Be used for urban bridge prefabricated bent cap hoist and mount bracket Download PDFInfo
- Publication number
- CN212175506U CN212175506U CN202020325102.1U CN202020325102U CN212175506U CN 212175506 U CN212175506 U CN 212175506U CN 202020325102 U CN202020325102 U CN 202020325102U CN 212175506 U CN212175506 U CN 212175506U
- Authority
- CN
- China
- Prior art keywords
- oar
- bent cap
- groove
- fixedly connected
- receipts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a be used for urban bridge assembled bent cap hoist and mount bracket, including flexible platform and bent cap, the bent cap periphery is through bolt fixedly connected with flexible platform, flexible platform still includes receipts oar groove and receipts oar bucket, flexible platform below is through bolt fixedly connected with receipts oar groove, it hangs through the couple and is connected with receipts oar bucket to receive oar groove four corners department; the utility model discloses a with flexible platform fixed mounting to stand periphery to make between bent cap and the stand sit thick liquids or binder can effectually drip to the receipts oar inslot of flexible platform below through the action of gravity, and make the thick liquids carry to receipts oar bucket in through the drainage effect of receiving the oar groove, thereby it can also realize reaching the environmental protection to stand off-the-shelf protection when making to sit thick liquids or binder can effectual implementation recovery reuse, reliable, full and reuse's effect.
Description
Technical Field
The utility model relates to a hoist and mount bracket technical field specifically is a be used for urban bridge assembled bent cap hoist and mount bracket.
Background
Urban bridge refers to the urban area, build bridge and road overpass on the river course and road, road cross the overpass and pedestrian bridge of railway, including permanent bridge and semipermanent bridge, do not include temporary bridge, railway bridge, culvert, the bent cap refers to for supporting, distributing and transmitting the load of superstructure, the crossbeam that sets up at framed bent pier top, also known as the bent cap, set up the crossbeam of reinforced concrete or little reinforced concrete on pier (platform) or on the campshed, the main function is to support bridge superstructure, and transmit the substructure to, have the bent cap of stake direct connection bent cap, also have the bent cap of stake connection post back, can effectively implement the hoist and mount of assembled bent cap through the hoist and mount bracket in the actual construction process, but the hoist and mount bracket in the prior art still has certain shortcoming in the actual application, for example:
the urban bridge finished product stand column in the prior art is very easy to cause the condition of environmental pollution caused by slurry dripping when the cover beam is assembled, hoisted, connected and grouted, is not favorable for reasonable utilization of the slurry, easily causes resource waste, and cannot meet the requirements of the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a be used for city bridge prefabricated bent cap hoist and mount bracket to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a be used for city bridge prefabricated bent cap hoist and mount bracket, includes flexible platform and stand, the stand periphery is through the flexible platform of bolt fixedly connected with, flexible platform still includes receipts oar groove and receipts oar bucket, flexible platform below receives the oar groove through bolt fixedly connected with, it has the receipts oar bucket to receive oar groove four corners department through the couple suspension connection.
Preferably, the telescopic platform further comprises a steel bar, the steel bar is inserted into the upper surface of the telescopic platform close to the edge of the corner through threads, and the steel bar is of a cylindrical structure.
Preferably, the telescopic platform further comprises a connecting piece, the lower surface of the telescopic platform is close to four corners and is fixedly connected with the connecting piece through bolts, and the bottom end of the connecting piece is fixedly connected with the oar collecting groove through bolts.
Preferably, the oar collecting groove further comprises a guard plate, and the guard plate is fixedly connected to the edge of the periphery of the oar collecting groove through bolts.
Preferably, the lower surface of the inner wall of the oar collecting groove is in an isosceles triangle shape, and the guard plate is in a rectangular structure.
