Prior art keywords
guide pipe
impact column
weighting rod
hole
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020144131.8U
Other languages
Chinese (zh)
Inventor
郭栓宁
张石友
章杰
李强
吴发荣
张春光
陈秀荣
陈泽虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Engineering Corp Ltd
Original Assignee
China United Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Engineering Corp Ltd filed Critical China United Engineering Corp Ltd
Priority to CN202020144131.8U priority Critical patent/CN212129099U/en
Application granted granted Critical
Publication of CN212129099U publication Critical patent/CN212129099U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model provides a pile body sampling device in crowded close pile work progress of lime soil, the operation is safe, and the sampling quality is controllable, and is efficient. The utility model comprises a weighting rod, an impact column, a guider and a guide pipe; the upper end of the weighting rod is provided with a traction hole, and the lower end of the weighting rod is provided with female threads; the upper end of the impact column is provided with a male thread, and the lower end of the impact column is provided with an expansion head; a cavity is arranged in the guide pipe, a round hole is formed in the upper end of the guide pipe, the lower end of the guide pipe is sealed, a mounting hole is formed in the lower end of the guide pipe, and female threads are arranged in the mounting hole; the impact column is arranged in a cavity in the guide pipe in a vertically sliding manner, and the expansion head is positioned above the lower end of the guide pipe; after the upper end of the impact column penetrates through the round hole in the upper end of the guide pipe, the male thread in the upper end of the impact column is connected with the female thread in the lower end of the weighting rod, so that the impact column and the weighting rod are connected and fixed together; the pilot device is sleeved and fixed outside the pilot tube.

