CN212050343U - Cable suspension device for engineering construction - Google Patents

Cable suspension device for engineering construction Download PDF

Info

Publication number
CN212050343U
CN212050343U CN202020338369.4U CN202020338369U CN212050343U CN 212050343 U CN212050343 U CN 212050343U CN 202020338369 U CN202020338369 U CN 202020338369U CN 212050343 U CN212050343 U CN 212050343U
Authority
CN
China
Prior art keywords
fixing
portal frame
rods
fixedly arranged
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020338369.4U
Other languages
Chinese (zh)
Inventor
陈茂涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yangtze River Construction Group Co Ltd
Original Assignee
Shanghai Yangtze River Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yangtze River Construction Group Co Ltd filed Critical Shanghai Yangtze River Construction Group Co Ltd
Priority to CN202020338369.4U priority Critical patent/CN212050343U/en
Application granted granted Critical
Publication of CN212050343U publication Critical patent/CN212050343U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to an engineering construction technical field discloses a cable suspension device for engineering construction, the on-line screen storage device comprises a base, the last fixed surface of base is equipped with the portal frame, the fixed hoist engine that is equipped with in top of portal frame, the outer wall of hoist engine is around having the lifting rope, the inside level of portal frame is equipped with the hanger plate, the one end that the hoist engine was kept away from to the lifting rope run through to the inside of portal frame and with hanger plate fixed connection, the hanger plate is hollow structure, the inside symmetry slip of hanger plate is equipped with two fixed blocks, the inside symmetry of hanger plate is equipped with the kelly that two left and right sides distribute and set up, two the kelly is fixed and crosses in two the inside setting of fixed block, two the equal activity of the pole wall of kelly has cup jointed the spring, and the both ends of spring respectively with the inside wall fixed connection of fixed block and hanger plate. The utility model discloses can avoid the hanger plate to appear the phenomenon of rocking after rising, guarantee constructor's operability and security.

Description

Cable suspension device for engineering construction
Technical Field
The utility model relates to an engineering construction technical field especially relates to a cable suspension device for engineering construction.
Background
At engineering construction's in-process, need transport some materials, at the in-process of transporting, some materials are heavier, and the manpower is relied on to transport and is folded, and the degree of difficulty is higher and efficiency is lower, so at foretell in-process, need use cable suspension device.
Wherein patent number is CN109160438A, discloses a cable suspension device for engineering construction, which comprises a supporting plate, the welding of the bottom outer wall of backup pad has four support columns, and the welding of one side outer wall that four support columns are relative is close to the bottom position has same bottom plate, the top outer wall of bottom plate is opened there is the mounting hole, and the inner wall of mounting hole has first aircraft bonnet through the bolt fastening, the inner wall of first aircraft bonnet has first motor through the bolt fastening, and the top welding of first motor output shaft has the transmission shaft, the bottom outer wall of backup pad is opened there is the circular slot, and the inner wall welding of circular slot has first bearing, the top welding of transmission shaft is at the inner wall of first bearing, the outer wall welding of transmission shaft has the master gear, the top outer wall of backup pad is opened there is the fixed orifices. This solution has the drawback that after the basket is lifted and the worker stands inside it, the basket is very likely to shake, which not only does not guarantee the workability of the work, but also increases the risk of the worker.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the hanging basket is easy to shake after being lifted and when a worker stands in the hanging basket, the construction operability of the worker cannot be guaranteed, and the danger of the worker is increased.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a hanging device for engineering construction comprises a base, wherein a portal frame is fixedly arranged on the upper surface of the base, a winch is fixedly arranged at the top of the portal frame, a lifting rope is wound on the outer wall of the winch, a hanging plate is horizontally arranged inside the portal frame, one end, far away from the winch, of the lifting rope penetrates into the portal frame and is fixedly connected with the hanging plate, the hanging plate is of a hollow structure, two fixing blocks are symmetrically and slidably arranged inside the hanging plate, two clamping rods which are distributed leftwards and rightwards are symmetrically arranged inside the hanging plate, the two clamping rods fixedly penetrate through the insides of the two fixing blocks, springs are movably sleeved on rod walls of the two clamping rods, two ends of each spring are fixedly connected with the fixing blocks and the inner side wall of the hanging plate respectively, connecting blocks are fixedly arranged on two sides of the hanging plate, two mounting blocks are symmetrically and fixedly arranged on the left side and the right side of the portal frame, the mounting block is characterized in that a limiting slide rod is fixedly arranged between the two mounting blocks at the same side, the side walls of the two connecting blocks are respectively connected with the rod walls of the two limiting slide rods in a sliding mode through limiting slide holes, one ends of the two clamping rods, which deviate from each other, are respectively penetrated into the two connecting blocks, a plurality of clamping grooves matched with the clamping rods are formed in the rod walls of the two clamping rods, moving blocks are fixedly arranged at the opposite ends of the two clamping rods, and fixing mechanisms are arranged on the two moving blocks.
Preferably, the fixing mechanism comprises fixing rods, fixing rings and a stop block, the fixing rods are respectively and fixedly arranged on the upper sides of the two moving blocks, the upper surface of the hanging plate is provided with strip-shaped holes, the upper ends of the two fixing rods penetrate through the strip-shaped holes and extend to the upper surface of the hanging plate, the fixing rings are movably sleeved between the rod walls of the two fixing rods, and the stop block is respectively and fixedly arranged at the upper ends of the two fixing rods.
Preferably, the upper surface of the hanger plate is fixedly provided with a guardrail, and the lifting rope is fixedly connected with the top of the guardrail.
Preferably, the top of the portal frame is fixedly provided with a fixed pulley, and the lifting rope penetrates through the fixed pulley and is connected with the winch.
Preferably, the four corners of the lower surface of the base are fixedly provided with universal wheels.
Compared with the prior art, the utility model provides a cable suspension device for engineering construction possesses following beneficial effect:
1. this cable suspension device for engineering construction through setting up fixed block, kelly, spring, connecting block and the movable block on the hanger plate is inside, can accomplish spacing fixedly between hanger plate and the spacing slide bar to avoid the hanger plate to appear the phenomenon of rocking after rising, guaranteed constructor's operability and security.
2. This cable suspension device for engineering construction through setting up dead lever and solid fixed ring on the movable block, shifts out two kellies after in the draw-in groove on the spacing slide bar, and the dead lever can be fixed with the position of two kellies with solid fixed ring to can guarantee that the hanger plate accomplishes the action of rising and descending.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses can avoid the hanger plate to appear the phenomenon of rocking after rising, guaranteed constructor's operability and security.
Drawings
Fig. 1 is a schematic structural view of a hanging device for engineering construction provided by the present invention;
FIG. 2 is a schematic view of the internal structure of the hanger plate of FIG. 1;
FIG. 3 is a schematic structural view of a limiting slide bar of FIG. 1;
fig. 4 is a schematic structural view of the fixing ring in fig. 1.
