CN212056125U - Water heating pipeline erection bracing frame for building - Google Patents

Water heating pipeline erection bracing frame for building Download PDF

Info

Publication number
CN212056125U
CN212056125U CN202020261053.XU CN202020261053U CN212056125U CN 212056125 U CN212056125 U CN 212056125U CN 202020261053 U CN202020261053 U CN 202020261053U CN 212056125 U CN212056125 U CN 212056125U
Authority
CN
China
Prior art keywords
mounting
water heating
connecting plate
building
sets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020261053.XU
Other languages
Chinese (zh)
Inventor
周彦杰
赵楠
马小兵
吴凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN202020261053.XU priority Critical patent/CN212056125U/en
Application granted granted Critical
Publication of CN212056125U publication Critical patent/CN212056125U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a building water heating pipe erection bracing frame, relate to the installation field of hot-water heating pipeline, including being used for laying the fixed mounting rail in the relative building plane of direction according to the body, the mounting rail sets up about the axis symmetry of body in the body both sides, the interval is equipped with the pedestal subassembly on the mounting rail, the pedestal subassembly is including fixing connecting piece and the connecting plate of assembly between two connecting pieces on two mounting rails respectively, it sets up at least two sets of bolt holes to correspond between two connecting pieces, the connecting plate passes through the relative connecting piece of bolt and sets up the structure that can dismantle relatively, be fixed with the supporting part on the connecting plate, the supporting part upper end is the arc structure with body looks adaptation, save the cost simultaneously to the utilization ratio in space when improving hot-water heating.

Description

Water heating pipeline erection bracing frame for building
Technical Field
The utility model relates to a building water heating pipe erection bracing frame.
Background
At present, need install heating pipe way in the hot-water heating field, for satisfying comprehensive heating demand, the hot-water heating passageway that sets up on the building is comparatively complicated, and occupation space is great, and current hot-water heating pipeline installing support is comparatively simple simultaneously, and highly comparatively single, a installing support only supports the hot-water heating pipeline of an installation height and lays, combines above problem now, need provide one kind and be used for improving space utilization and can highly carry out the installing support of adjusting according to setting up of actual installation demand to hot-water heating pipeline simultaneously.
SUMMERY OF THE UTILITY MODEL
The utility model provides a mounting bracket that is used for improving space utilization simultaneously can highly carry out the adjustment to setting up of hot-water heating pipeline according to actual installation demand.
The technical scheme of the utility model is realized like this: the utility model provides a building water heating pipe erection bracing frame, including being used for laying the relative building plane fixed mounting rail of direction according to the body, the mounting rail sets up about the axis symmetry of body in body both sides, the interval is equipped with the pedestal subassembly on the mounting rail, the pedestal subassembly is including fixing respectively connecting piece and the connecting plate of assembly between two connecting pieces on two mounting rails, it sets up two sets of at least bolt holes to correspond between two connecting pieces, the connecting plate passes through the relative connecting piece of bolt and sets up the structure that can dismantle relatively, be fixed with the supporting part on the connecting plate, the supporting part upper end is the arc structure with body looks adaptation.
Compare in prior art this scheme's beneficial effect does: the middle position department of mounting rail upwards extrudees and forms first installation department, and the lower tip of connecting piece corresponds the sunken second installation department that forms of first installation department, and the connecting piece passes through second installation department joint on the mounting rail, and the second installation department corresponds first installation department level and extends there is the fixed plate, and the fixed plate is fixed through the bolt with first installation department.
Compared with the prior art, the scheme has the following beneficial effects:
(1) improve the utilization efficiency in space when the body is laid, same installing support can support two at least bodies on vertical, has compared in prior art and has reduced the occupation to the space.
(2) The use of reduction to installing support quantity saves the cost, and same installing support can support two at least bodys, has further saved the use that the hot-water heating pipeline laid the in-process to support quantity.
(3) Can support the body of different heights of erectting, can adjust the support height of support through the relative assembly position of adjusting connection board and connecting piece, increase the suitability that this installing support used.
On the basis of the scheme, the pipe is further improved in the following way, the rolling parts are embedded in the upper end faces of the supporting parts, and the supporting parts are in contact with the outer wall of the pipe body through the rolling parts.
On the basis of the scheme, the rolling parts are rollers in further improvement.
On the basis of the scheme, the rolling parts are balls in a further improvement mode.
Compare in prior art this scheme's beneficial effect does: the pipe body is placed on the support to drag the pipe body to move in a labor-saving mode, the support part is in rolling contact with the outer wall of the pipe body through the rolling piece, and friction force generated between the pipe body and the support part when the pipe body is dragged is reduced.
On the basis of above-mentioned scheme, further improve as follows, still be fixed with on the connecting plate and be used for carrying out the fastener fixed to the body, the upper end of fastener is the arc structure, and the fastener cup joints at the body outside.
Compare in prior art this scheme's beneficial effect does: the fixed strength to the body has been improved, and after the body position control was accomplished, further used the fastener to fix the body, effectively improved the stability of body installation.
On the basis of the scheme, the connecting piece is further improved to be I-shaped steel.
On the basis of the scheme, the structure is further improved as follows, rectangular plate bodies vertical to the plate bodies of the connecting plates are formed at two ends of the connecting plates, and the connecting plates are in H-shaped structures.
On the basis of the scheme, the structure is further improved as follows, and the connecting plate is of an integrated structure.
Compared with the prior art, the scheme has the following beneficial effects:
(1) convenient to draw materials, in the work progress, the workman can cut I shaped steel as required, and the support intensity of connecting piece is higher simultaneously, has guaranteed the stability of body installation.
(2) The connecting plate is "H" shape structure, the assembly work between connecting plate and the connecting piece of being convenient for, convenient operation, and connecting plate formula structure as an organic whole has guaranteed the structural strength and the bearing capacity of connecting plate.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a front view of the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is a top view of the present invention;
wherein: 1-mounting rail, 11-first mounting part, 2-connecting piece, 21-second mounting part, 3-connecting plate, 31-supporting part, 32-rolling piece, 33-fastening piece, a-building plane and b-pipe body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. It should be noted that in the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicating the directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and "fourth" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
The utility model relates to a concrete embodiment of hot-water heating pipeline erection bracing frame for building, as shown in fig. 1-3:
the technical scheme provided by the utility model is mainly applied to buildings with independent heating, such as low-rise independent office buildings or shopping malls, the main heating pipeline of the water heating pipeline is usually arranged from the top end of the building, the mounting bracket provided by the utility model is mainly used for supporting the main pipeline of the water heating pipeline;
the utility model provides a pair of hot-water heating pipeline erection bracing frame for building, include and lay relative building plane a of direction according to the hot-water heating pipeline and construct the fixed mounting rail 1 of top surface promptly, mounting rail 1 is fixed in advance in the both sides of body b installation position, and the mounting rail 1 that is located body b installation position both sides sets up about body b's axis symmetry, and mounting rail 1 can be fixed through the relative building plane a of bolt, and the interval is equipped with the pedestal subassembly that is used for carrying out the support to body b on mounting rail 1, and the pedestal subassembly includes two connecting pieces 2 and two at least connecting plates 3.
Two connecting pieces 2 are respectively fixed on two mounting rails 1, the connecting pieces 2 are fixed relative to the mounting rails 1 through bolts, a connecting plate 3 is assembled between the two connecting pieces 2, the connecting plate 3 is in an H-shaped structure, the connecting pieces 2 can be I-shaped steel, a plurality of groups of bolt holes are correspondingly arranged on two opposite sides of the connecting pieces 2, the intervals between the bolt holes can be the same, bolt holes are also arranged on two sides of the connecting plate 3 corresponding to the connecting pieces 2, the connecting plate 3 and the connecting plate 3 are further assembled through bolts, in the assembling process, the relative position between the connecting plate 3 and the connecting pieces 2 is selected according to the actual mounting requirement of a pipe body b, a supporting part 31 is fixed on the horizontal part of the connecting plate 3, the upper end of the supporting part 31 is in an arc structure matched with the outer wall of the pipe body b, and the lower, the support portion 31 and the connecting plate 3 may be fixed by bolts.
Still be fixed with on the connecting plate 3 and be used for further carrying out the fastener 33 fixed to body b, the upper end of fastener 33 is semi-circular structure, and the lower extreme of fastener 33 passes through bolt or fix with screw on connecting plate 3, and fastener 33 cup joints in body b's outside, and the upper end of fastener 33 is laminated with body b's outer wall.
In a preferred embodiment, a plurality of rolling members 32 are embedded in the supporting portion 31, each rolling member 32 may be a ball or a roller, the supporting portion 31 is in sliding contact with the outer wall of the tube b through the rolling members 32, and when the tube b is pulled relative to the supporting portion 31, sliding friction force is generated between the outer wall of the tube b and the supporting portion 31, thereby further facilitating the movement of the position of the tube b by a worker.
In a preferred embodiment, a first mounting portion 11 is formed by protruding upward at the middle position of the mounting rail 1, a second mounting portion 21 is formed by recessing the lower end portion of the connecting member 2 corresponding to the first mounting portion 11, the connecting member 2 is connected to the mounting rail 1 by the second mounting portion 21 in a clamping manner, a fixing plate horizontally extends from the second mounting portion 21 corresponding to the first mounting portion 11, the fixing plate and the first mounting portion 11 are fixed by bolts, the fixing plate and the second mounting portion 21 can be welded, and the first mounting portion 11 and the second mounting portion 21 can further facilitate the fixing between the mounting rail 1 and the pre-connecting member 2.
The specific implementation manner of the utility model is as follows:
firstly, fixing a mounting rail 1 on a building plane a according to the arrangement direction of pipe bodies b, fixing seat body components on the mounting rail 1 at intervals as required, when fixing the seat body components, firstly fixing the connecting pieces 2 on the mounting rails 1, then selecting a proper number of connecting plates 3 according to requirements and fixing the connecting plates at proper positions of the connecting pieces 2, in order to ensure the supporting strength of the bracket on the tube bodies b, the scheme can support two tube bodies b by the same bracket in the implementation process, placing the tube bodies b on each seat body component and enabling the tube bodies b to be contacted with the supporting parts 31, drag body b as required and adjust body b's position, further use fastener 33 to fix body b's position after body b position is confirmed, the installing support that this scheme provided can reduce body b and to the occupation in space, saves the quantity of required support simultaneously.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The utility model provides a building water heating pipe erection bracing frame, a serial communication port, including being used for laying the relative building plane fixed mounting rail of direction according to the body, the mounting rail sets up about the axis symmetry of body in body both sides, the interval is equipped with the pedestal subassembly on the mounting rail, the pedestal subassembly is including fixing respectively connecting piece on two mounting rails and the connecting plate of assembly between two connecting pieces, it sets up two sets of at least bolt holes to correspond between two connecting pieces, the connecting plate passes through the relative connecting piece of bolt and sets up the structure that can dismantle relatively, be fixed with the supporting part on the connecting plate, the supporting part upper end is the arc structure with body looks adaptation.
2. The support frame for mounting the water heating pipe for the building as claimed in claim 1, wherein a first mounting portion is formed at a middle position of the mounting rail by protruding upward, a second mounting portion is formed at a lower end portion of the connecting member by recessing corresponding to the first mounting portion, the connecting member is fastened to the mounting rail by the second mounting portion, a fixing plate is horizontally extended from the second mounting portion corresponding to the first mounting portion, and the fixing plate and the first mounting portion are fixed by a bolt.
3. A support frame for mounting a water heating pipe for construction according to claim 1, wherein the support part is provided with rolling members at an upper end surface thereof, and the support part is in contact with the outer wall of the pipe body via the rolling members.
4. A support frame for mounting a water heating pipe in a building as claimed in claim 3, wherein the rolling members are rollers.
5. A support frame for mounting a water heating pipe in a building as claimed in claim 3, wherein the rolling member is a ball.
6. The support frame for mounting the water heating pipeline for the building as claimed in any one of claims 1 to 5, wherein a fastening member for fixing the pipe body is further fixed on the connecting plate, an upper end of the fastening member is in an arc structure, and the fastening member is sleeved outside the pipe body.
7. A support frame for mounting water heating pipes for buildings according to any one of claims 1 to 5, wherein the connecting member is an I-shaped steel.
8. A support frame for mounting water heating pipes for buildings according to any one of claims 1 to 5, wherein the two ends of the connecting plate form rectangular plates perpendicular to the plate body of the connecting plate, and the connecting plate is in an H-shaped structure.
9. A support frame for mounting a water heating pipe in a building as claimed in claim 8, wherein the connecting plate is of a one-piece construction.
CN202020261053.XU 2020-03-05 2020-03-05 Water heating pipeline erection bracing frame for building Expired - Fee Related CN212056125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020261053.XU CN212056125U (en) 2020-03-05 2020-03-05 Water heating pipeline erection bracing frame for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020261053.XU CN212056125U (en) 2020-03-05 2020-03-05 Water heating pipeline erection bracing frame for building

