CN212198422U - Hanging basket platform for structure experiment loading system - Google Patents

Hanging basket platform for structure experiment loading system Download PDF

Info

Publication number
CN212198422U
CN212198422U CN202020771664.9U CN202020771664U CN212198422U CN 212198422 U CN212198422 U CN 212198422U CN 202020771664 U CN202020771664 U CN 202020771664U CN 212198422 U CN212198422 U CN 212198422U
Authority
CN
China
Prior art keywords
loading system
rectangular plate
plate
bottom plate
experiment loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020771664.9U
Other languages
Chinese (zh)
Inventor
胡电锋
刘涛
隋*
胡叶松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Tongji Jianyi Electromechanical Technology Co ltd
Original Assignee
Suzhou Tongji Jianyi Electromechanical Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Tongji Jianyi Electromechanical Technology Co ltd filed Critical Suzhou Tongji Jianyi Electromechanical Technology Co ltd
Priority to CN202020771664.9U priority Critical patent/CN212198422U/en
Application granted granted Critical
Publication of CN212198422U publication Critical patent/CN212198422U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses a hanging basket platform for a structure experiment loading system, which comprises a bottom plate, the whole hanging basket platform is E-shaped, the bottom plate is provided with two notches which are opened along the same horizontal direction, and the notches are used for a stand column of the structure experiment loading system to pass through; the connecting plate is fixed at the edge of the notch and is vertically fixed with the bottom plate, and the connecting plate is assembled and fixed with the upright post of the structural experiment loading system; the lifting appliance is fixed above the bottom plate through the portal frame, the lifting appliance has a reciprocating degree of freedom along the horizontal straight line of the portal frame, and the horizontal movement direction of the lifting appliance is parallel to the connecting line direction between the two gaps; the mass center of the whole body of the bottom plate, the connecting plate and the lifting appliance and the mass center of the connecting plate are coincided on the same space vertical plane. Adopt this utility model discloses can hanging flower basket platform and structure experiment loading system's interim assembly, realize personnel operation of ascending a height, the time of putting up of operation platform of ascending a height is short, also makes things convenient for the assembly of some big quality spare parts at the eminence to shift work.

