CN212189505U - Household garbage incinerator slag recycling and grinding device - Google Patents

Household garbage incinerator slag recycling and grinding device Download PDF

Info

Publication number
CN212189505U
CN212189505U CN202020723796.4U CN202020723796U CN212189505U CN 212189505 U CN212189505 U CN 212189505U CN 202020723796 U CN202020723796 U CN 202020723796U CN 212189505 U CN212189505 U CN 212189505U
Authority
CN
China
Prior art keywords
cavity
chamber
grinding
grinding disc
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020723796.4U
Other languages
Chinese (zh)
Inventor
廖平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renshou Yuen Environmental Industry Co ltd
Original Assignee
Renshou Yuen Environmental Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Renshou Yuen Environmental Industry Co ltd filed Critical Renshou Yuen Environmental Industry Co ltd
Priority to CN202020723796.4U priority Critical patent/CN212189505U/en
Application granted granted Critical
Publication of CN212189505U publication Critical patent/CN212189505U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The utility model discloses a domestic waste incinerator slag recovery grinding device, which comprises a first processing cavity, a dust absorption cavity, a crushing cavity, a clapboard, a first hydraulic pushing rod, a protective cover, a second processing cavity, a second hydraulic pushing rod, a bearing cavity, a motor mounting cavity, a first millstone, a second millstone, a material pouring pipe and a grinding cavity, the upper end of the first processing cavity is connected with a protective cover through a bolt, the first processing cavity is positioned below the protective cover and is fixedly connected with a dust absorption cavity, the lower part of the dust suction cavity is fixedly connected with the crushing cavity, the dust suction cavity and the crushing cavity are of an integrated structure, a clapboard is fixedly arranged between the dust suction cavity and the crushing cavity, first hydraulic push rods are fixedly arranged at two sides of the crushing cavity, the grinding device is characterized in that a material pouring pipe is fixedly connected to the lower portion of the grinding cavity and fixedly connected with the bearing cavity, a grinding cavity is fixedly arranged at the lower end of the bearing cavity, and a motor placement cavity is fixedly arranged at the lower end of the grinding cavity.

Description

Household garbage incinerator slag recycling and grinding device
Technical Field
The utility model relates to a slag treatment technical field, in particular to grinder is retrieved to domestic waste incineration slag.
Background
The existing slag grinding device is single in arrangement and only provided with a primary grinding mechanism, the time consumed by the larger massive slag encountered in the past is long when the slag is ground, the slag grinding efficiency is not high, a large amount of smoke is generated in the smoke during the grinding process, and a novel slag recovery grinding device is particularly designed for the reason.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a grinder is retrieved to domestic waste incineration slag to solve the problem that proposes in the above-mentioned background art.
The utility model aims at realizing through the following technical scheme: a household garbage incinerator slag recovery grinding device comprises a first treatment cavity, a dust absorption cavity, a crushing cavity, a partition plate, a first hydraulic pushing rod, a protective cover, a second treatment cavity, a second hydraulic pushing rod, a bearing cavity, a motor placing cavity, a first grinding disc, a second grinding disc, a material pouring pipe and a grinding cavity, the upper end of the first processing cavity is connected with a protective cover through a bolt, the first processing cavity is positioned below the protective cover and is fixedly connected with a dust absorption cavity, the lower part of the dust suction cavity is fixedly connected with the crushing cavity, the dust suction cavity and the crushing cavity are of an integrated structure, a clapboard is fixedly arranged between the dust suction cavity and the crushing cavity, first hydraulic push rods are fixedly arranged at two sides of the crushing cavity, the grinding device is characterized in that a material pouring pipe is fixedly connected to the lower portion of the grinding cavity and fixedly connected with the bearing cavity, a grinding cavity is fixedly arranged at the lower end of the bearing cavity, and a motor placement cavity is fixedly arranged at the lower end of the grinding cavity.
As a preferred technical scheme: the partition board and the dust suction cavity are fixed together in a welding mode, and a plurality of through holes are formed in the partition board.
As a preferred technical scheme: the two bearing cavities are symmetrically arranged, and the joint of the bearing cavity and the material pouring pipe is arranged in the bearing cavity and adopts an inclined plane design.
As a preferred technical scheme: a material conveying pipe is fixedly connected between the grinding cavity and the bearing cavity, second hydraulic pushing rods are arranged at two ends in the grinding cavity, and a pushing disc is fixedly arranged at the front ends of the second hydraulic pushing rods;
the second hydraulic pushing rod is electrically connected with an externally arranged motor.
As a preferred technical scheme: a first grinding disc and a second grinding disc are arranged at the upper end and the lower end of the grinding cavity, the first grinding disc is fixed at the upper end of the grinding cavity, and the second grinding disc is fixed at the lower end of the grinding cavity;
the first grinding disc is electrically connected with a rotating motor arranged between the two bearing cavities;
the second grinding disc is electrically connected with a motor arranged in the motor arranging cavity;
the first grinding disc is connected with a first base at the bottom through a hydraulic lifting rod, and the second grinding disc is connected with a second base at the bottom through a hydraulic lifting rod.
As a preferred technical scheme: the material pouring pipe is fixedly provided with a flashboard, and the flashboard and the material pouring pipe are fixedly connected in a sliding groove connection mode.
As a preferred technical scheme: the front end of the first hydraulic pushing rod is fixedly provided with an extrusion plate, and the extrusion plate is provided with sawteeth
As a preferred technical scheme: and the exhaust device is fixed on a supporting plate in the first treatment cavity and is fixed by bolts.
Compared with the prior art, the beneficial effects of the utility model are that: this novel structure simple structure adopts the two-stage to handle, accomplishes the grinding work to the slag for pounding to pieces and grinding two parts respectively, and is provided with the suction chamber on the device, and the suction chamber can absorb smog and handle the smoke and dust through exhaust ware coupling hose.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
As shown in fig. 1, a household garbage incinerator slag recycling and grinding device comprises a first processing chamber 1, a dust suction chamber 2, a grinding chamber 3, a partition plate 4, a first hydraulic push rod 5, a protective cover 6, a second processing chamber 7, a second hydraulic push rod 8, a receiving chamber 9, a motor placing chamber 10, a first grinding disc 11, a second grinding disc 12, a material pouring pipe 13 and a grinding chamber 14, wherein the upper end of the first processing chamber 1 is connected with the protective cover 6 through a bolt, the first processing chamber 1 is positioned below the protective cover 6 and fixedly connected with the dust suction chamber 2, the lower part of the dust suction chamber 2 is fixedly connected with the grinding chamber 3, the dust suction chamber 2 and the grinding chamber 3 are of an integral structure, the partition plate 4 is fixedly arranged between the dust suction chamber 2 and the grinding chamber 3, the first hydraulic push rod 5 is fixedly arranged at two sides of the grinding chamber 3, the material pouring pipe 13 is fixedly connected below the grinding chamber 3, the material pouring pipe 13 is fixedly connected with the receiving chamber 9, and a grinding cavity 14 is fixedly arranged at the lower end of the bearing cavity 9, and a motor mounting cavity 10 is fixedly arranged at the lower end of the grinding cavity 14.
In this embodiment, the partition plate 4 and the dust suction chamber 2 are fixed together by welding, and a plurality of through holes are formed on the partition plate 4.
In this embodiment, two receiving cavities 9 are symmetrically arranged, and the connecting portion between the receiving cavity 9 and the material pouring pipe 13 is designed to be an inclined surface.
In this embodiment, a material conveying pipe is fixedly connected between the grinding chamber 14 and the receiving chamber 9, and two ends of the material conveying pipe located in the grinding chamber 14 are provided with second hydraulic pushing rods 8, and the front ends of the second hydraulic pushing rods 8 are fixedly provided with pushing discs;
the second hydraulic pushing rod 8 is electrically connected with an externally arranged motor.
In this embodiment, a first grinding disc 11 and a second grinding disc 12 are arranged at the upper end and the lower end of the grinding cavity 14, the first grinding disc 11 is fixed at the upper end of the grinding cavity 14, and the second grinding disc 12 is fixed at the lower end of the grinding cavity 14;
the first grinding disc 11 is electrically connected with a rotating motor arranged between the two bearing cavities 9;
the second grinding disc 12 is electrically connected with a motor arranged in the motor arranging cavity 10;
the first grinding disc 11 is connected with a first base at the bottom by a hydraulic lifting rod, and the second grinding disc 12 is connected with a second base at the bottom by a hydraulic lifting rod.
In this embodiment, a gate plate is fixedly mounted on the material pouring pipe 13, and the gate plate and the material pouring pipe 13 are fixedly connected in a sliding groove connection manner.
In this embodiment, a squeezing plate is fixedly arranged at the front end of the first hydraulic pushing rod 5, and saw teeth are arranged on the squeezing plate.
In this embodiment, an exhaust fan is fixedly installed above the dust absorption cavity 2 in the protective cover 6, and the exhaust fan is fixed on the supporting plate in the first processing cavity 1 by bolts.
Open on smashing chamber 3 and have the slag material import, it has the through-hole to open on smashing the fixed baffle 4 that is equipped with in chamber 3 top, it is discharging fume the fog using the exhaust fan and can play the effect of blockking and avoid large granule slag to get into and cause the machine damage in the exhaust fan, it can be connected with outside defogging pond to the external coupling hose of exhaust fan, get rid of smog, the effect that sets up baffle 4 can be convenient for at the sponge of the light large aperture of baffle top formula, place and suction large granule slag when the exhaust fan suction.
Smash 3 interior both sides fixed mounting of chamber have first hydraulic pressure propulsion pole 5, 5 external connection motors of first hydraulic pressure propulsion pole, it is the rectangle slot chamber to smash chamber 3, the stripper plate that 5 front ends of first hydraulic pressure propulsion pole are fixed to be equipped with is less than the width and the height of smashing chamber 3, and first hydraulic pressure propulsion pole 5 is located position between the stripper plate, and first hydraulic pressure propulsion pole 5 adopts the telescopic construction design, first hydraulic pressure propulsion pole 5 realizes through outside motor control that reciprocal relative motion is to the stripper plate of smashing the flexible both sides in chamber, can pulverize the slag body of large granule at first through the sawtooth on the stripper plate.
The first hydraulic pushing rod 5 is controlled by an external motor to realize reciprocating relative motion of the extrusion plates on the telescopic two sides of the crushing cavity, and can push the crushed slag to the corresponding position of the material pouring pipe opening.
Smash 3 fixed pouring pipe 13 that is equipped with in bottom of chamber and put in the slag material of smashing the intracavity and just also accept chamber 9, it sets up two just to accept chamber 9 symmetry, and is located accept chamber 9 in and adopt the inclined plane design with pouring pipe 13 junction, this structural design is convenient for can play the effect of buffering when the material is transferred and enter into grinding chamber 14 in, accept chamber 9, motor arrangement chamber 10, grinding chamber 14 all be the rectangle cavity, fixed mounting has the motor in the motor arrangement chamber 10, the motor passes through the connecting wire and connects peripheral power supply, 8 front ends of second hydraulic pressure propulsion pole are fixed and are equipped with the push disk, should push disk structure and grinding chamber 14 structure imitate mutually, and its height and width are less than the structure in rectangle cavity.
The material pouring pipe 13 is of a rectangular hollow pipe structure and is fixedly welded in a rectangular hole formed in the bottom of the crushing cavity 3.
A material conveying pipe is fixedly connected between the grinding cavity 14 and the bearing cavity 9, second hydraulic push rods 8 are arranged at two ends in the grinding cavity 14, the second hydraulic push rods 8 are of a telescopic structure, and push discs are fixedly arranged at the front ends of the second hydraulic push rods 8; second hydraulic pressure pushing ram 8 and the motor electric connection of outside setting, the effect of pushing away the dish is through the motor action drive second hydraulic pressure pushing ram to drawing close and pushing away the slag material to first mill 11, second mill 12 in the district that is located, then carries out the secondary grinding through the rotatory extrusion of first mill 11, second mill 12 to the slag.
The first grinding disc 11 and the second grinding disc 12 are positioned in the grinding cavity 14, and the first grinding disc 11 and the second grinding disc are designed into circular disc structures,
holding grooves for holding the first grinding disc 11 and the second grinding disc 12 are formed in the upper end and the lower end of the grinding cavity 14, the first grinding disc 11 is fixed at the upper end of the grinding cavity 14, and the second grinding disc 12 is fixed at the lower end of the grinding cavity 14;
the first grinding disc 11 is electrically connected with a motor arranged between the two bearing cavities 9;
the second grinding disc 12 is electrically connected with a motor arranged in the motor arranging cavity 10;
the first grinding disc 11 is connected with a first base at the bottom by a hydraulic lifting rod penetrating through a grinding cavity, and the second grinding disc 12 is connected with a second base at the bottom by a hydraulic lifting rod penetrating through a grinding cavity.
And two material door outlets are fixedly arranged on the rear end face of the grinding cavity, so that the materials can be taken out after grinding.
First mill 11, second mill 12 realize rotatory and relative movement from top to bottom through the effect of motor, drive first mill 11, second mill 12 through hydraulic lifting rod and be close to each other and grind the slag material, at the in-process of grinding, can pass through the motor electric connection of second hydraulic pressure pushing ram 8 and outside setting, the effect of pushing away the dish is that drive second hydraulic pressure pushing ram through the motor effect and push away the slag material to drawing close to in the district that first mill 11, second mill 12 place, and is continuous to grind the slag material.
The material pouring pipe 13 is fixedly provided with a flashboard, and the flashboard is arranged to prevent the material from directly falling into the crushing cavity through the material pipe in the bearing cavity without primary treatment. The flashboard and the material pouring pipe 13 are fixedly connected in a sliding groove connection mode, and are controlled in a plug-in structure design or an electric control mode.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (8)

1. The utility model provides a grinder is retrieved to domestic waste incineration slag which characterized in that: comprises a first processing chamber (1), a dust absorption chamber (2), a crushing chamber (3), a partition plate (4), a first hydraulic pushing rod (5), a protective cover (6), a second processing chamber (7), a second hydraulic pushing rod (8), a bearing chamber (9), a motor arrangement chamber (10), a first grinding disc (11), a second grinding disc (12), a material pouring pipe (13) and a grinding chamber (14), wherein the upper end of the first processing chamber (1) is connected with the protective cover (6) through a bolt, the first processing chamber (1) is positioned below the protective cover (6) and fixedly connected with the dust absorption chamber (2), the lower part of the dust absorption chamber (2) is fixedly connected with the crushing chamber (3), the dust absorption chamber (2) and the crushing chamber (3) are of an integrated structure, the partition plate (4) is fixedly arranged between the dust absorption chamber (2) and the crushing chamber (3), and the two sides of the crushing chamber (3) are fixedly provided with the first hydraulic pushing rod (5), smash fixedly connected with material pouring pipe (13) under chamber (3), material pouring pipe (13) and accept chamber (9) fixed connection are located accept chamber (9) lower extreme fixed are equipped with and grind chamber (14), it settles chamber (10) to grind chamber (14) lower extreme fixed mounting has the motor.
2. The domestic waste incineration slag recycling grinding device of claim 1, wherein: the partition plate (4) is fixed with the dust absorption cavity (2) in a welding mode, and a plurality of through holes are formed in the partition plate (4).
3. The domestic waste incineration slag recycling grinding device of claim 1, wherein: two receiving cavities (9) are symmetrically arranged, and the connecting part of the receiving cavities (9) and the material pouring pipe (13) adopts an inclined plane design.
4. The domestic waste incineration slag recycling grinding device of claim 1, wherein: a material conveying pipe is fixedly connected between the grinding cavity (14) and the bearing cavity (9), second hydraulic pushing rods (8) are arranged at two ends in the grinding cavity (14), and a pushing disc is fixedly arranged at the front ends of the second hydraulic pushing rods (8);
the second hydraulic pushing rod (8) is electrically connected with an externally arranged motor.
5. The recycling and grinding device for the household garbage incineration slag as claimed in claim 1 or 4, wherein: a first grinding disc (11) and a second grinding disc (12) are arranged at the upper end and the lower end of the grinding cavity (14), the first grinding disc (11) is fixed at the upper end of the grinding cavity (14), and the second grinding disc (12) is fixed at the lower end of the grinding cavity (14);
the first grinding disc (11) is electrically connected with a rotating motor arranged between the two bearing cavities (9);
the second grinding disc (12) is electrically connected with a motor arranged in the motor arranging cavity (10);
the first grinding disc (11) is connected with a first base at the bottom through a hydraulic lifting rod, and the second grinding disc (12) is connected with a second base at the bottom through a hydraulic lifting rod.
6. The domestic waste incineration slag recycling grinding device of claim 1, wherein: the material pouring pipe (13) is fixedly provided with a flashboard, and the flashboard and the material pouring pipe (13) are fixedly connected in a sliding groove connection mode.
7. The domestic waste incineration slag recycling grinding device of claim 1, wherein: the front end of the first hydraulic pushing rod (5) is fixedly provided with an extrusion plate, and the extrusion plate is provided with sawteeth.
8. The domestic waste incineration slag recycling grinding device of claim 1, wherein: the top fixed mounting that is located dust absorption chamber (2) in protective cover (6) has the ware of airing exhaust, it adopts the bolt fastening in the backup pad in first process chamber (1) to exhaust the ware.
CN202020723796.4U 2020-05-06 2020-05-06 Household garbage incinerator slag recycling and grinding device Expired - Fee Related CN212189505U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020723796.4U CN212189505U (en) 2020-05-06 2020-05-06 Household garbage incinerator slag recycling and grinding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020723796.4U CN212189505U (en) 2020-05-06 2020-05-06 Household garbage incinerator slag recycling and grinding device

Publications (1)

Publication Number Publication Date
CN212189505U true CN212189505U (en) 2020-12-22

Family

ID=73830736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020723796.4U Expired - Fee Related CN212189505U (en) 2020-05-06 2020-05-06 Household garbage incinerator slag recycling and grinding device

Country Status (1)

Country Link
CN (1) CN212189505U (en)

Similar Documents

Publication Publication Date Title
CN208642853U (en) A kind of construction material recycling grinding device
CN208275473U (en) A kind of solid waste grinding device
CN209810289U (en) Road stone breaker for municipal construction
CN212189505U (en) Household garbage incinerator slag recycling and grinding device
CN208775532U (en) A kind of dustbin conveniently toppled over
CN110653055A (en) High efficiency coal grinder
CN209254941U (en) Multistage ore pulverizer
CN219527466U (en) Rubbish recovery plant for construction
CN208542263U (en) A kind of civil engineering work waste treatment device
CN214184559U (en) Domestic garbage treatment device
CN211964331U (en) Building waste processing apparatus for civil engineering
CN212418050U (en) Waste residue collection device of silicon manganese alloy processing usefulness
CN219663853U (en) Building waste breaker
CN112317516B (en) Building energy-saving and environment-friendly device
CN213194006U (en) Material crushing equipment for machining
CN209934846U (en) Coal reducing mechanism is used in thermal power plant
CN213557325U (en) Environment-friendly construction waste reducing mechanism
CN217329809U (en) Feeding device for automatic garbage combustion control system
CN212820305U (en) Waste material environmental protection treatment facility for construction
CN208542325U (en) A kind of cleaning equipment of contaminated soil
CN212387052U (en) Building site rubbish cleaning device
CN211418377U (en) Garbage cleaning device for construction
CN214051889U (en) Sludge carbon-based iron-carbon ceramsite preparation device
CN213854943U (en) Environment-friendly waste treatment device
CN216987842U (en) Garbage disposal device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201222