Preferably, the paddle collecting groove is sleeved with the upright post, and the inner diameter of the paddle collecting barrel is not smaller than the side length of the corner of the paddle collecting groove.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a with flexible platform fixed mounting to stand periphery to make between bent cap and the stand sit thick liquids or binder can effectually drip to the receipts oar inslot of flexible platform below through the action of gravity, and make the thick liquids carry to receipts oar bucket in through the drainage effect of receiving the oar groove, thereby it can also realize reaching the environmental protection to stand off-the-shelf protection when making to sit thick liquids or binder can effectual implementation recovery reuse, reliable, full and reuse's effect.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
In the figure: 1-a telescopic platform; 11-reinforcing steel bars; 12-a connector; 2-a paddle collecting groove; 21-guard board; 3-collecting the oar barrel; 4-upright post.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: a lifting bracket for an assembled bent cap of an urban bridge comprises a telescopic platform 1 and an upright post 4, wherein the periphery of the upright post 4 is fixedly connected with the telescopic platform 1 through bolts, the telescopic platform 1 can effectively realize moving and fixing on the upright post 4, the upper surface of the telescopic platform 1 close to the corner edge is in threaded connection with a reinforcing steel bar 11, the reinforcing steel bar 11 is in a cylindrical structure, when the telescopic platform 1 can be effectively moved, installed and fixed and the upright post 4 can be positioned through the reinforcing steel bar 11, the lower surface of the telescopic platform 1 close to the four corners is fixedly connected with a connecting piece 12 through bolts, the bottom end of the connecting piece 12 is fixedly connected with a propeller collecting groove 2 through bolts, the stability when the propeller collecting groove 2 is connected with the telescopic platform 1 can be effectively improved through the propeller collecting groove 2, the telescopic platform 1 further comprises a propeller collecting groove 2 and a propeller collecting barrel 3, the lower part of the telescopic platform 1 is fixedly connected with a propeller collecting groove 2, receive 2 inner walls of oar groove lower surface and be the isosceles triangle, thereby can effectually realize the drainage effect through the receipts oar groove 2 of triangle and avoid receiving 2 inner walls of oar groove and remaining circumstances and take place to block, receive oar groove 2 with stand 4 cup joints, receive 2 peripheral edges in oar groove through bolt fixedly connected with backplate 21, backplate 21 is the rectangle structure, can effectually promote the oar material through backplate 21 and carry out spacing when the drainage and avoid splashing, receive 2 four corners departments in oar groove and hang through the couple and be connected with receipts oar bucket 3, and receive 3 internal diameter size of oar bucket and be not less than receive 2 corners side length size in oar groove, can effectually collect the oar material through receiving oar bucket 3 and avoid polluting.
The working principle is as follows: when in use, the telescopic platform is fixedly installed to the periphery of the stand column, so that slurry or bonding material can be effectively dropped into the slurry collecting groove below the telescopic platform through the action of gravity between the cover beam and the stand column, and the slurry is conveyed into the slurry collecting barrel through the drainage action of the slurry collecting groove, and further the slurry or the bonding material can be effectively recycled, and meanwhile, the finished stand column can be protected to achieve the effects of environmental protection, reliability, fullness and reutilization.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a be used for city bridge prefabricated bent cap hoist and mount bracket which characterized in that includes:
a telescopic platform (1);
a column (4);
wherein, stand (4) periphery is through flexible platform (1) of bolt fixedly connected with, flexible platform (1) still includes:
a blade collecting groove (2);
a paddle collecting barrel (3);
wherein, flexible platform (1) below is through bolt fixedly connected with receipts oar groove (2), receipts oar groove (2) four corners department hangs through the couple and is connected with receipts oar bucket (3).
2. The urban bridge fabricated bent cap hoisting bracket according to claim 1, wherein: the telescopic platform (1) further comprises:
a reinforcing bar (11);
the upper surface of the telescopic platform (1) is in threaded connection with a steel bar (11) close to the edge of the corner, and the steel bar (11) is of a cylindrical structure.
3. The urban bridge fabricated bent cap hoisting bracket according to claim 1, wherein: the telescopic platform (1) further comprises:
a connecting piece (12);
the lower surface of the telescopic platform (1) is close to four corners and is fixedly connected with connecting pieces (12) through bolts, and the bottom ends of the connecting pieces (12) are fixedly connected with the oar collecting grooves (2) through bolts.
4. The urban bridge fabricated bent cap hoisting bracket according to claim 1, wherein: the oar collection groove (2) further comprises:
a cover sheet (21);
the outer edge of the paddle collecting groove (2) is fixedly connected with a guard plate (21) through bolts.
5. The urban bridge fabricated bent cap hoisting bracket according to claim 4, wherein: the lower surface of the inner wall of the oar collecting groove (2) is in an isosceles triangle shape, and the guard plate (21) is in a rectangular structure.
6. The urban bridge fabricated bent cap hoisting bracket according to claim 1, wherein: the paddle collecting groove (2) is sleeved with the upright post (4), and the inner diameter of the paddle collecting barrel (3) is not smaller than the side length of the corner of the paddle collecting groove (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020325102.1U CN212175506U (en) | 2020-03-16 | 2020-03-16 | Be used for urban bridge prefabricated bent cap hoist and mount bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020325102.1U CN212175506U (en) | 2020-03-16 | 2020-03-16 | Be used for urban bridge prefabricated bent cap hoist and mount bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212175506U true CN212175506U (en) | 2020-12-18 |
Family
ID=73777834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020325102.1U Active CN212175506U (en) | 2020-03-16 | 2020-03-16 | Be used for urban bridge prefabricated bent cap hoist and mount bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212175506U (en) |
-
2020
- 2020-03-16 CN CN202020325102.1U patent/CN212175506U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206768675U (en) | A kind of ripple joist steel guardrail raised type obstruction block of highway three | |
CN212175506U (en) | Be used for urban bridge prefabricated bent cap hoist and mount bracket | |
CN209178915U (en) | A kind of connection structure of assembled long piled wharf | |
CN211815626U (en) | Temporary buttress leveling device for hoisting assembled bridge subsection capping beam | |
CN107905112A (en) | A kind of not contour steel suspended box cofferdam base arrangement | |
CN212561174U (en) | Device for preventing sundries from falling during construction of wet joints and transverse partition plates of bridge | |
CN206667070U (en) | A kind of suspension holdfast for being used for constructing tie beam in water | |
CN211520604U (en) | Movable assembly type chute | |
CN205768899U (en) | A kind of beam car | |
CN209907195U (en) | Bridge anticollision barrier template mounting safety device | |
CN207063483U (en) | A can hoist and mount construction platform for installation of prefabricated staircase | |
CN212477577U (en) | Bearing frame structure suitable for shoreside type sea pond platform of encorbelmenting | |
CN211720172U (en) | Simple cable overhead support | |
CN209703982U (en) | A kind of opposite sex chimney construction security platform structure | |
CN211228177U (en) | Slurry splashing prevention device used during bridge flange plate dismantling | |
CN206220547U (en) | A kind of operating platform for steel structure column installation | |
CN206986736U (en) | A kind of box girder bridge transverse prestress construction mobile closed formula platform | |
CN207958998U (en) | A kind of not contour steel suspended box cofferdam floor structure | |
CN210134343U (en) | Trolley for mounting drain pipe on outer side edge of bridge | |
CN208039918U (en) | A kind of steel structure canopy | |
CN212533760U (en) | Highway bridge pier shaft construction platform device | |
CN218715096U (en) | Wet seam concrete placement template of precast beam leaks thick liquid antidrip device that falls | |
CN215055124U (en) | Cantilever frame bottom closing device | |
CN216765938U (en) | A side slope reinforcerment system for basic building engineering | |
CN204940125U (en) | A kind of bridge construction jacking counter-force bracing or strutting arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |