CN212200231U - Automatic dust fall spraying system attached to temporary railing in construction site - Google Patents

Automatic dust fall spraying system attached to temporary railing in construction site Download PDF

Info

Publication number
CN212200231U
CN212200231U CN202020435958.4U CN202020435958U CN212200231U CN 212200231 U CN212200231 U CN 212200231U CN 202020435958 U CN202020435958 U CN 202020435958U CN 212200231 U CN212200231 U CN 212200231U
Authority
CN
China
Prior art keywords
railing
water pump
construction site
dust fall
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020435958.4U
Other languages
Chinese (zh)
Inventor
冯庆涛
孙振
鹿林
徐杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, China Railway Construction Engineering Group Shandong Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202020435958.4U priority Critical patent/CN212200231U/en
Application granted granted Critical
Publication of CN212200231U publication Critical patent/CN212200231U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an automatic dust fall spraying system that construction site attaches in interim railing, including injection system, acoustic control system, infrared induction system and railing system, injection system includes water pump, feed pipe, shower head and water pump controller, the water pump links to each other with the water source, and water pump controller links to each other with acoustic control system and infrared induction system, water pump controller arranges the exit position at the job site with acoustic control system and infrared induction system, the feed pipe is attached to by bolted connection in railing system, the feed pipe divide into vertical and the inside UNICOM of horizontal feed pipe, and vertical direction feed pipe sets up the shower head, railing system comprises square steel pipe. The utility model discloses combine together building site's interim enclosure and dust fall spraying system, simple structure, the cost is lower, and simple to operate, installation that can be nimble is used, has not only saved the cost for the enterprise, can play the effect of high-efficient dust fall moreover.

Description

Automatic dust fall spraying system attached to temporary railing in construction site
Technical Field
The utility model relates to a construction technical field especially relates to an automatic dust fall spraying system that construction site attaches in interim railing.
Background
The construction site refers to construction activities such as house building, civil engineering, equipment installation, pipeline laying and the like of industrial and civil projects, construction sites occupied by the construction site and sites where human beings carry out safe production, civilized work and construction, including all regions capable of carrying out construction work on land, sea and in the air, and a project manager is comprehensively responsible for site management of the construction process, establishes the management responsibility of the construction site and organizes and implements the management responsibility according to the engineering scale, the technical complexity and the specific conditions of the construction site;
building construction site generally can adopt traditional dust fall methods such as artifical watering or watering lorry, and traditional dust fall method cost is higher and can not high-efficient dust fall, and it is higher to current construction site spraying equipment cost, and the installation is loaded down with trivial details, can not use in a flexible way and seriously waste water resource, for this we propose a construction site and attach in the automatic dust fall spraying system of interim railing and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the building construction site that exists among the prior art and generally can adopt traditional dust fall methods such as artifical watering or watering lorry, traditional dust fall method cost is higher and can not high-efficient dust fall, and it is higher to current construction site spraying equipment cost, and the installation is loaded down with trivial details, can not use in a flexible way and seriously waste the problem of water resource, and the automatic dust fall spraying system who offers that a construction site attaches to in interim railing.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an automatic dust fall spraying system attached to a temporary railing in a construction site comprises a spraying system, a sound control system, an infrared induction system and a railing system, wherein the spraying system comprises a water pump, a water supply pipe, a spray head and a water pump controller, the water pump is connected with a water source, the water pump controller is connected with the sound control system and the infrared induction system, the water pump controller, the sound control system and the infrared induction system are arranged at the inlet and outlet positions of the construction site, the water supply pipe is attached to the railing system and is connected with the railing system through bolts, the water supply pipe is communicated with the inside of the horizontal water supply pipe in a vertical direction, the spray head is arranged on the water supply pipe in the vertical direction, the railing system is composed of square steel pipes, the railing system is divided into a vertical railing and a horizontal railing, the vertical railing is connected with the horizontal railing through bolts, the water supply, and a screw is embedded in the concrete layer.
Preferably, the shower head is arranged at the upper end of the vertical rail.
Preferably, the horizontal rail and the vertical rail are connected through a bolt.
Preferably, the lower extreme of vertical railing is equipped with the connecting plate, and vertical railing and connecting plate welding, the connecting plate passes through the nut and is connected with the screw rod of predetermineeing in the concrete layer.
Preferably, a water source is arranged outside the water pump, the water pump is connected with a water pump controller and the water source, and the water pump controller is connected with the sound control system and the infrared induction system.
Preferably, the sound control system and the infrared sensing system are arranged at the inlet and outlet positions of a construction site.
The utility model discloses well beneficial effect as follows:
1. the temporary enclosure of the construction site is combined with the dust fall spraying system, so that the structure is simple, the manufacturing cost is low, the installation is convenient, the installation and the use can be flexible, the cost is saved for enterprises, and the high-efficiency dust fall effect can be realized;
2. when the car passes through from the construction road, the car is monitored simultaneously to acoustic control system and infrared induction system, automatically, with command transmission water pump controller, there is the function that the time delay 2min closed in the water pump controller, after 2min, the water pump stop work, because acoustic control system and infrared induction system only install the position at the exit railing system of construction road, no matter the car is gone into the field or is gone out of the field and can trigger injection system, acoustic control system and infrared induction system, thereby make the building site in this embodiment with interim railing dust fall spraying system can work with more nimble local mode, reach the basis of dust fall purpose, water saving.
Drawings
Fig. 1 is a schematic structural view of an automatic dust-settling spraying system attached to a temporary railing in a construction site;
fig. 2 is the utility model provides a construction site attaches to the structural schematic diagram of the railing system of the automatic dust fall spraying system of interim railing.
In the figure: the system comprises a spraying system 1, a sound control system 2, an infrared sensing system 3, a railing system 4, a water pump 5, a water supply pipe 6, a spray header 7, a connecting plate 8, a vertical railing 9, a horizontal railing 10, a screw rod 11, a concrete layer 12, a water pump controller 13, a bolt 14 and a water source 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, an automatic dust-settling spray system attached to a temporary railing at a construction site comprises a spray system 1, a sound control system 2, an infrared induction system 3 and a railing system 4, wherein the spray system 1 comprises a water pump 5, a water supply pipe 6, a spray header 7 and a water pump controller 13, the water pump 5 is connected with a water source 15, the water pump controller 13 is connected with the sound control system 2 and the infrared induction system 3, the water pump controller 13, the sound control system 2 and the infrared induction system 3 are arranged at an inlet and an outlet of the construction site, the water supply pipe 6 is attached to the railing system 4 and connected by bolts, the water supply pipe 6 is vertically communicated with the inside of a horizontal water supply pipe, the spray header 7 is arranged on the vertical water supply pipe, the railing system 4 is composed of square steel pipes, and the railing system 4 is divided into a vertical;
the vertical railing 9 is connected with the horizontal railing 10 through a bolt 14, the water supply pipe 6 is placed on the ground, a concrete layer 12 is arranged on the ground, a screw rod 11 is embedded in the concrete layer 12, a spray head 7 is arranged at the upper end of the vertical railing 9, the horizontal railing 10 is connected with the vertical railing 9 through the bolt 14, a connecting plate 8 is arranged at the lower end of the vertical railing 9, the vertical railing 9 is welded with the connecting plate 8, the connecting plate 8 is connected with the screw rod 11 preset in the concrete layer 12 through a nut, a water source 15 is arranged outside the water pump 4, the water pump 4 is connected with a water pump controller 13 and the water source 15, the water pump controller 13 is connected with the sound control system 2 and the infrared induction system 2, the sound control system 2 and the infrared induction system 3 are arranged at the inlet and outlet positions of a construction site, a microphone in the sound control system 2 is connected with an adjustable resistor in series, the car is monitored simultaneously to acoustic control system 2 and infrared induction system 3, automatically, with command transmission to water pump controller 13, there is the function that the time delay 2min was closed in the water pump controller 13, after 2min, water pump 5 stop work, because acoustic control system 2 and infrared induction system 3 only install the position at the exit railing system 4 of construction road, regardless of whether the car enters the field or leaves the field and can trigger injection system 1, acoustic control system 2 and infrared induction system 3, thereby make the building site in this embodiment with interim railing spray dust fall system can work with more nimble local mode, reach the basis of dust fall purpose, water conservation.
The utility model discloses in, when the car passes through from the construction road, the car is monitored simultaneously to acoustic control system 2 and infrared induction system 3, automatically, communicate the order to water pump controller 13, there is the function that 2min closed of time delay in the water pump controller 13, after 2min, 5 stop work of water pump, because acoustic control system 2 and infrared induction system 3 only install the position at the exit railing system 4 of construction road, no matter the car enters the field or the field of the play can trigger injection system 1, acoustic control system 2 and infrared induction system 3, thereby make building site in this embodiment with interim railing dust fall spraying system can work with more nimble local mode, reach on the basis of dust fall purpose, the using water wisely.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The automatic dust-settling spraying system attached to the temporary railing at the construction site comprises a spraying system (1), a sound control system (2), an infrared induction system (3) and a railing system (4), and is characterized in that the spraying system (1) comprises a water pump (5), a water supply pipe (6), a spraying head (7) and a water pump controller (13), the water pump (5) is connected with a water source (15), the water pump controller (13) is connected with the sound control system (2) and the infrared induction system (3), the water pump controller (13) is arranged at the inlet and outlet positions of the construction site together with the sound control system (2) and the infrared induction system (3), the water supply pipe (6) is attached to the railing system (4) and is connected with bolts, the water supply pipe (6) is divided into a vertical water supply pipe and a horizontal water supply pipe which are communicated with each other inside, and the spraying head (7) is arranged on the water supply pipe, railing system (4) comprise square steel pipe, and railing system (4) divide into vertical railing (9) and horizontal railing (10), vertical railing (9) are connected through bolt (14) with horizontal railing (10), place subaerial in feed pipe (6), subaerial concrete layer (12) that is equipped with, and pre-buried in concrete layer (12) have screw rod (11).
2. An automatic dust fall spraying system attached to a temporary railing at a construction site according to claim 1, characterized in that the spraying head (7) is arranged at the upper end of the vertical railing (9).
3. An automatic dust fall spraying system attached to a temporary railing at a construction site according to claim 1, characterized in that the horizontal railing (10) and the vertical railing (9) are connected by a bolt (14).
4. The automatic dust fall spraying system attached to the temporary handrail at the construction site according to claim 1, wherein a connecting plate (8) is arranged at the lower end of the vertical handrail (9), the vertical handrail (9) is welded with the connecting plate (8), and the connecting plate (8) is connected with a screw (11) preset in the concrete layer (12) through a nut.
5. The automatic dust fall spraying system attached to the temporary handrail at the construction site of claim 1, wherein a water source (15) is arranged outside the water pump (5), the water pump (5) is connected with a water pump controller (13) and the water source (15), and the water pump controller (13) and the sound control system (2) are connected with the infrared induction system (3).
6. An automatic dust fall spraying system for a construction site attached to a temporary railing according to claim 1, characterized in that the sound control system (2) and the infrared sensing system (3) are arranged at the entrance and exit of the construction site.
CN202020435958.4U 2020-03-31 2020-03-31 Automatic dust fall spraying system attached to temporary railing in construction site Expired - Fee Related CN212200231U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020435958.4U CN212200231U (en) 2020-03-31 2020-03-31 Automatic dust fall spraying system attached to temporary railing in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020435958.4U CN212200231U (en) 2020-03-31 2020-03-31 Automatic dust fall spraying system attached to temporary railing in construction site

Publications (1)

Publication Number Publication Date
CN212200231U true CN212200231U (en) 2020-12-22

Family

ID=73825696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020435958.4U Expired - Fee Related CN212200231U (en) 2020-03-31 2020-03-31 Automatic dust fall spraying system attached to temporary railing in construction site

Country Status (1)

Country Link
CN (1) CN212200231U (en)

Similar Documents

Publication Publication Date Title
CN205461539U (en) Tower crane high altitude sprays dust fall system
CN203919328U (en) The circulating automatic spray curing system in bridge prefabrication field
CN205704645U (en) A kind of underground engineering high-efficiency water-saving automatic concrete spraying curing system
CN104772816A (en) Automatic control and spray system and method for concrete curing
CN212200231U (en) Automatic dust fall spraying system attached to temporary railing in construction site
CN216517007U (en) High-rise building outer wall concrete construction maintenance and spray dust fall system
CN104389429B (en) Intelligent landscape style spray curing concrete device and curing concrete method thereof
CN107775786B (en) Automatic spraying health preserving system and spraying method
CN212052962U (en) Dust falling device for excavator
CN201544337U (en) Small-box girder reciprocating circulating timing spray health care system
CN205127620U (en) Portable over -and -under type raise dust treatment equipment
CN207846530U (en) A kind of special box pumping plant of integration of construction
CN210288621U (en) Sewage pipeline plugging device
CN104314311B (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN205797530U (en) A kind of dust-proof temp-lowering system
CN212327756U (en) Dust device for construction site
CN210434198U (en) Green construction net-shaped spraying automatic dust settling system
CN211488212U (en) Anti-pollution device for spraying fireproof paint
CN206267087U (en) A kind of multi-functional device for reducing dust of building engineering construction
CN112033606A (en) Gable wall water spraying test device and operation method thereof
CN212105197U (en) Super high building body curing means
CN204357130U (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN210947755U (en) Remote control type automatic water-supplementing tower crane spraying device
CN205954550U (en) A spraying dedusting device for improving underground cavern air quality
CN213174866U (en) Spraying maintenance device for super high-rise concrete shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201222

CF01 Termination of patent right due to non-payment of annual fee