Description

Hanging basket platform for structure experiment loading system
Technical Field
The utility model relates to a manned hanging flower basket field, concretely relates to hanging flower basket platform for structure experiment loading system.
Background
General structure experiment loading system's volume is all comparatively huge, and is highly higher moreover, no matter be in the aspect of the construction installation or in the aspect of the daily operation maintenance comparatively difficult, the operation of ascending a height possesses certain degree of difficulty, has great potential safety hazard moreover. The existing solution is that an assembled scaffold is adopted, the scaffold has the defects of frequent repeated disassembly, complex operation and unsatisfactory height controllability. Especially, when working aloft, the working tool is heavy, and long-time operation is fatigued, which easily causes safety accidents.
SUMMERY OF THE UTILITY MODEL
The to-be-solved problem of the utility model is to provide a hanging flower basket platform for structure experiment loading system can the interim assembly of hanging flower basket platform and structure experiment loading system, realizes that personnel ascend a height the operation, and the time of putting up of operation platform of ascending a height is short, also makes things convenient for the assembly of some big quality spare parts at the eminence to shift work.
In order to solve the above problem, the utility model provides a hanging flower basket platform for structure experiment loading system, for reaching the above-mentioned purpose, the utility model provides a technical scheme that its technical problem adopted is:
a basket platform for a structural experiment loading system, comprising: the bottom plate is integrally E-shaped, and is provided with two notches which are opened along the same horizontal direction and are used for an upright post of the structural experiment loading system to pass through; the connecting plate is fixed at the edge of the notch and is vertically fixed with the bottom plate, and the connecting plate is assembled and fixed with the upright post of the structural experiment loading system; the lifting appliance is fixed above the bottom plate through the portal frame, the lifting appliance has a reciprocating degree of freedom along the horizontal straight line of the portal frame, and the horizontal movement direction of the lifting appliance is parallel to the connecting line direction between the two gaps; the mass center of the whole body of the bottom plate, the connecting plate and the lifting appliance and the mass center of the connecting plate are coincided on the same space vertical plane.
The beneficial effect of adopting above-mentioned technical scheme is: the bottom plate of E font constitutes two syntropy breachs naturally, is convenient for the hanging flower basket to move into structure experiment loading system, and the hanging flower basket platform can the translation embedding stand, also is convenient for go up and down on the stand. The connecting plate can be temporarily fixed with the upright column, so that personnel can work at a high place. The surface contact mode can provide strong fastening force. Simultaneously because the position of connecting plate, with the stand fixed back, the hanging flower basket can not have too big torsional force because of self gravity, guarantees the stability after the hanging flower basket platform is fixed. The manned hanging basket can replace a scaffold, is more convenient to install and shift, and saves working hours. Vertical hoist and certain horizontal displacement can be realized with the help of the hoist of top to the spare part of big mass is put on the bottom plate, then assembles the spare part to the structure experiment loading system on, and the hanging flower basket platform all provides the laying position for big mass spare part, supplementary operating personnel.
As a further improvement of the utility model, the bottom plate comprises the first rectangular plate, the second rectangular plate, the third rectangular plate, the fourth rectangular plate is integrative that are in same horizontal plane, first rectangular plate all is connected with second rectangular plate, the third rectangular plate, the fourth rectangular plate, the second rectangular plate is located between third rectangular plate, the fourth rectangular plate, the second rectangular plate constitutes the breach with the clearance between third rectangular plate, the fourth rectangular plate respectively, two connecting plates are fixed in a pair of edge of second rectangular plate respectively.
The beneficial effect of adopting above-mentioned technical scheme is: the first rectangular plate, the second rectangular plate, the third rectangular plate and the fourth rectangular plate are integrally connected to form an integral E-shaped bottom plate. The third rectangular plate and the fourth rectangular plate on the two sides are convenient for personnel to stand for a long time and assist in operating the lifting appliance, and the personnel can also transfer the position where the personnel stand by means of the first rectangular plate. The second rectangular plate in the middle is convenient for placing large-mass parts, and is just convenient for hoisting and moving the lifting appliance.
As a further improvement, the third rectangular plate and the fourth rectangular plate are respectively provided with an opening, and the edge shaft of the opening is connected with a movable cover plate covering the opening.
The beneficial effect of adopting above-mentioned technical scheme is: staff come in and go out from the opening, the movable cover plate is closed, and the staff can stand on the bottom plate safely.
As the utility model discloses a further improvement again possesses a circular port, three waist type hole on every connecting plate, and the length direction in waist type hole is the horizontal direction, and the line in proper order of the respective centroid in circular port, waist type hole encloses into the rectangle, has worn the bolt in circular port, the waist type hole and has fixed with structure experiment loading system's stand.
The beneficial effect of adopting above-mentioned technical scheme is: the bolt is passed in circular hole, the accurate location of the erection dimension of being convenient for, and three waist type hole has then reduced the counterpoint degree of difficulty of here bolt assembly, makes things convenient for the assembly of on-the-spot and stand, and the length direction in waist type hole is the horizontally, has guaranteed the precision of mounted position department height.
As the utility model discloses a further improvement again, the lower surface of bottom plate possesses the skeleton that extends along bottom plate profile orbit, and the skeleton possesses the lug that the level extends, and the vertical projection of lug is not crossing with the bottom plate.
The beneficial effect of adopting above-mentioned technical scheme is: the framework plays a role in supporting the bottom plate, a firm hanging basket bottom frame is constructed, the lifting lugs are convenient to hoist when in special needs, and the sling penetrating through the lifting lugs cannot interfere with the bottom plate.
As a further improvement, the framework comprises a plurality of square tubes welded with each other, and the edge of the opening is also provided with the square tubes.
The beneficial effect of adopting above-mentioned technical scheme is: the square pipe of mutual welding possesses sufficient structural strength, and the entrance to a cave border also possesses square pipe, has further strengthened the intensity of skeleton, also can avoid the deformation of entrance to a cave.
As a further improvement of the utility model, the edge of the bottom plate is provided with a vertical upwardly extending guardrail.
The beneficial effect of adopting above-mentioned technical scheme is: the guardrail provides safety protection for an operator standing on the base plate.
As the utility model discloses a further improvement again, portal frame and guardrail welded fastening, the root and bottom plate or the skeleton welded fastening of portal frame.
The beneficial effect of adopting above-mentioned technical scheme is: the guard bar, the bottom plate and the framework play a role in multi-point fixation for the portal frame, and the stability of the portal frame is guaranteed.
As the utility model discloses a further improvement again, the hoist include with portal frame swing joint's translation motor, translation motor's below is connected with electric block.
The beneficial effect of adopting above-mentioned technical scheme is: the translation motor provides the power of translation, and electric block provides the power of vertical removal for the lifting hook.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of an embodiment of the present invention.
Fig. 2 is a left side view of an embodiment of the present invention.
Fig. 3 is a top view of an embodiment of the present invention.
Fig. 4 is a perspective view of a connection plate according to an embodiment of the present invention.
Fig. 5 is a perspective view of an embodiment of the present invention.
Fig. 6 is a perspective view of an embodiment of the present invention.
1-a framework; 2-a bottom plate; 2 a-a first rectangular plate; 2 b-a second rectangular plate; 2 c-a third rectangular plate; 2 d-a fourth rectangular plate; 3, protecting the fence; 4-an opening; 5-a removable cover plate; 6-lifting lugs; 7-a lifting appliance; 8-connecting plates; 8 a-circular hole; 8 b-kidney shaped holes; 9-a portal frame; 10-a translation motor; 11-notch.
Detailed Description
The following detailed description is made in conjunction with specific embodiments of the present invention:
in order to achieve the purpose of the utility model, a hanging flower basket platform for structure experiment loading system includes: the base plate 2 is E-shaped as a whole, the base plate 2 is provided with two notches 11 which are opened along the same horizontal direction, and the notches 11 are used for a stand column of the structural experiment loading system to penetrate through; the connecting plate 8 is fixed at the edge of the notch 11 and is vertically fixed with the bottom plate 2, and the connecting plate 8 is assembled and fixed with an upright post of the structural experiment loading system; the lifting appliance is fixed above the bottom plate 2 through a portal frame 9, the lifting appliance has a reciprocating degree of freedom along a horizontal straight line of the portal frame 9, and the horizontal movement direction of the lifting appliance is parallel to the connecting line direction between the two gaps 11; the whole mass center of bottom plate 2, connecting plate 8, hoist and the mass center of connecting plate 8 self coincide in the vertical plane in same space.
The beneficial effect of adopting above-mentioned technical scheme is: the bottom plate of E font constitutes two syntropy breachs naturally, is convenient for the hanging flower basket to move into structure experiment loading system, and the hanging flower basket platform can the translation embedding stand, also is convenient for go up and down on the stand. The connecting plate can be temporarily fixed with the upright column, so that personnel can work at a high place. The surface contact mode can provide strong fastening force. Simultaneously because the position of connecting plate, with the stand fixed back, the hanging flower basket can not have too big torsional force because of self gravity, guarantees the stability after the hanging flower basket platform is fixed. The manned hanging basket can replace a scaffold, is more convenient to install and shift, and saves working hours. Vertical hoist and certain horizontal displacement can be realized with the help of the hoist of top to the spare part of big mass is put on the bottom plate, then assembles the spare part to the structure experiment loading system on, and the hanging flower basket platform all provides the laying position for big mass spare part, supplementary operating personnel.