Publications (1)

Publication Number Publication Date
CN212056125U true CN212056125U (en) 2020-12-01

Family

ID=73531037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020261053.XU Expired - Fee Related CN212056125U (en) 2020-03-05 2020-03-05 Water heating pipeline erection bracing frame for building

Country Status (1)

Country Link
CN (1) CN212056125U (en)

Similar Documents

Publication Publication Date Title
CN101948060A (en) Elevator cabin guide rail bracket for expresselevator
CN212203401U (en) Simple anti-seismic support
CN202201602U (en) Elevator car guide rail bracket of high-speed elevator
CN212056125U (en) Water heating pipeline erection bracing frame for building
CN201834636U (en) Elevator car guide rail support for high-speed elevator
CN209780318U (en) prefabricated component installation bearing structure
CN210636636U (en) Building installation portable built-in fitting
CN204570723U (en) A kind of assembly type stove installation foundation structure
CN210423968U (en) Assembled support and hanger and building using same
CN103291042A (en) Curtain pendant capable of being adjusted in three-dimensional manner
CN210484808U (en) Adjustable temporary pipeline support
CN216407924U (en) Single tube support convenient to installation
CN218597455U (en) Heat-insulating bridge structure of steel frame stone curtain wall
CN220504526U (en) Support assembly for connecting formwork support beam and formwork support system
CN214195168U (en) Modular boarding hall top frame structure
CN219219518U (en) Connecting piece of roof furred ceiling conversion layer
CN211455922U (en) Adjustable short pole holding support for floor antenna
CN218233787U (en) A assembled room roof beam supports steelframe for green building
CN220336166U (en) Wall body with air conditioner bearing structure
CN219100420U (en) Mounting structure of assembled oversized glass screen
CN219548440U (en) Assembled building wall body installation component
CN215107481U (en) Prefabricated outer wall auxiliary positioning combined member
CN211172065U (en) Shared equipment foundation for multi-pipeline space
CN217463488U (en) Electric power construction is with two-way antidetonation support
CN220768583U (en) Assembled conversion layer jib mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201