CN212176512U - Building is climbed and is used supplementary strutting arrangement - Google Patents

Building is climbed and is used supplementary strutting arrangement Download PDF

Info

Publication number
CN212176512U
CN212176512U CN202020076588.XU CN202020076588U CN212176512U CN 212176512 U CN212176512 U CN 212176512U CN 202020076588 U CN202020076588 U CN 202020076588U CN 212176512 U CN212176512 U CN 212176512U
Authority
CN
China
Prior art keywords
plate
fixed
building
frame
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020076588.XU
Other languages
Chinese (zh)
Inventor
成燕
柯贤孝
向文锦
吴明
陈一鸣
史广华
丁毅
张登柱
王焕强
王再强
王峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN202020076588.XU priority Critical patent/CN212176512U/en
Application granted granted Critical
Publication of CN212176512U publication Critical patent/CN212176512U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

An auxiliary supporting device for a building climbing frame comprises a base, supporting rods, clamping columns, connecting pieces, adjusting rods, a fixing frame and fasteners, wherein the supporting rods are fixedly arranged on the upper surface of the base, an installing plate is arranged at the top of each supporting rod, and the installing plate is fixed to the bottom of the climbing frame through external bolts; the bottom of base is equipped with connecting piece and card post, and card post fixed connection is in the bottom of base, and the connecting piece includes the connecting plate, and the upper surface of connecting plate is equipped with the locating hole, and the inside activity interlude of locating hole has the card post, and the side of connecting plate is equipped with the cylindricality hole, and the inside activity interlude in cylindricality hole has the regulation pole, adjusts the one end and the fixed frame fixed connection that the connecting plate was kept away from to the pole, and fixed frame passes through the fastener and fixes to the atress post of building on. This strutting arrangement can carry out the outrigger to the bottom of climbing the frame, can reduce the atress of climbing the frame bottom to improve the stability of climbing the frame bottom, and can improve the security of climbing the use of frame, easy operation, convenient to use.

Description

Building is climbed and is used supplementary strutting arrangement
The technical field is as follows:
the utility model relates to a building engineering technical field, in particular to building climbing frame technical field, specifically speaking are building climbing frame is with supplementary strutting arrangement.
Background art:
the building climbing frame, also called lifting frame, can be divided into several main types, such as hydraulic type, electric type, manual pull type and the like according to the power source, is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type floors, and can ascend or descend along the building. The system completely changes the scaffold technology, namely, the scaffold does not need to be turned over; and secondly, the scaffold is free from the dismounting and mounting processes (the scaffold is used till the construction is finished after one-time assembly), is not limited by the height of a building, greatly saves manpower and materials, has greater improvement on the traditional scaffold in a safety angle, and has great development advantages in high-rise buildings.
The existing climbing frame is mainly fixedly connected with a wall body through a bolt, the stress of the bottom of the climbing frame is large, the stability is poor, the shaking condition is most likely to occur at the bottom of the climbing frame in the using process, and the safety is low.
The invention content is as follows:
the to-be-solved technical problem of the utility model is to overcome current defect, provide a building climb frame and use auxiliary stay device, can carry out the outrigger to the bottom of climbing the frame, can reduce the atress of climbing the frame bottom to improve the stability of climbing the frame bottom.
In order to solve the above problem, the utility model adopts the following technical scheme:
the utility model provides an auxiliary supporting device for a building climbing frame, which comprises a base, a supporting rod, a clamping column, a connecting piece, an adjusting rod, a fixed frame and a fastener, wherein the upper surface of the base is fixedly provided with the supporting rod, the top of the supporting rod is provided with a mounting plate, and the mounting plate is fixed to the bottom of the climbing frame through an external bolt; the bottom of base is equipped with connecting piece and card post, and card post fixed connection is in the bottom of base, and the connecting piece includes the connecting plate, and the upper surface of connecting plate is equipped with the locating hole, and the inside activity interlude of locating hole has the card post, and the side of connecting plate is equipped with the cylindricality hole, and the inside activity interlude in cylindricality hole has the regulation pole, adjusts the one end and the fixed frame fixed connection that the connecting plate was kept away from to the pole, and fixed frame passes through the fastener and fixes to the atress post of building on.
The upper surface of base fixed be provided with two spinal branch vaulting poles, an slope sets up, a vertical setting, and the top of two spinal branch vaulting poles all is equipped with the mounting panel that the level set up.
The upper surfaces of the two mounting plates arranged at the tops of the two support rods are parallel and level, the upper surfaces of the two mounting plates are provided with mounting holes which are uniformly distributed, and the mounting plates are fixed to the bottom of the climbing frame through the mounting holes by external bolts.
The upper surface of the connecting plate is provided with two symmetrically arranged positioning holes.
The side of the connecting plate is provided with two cylindrical holes which are symmetrically arranged, and the connecting plate is in threaded connection with fastening bolts in screw holes on the corresponding lower surfaces of the cylindrical holes.
Fixed frame include the fixed plate that two symmetries set up and the concave plate that two symmetries set up, and two fixed plates and two concave plates constitute the rectangle structure, the both ends of fixed plate all are equipped with the draw-in groove with the concave plate joint, the side that the fixed plate corresponds with the draw-in groove and the side of concave plate are equipped with the screw hole that corresponds the setting, and the inside threaded connection of screw hole has fixing bolt, fixes the stress column of building with fixed plate and concave plate through fixing bolt.
One end of the adjusting rod, which is far away from the connecting plate, is fixedly connected with the side surface of one of the fixed plates of the fixed frame.
The middle part of the concave plate at one end inside the clamping groove is provided with a guide rod, the middle part of the fixed plate is provided with a guide hole communicated with the clamping groove, and the guide rod is movably inserted into the guide hole.
The side of concave plate be equipped with the fastener, the fastener includes nut, adjusting bolt, stripper plate, slipmat, the nut is installed in the concave plate side, the side threaded connection of nut has adjusting bolt, the one end that adjusting bolt is located the fixed frame inboard rotates and is connected with the stripper plate, the side of stripper plate is equipped with the slipmat.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses can be fixed to the bottom of climbing the frame through the mounting panel that outside bolt will have the mounting hole, make the bracing piece can support the bottom of climbing the frame.
2. The fixing plate and the concave plate can be fixed to the stress column of the building through the fixing bolt, and the position of the fixing frame can be adjusted along the stress column, so that the fixing frame can support the base through the connecting piece; meanwhile, the adjusting bolt can be rotated to adjust the position of the extrusion plate, so that the extrusion plate can push the anti-slip pad to be in contact with the stress column, and the fixed frame can be fixed on the stress column.
3. The utility model discloses can follow the regulation pole and remove the connecting plate to can rotate fastening bolt and adjust the position of adjusting the pole fixedly, be convenient for fix the bottom of base.