In other embodiments of the present invention, the bottom plate 2 is composed of a first rectangular plate 2a, a second rectangular plate 2b, a third rectangular plate 2c, and a fourth rectangular plate 2d located on the same horizontal plane, the first rectangular plate 2a is connected to the second rectangular plate 2b, the third rectangular plate 2c, and the fourth rectangular plate 2d, the second rectangular plate 2b is located between the third rectangular plate 2c and the fourth rectangular plate 2d, the second rectangular plate 2b is connected to the third rectangular plate 2c and the fourth rectangular plate 2d, and the gap between the third rectangular plate 2c and the fourth rectangular plate 2d forms a gap 11, and the two connecting plates 8 are fixed to the pair of the second rectangular plate 2 b.
The beneficial effect of adopting above-mentioned technical scheme is: the first rectangular plate, the second rectangular plate, the third rectangular plate and the fourth rectangular plate are integrally connected to form an integral E-shaped bottom plate. The third rectangular plate and the fourth rectangular plate on the two sides are convenient for personnel to stand for a long time and assist in operating the lifting appliance, and the personnel can also transfer the position where the personnel stand by means of the first rectangular plate. The second rectangular plate in the middle is convenient for placing large-mass parts, and is just convenient for hoisting and moving the lifting appliance.
In other embodiments of the present invention, each of the third rectangular plate 2c and the fourth rectangular plate 2d has an opening 4, and the edge of the opening 4 is connected to a movable cover plate 5 covering the opening 4.
The beneficial effect of adopting above-mentioned technical scheme is: staff come in and go out from the opening, the movable cover plate is closed, and the staff can stand on the bottom plate safely.
In other embodiments of the present invention, as shown in fig. 4, each connecting plate 8 has a circular hole 8a and three waist-shaped holes 8b, the length direction of each waist-shaped hole 8b is the horizontal direction, the sequential connecting lines of the respective centroids of the circular hole 8a and the waist-shaped hole 8b enclose a rectangle, and the circular hole 8a and the waist-shaped hole 8b are penetrated with bolts and fixed with the column of the structure experiment loading system.
The beneficial effect of adopting above-mentioned technical scheme is: the bolt is passed in circular hole, the accurate location of the erection dimension of being convenient for, and three waist type hole has then reduced the counterpoint degree of difficulty of here bolt assembly, makes things convenient for the assembly of on-the-spot and stand, and the length direction in waist type hole is the horizontally, has guaranteed the precision of mounted position department height.
In other embodiments of the present invention, the lower surface of the bottom plate 2 has the frame 1 extending along the contour track of the bottom plate 2, the frame 1 has the horizontally extending lifting lug 6, and the vertical projection of the lifting lug 6 does not intersect with the bottom plate 2.
The beneficial effect of adopting above-mentioned technical scheme is: the framework plays a role in supporting the bottom plate, a firm hanging basket bottom frame is constructed, the lifting lugs are convenient to hoist when in special needs, and the sling penetrating through the lifting lugs cannot interfere with the bottom plate.
In other embodiments of the present invention, the frame 1 includes a plurality of square pipes welded to each other, and the edge of the opening 4 also has the square pipe.
The beneficial effect of adopting above-mentioned technical scheme is: the square pipe of mutual welding possesses sufficient structural strength, and the entrance to a cave border also possesses square pipe, has further strengthened the intensity of skeleton, also can avoid the deformation of entrance to a cave.
In other embodiments of the present invention, the edge of the bottom plate 2 is provided with a guardrail 3 extending vertically upward.
The beneficial effect of adopting above-mentioned technical scheme is: the guardrail provides safety protection for an operator standing on the base plate.
In other embodiments of the present invention, the portal frame 9 is welded to the guard rail 3, and the root of the portal frame 9 is welded to the bottom plate 2 or the frame 1.
The beneficial effect of adopting above-mentioned technical scheme is: the guard bar, the bottom plate and the framework play a role in multi-point fixation for the portal frame, and the stability of the portal frame is guaranteed.
In other embodiments of the present invention, the lifting device includes a translation motor 10 movably connected to the gantry 9, and an electric hoist is connected to a lower portion of the translation motor 10.
The beneficial effect of adopting above-mentioned technical scheme is: the translation motor provides the power of translation, and electric block provides the power of vertical removal for the lifting hook.
The above embodiments are only for illustrating the technical concept and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and implement the present invention, and the protection scope of the present invention can not be limited thereby, and all equivalent changes or modifications made according to the spirit of the present invention should be covered by the protection scope of the present invention.

Claims (9)

1. A basket platform for a structural experiment loading system, comprising:
the whole base plate is E-shaped, the base plate is provided with two notches which are opened along the same horizontal direction, and the notches are used for an upright post of the structural experiment loading system to penetrate through;
the connecting plate is fixed at the edge of the notch and is vertically fixed with the bottom plate, and the connecting plate is assembled and fixed with the upright post of the structural experiment loading system;
the lifting appliance is fixed above the bottom plate through the portal frame, the lifting appliance has a reciprocating degree of freedom along a horizontal straight line of the portal frame, and the horizontal movement direction of the lifting appliance is parallel to the connecting line direction between the two gaps;
the mass center of the whole body of the bottom plate, the connecting plate and the lifting appliance and the mass center of the connecting plate are coincided on the same spatial vertical plane.
2. The basket platform for structural experiment loading system of claim 1, wherein: the bottom plate comprises a first rectangular plate, a second rectangular plate, a third rectangular plate and a fourth rectangular plate which are positioned on the same horizontal plane, the first rectangular plate is connected with the second rectangular plate, the third rectangular plate and the fourth rectangular plate, the second rectangular plate is positioned between the third rectangular plate and the fourth rectangular plate, the second rectangular plate forms a gap with a gap between the third rectangular plate and the fourth rectangular plate, and the two connecting plates are fixed on a pair of butt edges of the second rectangular plate respectively.
3. The basket platform for structural experiment loading system of claim 2, wherein: the third rectangular plate and the fourth rectangular plate are respectively provided with a hole, and the edge of each hole is connected with a movable cover plate covering the hole through a shaft.
4. The basket platform for structural experiment loading system of claim 2, wherein: possess a circular port, three waist type hole on every connecting plate, the length direction in waist type hole is the horizontal direction, the line in proper order of the respective centroids of circular port, waist type hole encloses into the rectangle, wear the bolt in circular port, the waist type hole and fixed with structure experiment loading system's stand.
5. The basket platform for structural experiment loading system of claim 3, wherein: the lower surface of the bottom plate is provided with a framework extending along the contour track of the bottom plate, the framework is provided with a lifting lug extending horizontally, and the vertical projection of the lifting lug is not intersected with the bottom plate.
6. The basket platform for structural experiment loading system of claim 5, wherein: the skeleton includes a plurality of mutual welded square pipes, the border of entrance to a cave also possesses square pipe.
7. The basket platform for structural experiment loading system of claim 5, wherein: the edge of the bottom plate is provided with a guardrail extending vertically and upwards.
8. The basket platform for structural experiment loading system of claim 7, wherein: the portal frame is welded and fixed with the guardrail, and the root of the portal frame is welded and fixed with the bottom plate or the framework.
9. The basket platform for structural experiment loading system of claim 1, wherein: the lifting appliance comprises a translation motor movably connected with the portal frame, and an electric hoist is connected below the translation motor.
CN202020771664.9U 2020-05-11 2020-05-11 Hanging basket platform for structure experiment loading system Active CN212198422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020771664.9U CN212198422U (en) 2020-05-11 2020-05-11 Hanging basket platform for structure experiment loading system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020771664.9U CN212198422U (en) 2020-05-11 2020-05-11 Hanging basket platform for structure experiment loading system

Publications (1)

Publication Number Publication Date
CN212198422U true CN212198422U (en) 2020-12-22

Family

ID=73814084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020771664.9U Active CN212198422U (en) 2020-05-11 2020-05-11 Hanging basket platform for structure experiment loading system

Country Status (1)

Country Link
CN (1) CN212198422U (en)

Similar Documents

Publication Publication Date Title
CN101696598A (en) Wholly lifted construction external frame
CN104577876A (en) Plug-in hanging basket for live working of helicopter
CN212198422U (en) Hanging basket platform for structure experiment loading system
CN213475354U (en) Operating platform for installation of fire-fighting engineering
CN210393625U (en) Remove portable lift high altitude construction car
CN209193460U (en) A kind of movable lifting Large-size rebar cage weld job operating platform
CN216889750U (en) Detachable movable portal frame for improving hoisting operation safety
CN204703542U (en) The assembled passage of a kind of Construction of Steel Structure regularization
CN210086058U (en) Matching type operating platform
CN215057266U (en) Portable undercarriage of standing
CN219993595U (en) Workshop filling area personnel ladder
CN216516796U (en) Novel electric power iron tower rest platform
CN217897230U (en) Integral operation platform of cylinder mound concrete placement
CN220962617U (en) Equipment for training and experiencing hoisting exercises
CN219751849U (en) Lifting type maintenance platform device
CN219620726U (en) Gantry type operation platform
CN211714521U (en) Foot rest for power maintenance
CN216105887U (en) U-shaped hanging basket suitable for online maintenance of blades of wind generating set
CN217264116U (en) Installation tool for elevator without machine room
CN210973766U (en) Power maintenance device
CN202482021U (en) Lifting device for assembling large-scale components
CN221095782U (en) Special maintenance equipment for converter
CN218343513U (en) Urban rail vehicle door overhauling platform
CN215672187U (en) Coal machine overhauls protects group's device
CN220098312U (en) GIL bus overhaul and installation operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A Basket Platform for Structural Experimental Loading System

Effective date of registration: 20221221

Granted publication date: 20201222

Pledgee: CITIC Bank Limited by Share Ltd. Suzhou branch

Pledgor: Suzhou Tongji Jianyi Electromechanical Technology Co.,Ltd.

Registration number: Y2022320010829