In the figure: the device comprises a base 1, a portal frame 2, a winch 3, a lifting rope 4, a lifting plate 5, a fixing block 6, a clamping rod 7, a spring 8, a connecting block 9, a mounting block 10, a limiting slide rod 11, a clamping groove 12, a moving block 13, a fixing rod 14, a fixing ring 15, a guardrail 16, a universal wheel 17 and a fixed pulley 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a hanging device for engineering construction comprises a base 1, a portal frame 2 is fixedly arranged on the upper surface of the base 1, a hoist 3 is fixedly arranged on the top of the portal frame 2, a lifting rope 4 is wound on the outer wall of the hoist 3, a hanging plate 5 is horizontally arranged inside the portal frame 2, one end of the lifting rope 4 far away from the hoist 3 penetrates into the portal frame 2 and is fixedly connected with the hanging plate 5, a guardrail 16 is fixedly arranged on the upper surface of the hanging plate 5, the lifting rope 4 is fixedly connected with the top of the guardrail 16, a fixed pulley 18 is fixedly arranged on the top of the portal frame 2, the lifting rope 4 penetrates through the fixed pulley 18 and is connected with the hoist 3, the hanging plate 5 is of a hollow structure, two fixed blocks 6 are symmetrically arranged inside the hanging plate 5 in a sliding manner, two clamping rods 7 which are symmetrically arranged on the left and right sides are arranged inside the hanging plate 5, and the two clamping rods 7 are fixedly arranged in a way to, spring 8 has been cup jointed to the equal activity of pole wall of two kellies 7, and spring 8's both ends respectively with the inside wall fixed connection of fixed block 6 and hanger plate 5, hanger plate 5's both sides are all fixed and are equipped with connecting block 9, the equal symmetrical fixed two installation pieces 10 that are equipped with in the left and right sides of portal frame 2, it is equipped with spacing slide bar 11 to fix jointly between two installation pieces 10 of homonymy, the lateral wall of two connecting blocks 9 all through spacing slide opening respectively with the pole wall sliding connection of two spacing slide bars 11, the inside to two connecting blocks 9 is run through respectively to the one end that two kellies 7 deviate from mutually, a plurality of draw-in grooves 12 with kellies 7 matched with have all been seted up to the pole wall of two spacing slide bars 11, the equal fixed movable block 13 that is equipped with of one end that two kellies 7 are.
The fixing mechanism comprises fixing rods 14, fixing rings 15 and a stop block, the fixing rods 14 are respectively fixedly arranged on the upper sides of the two moving blocks 13, the upper surface of the hanging plate 5 is provided with a strip-shaped hole, the upper ends of the two fixing rods 14 penetrate through the strip-shaped hole and extend to the upper surface of the hanging plate 5, the fixing rings 15 are movably sleeved between the rod walls of the two fixing rods 14, the stop block is respectively fixedly arranged at the upper ends of the two fixing rods 14, when the hanging plate 5 is required to lift, a constructor pulls the two fixing rods 14 in opposite directions to enable the two clamping rods 7 to move out of the clamping grooves 12 on the limiting slide rods 11 and enable the fixing blocks 6 to pull the springs 8, the fixing rings 15 are inserted into the two fixing rods 14, and finally the hanging plate 5.
The universal wheels 17 are fixedly arranged at the four corners of the lower surface of the base 1, so that the device can be moved conveniently.
In the utility model, when in use, the winch 3 is opened to work, the winch 3 can drive the lifting rope 4 to move upwards, thereby driving the lifting plate 5 to rise, the constructor takes out the fixing rings 15 on the two fixing rods 14, at the moment, the spring 8 arranged inside the lifting plate 5 can apply tension to the fixing block 6, thereby the clamping rod 7 can extend into the two connecting blocks 9 and be matched with the clamping groove 12 on the rod wall of the limiting slide rod, thereby the position of the lifting plate 5 is fixed, the phenomenon that the lifting plate 5 shakes after rising is avoided, the operability and safety of the constructor are ensured, when the lifting plate 5 is required to be lifted, the constructor pulls the two fixing rods 14 in opposite directions to enable the two clamping rods 7 to move out from the clamping grooves 12 on the limiting slide rod 11 and enable the fixing block 6 to pull the spring 8, at the moment, the fixing rings 15 are inserted on the two fixing rods 14, finally, the hanging plate 5 can be ensured to slide on the two limiting slide rods 11.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A hanging device for engineering construction comprises a base (1) and is characterized in that a portal frame (2) is fixedly arranged on the upper surface of the base (1), a winch (3) is fixedly arranged at the top of the portal frame (2), a lifting rope (4) is wound on the outer wall of the winch (3), a lifting plate (5) is horizontally arranged in the portal frame (2), one end, far away from the winch (3), of the lifting rope (4) penetrates into the portal frame (2) and is fixedly connected with the lifting plate (5), the lifting plate (5) is of a hollow structure, two fixing blocks (6) are symmetrically arranged in the lifting plate (5) in a sliding manner, two clamping rods (7) are symmetrically arranged in a left-right distribution manner in the lifting plate (5), the two clamping rods (7) are fixedly crossed in the two fixing blocks (6), springs (8) are movably sleeved on the rod walls of the two clamping rods (7), and two ends of the spring (8) are respectively fixedly connected with the inner side walls of the fixed block (6) and the hanging plate (5), the two sides of the hanger plate (5) are fixedly provided with connecting blocks (9), the left side and the right side of the portal frame (2) are symmetrically and fixedly provided with two mounting blocks (10), two mounting blocks (10) are arranged on the same side, a limiting slide rod (11) is fixedly arranged between the mounting blocks (10), the side wall of each connecting block (9) is connected with the rod wall of each limiting slide rod (11) in a sliding mode through a limiting slide hole, the clamping rods (7) are separated from one end of each clamping rod (7) and penetrate through the inside of the corresponding connecting blocks (9), the rod walls of the corresponding limiting slide rods (11) are provided with a plurality of clamping grooves (12) matched with the clamping rods (7), two movable blocks (13) are fixedly arranged at the opposite ends of the clamping rods (7), and fixing mechanisms are arranged on the movable blocks (13).
2. The hanging device for engineering construction according to claim 1, wherein the fixing mechanism comprises fixing rods (14), fixing rings (15) and stoppers, the fixing rods (14) are respectively and fixedly arranged on the upper sides of the two moving blocks (13), the upper surface of the hanging plate (5) is provided with a strip-shaped hole, the upper ends of the two fixing rods (14) penetrate through the strip-shaped hole and extend to the upper surface of the hanging plate (5), the fixing rings (15) are movably sleeved between the rod walls of the two fixing rods (14), and the stoppers are respectively and fixedly arranged on the upper ends of the two fixing rods (14).
3. The hanging device for engineering construction according to claim 1, wherein a guardrail (16) is fixedly arranged on the upper surface of the hanging plate (5), and the lifting rope (4) is fixedly connected with the top of the guardrail (16).
4. The hanging device for engineering construction according to claim 1, wherein a fixed pulley (18) is fixedly arranged at the top of the portal frame (2), and the lifting rope (4) passes through the fixed pulley (18) and is connected with the winch (3).
5. The hanging device for engineering construction according to claim 1, wherein universal wheels (17) are fixedly arranged at four corners of the lower surface of the base (1).
CN202020338369.4U 2020-03-18 2020-03-18 Cable suspension device for engineering construction Expired - Fee Related CN212050343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020338369.4U CN212050343U (en) 2020-03-18 2020-03-18 Cable suspension device for engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020338369.4U CN212050343U (en) 2020-03-18 2020-03-18 Cable suspension device for engineering construction