Description

Pile body sampling device in construction process of lime-soil compaction pile
Technical Field
The utility model relates to a pile body sampling device in lime soil compaction pile work progress for in lime soil compaction pile ground treatment work progress, take pile body tamp filling original state sample.
Background
The lime-soil compaction pile is a foundation treatment method commonly used in engineering, according to the requirements of technical Specification for treating building foundation JGJ79-2012, the quality detection work is required in the construction process of the lime-soil compaction pile, the filling materials in the holes are backfilled and tamped layer by layer, and the average compaction coefficient lambda of the filling materials iscShould not be less than 0.97, wherein the compaction factor minimum should not be less than 0.93. In order to evaluate the construction quality of the filler, original samples are taken at different depths in a pile hole in the construction process, the samples are sent to a laboratory for dry density test, the compaction coefficient is calculated, and the construction quality is evaluated. However, in the actual construction process, no proper equipment for taking an original sample in a pile hole exists at home at present, and particularly, in the deep layer of the pile hole, a cutting ring sample is often manually put into the pile hole for multiple times, so that the danger is high, the artificial influence factors are many, the sampling quality is uncontrollable, and the efficiency is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the above-mentioned not enough that exists among the prior art, and provide a pile body sampling device in crowded close pile work progress of lime soil that structural design is reasonable, operation safety, sampling quality is controllable, and is efficient.
The utility model provides a technical scheme that above-mentioned problem adopted is: the utility model provides a pile body sampling device in lime-soil compaction pile work progress which characterized in that: comprises a weighting rod, an impact column, a guider and a guide pipe; the upper end of the weighting rod is provided with a traction hole, and the lower end of the weighting rod is provided with female threads; the upper end of the impact column is provided with a male thread, and the lower end of the impact column is provided with an expansion head; a cavity is arranged in the guide pipe, a round hole is formed in the upper end of the guide pipe, the lower end of the guide pipe is sealed, a mounting hole is formed in the lower end of the guide pipe, and female threads are arranged in the mounting hole; the impact column is arranged in a cavity in the guide pipe in a vertically sliding manner, and the expansion head is positioned above the lower end of the guide pipe; after the upper end of the impact column penetrates through the round hole in the upper end of the guide pipe, the male thread in the upper end of the impact column is connected with the female thread in the lower end of the weighting rod, so that the impact column and the weighting rod are connected and fixed together; the pilot device is sleeved and fixed outside the pilot tube.
The guide device of the utility model is cylindrical.
Lead just ware in the middle of be provided with cylindrical hole, the stand pipe is worn to adorn and is fixed in cylindrical hole.
Compared with the prior art, the utility model, have following advantage and effect: the problem of tamped grey soil filler sample in the crowded close stake deep hole of grey soil is solved, avoided the safe risk of artifical lower pile hole in the sample, the sample is taken simultaneously in the construction, in time effective control construction quality, and efficient, low cost, once purchase, long-term used repeatedly, low carbon environmental protection.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail by way of examples with reference to the accompanying drawings, which are illustrative of the present invention and are not intended to limit the present invention.
Referring to fig. 1, the present embodiment includes a weight bar 3, an impact post 4, a guide 5, and a guide tube 6.
The upper end of the weighting rod 3 is provided with a traction hole 2, and the center of the lower end is provided with female threads.
The upper end of the impact column 4 is provided with a male thread, and the lower end is provided with an expansion head 7.
The inside cavity that is provided with of stand pipe 6, the upper end is provided with the round hole, and the round hole diameter is less than enlarged head 7 diameter and cavity diameter, so enlarged head 7 just can not fall out from the round hole, and the round hole can be passed to the upper end of impact post 4. The lower end of the guide pipe 6 is sealed, a mounting hole 8 is formed in the guide pipe, and female threads are arranged in the mounting hole 8.
The impact column 4 is slidably mounted up and down in a cavity inside the guide tube 6, and the enlarged head 7 is located above the lower end of the guide tube 6. After the upper end of the impact column 4 passes through the round hole at the upper end of the guide pipe 6, the male thread at the upper end of the impact column 4 is connected with the female thread at the lower end of the weighting rod 3, so that the impact column 4 and the weighting rod 3 are fixedly connected together.
The guide device 5 is cylindrical, a cylindrical hole is formed in the middle of the guide device, the guide tube 6 is fixedly arranged in the cylindrical hole in a penetrating mode, and the guide device 5 is fixedly sleeved outside the guide tube 6. The guide device 5 plays a role in guiding in the sampling process, and prevents the utility model discloses rock too big.
The field sampling operation flow is as follows:
connecting a steel wire rope 1 on a construction machinery winch on a traction hole 2 at the upper end of a weighting rod 3, connecting male threads at the upper end of an impact column 4 with female threads at the lower end of the weighting rod 3, installing a guide device 5 outside a guide pipe 6, connecting male threads at the upper end of a thick-wall soil sampler 9 of the existing equipment with female threads at the lower end of the guide pipe 6, starting the winch, hoisting the weighting rod 3, the impact column 5, the guide pipe 6 and the thick-wall soil sampler 9, installing a guide device 5 with a proper diameter which is slightly smaller than the diameter of a pile hole 11 of a lime soil compaction pile, slowly placing the device on the surface of a lime soil filler 10 which is just tamped in the pile hole 11, pulling up the impact column 5 (the stroke is smaller than the height of a cavity of the guide pipe 6), loosening the winch to enable the weighting rod 3 and the impact column 5 to freely fall (the maximum height of a free fall is 1.2 m), and beating the lower end of the guide pipe 6 by an expansion head 7, repeatedly pulling up and putting down, pulling out the device by a winch and horizontally placing on the ground after the thick-wall soil sampler 9 is driven into the soil filler 10 and reaches the sampling depth, unloading the thick-wall soil sampler, taking out the soil sample, and completing the sampling.
The above description in this specification is merely illustrative of the present invention. Various modifications, additions and substitutions may be made by those skilled in the art without departing from the scope of the invention as defined in the accompanying claims.

Claims (3)

1. The utility model provides a pile body sampling device in lime-soil compaction pile work progress which characterized in that: comprises a weighting rod, an impact column, a guider and a guide pipe; the upper end of the weighting rod is provided with a traction hole, and the lower end of the weighting rod is provided with female threads; the upper end of the impact column is provided with a male thread, and the lower end of the impact column is provided with an expansion head; a cavity is arranged in the guide pipe, a round hole is formed in the upper end of the guide pipe, the lower end of the guide pipe is sealed, a mounting hole is formed in the lower end of the guide pipe, and female threads are arranged in the mounting hole; the impact column is arranged in a cavity in the guide pipe in a vertically sliding manner, and the expansion head is positioned above the lower end of the guide pipe; after the upper end of the impact column penetrates through the round hole in the upper end of the guide pipe, the male thread in the upper end of the impact column is connected with the female thread in the lower end of the weighting rod, so that the impact column and the weighting rod are connected and fixed together; the pilot device is sleeved and fixed outside the pilot tube.
2. The pile body sampling device in the lime-soil compaction pile construction process according to claim 1, characterized in that: the pilot is cylindrical.
3. The pile body sampling device in the lime-soil compaction pile construction process according to claim 1, characterized in that: the middle of the guide device is provided with a cylindrical hole, and the guide tube is fixedly arranged in the cylindrical hole in a penetrating mode.
CN202020144131.8U 2020-01-22 2020-01-22 Pile body sampling device in construction process of lime-soil compaction pile Active CN212129099U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020144131.8U CN212129099U (en) 2020-01-22 2020-01-22 Pile body sampling device in construction process of lime-soil compaction pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020144131.8U CN212129099U (en) 2020-01-22 2020-01-22 Pile body sampling device in construction process of lime-soil compaction pile

Publications (1)

Publication Number Publication Date
CN212129099U true CN212129099U (en) 2020-12-11

Family

ID=73677846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020144131.8U Active CN212129099U (en) 2020-01-22 2020-01-22 Pile body sampling device in construction process of lime-soil compaction pile

Country Status (1)

Country Link
CN (1) CN212129099U (en)

Similar Documents

Publication Publication Date Title
WO2018133886A1 (en) Rope coring drill-based engineering geology drilling construction method
CN102108706A (en) Simple manual spiral earth fetching device for reinforcing pile core of pre-stressed pipe pile
CN107338781A (en) A kind of compacting pile construction device and its construction method
CN107938666B (en) Pile end inner hammering pile sinking with pile shoe and synchronous end grouting structure and process
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN212129099U (en) Pile body sampling device in construction process of lime-soil compaction pile
CN1206421C (en) A drill hole grout pile drag reduction extraction process
CN111335347B (en) Cast-in-situ bored pile and construction method thereof
CN111024436B (en) Coring device and method for cement mixing pile test detection
CN212612466U (en) Special geological pile foundation construction equipment
CN216077072U (en) Non-gas-lift accurate liquid level control gas production device for low-normal-pressure gas well
CN203808055U (en) Screw post-reinforced compacted pile
CN207277312U (en) A kind of compacting pile construction device
CN203373723U (en) Dynamic compactor with functions of hooking automatically and unhooking at fixed height
CN210946790U (en) Rotary drilling rig for rotary-expanding steel pipe pile
CN210105782U (en) Drilling equipment capable of applying pressure
CN208309577U (en) A kind of movable type back-up sand ring tubular pole back-up sand constructing device
CN108086309B (en) Mini pile reinforcement cage installation method
CN213953549U (en) Tool for salvaging well tank from deep well
CN219710260U (en) Construction device for sampling rock and soil at pile end of ultra-deep bored concrete pile
CN220377287U (en) Drilling pile construction is with storing up thick liquid box subassembly and green detection device that handles of abandonment mud
CN216082104U (en) Simple and easy asphalt concrete core appearance extraction element
CN214365965U (en) Hole bottom slag fishing device for well drilling
CN217923548U (en) Anchoring structure for foundation pit protection
CN219450726U (en) Integrated hydraulic impact hammer and spring vibration hammer's integration frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant