CN212077588U - Prefabricated arch bridge node structure - Google Patents

Prefabricated arch bridge node structure Download PDF

Info

Publication number
CN212077588U
CN212077588U CN202020503886.2U CN202020503886U CN212077588U CN 212077588 U CN212077588 U CN 212077588U CN 202020503886 U CN202020503886 U CN 202020503886U CN 212077588 U CN212077588 U CN 212077588U
Authority
CN
China
Prior art keywords
steel plate
arch bridge
shaped connecting
end part
seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020503886.2U
Other languages
Chinese (zh)
Inventor
李梅秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Lvbo Haojing Landscape Engineering Co Ltd
Original Assignee
Beijing Lvbo Haojing Landscape Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Lvbo Haojing Landscape Engineering Co Ltd filed Critical Beijing Lvbo Haojing Landscape Engineering Co Ltd
Priority to CN202020503886.2U priority Critical patent/CN212077588U/en
Application granted granted Critical
Publication of CN212077588U publication Critical patent/CN212077588U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a prefabricated arch bridge node structure, which comprises a pier, an arch bridge, a seam, a Z-shaped connecting steel plate, a first fixed steel plate, a second fixed steel plate, a chemical anchor bolt and a caulking paste layer; an L-shaped concave structure is arranged on the inner side of the top end of the pier, and a convex structure is arranged on the outer side of the top end of the pier; the arch bridge is of a prefabricated reinforced concrete structure, and the end part of the arch bridge is arranged on the L-shaped sunken structure; a seam is reserved between the end part of the arch bridge and the convex structure; a Z-shaped connecting steel plate is arranged between the end part of the arch bridge and the L-shaped sunken structure, and the middle edge of the Z-shaped connecting steel plate is arranged at the seam; one end of the Z-shaped connecting steel plate is provided with a first fixing steel plate jointed with the end part of the arch bridge, and the other end of the Z-shaped connecting steel plate is provided with a second fixing steel plate jointed with the outer side surface of the convex structure; the utility model discloses prefabricated arch bridge node structural design is reasonable, and the structure is firm, and the deformation that adaptable arch bridge takes place.

Description

Prefabricated arch bridge node structure
Technical Field
The utility model relates to a landscape bridge field especially relates to a prefabricated arch bridge node structure.
Background
Along with the improvement of living standard of people, gardens are the excellent place that people had a rest and play, also develop fast, and the arch bridge is one of the common facility in landscape, and traditional arch bridge adopts cast-in-place construction, but need build the template, tie up the reinforcing bar and maintain, and this makes the engineering time longer undoubtedly, therefore prefabricated arch bridge begins to implement, but the arch bridge node is still undefined, leads to having no reliable technical reference during the construction, consequently easily causes a series of problems, such as the steadiness of structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect with not enough, provide a prefabricated arch bridge node structure, this prefabricated arch bridge node structural design is reasonable, and the structure is firm, has water-proof effects, and the deformation that adaptable arch bridge takes place.
In order to achieve the above object, the utility model adopts the following technical scheme: a prefabricated arch bridge node structure comprises a bridge pier, an arch bridge, a seam, a Z-shaped connecting steel plate, a first fixing steel plate, a second fixing steel plate, a chemical anchor bolt and a caulking paste layer; an L-shaped concave structure is arranged on the inner side of the top end of the pier, and a convex structure is arranged on the outer side of the top end of the pier; the arch bridge is of a prefabricated reinforced concrete structure, and the end part of the arch bridge is arranged on the L-shaped sunken structure; a seam is reserved between the end part of the arch bridge and the convex structure; a Z-shaped connecting steel plate is arranged between the end part of the arch bridge and the L-shaped sunken structure, and the middle edge of the Z-shaped connecting steel plate is arranged at the seam; one end of the Z-shaped connecting steel plate is provided with a first fixing steel plate jointed with the end part of the arch bridge, and the other end of the Z-shaped connecting steel plate is provided with a second fixing steel plate jointed with the outer side surface of the convex structure; chemical anchor bolts are arranged between the first fixing steel plate and the end part of the arch bridge and between the second fixing steel plate and the protruding structure for fastening; and the joints are filled with caulking paste layers.
Preferably, the seam width is 30-50 mm.
The utility model has the advantages that: this prefabricated arch bridge node structural design is reasonable, and the structure is firm, has water-proof effects, and the deformation that adaptable arch bridge takes place.
Drawings
Fig. 1 is a schematic structural diagram of a prefabricated arch bridge node.
Wherein: 1 is the pier, 11 is L type sunk structure, and 12 are protruding structure, and 2 are the arched bridge, and 3 are the seam, and 4 are Z type connecting steel plate, and 5 are first fixed steel plate, and 6 are the fixed steel plate of second, and 7 are chemical crab-bolt, and 8 are the caulking plaster layer.
Detailed Description
The present invention will be described in further detail with reference to fig. 1.
As shown in fig. 1, a prefabricated arch bridge node structure comprises a pier 1, an arch bridge 2, a seam 3, a Z-shaped connecting steel plate 4, a first fixing steel plate 5, a second fixing steel plate 6, a chemical anchor bolt 7 and a caulking paste layer 8; an L-shaped concave structure 11 is arranged on the inner side of the top end of the pier 1, and a convex structure 12 is arranged on the outer side of the top end of the pier 1; the arch bridge 2 is of a prefabricated reinforced concrete structure, and the end part of the arch bridge 2 is arranged on the L-shaped sunken structure 11; a seam 3 is reserved between the end part of the arch bridge 2 and the convex structure 12; a Z-shaped connecting steel plate 4 is arranged between the end part of the arch bridge 2 and the L-shaped sunken structure 11, and the middle edge of the Z-shaped connecting steel plate 4 is arranged at the seam 3; one end of the Z-shaped connecting steel plate 4 is provided with a first fixed steel plate 5 jointed with the end part of the arch bridge 2, and the other end of the Z-shaped connecting steel plate 4 is provided with a second fixed steel plate 6 jointed with the outer side surface of the convex structure 12; chemical anchor bolts 7 are arranged between the first fixing steel plate 5 and the end part of the arch bridge 2 and between the second fixing steel plate 6 and the convex structure 12 for fastening; the joint 3 is filled with a layer of caulking compound 8.
In specific implementation, the width of the seam 3 is 30-50 mm.

Claims (2)

1. A prefabricated arch bridge node structure which characterized in that: comprises a bridge pier, an arch bridge, a seam, a Z-shaped connecting steel plate, a first fixed steel plate, a second fixed steel plate, a chemical anchor bolt and a caulking paste layer; an L-shaped concave structure is arranged on the inner side of the top end of the pier, and a convex structure is arranged on the outer side of the top end of the pier; the arch bridge is of a prefabricated reinforced concrete structure, and the end part of the arch bridge is arranged on the L-shaped sunken structure; a seam is reserved between the end part of the arch bridge and the convex structure; a Z-shaped connecting steel plate is arranged between the end part of the arch bridge and the L-shaped sunken structure, and the middle edge of the Z-shaped connecting steel plate is arranged at the seam; one end of the Z-shaped connecting steel plate is provided with a first fixing steel plate jointed with the end part of the arch bridge, and the other end of the Z-shaped connecting steel plate is provided with a second fixing steel plate jointed with the outer side surface of the convex structure; chemical anchor bolts are arranged between the first fixing steel plate and the end part of the arch bridge and between the second fixing steel plate and the protruding structure for fastening; and the joints are filled with caulking paste layers.
2. A prefabricated arch bridge node structure according to claim 1, wherein: the width of the seam is 30-50 mm.
CN202020503886.2U 2020-04-08 2020-04-08 Prefabricated arch bridge node structure Expired - Fee Related CN212077588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020503886.2U CN212077588U (en) 2020-04-08 2020-04-08 Prefabricated arch bridge node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020503886.2U CN212077588U (en) 2020-04-08 2020-04-08 Prefabricated arch bridge node structure

Publications (1)

Publication Number Publication Date
CN212077588U true CN212077588U (en) 2020-12-04

Family

ID=73595015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020503886.2U Expired - Fee Related CN212077588U (en) 2020-04-08 2020-04-08 Prefabricated arch bridge node structure

Country Status (1)

Country Link
CN (1) CN212077588U (en)

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN206189455U (en) Piping lane
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN108756021A (en) Envelope storehouse method for assembled architecture conversion layer sleeve grouting exterior wall
CN207003634U (en) A kind of balcony slab installs node
CN106481006A (en) Assembly concrete beam slab tongue and groove method of attachment
CN110206563A (en) A kind of full packet waterproof composite lining structure resistant to pressure and its construction method
CN212077588U (en) Prefabricated arch bridge node structure
CN213805362U (en) A antiseep anchor head structure of prestressing force anti-floating anchor rod for bottom plate is pour back stretch-draw
CN206189456U (en) Three cabin piping lanes
CN208363636U (en) Envelope storehouse tool for assembled architecture conversion layer sleeve grouting exterior wall
CN212357943U (en) Prefabricated double-arch bridge middle connecting node structure
CN207660193U (en) A kind of overlength eaves gutter applied in assembling type steel structure building
CN215053220U (en) Structure system for zero-distance crossing stub subway station
CN213268014U (en) Corrugated cover plate mounting structure for advanced construction of roof post-cast strip
CN113374180B (en) Grouting sleeve connection concrete reinforcing structure and construction method
CN209942845U (en) Be suitable for shield formula TBM's intermediate layer formula steel combination section of jurisdiction
CN210766887U (en) Face combination underground groove type structure forever
CN207048079U (en) Waterproof structure for embedded steel-concrete connecting piece
CN206477431U (en) Overlap balcony
CN218263854U (en) Continuous closed underground anti-floating anchor rod water-proof treatment structure
CN217078857U (en) Assembled concrete side ditch
CN220789821U (en) Reverse construction method reinforced foundation slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201204

Termination date: 20210408