Publications (1)

Publication Number Publication Date
CN212050343U true CN212050343U (en) 2020-12-01

Family

ID=73529524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020338369.4U Expired - Fee Related CN212050343U (en) 2020-03-18 2020-03-18 Cable suspension device for engineering construction

Country Status (1)

Country Link
CN (1) CN212050343U (en)

Similar Documents

Publication Publication Date Title
CN212050343U (en) Cable suspension device for engineering construction
CN210620052U (en) Assembled building hoisting accessory
CN219489345U (en) Large-span steel member hoisting device
CN218619860U (en) Special lifting appliance for concrete drain pipe
CN219194266U (en) Three-dimensional stabilizing device for lifting and transferring and batch lifting system for cultivation boxes
CN111943025A (en) Plate hoisting device for building construction
CN217264258U (en) Bagged concrete lifting frame device
CN210973633U (en) Clamping danger-avoiding crane
CN113068644B (en) Culture platform and shaking prevention device thereof
CN215331379U (en) Elevator shaft lifting operation platform
CN210944580U (en) Railway freight lifting device
CN106365058A (en) Portal crane for assembling motor with weight being above 100T
CN208200186U (en) Large-scale power distribution cabinet transfer device
CN2490131Y (en) Wheel stacked when lifting
CN206437770U (en) Detachable reuse fixed clamping device
CN209989000U (en) Novel hoisting accessory
JP2588460Y2 (en) Hanging equipment
CN221216786U (en) Stirrup lifting appliance
CN214828415U (en) Hoisting frame for overhauling chemical equipment
CN221587858U (en) Electric hoist
CN214935324U (en) Lifting appliance for lifting container
CN219058396U (en) Hoisting device for track
CN218024950U (en) Hoisting assembly in workshop
CN221070679U (en) Lifting appliance suitable for axle box assembly
CN221700825U (en) Elevator for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201

Termination date: 20210318