12 hours and can carry out maintenance, retaining maintenance is to loosen screw rod 5 and template strip 4 of the upper jaw, go deep into shear wall body 1 surface irrigation with the water pipe, lock screw rod 5 again after all wall bodies soak, the wetting, the preceding twice a day of watering then tectorial membrane maintenance, and the subsequent closed maintenance is carried out by watering once every day, and the continuous watering maintenance is not less than 14 days, so that the shear wall can be maintained in a wet state all the time.
The utility model discloses the original entrance to a cave of make full use of wall body and the material that on-the-spot useless timber stuff used simultaneously all can be accomplished the back at the maintenance and turn to the standard layer in the upper surface and continue to use, can make things convenient for the upper and lower regulation of butterfly buckle 6 and wall screw rod 5 simultaneously, and application scope is wide, and the convenience is demolishd in the installation, can be reuse many times, is worth wideling popularize.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (3)

1. The utility model provides a shear force wall plastic film maintenance fixing device, is including shear force wall body (1) that is L shape, its characterized in that: the outside parcel of shear force wall body (1) has plastic film (2), a plurality of screw hole (3) have all been seted up at the upper and lower both ends of shear force wall body (1), the upper and lower end surface of shear force wall body (1) in screw hole (3) high department is equipped with template strip (4), correspond on template strip (4) screw hole (3) department has seted up the perforation, screw hole (3) female connection has screw rod (5), the one end of screw rod (5) is passed the perforation threaded connection has butterfly buckle (6).
2. The shear wall plastic film curing and fixing device of claim 1, wherein: the distance between two adjacent screw holes (3) is 1.5 m.
3. The shear wall plastic film curing and fixing device of claim 1, wherein: the width of the template strip (4) is 20cm, the thickness of the template strip is 1.8cm, and the template strip is made of wood strips.
CN202020583760.0U 2020-04-20 2020-04-20 Shear force wall plastic film maintenance fixing device Active CN212201380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020583760.0U CN212201380U (en) 2020-04-20 2020-04-20 Shear force wall plastic film maintenance fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020583760.0U CN212201380U (en) 2020-04-20 2020-04-20 Shear force wall plastic film maintenance fixing device

Publications (1)

Publication Number Publication Date
CN212201380U true CN212201380U (en) 2020-12-22

Family

ID=73832745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020583760.0U Active CN212201380U (en) 2020-04-20 2020-04-20 Shear force wall plastic film maintenance fixing device

Country Status (1)

Country Link
CN (1) CN212201380U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585783A (en) * 2021-07-24 2021-11-02 杭州中庆建设有限公司 Cut and found wall water spray curing means

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585783A (en) * 2021-07-24 2021-11-02 杭州中庆建设有限公司 Cut and found wall water spray curing means
CN113585783B (en) * 2021-07-24 2022-06-14 杭州中庆建设有限公司 Wall body water spray curing means

Similar Documents

Publication Publication Date Title
CN212201380U (en) Shear force wall plastic film maintenance fixing device
CN204590634U (en) For pouring into a mould the feed arrangement of constructional column
CN207578686U (en) A kind of self-adapting type precast concrete block makes mold
CN204040078U (en) A kind of alter-pouring strips mould plate installs structure
CN201687127U (en) Prefabricated composite outer heat preservation wallboard
CN203307968U (en) Cultivation structure for long-root plant in load-bearing wall on top of building
CN216442759U (en) General mould of prefabricated wallboard of assembly type structure
CN2841837Y (en) Wood-plastic composite material building shuttering
CN215106659U (en) Finished product separation seam for roof rigid protective layer
CN105822068B (en) Ultralong thin walled concrete walls under hot environment pour and maintenance process
CN201649631U (en) T-shaped pole template system protruding from the exterior wall
CN201137298Y (en) Post pouring strip, construction joint side steel die
CN104612343A (en) Method for constructing extruded polystyrene board molding of building outer wall
CN203924102U (en) Building implements foundation bolt preformed hole construction mould
CN207794601U (en) Lightweight cast-in-situ wall Quick Release template
CN213829507U (en) Hollow nut block vertical casting mold
CN107060318B (en) Composite building template and manufacturing method thereof
CN206110473U (en) Atress island cavity is assembled cavity board for superstructure
US1655725A (en) Apparatus for making concrete lumber
CN209350489U (en) A kind of wire box precast concrete block structure of transvers plate for building
CN209443494U (en) A kind of piping lane aluminum dipping form support system
CN103334517A (en) Long-rooted plant planting structure in bearing wall at top of building and construction method
CN209224259U (en) Turnover type concrete precast block makes mold
CN208618442U (en) A kind of prefabricated assembled empty van retaining wall
CN208455931U (en) A kind of heat preservation assembled wallboard with decorative layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant