CN217897230U - Integral operation platform of cylinder mound concrete placement - Google Patents

Integral operation platform of cylinder mound concrete placement Download PDF

Info

Publication number
CN217897230U
CN217897230U CN202221842074.6U CN202221842074U CN217897230U CN 217897230 U CN217897230 U CN 217897230U CN 202221842074 U CN202221842074 U CN 202221842074U CN 217897230 U CN217897230 U CN 217897230U
Authority
CN
China
Prior art keywords
platform
main frame
aisle
fence
operating platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221842074.6U
Other languages
Chinese (zh)
Inventor
官铖
周焕涛
李世磊
赵家广
程鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202221842074.6U priority Critical patent/CN217897230U/en
Application granted granted Critical
Publication of CN217897230U publication Critical patent/CN217897230U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a concrete pouring integral type operation platform for a cylindrical pier, which comprises a first main frame and a second main frame; the first main frame and the second main frame are respectively of a cylindrical pier stud structure and are fixedly arranged on the ground side by side along the vertical direction; operating platforms are fixedly arranged at the tops of the first main frame and the second main frame respectively, an aisle platform is designed between the operating platform on the first main frame and the operating platform on the second main frame, one end of the aisle platform is fixedly connected to the operating platform of the first main frame, and the other end of the aisle platform is fixedly connected to the operating platform of the second main frame; protective structures are respectively arranged on the side surfaces of the operating platform and the aisle platform; the utility model provides an integral operation platform of cylinder mound concrete placement has optimized the wire rod and has deposited, can reduce operation personnel construction safety, and safe and reliable improves machining efficiency, the effective control construction cost.

Description

Integral operation platform of cylinder mound concrete placement
Technical Field
The utility model belongs to the technical field of the integral operation platform of column pier concrete placement, concretely relates to integral operation platform of column pier concrete placement.
Background
The existing pier stud concrete pouring and vibrating platform adopts a full scaffold to lay a scaffold board, and an operator stands on the scaffold board to perform concrete pouring through a control pump pipe and a chute, but because the full scaffold needs to be erected on the pouring platform, the operation time is long, the operation surface is limited, and when the constructor performs concrete pouring and vibrating on the scaffold board, the constructor is limited in space and cannot guarantee the uniform distribution and vibrating quality of concrete. When a person stands on the scaffold board for construction, safety accidents are easy to happen under the thrust action of the pump pipe.
Based on the technical problems existing in the pier column concrete pouring and vibrating platform, no relevant solution is provided; there is therefore a pressing need to find effective solutions to the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the weak point that exists in the above-mentioned technique, provide an integral operation platform of cylinder mound concrete placement, aim at solving the problem of current pier stud concrete placement and the safe construction of vibrating.
The utility model provides a concrete pouring integral operation platform for a cylindrical pier, which comprises a first main frame and a second main frame; the first main frame and the second main frame are respectively of a cylindrical pier stud structure and are fixedly arranged on the ground side by side along the vertical direction; operating platforms are fixedly arranged at the tops of the first main frame and the second main frame respectively, an aisle platform is designed between the operating platform on the first main frame and the operating platform on the second main frame, one end of the aisle platform is fixedly connected to the operating platform of the first main frame, and the other end of the aisle platform is fixedly connected to the operating platform of the second main frame; protective structures are respectively arranged on the side surfaces of the operating platform and the aisle platform.
Further, the operating platform is respectively fixed on the first main frame and the second main frame through bolts; the operating platform is of a quadrilateral structure; the periphery of the upper end face of the operating platform is provided with a first walkway, a second walkway, a third walkway and a fourth walkway respectively.
Further, the protective structure comprises a protective fence, the protective fence comprises a first protective fence and a second protective fence; the first protective fence is fixedly arranged on four side surfaces of the operating platform of the first main frame along the vertical direction and is higher than the operating platform; one end of the first protective fence, which is positioned on the aisle platform, is provided with an aisle passing opening; the second protective fence is fixedly arranged on four side surfaces of the operating platform of the second main frame along the vertical direction and is higher than the operating platform; the other end of the second protective fence, which is positioned on the aisle platform, is provided with an aisle passing opening.
Furthermore, the protective fence also comprises passageway protective fences which are respectively and fixedly arranged on two sides of the passageway platform along the vertical direction and are higher than the passageway platform; two ends of the passageway protection fence are respectively fixedly connected with the protection fences at the passageway openings at the two ends of the passageway platform.
Further, the operation platform comprises a main frame and a panel; the main frame is by # channel-section steel welding formation quadrangle structure, and the panel is the steel sheet of mm thickness, and panel welded fastening is around the main frame up end to form the pavement.
Furthermore, the protective fence is formed by welding a guardrail cross rod and a guardrail vertical rod to form a quadrilateral protective frame, and a coaming is fixedly arranged at the lower end of the protective frame along the horizontal direction; the bottom of the protection frame extends to form a mounting rod; the protection frame is fixedly connected to the surface of the operating platform through the mounting rod.
Furthermore, the passageway protection fence is formed by welding a guardrail cross rod and a guardrail vertical rod to form a quadrilateral fence frame, and a fence plate is fixedly arranged at the lower end of the fence frame along the horizontal direction; the bottom of the fence frame is provided with a connecting rod along the horizontal direction; the fence frame is fixedly connected to the two sides of the aisle platform through connecting rods.
Furthermore, the guardrail cross rod and the guardrail vertical rod are respectively made of # square steel, and the coaming is made of steel plates.
Furthermore, the fence plate is a steel plate, and the connecting rod is square steel; the bottom of the connecting rod is welded and fixed on two sides of the aisle platform, and two ends of the connecting rod are respectively welded and fixed with the protective fences at the aisle passing openings at two ends of the aisle platform.
Further, the operation platform on the first main frame, the operation platform on the second main frame and the aisle platform are located on the same horizontal plane.
The utility model provides a cylinder mound concrete placement integral work platform can directly be built, when pier stud concrete construction, need not set up full hall scaffold frame again, can greatly save pier stud construction period, can provide the relatively great activity space for the operating personnel to ensure concrete even distribution, and can fully vibrate, avoid the local honeycomb pitted surface phenomenon that leads to because of the cloth is inhomogeneous or the corner position vibrates not in place, guaranteed concrete appearance quality; and constructors can lean on the side guard rail to operate, and meanwhile, the activity space is enlarged, so that safe and reliable guarantee is provided for the constructors.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
The present invention will be further explained with reference to the accompanying drawings:
FIG. 1 is a front view of the integral type work platform for concrete pouring of a cylindrical pier of the present invention;
FIG. 2 is a top view of the integral type work platform for concrete pouring of the cylindrical pier of the present invention;
FIG. 3 is a side view of the integral type work platform for concrete pouring of the cylindrical pier of the present invention;
fig. 4 is a top view of the operation platform of the present invention;
FIG. 5 is a front view of the operation platform of the present invention;
FIG. 6 is a schematic view of the operation platform guard rail of the present invention;
figure 7 is the utility model discloses the passageway platform guard rail schematic diagram.
In the figure: 1. a first main frame; 2. a second main frame; 3. an operating platform; 31. a first walkway. 32. A second walkway; 33. a third walkway; 34. a fourth walkway; 4. an aisle platform; 5. a first protective fence; 51. a protective frame; 52. enclosing plates; 53. mounting a rod; 6. a passageway protection fence; 61. a fence frame; 62. a fence panel; 63. a connecting rod; 7. a second protective enclosure.
Detailed Description
In order to make the technical problem, technical solution and beneficial effects to be solved by the present invention more clearly understood, the following description is made in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
It will be understood that when an element is referred to as being "secured to" or "disposed on" another element, it can be directly on the other element or be indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or be indirectly connected to the other element.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise. The meaning of "a number" is one or more unless specifically limited otherwise.
In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", and the like indicate orientations or positional relationships based on orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
As shown in fig. 1 to 7, the utility model provides an integral operation platform for cylindrical pier concrete pouring, which is suitable for cylindrical pier construction in highway bridge construction, and especially under the conditions of complex terrain conditions, tight construction period and high construction pressure, the operation platform can effectively ensure the safety of constructors, improve the construction quality of the cylindrical pier to a great extent, shorten the construction period and improve the economic benefit; the working platform comprises a first main frame 1 and a second main frame 2; the first main frame 1 and the second main frame 2 are respectively of a cylindrical pier stud structure and are fixedly arranged on the ground side by side along the vertical direction; further, operation platforms 3 are respectively and fixedly arranged at the tops of the first main frame 1 and the second main frame 2, an aisle platform 4 is designed between the operation platform 3 on the first main frame 1 and the operation platform 3 on the second main frame 2, one end of the aisle platform 4 is fixedly connected to the operation platform 3 of the first main frame 1, and the other end of the aisle platform 4 is fixedly connected to the operation platform 3 of the second main frame 2; protective structures are respectively arranged on the side surfaces of the operating platform 3 and the aisle platform 4; the utility model provides an integral operation platform of cylinder mound concrete placement has optimized the wire rod and has deposited, can reduce operation personnel safety of being under construction, and safe and reliable improves machining efficiency, effective control construction cost.
Preferably, in combination with the above solution, as shown in fig. 1 to 7, the operation platform 3 is fixed on the first main frame 1 and the second main frame 2 by bolts respectively; further, the operating platform 3 is a quadrilateral structure, and the tops of the first main frame 1 and the second main frame 2 are respectively connected to the central position of the operating platform 3; furthermore, a first walkway 31, a second walkway 32, a third walkway 33 and a fourth walkway 34 are respectively arranged on the periphery of the upper end surface of the operating platform 3, and the walkways are respectively designed on the periphery of the operating platform 3, so that the center position of the walkways can be used for connecting a cylindrical pier column structure; by adopting the design, the operating platform 3 is designed into a quadrilateral structure, and the walkways are respectively formed around, so that a relatively large moving space is provided for operators, safe and reliable guarantee is provided for constructors, the construction quality is improved, the construction period is shortened, and the economic benefit is improved.
Preferably, in combination with the above, as shown in fig. 1 to 7, the guard structure comprises a guard rail comprising a first guard rail 5 and a second guard rail 7; the first protection fence 5 is respectively and fixedly arranged on four side surfaces of the operating platform 3 of the first main frame 1 along the vertical direction and is positioned on the outer side of the walkway, and the first protection fence 5 is higher than the operating platform 3, so that a fence structure is formed; furthermore, one end of the first protective fence 5, which is positioned at the aisle platform 4, is provided with an aisle passing opening, so that the aisle platform 4 can be conveniently passed through; further, second protective fences 7 are respectively and fixedly arranged on four side surfaces of the operating platform 3 of the second main frame 2 along the vertical direction and are positioned on the outer side of the walkway, and the second protective fences 7 are also higher than the operating platform 3, so that a fence structure is formed; correspondingly, the other end of the second protection fence 7, which is positioned on the aisle platform 4, is provided with an aisle passing opening, so that the aisle platform 4 can be conveniently passed through.
Preferably, in combination with the above solution, as shown in fig. 1 to 7, the protection fence further includes aisle protection fences 6, where the aisle protection fences 6 are respectively and fixedly disposed on two sides of the aisle platform 4 along the vertical direction and are higher than the aisle platform 4; and the two ends of the passageway protection fence 6 are respectively and fixedly connected with the protection fences at the passageway openings at the two ends of the passageway platform 4, so that a protection structure is formed, and the construction and walking safety of the passageway platform 4 is ensured.
Preferably, in combination with the above solution, as shown in fig. 1 to 7, the operation platform 3 comprises a main frame and a panel; furthermore, the main frame is welded by 8# channel steel to form a quadrilateral structure, and the main frame is connected with a cylindrical pier stud structure through a high-strength bolt, so that the stability of the pier stud can be ensured; furthermore, the panel is a steel plate with the thickness of 3mm, and the panel is welded and fixed on the periphery of the upper end face of the main frame, so that the walkway is formed.
Preferably, in combination with the above solution, as shown in fig. 1 to 7, the guard fence is formed by welding a guard rail cross bar and a guard rail upright to form a quadrilateral guard frame 51, and a coaming 52 is fixedly arranged at the lower end of the guard frame 51 along the horizontal direction; further, a mounting rod 53 extends from the bottom of the protection frame 51, so that the protection frame 51 is fixedly connected to the surface of the operation platform 3 through the mounting rod 53 to form a connection structure.
Preferably, in combination with the above solution, as shown in fig. 1 to 7, the aisle protection fence 6 is formed by welding a guardrail cross bar and a guardrail vertical bar to form a quadrilateral fence frame 61, and a fence plate 62 is fixedly arranged at the lower end of the fence frame 61 along the horizontal direction; further, the bottom of the fence frame 61 is provided with a connecting rod 63 along the horizontal direction; the fence frame 61 is fixedly connected to both sides of the aisle deck 4 by means of connecting rods 63, thereby forming a connection structure.
Preferably, in combination with the above, as shown in fig. 1 to 7, the guardrail cross bar and the guardrail vertical bar are 3# square steel, and the coaming 52 is a steel plate.
Preferably, in combination with the above solutions, as shown in fig. 1 to 7, the fence plate 62 is a steel plate, and the connecting rod 63 is a square steel; the bottom of the connecting rod 63 is welded and fixed on two sides of the aisle platform 4, and two ends of the connecting rod 63 are respectively welded and fixed with the protective fences 5 at the aisle crossing positions at two ends of the aisle platform 4, so that a butt joint structure is formed.
Preferably, in combination with the above solution, as shown in fig. 1 to 7, the operation platform 3 on the first main frame 1, the operation platform 3 on the second main frame 2, and the aisle platform 4 are located on the same horizontal plane.
The utility model provides an integral operation platform of cylinder mound concrete placement, can directly build, when pier stud concrete construction, need not set up full hall scaffold frame again, can greatly save pier stud construction period, can provide the relatively great activity space for the operating personnel to ensure the even cloth of concrete, and can fully vibrate, avoid because of cloth inhomogeneous or corner position vibrate not in place the local honeycomb pitted surface phenomenon that leads to, guaranteed concrete appearance quality; and constructors can lean on the side guard rail to operate, and meanwhile, the activity space is enlarged, so that safe and reliable guarantee is provided for the constructors.
The foregoing is illustrative of the present invention and is not to be construed as limiting thereof in any manner. The technical solutions of the present invention can be used by anyone skilled in the art to make many possible variations and modifications to the technical solution of the present invention, or to modify equivalent embodiments with equivalent variations, without departing from the scope of the technical solution of the present invention. Therefore, any modification, equivalent change and modification of the above embodiments according to the present invention are all within the protection scope of the present invention.

Claims (10)

1. The integral type work platform for pouring the concrete of the cylindrical pier is characterized by comprising a first main frame (1) and a second main frame (2); the first main frame (1) and the second main frame (2) are respectively of a cylindrical pier column structure and are fixedly arranged on the ground side by side along the vertical direction; operating platforms (3) are respectively and fixedly arranged at the tops of the first main frame (1) and the second main frame (2), an aisle platform (4) is designed between the operating platform (3) on the first main frame (1) and the operating platform (3) on the second main frame (2), one end of the aisle platform (4) is fixedly connected to the operating platform (3) of the first main frame (1), and the other end of the aisle platform (4) is fixedly connected to the operating platform (3) of the second main frame (2); and protective structures are respectively arranged on the side surfaces of the operating platform (3) and the passageway platform (4).
2. The concrete pouring integral work platform for the cylindrical piers as claimed in claim 1, wherein the work platform (3) is fixed on the first main frame (1) and the second main frame (2) by bolts respectively; the operating platform (3) is of a quadrilateral structure; the periphery of the upper end face of the operating platform (3) is provided with a first walkway (31), a second walkway (32), a third walkway (33) and a fourth walkway (34) respectively.
3. Cylindrical pier concrete pouring integral work platform according to claim 1, characterized in that the protection structure comprises a protection fence comprising a first protection fence (5) and a second protection fence (7); the first protective fence (5) is fixedly arranged on four side surfaces of the operating platform (3) of the first main frame (1) along the vertical direction and is higher than the operating platform (3); one end of the first protective fence (5) positioned on the aisle platform (4) is provided with an aisle passing opening; the second protective fence (7) is fixedly arranged on four side surfaces of the operating platform (3) of the second main frame (2) along the vertical direction and is higher than the operating platform (3); the second protective fence (7) is positioned at the other end of the aisle platform (4) and is provided with an aisle passing opening.
4. The concrete pouring integral working platform with cylindrical piers as claimed in claim 3, wherein the protection fence further comprises aisle protection fences (6), the aisle protection fences (6) are respectively and fixedly arranged on two sides of the aisle platform (4) along the vertical direction and are higher than the aisle platform (4); and two ends of the passageway protection fence (6) are respectively and fixedly connected with the protection fence at the passageway crossing at the two ends of the passageway platform (4).
5. Concrete pouring integral work platform of cylindrical piers according to claim 2, characterized in that said work platform (3) comprises a main frame and a panel; the main frame is by 8# channel-section steel welding formation quadrilateral structure, the panel is the steel sheet of 3mm thickness, panel welded fastening is in the periphery of main frame up end to form the pavement.
6. The concrete pouring integral work platform with cylindrical piers as claimed in claim 3, wherein the protective fence is formed by welding guardrail cross bars and guardrail vertical bars into a quadrilateral protective frame (51), and a coaming (52) is fixedly arranged at the lower end of the protective frame (51) along the horizontal direction; the bottom of the protection frame (51) extends to form a mounting rod (53); the protective frame (51) is fixedly connected to the surface of the operating platform (3) through the mounting rod (53).
7. The concrete pouring integral work platform with the cylindrical piers as claimed in claim 4, wherein the aisle protection fence (6) is welded by a guardrail cross rod and a guardrail vertical rod to form a quadrilateral fence frame (61), and a fence plate (62) is fixedly arranged at the lower end of the fence frame (61) along the horizontal direction; the bottom of the fence frame (61) is provided with a connecting rod (63) along the horizontal direction; the fence frame (61) is fixedly connected to two sides of the aisle platform (4) through the connecting rods (63).
8. The concrete pouring integral work platform with cylindrical piers as claimed in claim 6, wherein the guardrail cross bars and the guardrail vertical bars are 3# square steel respectively, and the enclosing plates (52) are steel plates.
9. The concrete pouring integral work platform with cylindrical piers as claimed in claim 7, wherein the fence plate (62) is a steel plate, and the connecting rod (63) is a square steel; the bottom of the connecting rod (63) is welded and fixed on two sides of the passageway platform (4), and two ends of the connecting rod (63) are respectively welded and fixed with the protective fences (5) at the passageway openings at two ends of the passageway platform (4).
10. Cylindrical pier concrete pouring integral work platform according to claim 1, characterized in that the operating platform (3) on the first main frame (1), the operating platform (3) on the second main frame (2) and the aisle platform (4) are located on the same horizontal plane.
CN202221842074.6U 2022-07-18 2022-07-18 Integral operation platform of cylinder mound concrete placement Expired - Fee Related CN217897230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221842074.6U CN217897230U (en) 2022-07-18 2022-07-18 Integral operation platform of cylinder mound concrete placement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221842074.6U CN217897230U (en) 2022-07-18 2022-07-18 Integral operation platform of cylinder mound concrete placement

Publications (1)

Publication Number Publication Date
CN217897230U true CN217897230U (en) 2022-11-25

Family

ID=84134215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221842074.6U Expired - Fee Related CN217897230U (en) 2022-07-18 2022-07-18 Integral operation platform of cylinder mound concrete placement

Country Status (1)

Country Link
CN (1) CN217897230U (en)

Similar Documents

Publication Publication Date Title
CN212742204U (en) Arc stand anticollision steel guardrail for bridge
CN217897230U (en) Integral operation platform of cylinder mound concrete placement
CN111648229A (en) Assembled hoop platform for bent cap construction and mounting method thereof
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN208167484U (en) The steel construction overline bridge being easily installed
CN110029804A (en) A kind of sizing steel operating platform
CN206428986U (en) A kind of detachable turnover type support jig
CN211473320U (en) Tool type external hanging rack for corridor
CN211313347U (en) Assembled walkway plate device
CN208870179U (en) A kind of vertical supporting member of T font and connection structure for assembling type steel structure
CN211421793U (en) Design steel operation platform
CN113684766A (en) Construction platform for bracket of main tower of bridge and construction method thereof
CN216999353U (en) Assembled pier stud protection platform
CN112726416A (en) Support structure meeting field construction security and construction method
CN221276345U (en) General integrated safety operation platform for tie beam and bent cap
CN214423126U (en) Steel temporary bridge for high-pile wharf construction
CN212533700U (en) Pin-connected panel staple bolt platform of bent cap construction usefulness
CN208870170U (en) A kind of vertical supporting member of "-" type for assembling type steel structure
CN213326398U (en) Overhead traveling crane conductive angle iron protection device
CN217870008U (en) Bearing platform concrete appearance protection device
CN213681753U (en) Simple construction platform for pier stud
CN218563222U (en) Make things convenient for rain-proof sun-proof canopy of portable standardized welding machine of dismouting
CN219887632U (en) Guardrail assembly and be used for steel reinforced concrete roof beam to face limit safety protection's portable guardrail
CN215164708U (en) Combined bracket suitable for construction of double-column pier large-cantilever large-span bent cap
CN220364860U (en) Quick-mounting plate type bridge panel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221125