CN212053257U - Hole filling device for constructional engineering - Google Patents

Hole filling device for constructional engineering Download PDF

Info

Publication number
CN212053257U
CN212053257U CN202020206804.8U CN202020206804U CN212053257U CN 212053257 U CN212053257 U CN 212053257U CN 202020206804 U CN202020206804 U CN 202020206804U CN 212053257 U CN212053257 U CN 212053257U
Authority
CN
China
Prior art keywords
plate
hole
membrane
screw rod
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020206804.8U
Other languages
Chinese (zh)
Inventor
张海堂
葛建双
宫保君
凌子健
胡飞
施超
徐正朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202020206804.8U priority Critical patent/CN212053257U/en
Application granted granted Critical
Publication of CN212053257U publication Critical patent/CN212053257U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a hole patching device for constructional engineering, which comprises an upper supporting plate, an upper plate, a steel cable and a lower plate, wherein the upper supporting plate is of a hollow circular truncated cone structure, the upper supporting plate is arranged in a clamping plate groove on the upper plate, the upper end of the upper supporting plate is in threaded connection with a screw rod, the lower end of the screw rod is movably connected with a clamping block, the clamping block is connected with the upper end of the steel cable through a connecting ring below, the connecting ring is arranged above the upper plate, a feeding hole is formed in the upper plate, the bottom of the upper plate is connected with an upper film in an attaching mode, the upper part of the lower plate is fixedly connected with a rubber plate, the upper part of the rubber plate is connected with a lower film in an attaching mode, the lower plane of the lower plate is fixedly connected with a cross rod, and the cross rod is.

Description

Hole filling device for constructional engineering
Technical Field
The invention belongs to the technical field of constructional engineering, and particularly relates to a hole patching device for constructional engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The building construction is a project entity which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of people on production, living, study and public activities, and the building construction is a project entity which is used for planning, surveying, designing, constructing, completing and other technical works and completed for newly building, reconstructing or expanding a building construction and an auxiliary structure facility and is matched with the building construction, the engineering entity and the installation project of lines, pipelines and equipment. Also refers to the construction of various houses and buildings, also known as the construction workload. The part of investment amount needs to be realized by the aid of construction activities with materials being moved, most walls need to be provided with reserved holes for subsequent operation in the engineering implementation process, and the reserved holes need to be filled when the engineering is finished.
Most of the existing hole patching devices for building engineering are formed by simply lapping plates, the bottom plate is not tightly attached to a wall body, mortar in the hole patching is easy to leak, the hole patching position is uneven, the plates are inconvenient to separate after the hole patching is finished, and the splitting is not fast and convenient.
Disclosure of Invention
In order to solve the problems, the invention discloses a hole patching device for constructional engineering, which is novel in structure, quick and convenient to mount and dismount and good in hole patching effect.
In order to achieve the purpose, the technical scheme of the invention is as follows:
a hole patching device for building engineering comprises an upper supporting plate (1), an upper plate, a steel cable (7) and a lower plate (11), wherein the upper supporting plate (1) is of a hollow circular truncated cone structure, a clamping plate groove is formed in the upper plate, the lower plane of the upper supporting plate is arranged in the clamping plate groove, the upper end of the upper supporting plate (1) is in threaded connection with a screw rod (3), the lower end of the screw rod (3) is movably connected with a clamping block (4), the clamping block (4) is connected with the upper end of the steel cable (7) through a connecting ring (6) below, the connecting ring (6) is arranged above the upper plate, a feeding hole (9) is formed in the upper plate, the bottom of the upper plate (8) is attached and connected with an upper film (10), the upper side of the lower plate (11) is fixedly connected with a rubber plate (12), the upper side of the rubber plate (12) is attached and connected with a lower film (14), and the lower plane of the lower plate (11, the cross rod (13) is connected with the lower end of the steel cable (7).
As an improvement of the invention, the interior of the upper supporting plate (1) is in a hollow convex shape, a threaded hole matched with the screw rod (3) is arranged at the center position of the upper end of the upper supporting plate (1), the upper supporting plate (1) in the convex hollow shape can facilitate the installation of internal elements, the screw rod (3) can tension the internal steel cable (7), and the device is conveniently and tightly attached to a wall body (15).
As an improvement of the invention, a clamping groove (5) is arranged in the clamping block (4), the clamping groove (5) is movably clamped with one end of the screw rod (3) correspondingly, and the clamping groove (5) in the clamping block (4) is movably clamped with one end of the screw rod (3), so that the clamping block (4) can be prevented from being driven to rotate when the screw rod (3) rotates, and the steel cable (7) is prevented from being excessively turned to influence the mechanical performance.
As an improvement of the invention, the feeding hole (9) is eccentrically arranged in the upper plate (8), the position of the feeding hole (9) and the supporting part of the upper supporting plate (1) are arranged in a staggered manner, and feeding is carried out through the eccentrically arranged feeding hole (9), so that the feeding hole (9) is prevented from being shielded by the upper supporting plate (1) and the material injection is prevented from being influenced.
As an improvement of the invention, the setting diameters of the upper membrane (10) and the lower membrane (14) are larger than the setting diameters of the upper plate (8) and the lower plate (11), the upper membrane (10) and the lower membrane (14) are both oily, and the upper membrane (10) and the lower membrane (14) are used for isolating the pouring material from the upper plate (8) and the lower plate (11), so that the pouring material is prevented from being adhered to the upper plate (8) and the lower plate (11), and the later-stage disassembly and assembly of the upper plate (8) and the lower plate (11) are facilitated.
As an improvement of the invention, through holes are arranged on the upper plate (8) and the lower plate (11), the through holes between the upper plate (8) and the lower plate (11) are arranged oppositely, the through holes on the upper plate (8) and the lower plate (11) can facilitate the passing of the steel cable (7), the steel cable (7) provides a pulling force (a protective tube can also be arranged in the through holes on the upper plate (8) and the lower plate (11), and the steel cable (7) passes through the protective tube).
As an improvement of the invention, a wall body (15) is arranged between the upper plate (8) and the lower plate (11), a reserved hole is arranged in the wall body (15), the upper plate (8) and the lower plate (11) on two sides of the wall body (15) can seal the two sides of the reserved hole, the upper plate (8) and the lower plate (11) which are arranged in a fitting manner can ensure the flatness of the formed pouring material, and the hole filling effect is good.
The invention has the beneficial effects that:
1. the utility model discloses there is the screw rod upper end threaded connection at last fagging, there is the joint piece at the one end activity joint of screw rod, one side fixedly connected with go-between at the joint piece, the go-between can be convenient for be connected the cable wire one end, the other end of cable wire passes through the horizontal pole and is connected with lower board, there is the upper plate in the inboard bottom joint of last fagging, the upper plate seals the inside preformed hole both sides of wall body with lower board, it is taut with the cable wire through rotatory screw rod, the taut in-process of cable wire can laminate upper plate and lower board and wall body, it pours the material and pours into through the feed port, the planarization after the material shaping can be guaranteed to pour with lower board to the upper plate of inseparable laminating, it is effectual to men.
2. The utility model discloses in, be connected epitoma and lower membrane in one side of epitoma and lower board, epitoma and lower membrane are oily setting, pour the material through epitoma and lower membrane and keep apart with epitoma and lower board, avoid pouring material and epitoma and lower board bonding, the later stage dismouting of the epitoma and the lower board of being convenient for, the material of mending a hole condenses to accomplish the back and only needs to cut off the upper end cable wire, can be with device and wall body separation, it is convenient fast that the installation is dismantled, it is efficient to mend a hole.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of the upper supporting plate according to the present invention.
Fig. 3 is an enlarged view of a in fig. 1.
List of reference numerals:
1. go up backup pad, 2, cardboard groove, 3, screw rod, 4, joint piece, 5, joint groove, 6, go-between, 7, cable wire, 8, upper plate, 9, feed port, 10, go up the membrane, 11, lower template, 12, rubber slab, 13, horizontal pole, 14, lower membrane, 15, wall body.
Detailed Description
The present invention will be further illustrated with reference to the accompanying drawings and specific embodiments, which are to be understood as merely illustrative of the invention and not as limiting the scope of the invention. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in fig. 1-3, the hole patching device for building engineering, provided by the invention, comprises an upper supporting plate 1, a steel cable 7 and a lower plate 11, wherein the upper supporting plate 1 is placed in a clamping plate groove 2 of the upper plate 8, the upper end of the upper supporting plate 1 is in threaded connection with a screw rod 3, one end of the screw rod 3 is movably clamped with a clamping block 4, the bottom of the clamping block 4 is fixedly connected with a connecting ring 6, the connecting ring 6 is connected with the steel cable 7, the inside of the clamping plate groove 2 is correspondingly clamped with the upper plate 8, the upper end of the upper plate 8 is provided with a feeding hole 9, the bottom of the upper plate 8 is in fit connection with an upper membrane 10, one side of the lower plate 11 is fixedly connected with a rubber plate 12, one side of the rubber plate 12 is in fit connection with a lower membrane 14, one side of the lower plate 11 is fixedly connected.
As shown in fig. 1, the interior of the upper supporting plate 1 is a hollow round table (big end up), a threaded hole matched with the screw rod 3 is formed in the center of the upper end of the upper supporting plate 1, the upper supporting plate 1 which is arranged in a hollow concave manner can facilitate the installation of internal elements, the screw rod 3 can tension the inner steel cable 7, and the device is tightly attached to the wall body 15.
As shown in fig. 3, the inside of joint piece 4 is provided with joint groove 5, and joint groove 5 corresponds the joint with the one end activity of screw rod 3, through joint groove 5 and the 3 one end activity joint of screw rod of the inside joint of joint piece 4, can avoid driving the rotation to joint piece 4 when screw rod 3 is rotatory, avoids carrying out excessive knob to cable wire 7, influences mechanical properties.
The feeding hole 9 is eccentrically arranged in the upper plate 8, the position of the feeding hole 9 and the supporting part of the upper supporting plate 1 are arranged in a staggered manner, and feeding is carried out through the eccentrically arranged feeding hole 9, so that the upper supporting plate 1 is prevented from shielding the feeding hole 9 and influencing material injection.
The setting diameters of the upper membrane 10 and the lower membrane 14 are larger than the setting diameters of the upper plate 8 and the lower plate 11, the upper membrane 10 and the lower membrane 14 are both arranged in an oil state, and pouring materials are isolated from the upper plate 8 and the lower plate 11 through the upper membrane 10 and the lower membrane 14, so that the pouring materials are prevented from being adhered to the upper plate 8 and the lower plate 11, and the later-stage disassembly and assembly of the upper plate 8 and the lower plate 11 are facilitated.
Through holes are formed in the upper plate 8 and the lower plate 11, the through holes in the middle of the upper plate 8 and the lower plate 11 are arranged oppositely, the through holes in the upper plate 8 and the lower plate 11 can facilitate the steel cable 7 to pass through, and the steel cable 7 provides tension.
According to the invention, the wall body 15 is arranged between the upper plate 8 and the lower plate 11, the reserved hole is arranged in the wall body 15, the upper plate 8 and the lower plate 11 on the two sides of the wall body 15 can seal the two sides of the reserved hole, and the upper plate 8 and the lower plate 11 which are arranged in a joint mode can ensure the flatness of the formed pouring material and have a good hole filling effect.
The technical means disclosed in the invention scheme are not limited to the technical means disclosed in the above embodiments, but also include the technical scheme formed by any combination of the above technical features.

Claims (7)

1. The utility model provides a mend hole device that building engineering used which characterized in that: comprises an upper supporting plate (1), an upper plate (8), a steel cable (7) and a lower plate (11), wherein the upper supporting plate (1) is of a hollow round table structure, a clamping plate groove (2) is formed in the upper plate (8), the lower plane of the upper supporting plate (1) is arranged in the clamping plate groove (2), the upper end of the upper supporting plate (1) is in threaded connection with a screw rod (3), the lower end of the screw rod (3) is movably connected with a clamping block (4), the clamping block (4) is connected with the upper end of the steel cable (7) through a connecting ring (6) below, the connecting ring (6) is arranged above the upper plate (8), a feeding hole (9) is formed in the upper plate, the bottom of the upper plate (8) is attached and connected with an upper membrane (10), the upper side of the lower plate (11) is fixedly connected with a rubber plate (12), the upper side of the rubber plate (12) is attached and connected with a lower membrane (14), and the, the cross rod (13) is connected with the lower end of the steel cable (7).
2. A hole patching device for building engineering according to claim 1, characterized in that the center of the upper end of the upper supporting plate (1) is provided with a threaded hole matched with the screw rod (3).
3. The hole patching device for constructional engineering as claimed in claim 1, wherein the inside of the clamping block (4) is provided with a clamping groove (5), and the clamping groove (5) is movably clamped with one end of the screw rod (3) correspondingly.
4. A hole patching device for building engineering according to claim 1, characterized in that the feeding hole (9) is eccentrically arranged in the upper plate (8), and the feeding hole (9) is positioned in a staggered way with respect to the supporting part of the upper supporting plate (1).
5. A hole patching device for construction engineering as claimed in claim 1, characterized in that the upper membrane (10) and the lower membrane (14) are both arranged with a diameter greater than the diameter of the upper plate (8) and the lower plate (11), and both the upper membrane (10) and the lower membrane (14) are arranged oily.
6. A hole patching device for constructional engineering as claimed in claim 1, wherein the upper plate (8) and the lower plate (11) are provided with through holes, and the through holes in the middle of the upper plate (8) and the lower plate (11) are arranged in an opposite way.
7. A hole patching device for constructional engineering as claimed in claim 1, wherein a wall (15) is arranged between the upper plate (8) and the lower plate (11), and a reserved hole is arranged inside the wall (15).
CN202020206804.8U 2020-02-25 2020-02-25 Hole filling device for constructional engineering Expired - Fee Related CN212053257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020206804.8U CN212053257U (en) 2020-02-25 2020-02-25 Hole filling device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020206804.8U CN212053257U (en) 2020-02-25 2020-02-25 Hole filling device for constructional engineering

Publications (1)

Publication Number Publication Date
CN212053257U true CN212053257U (en) 2020-12-01

Family

ID=73534013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020206804.8U Expired - Fee Related CN212053257U (en) 2020-02-25 2020-02-25 Hole filling device for constructional engineering

Country Status (1)

Country Link
CN (1) CN212053257U (en)

Similar Documents

Publication Publication Date Title
CN208718166U (en) A kind of prefabricated assembled movable partition wall plate, wall and partition plate moving structure
CN108104837B (en) A method of tunnel-liner fast continuous placing is realized using automatic material distributing device
CN109944461B (en) High-rise building connecting beam horizontal hole plugging structure and construction method thereof
CN212053257U (en) Hole filling device for constructional engineering
CN210421925U (en) Positioning and embedding device for water stop joint of building
CN104047423B (en) A kind of mould and construction method of wearing the accurate reserved opening of flooring plate
CN208056107U (en) A kind of combined steel formwork support system
CN107576574B (en) Testing method for equal-size limit water pressure resistance of deformation joint embedded water stop
CN206988597U (en) Compound plastic film precast concrete pipeline and its special prepare mould
CN115749257A (en) Prefabricated laminated slab cast-in-place strip construction supporting device and supporting method
CN208040405U (en) A kind of tunnel double-lining trolley vault assembled secondary grouting system
CN108118911A (en) Detachable steel tube concrete support device and application method
CN209799375U (en) Wear floor drain built-in fitting fixing device
CN208981359U (en) The gang form structure of the inspection shaft cast-in-place construction of town road pipeline
CN203403445U (en) Steel sleeve used for plugging basement tube well
CN207862974U (en) The quick support shuttering system of city integrated piping lane construction
CN216476374U (en) Template fixing device is used in building engineering construction
CN110966025A (en) Shield tunnel segment crack plugging device and construction method
CN210964841U (en) Building AB glue is with storing transportation mixing arrangement
CN205871259U (en) Magnetic screen cavity lateral wall bonds and fixes pressure device
CN107842199A (en) A kind of preforming combination tool of mattess partitioning slot and its built-in process
CN111042343B (en) A pre-buried device for creeping formwork hangs
CN213952994U (en) Template for building garden building house
CN112096066B (en) Device and method for controlling depth of pipeline pressing groove on structural plate
CN219219823U (en) BM interlocking building block core column core filling auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201