4. The utility model discloses can carry out the outrigger to the bottom of climbing the frame, can reduce the atress of climbing the frame bottom to improve the stability of climbing the frame bottom, and can improve the security of climbing the use of frame, easy operation, convenient to use.
Description of the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic bottom view of the structure of FIG. 1;
FIG. 3 is a schematic structural view of a connecting member of the present invention;
fig. 4 is a schematic structural diagram of the middle fixing frame of the present invention.
Reference numbers in the figures:
1-base, 2-support rod, 3-clamp column, 4-connecting plate, 5-adjusting rod, 6-fixing frame, 7-fastener, 8-guide hole and 9-guide rod.
21-mounting plate, 22-mounting hole.
41-positioning holes, 42-cylindrical holes and 43-fastening bolts.
61-a fixing plate, 62-a clamping groove, 63-a concave plate, 64-a threaded hole and 65-a fixing bolt.
71-nuts, 72-adjusting bolts, 73-extrusion plates, 74-non-slip mats.
The specific implementation mode is as follows:
the technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it is to be understood that the described embodiments are only some embodiments, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model provides a building is climbed and is used supplementary strutting arrangement, this supplementary strutting arrangement includes base 1, bracing piece 2, the card post 3, the connecting piece, adjust pole 5, fixed frame 6, fastener 7, base 1's last fixed surface is provided with the bracing piece 2 that a slope set up and a vertical setting, be convenient for support the one side of keeping away from the building bottom climbing, improve the stability of climbing the frame, and the top of two spinal branch vaulting poles 2 all is equipped with the mounting panel 21 that the level set up, the upper surface parallel and level of two mounting panels 21, and the upper surface of two mounting panels 21 all is equipped with evenly distributed's mounting hole 22, can be fixed the bottom of climbing the frame through the mounting panel 21 that outside bolt will have mounting hole 22, make bracing piece 2 can support the bottom of climbing the frame. The bottom of base 1 is equipped with connecting piece and card post 3, and card post 3 fixed connection is in the bottom of base 1. The connecting piece includes connecting plate 4, the upper surface of connecting plate 4 is equipped with the locating hole 41 that two symmetries set up, the inside activity interlude of locating hole 41 have with base 1 bottom fixed connection's card post 3, the side of connecting plate 4 is equipped with the cylindricality hole 42 that two symmetries set up, connecting plate 4 has fastening bolt 43 with the inside threaded connection of the screw of cylindricality hole 42 corresponding lower surface, and the inside activity interlude of cylindricality hole 42 has regulation pole 5, can follow regulation pole 5 and remove connecting plate 4, and can rotate fastening bolt 43 and adjust fixedly to the position of regulation pole 5, be convenient for fix base 1's bottom. Fixed frame 6 includes the fixed plate 61 that two symmetries set up and the notch plate 63 that two symmetries set up, and rectangular structure is constituteed to two fixed plates 61 and two notch plates 63, the both ends of fixed plate 61 all are equipped with the draw-in groove 62 with notch plate 63 joint, the side that fixed plate 61 and draw-in groove 62 correspond and the side of notch plate 63 are equipped with the screw hole 64 that corresponds the setting, and the internal thread connection of screw hole 64 has fixing bolt 65, can be fixed the stress column to the building with fixed plate 61 and notch plate 63 through fixing bolt 65, and can follow the position that fixed frame 6 was adjusted to the stress column, make fixed frame 6 can support base 1 through the connecting piece. The middle part that notch plate 63 is located the inside one end of draw-in groove 62 is equipped with guide bar 9, and the middle part of fixed plate 61 is equipped with the guiding hole 8 that communicates with draw-in groove 62, and the activity of guide bar 9 alternates inside guiding hole 8, when installation notch plate 63 and fixed plate 61, inserts inside guiding hole 8 with guide bar 9, can align notch plate 63 fast and the screw hole 64 of fixed plate 61 side. One end of the adjusting rod 5 far away from the connecting plate 4 is fixedly connected with the side surface of one fixing plate 61 of the fixing frame 6. The side of concave plate 63 is equipped with fastener 7, fastener 7 includes nut 71, adjusting bolt 72, extrusion plate 73, slipmat 74, nut 71 is installed in the concave plate 63 side, the side threaded connection of nut 71 has adjusting bolt 72, the one end that adjusting bolt 72 is located fixed frame 6 inboard rotates and is connected with extrusion plate 73, the side of extrusion plate 73 is equipped with slipmat 74, can rotate adjusting bolt 72 and adjust the position of extrusion plate 73, make extrusion plate 73 can promote slipmat 74 and stress column contact, make fixed frame 6 can be fixed to on the stress column.
When in use:
the fixed frame 6 composed of the concave plate 63 and the fixed plate 61 is clamped on the stress column of the building; the method comprises the following steps that a fixed frame 6 is moved along a stress column of a building, the fixed frame 6 drives a base 1 to move through an adjusting rod 5, the base 1 drives a mounting plate 21 to move through a supporting rod 2, the upper surface of the mounting plate 21 is in contact with the lower surface of a climbing frame, and the climbing frame is fixedly connected with the mounting plate 21 through an external bolt; the adjusting rod 5 is fixed by rotating the fastening bolt 43; the adjusting bolt 72 is rotated, the adjusting bolt 72 pushes the extrusion plate 73 to move, and the extrusion plate 73 drives the anti-slip pad 74 to contact with the stress column, so that the fixed frame 6 is fixedly connected with the stress column; fixed frame 6 supports connecting plate 4 through adjusting pole 5, and connecting plate 4 supports bracing piece 2 through base 1, and bracing piece 2 carries out the auxiliary stay through mounting panel 21 to the bottom of climbing the frame.

Claims (9)

1. The utility model provides a building is climbed and is used auxiliary stay device which characterized by: the auxiliary supporting device comprises a base (1), a supporting rod (2), a clamping column (3), a connecting piece, an adjusting rod (5), a fixed frame (6) and a fastener (7), wherein the supporting rod (2) is fixedly arranged on the upper surface of the base (1), a mounting plate (21) is arranged at the top of the supporting rod (2), and the mounting plate (21) is fixed to the bottom of a climbing frame through an external bolt; the bottom of base (1) is equipped with connecting piece and card post (3), card post (3) fixed connection is in the bottom of base (1), the connecting piece includes connecting plate (4), the upper surface of connecting plate (4) is equipped with locating hole (41), the inside activity interlude of locating hole (41) has card post (3), the side of connecting plate (4) is equipped with cylindricality hole (42), the inside activity interlude of cylindricality hole (42) has regulation pole (5), the one end and fixed frame (6) fixed connection of connecting plate (4) are kept away from in regulation pole (5), fixed frame (6) are fixed on the stress column of building through fastener (7).
2. The auxiliary supporting device for the building climbing frame according to claim 1, which is characterized in that: the upper surface of base (1) fixed be provided with two spinal branch vaulting poles (2), an slope setting, a vertical setting, and the top of two spinal branch vaulting poles (2) all is equipped with mounting panel (21) that the level set up.
3. The auxiliary supporting device for the building climbing frame according to claim 2, which is characterized in that: the upper surfaces of the two mounting plates (21) arranged at the tops of the two support rods (2) are parallel and level, the upper surfaces of the two mounting plates (21) are provided with uniformly distributed mounting holes (22), and external bolts are used for fixing the mounting plates (21) to the bottom of the climbing frame through the mounting holes (22).
4. The auxiliary supporting device for the building climbing frame according to claim 1, which is characterized in that: the upper surface of the connecting plate (4) is provided with two symmetrically arranged positioning holes (41).
5. The auxiliary supporting device for the building climbing frame according to claim 1, which is characterized in that: the side of connecting plate (4) be equipped with two cylindrical holes (42) that the symmetry set up, connecting plate (4) and cylindrical hole (42) correspond the screw internal thread of lower surface and are connected with fastening bolt (43).
6. The auxiliary supporting device for the building climbing frame according to claim 1, which is characterized in that: fixed frame (6) including fixed plate (61) that two symmetries set up and concave plate (63) that two symmetries set up, and rectangular structure is constituteed to two fixed plate (61) and two concave plate (63), the both ends of fixed plate (61) all are equipped with draw-in groove (62) with concave plate (63) joint, the side that fixed plate (61) and draw-in groove (62) correspond and the side of concave plate (63) are equipped with screw hole (64) that correspond the setting, and the inside threaded connection of screw hole (64) has fixing bolt (65), fix fixed plate (61) and concave plate (63) to the stress column of building through fixing bolt (65).
7. The auxiliary supporting device for the building climbing frame according to claim 1, which is characterized in that: one end of the adjusting rod (5) far away from the connecting plate (4) is fixedly connected with the side surface of one fixing plate (61) of the fixing frames (6).
8. The auxiliary supporting device for the building climbing frame according to claim 6, which is characterized in that: concave plate (63) be located the middle part of the inside one end of draw-in groove (62) and be equipped with guide bar (9), and the middle part of fixed plate (61) is equipped with guiding hole (8) with draw-in groove (62) intercommunication, and inside guide bar (9) activity interlude in guiding hole (8).
9. The auxiliary supporting device for the building climbing frame according to claim 6, which is characterized in that: the side of concave plate (63) be equipped with fastener (7), fastener (7) include nut (71), adjusting bolt (72), stripper plate (73), slipmat (74), install in concave plate (63) side nut (71), the side threaded connection of nut (71) has adjusting bolt (72), adjusting bolt (72) are located the inboard one end of fixed frame (6) and rotate and are connected with stripper plate (73), the side of stripper plate (73) is equipped with slipmat (74).
CN202020076588.XU 2020-01-14 2020-01-14 Building is climbed and is used supplementary strutting arrangement Active CN212176512U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020076588.XU CN212176512U (en) 2020-01-14 2020-01-14 Building is climbed and is used supplementary strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020076588.XU CN212176512U (en) 2020-01-14 2020-01-14 Building is climbed and is used supplementary strutting arrangement

Publications (1)

Publication Number Publication Date
CN212176512U true CN212176512U (en) 2020-12-18

Family

ID=73772797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020076588.XU Active CN212176512U (en) 2020-01-14 2020-01-14 Building is climbed and is used supplementary strutting arrangement

Country Status (1)

Country Link
CN (1) CN212176512U (en)

Similar Documents

Publication Publication Date Title
CN212176512U (en) Building is climbed and is used supplementary strutting arrangement
CN212031158U (en) Tension detection device for building engineering
CN210316214U (en) Assembled steel construction building dysmorphism post
CN213773821U (en) Green building steel structure frame convenient to dismantle
CN214144117U (en) Steel construction foot post connecting piece
CN213087461U (en) Brickwork wall construction fixing device
CN212203919U (en) Video monitoring equipment with adjustable monitoring height
CN212773638U (en) Strutting arrangement for building engineering
CN212926945U (en) Building site is with scaffold frame of just dismantling
CN213710269U (en) Prefabricated T roof beam construction operation platform
CN215716610U (en) Assembled roof suspended beam structure is built in room
CN220301524U (en) Girder steel post connection structure
CN219261736U (en) Support frame for profiled steel sheet
CN209855216U (en) Scaffold convenient to installation for curtain wall construction
CN220247600U (en) Adjustable windowsill template reinforcing device
CN219931823U (en) Outdoor railing with adjustable
CN218563101U (en) Beam adjusting device for house building
CN212926972U (en) Fixing device for vertical rod of cantilever frame
CN220487147U (en) Positioning device for curtain wall construction
CN216476241U (en) Connecting node for SRC column
CN213802459U (en) Building construction elevator fixing equipment
CN216276337U (en) Anti-drop reinforcing assembly of building curtain wall
CN211873960U (en) Support frame for building
CN213837720U (en) Supporting top support capable of early dismounting back edge and template supporting device
CN220556714U (en) But reuse's roofing photovoltaic mounting bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant