Prior art keywords
steel sheet
plate
steel plate
lower steel
bracer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020330451.2U
Other languages
Chinese (zh)
Inventor
宋军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Yaheng Tengfei Light Steel Housing Co ltd
Original Assignee
Hunan Yaheng Tengfei Light Steel Housing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Yaheng Tengfei Light Steel Housing Co ltd filed Critical Hunan Yaheng Tengfei Light Steel Housing Co ltd
Priority to CN202020330451.2U priority Critical patent/CN212027235U/en
Application granted granted Critical
Publication of CN212027235U publication Critical patent/CN212027235U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building site is with assembled official working packing box room frame relates to equipment room technical field, specifically is a building site is with assembled official working packing box room frame, including last steel sheet and lower steel sheet, it is located the top of lower steel sheet to go up the steel sheet, the both ends of going up steel sheet and lower steel sheet all are provided with fixed cardboard, the side fixedly connected with adhesive tape of fixed cardboard, the fixed joint of cover in inside of fixed cardboard has the connecting strip. This building site is with assembled official working packing box room frame, through using fixed cardboard to make up into bearing structure with the inseparable extrusion of a plurality of bracers together, because the side area of solitary bracer orientation last steel sheet and lower steel sheet is less, thereby the atress degree of bracer has been reduced, the possibility of bracer rupture has been reduced, utilize above-mentioned a plurality of bearing structure to support last steel sheet and lower steel sheet, the condition of sunken and the rupture on bracer surface has been reduced, the degree of consolidation of this packing box room frame has been improved.

Description

Building site is with assembled official working packing box house frame
Technical Field
The utility model relates to an equipment room technical field specifically is a building site is with assembled official working packing box room frame.
Background
The packing type box room is composed of a top frame assembly, a bottom frame assembly, corner posts and a plurality of interchangeable wall boards, one box room is modularized into standard parts by adopting a modular design concept and a production technology, and the standard parts are assembled or hoisted to a place to be used on site. The product takes the box body as a basic unit, the box body structure adopts a special cold-bending galvanized steel structural member, the enclosure heat-insulating material is completely made of non-combustible materials, the water heating, the electricity, the decoration and the matching functions are completely prefabricated in a factory, secondary construction is not needed, and the enclosure heat-insulating material can be put into place by field assembly or integral hoisting. Can be used independently, and can also form a wide use space and a laminated layer through different combinations of horizontal and vertical directions.
The packing type box house has the advantages of being simple and safe in structure, low in requirement on the foundation, fast in field installation, convenient to move, multiple in turnover frequency, long in service life and the like, being free of loss in assembly and disassembly, free of building rubbish, capable of being used as office, accommodation, dining room, bathroom, entertainment and combined large space, and capable of meeting requirements of building engineering camps, municipal temporary rooms, field operation barracks, emergency placement rooms, schools, hospitals, travel post houses and various commercial rooms.
In practical use, the packing box room is recycled for many times, so the firmness requirement on the frame of the packing box room is higher, and especially the frames with larger stress and more stress, such as the wall plate and the floor, can be broken after being stressed frequently, so that the service life of the packing box room is shortened, and meanwhile, danger also exists in the use process.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a building site is with assembled official working packing box room frame has solved the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a building site is with assembled official working packing case room frame, includes steel sheet and lower steel sheet, it is located the top of steel sheet down to go up the steel sheet, the both ends of going up steel sheet and lower steel sheet all are provided with fixed cardboard, the side fixedly connected with adhesive tape of fixed cardboard, the fixed joint in inside of fixed cardboard has the connecting strip, the side joint of going up steel sheet and lower steel sheet has the side hoop board, the bracer has been placed to one side of fixed cardboard, the through-hole has been seted up to the inside of bracer, the connecting strip runs through the through-hole and extends to the outside of through-hole.
Optionally, both ends of the fixing clamping plate are provided with clamping blocks, clamping grooves matched with the clamping blocks are formed in the side faces of the upper steel plate and the lower steel plate, the clamping blocks are clamped in the clamping grooves, fixing holes are formed in the clamping blocks, and fixing screws are fixedly sleeved in the fixing holes.
Optionally, the connecting strip includes steel cable, spacing ring, fixed curb plate, screw thread spliced pole and fastening nut, the fixed cover of outer wall of steel cable has connect the spacing ring, the bracer joint is in the middle of two adjacent spacing rings, the both ends of steel cable are provided with fixed curb plate and screw thread spliced pole respectively, fastening nut has been cup jointed in the outside rotation of screw thread spliced pole, the inside at fixed cardboard and bracer is connected in wire cable through-going.
Optionally, the upper end and the lower end of the supporting block are provided with pressing plates, the surface of each pressing plate is welded with an upper steel plate and a lower steel plate, and the two ends of each pressing plate are fixedly connected to the surface of the corresponding fixing clamping plate.
Optionally, the side hoop plates are located on four sides of the upper steel plate and the lower steel plate, the side hoop plates are welded to the side edges of the upper steel plate and the lower steel plate, and the fixing clamping plates and the supporting blocks are located inside a space surrounded by the upper steel plate, the lower steel plate and the side hoop plates.
Optionally, the fixing clamping plate and the supporting block form a group of supporting structures, and an adhesive tape is arranged between the two adjacent groups of supporting structures.
The utility model provides a building site is with assembled official working packing box room frame possesses following beneficial effect:
1. this building site is with assembled official working packing box room frame, through using fixed cardboard to make up into bearing structure with the inseparable extrusion of a plurality of bracers together, because the side area of solitary bracer orientation last steel sheet and lower steel sheet is less, thereby the atress degree of bracer has been reduced, the possibility of bracer rupture has been reduced, utilize above-mentioned a plurality of bearing structure to support last steel sheet and lower steel sheet, the condition of sunken and the rupture on bracer surface has been reduced, the degree of consolidation of this packing box room frame has been improved.
2. This building site is with assembled official working packing box room frame connects fixedly with the bracer through using the connecting strip with the fixed cardboard in the supporting mechanism of organizing, utilizes connecting strip plasticity and deformation effect, plays the effect of buffering to the dynamics that is used in last steel sheet and lower steel sheet surface, has also avoided the problem of connecting strip rupture simultaneously, has improved this packing box room frame's steadiness.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic structural diagram of the connecting strip of the present invention.
In the figure: 1. steel plate feeding; 2. a lower steel plate; 3. fixing the clamping plate; 4. an adhesive tape; 5. a connecting strip; 501. a steel cord; 502. a limiting ring; 503. fixing the side plate; 504. a threaded connection post; 505. fastening a nut; 6. a side hoop plate; 7. a support block; 8. pressing a plate; 9. a clamping block; 10. and fixing the screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: an assembled office packaging box house frame for a construction site comprises an upper steel plate 1 and a lower steel plate 2, wherein the upper steel plate 1 is positioned above the lower steel plate 2, two ends of the upper steel plate 1 and the lower steel plate 2 are respectively provided with a fixed clamping plate 3, two ends of the fixed clamping plate 3 are respectively provided with a clamping block 9, the side surfaces of the upper steel plate 1 and the lower steel plate 2 are respectively provided with a clamping groove matched with the clamping block 9, the clamping block 9 is clamped inside the clamping groove, the stability of the connection of the fixed clamping plate 3 with the upper steel plate 1 and the lower steel plate 2 is improved, meanwhile, the connecting and mounting of the fixed clamping plate 3 with the upper steel plate 1 and the lower steel plate 2 are guided, the inside of the clamping block 9 is provided with a fixed hole, the inside of the fixed hole is fixedly sleeved with a fixed screw 10, the stability of the connection between the upper steel plate 1 and the lower steel plate 2 and, the connecting strip 5 is fixedly sleeved in the fixing clamp plate 3, the connecting strip 5 comprises a steel rope 501, a limiting ring 502, a fixing side plate 503, a threaded connecting column 504 and a fastening nut 505, the limiting ring 502 is fixedly sleeved on the outer wall of the steel rope 501, a support block 7 is clamped between two adjacent limiting rings 502, the longitudinal movement of the support block 7 is avoided, the shaking of the support block 7 is reduced, the support block 7 only moves along with the deformation of the connecting strip 5, the support block 7 is prevented from moving left and right on the connecting strip 5, the fixing side plate 503 and the threaded connecting column 504 are respectively arranged at two ends of the steel rope 501, the fastening nut 505 is rotatably sleeved outside the threaded connecting column 504, the fixing clamp plate 3 and the support block 7 can be connected together in series by utilizing the sleeving of the fastening nut 505 and the threaded connecting column 504, meanwhile, the tension degree of the connecting strip 5 is not too large when being fixed, a certain tension space is reserved for the connecting strip 5, when the connecting strip 5, the connecting strip 5 is not different from a traditional rigid connecting pipe, and is easy to break when stressed, the steel rope 501 is connected inside the fixed clamping plate 3 and the supporting block 7 in a penetrating way, the side faces of the upper steel plate 1 and the lower steel plate 2 are clamped with the side hoop plates 6, the side hoop plates 6 are positioned on four sides of the upper steel plate 1 and the lower steel plate 2, the side hoop plates 6 are welded with the side edges of the upper steel plate 1 and the lower steel plate 2, the fixed clamping plate 3 and the supporting block 7 are positioned inside a space surrounded by the upper steel plate 1, the lower steel plate 2 and the side hoop plates 6, the fixed clamping plate 3 and the supporting block 7 are positioned in the middle of the upper steel plate 1, the lower steel plate 2 and the side hoop plates 6, and play a supporting role for the upper steel plate 1 and the lower steel plate 2, the stress degree of the surface of a frame formed by the upper steel plate 1 and the lower steel plate 2 is improved, the supporting block 7 is arranged on one side of the fixed clamping plate 3, the upper and lower both ends of bracer 7 are provided with clamp plate 8, the dynamics of receiving of steel sheet 1 and lower steel sheet 2 is gone up in the reinforcing of clamp plate 8, the bracer 7 and last steel sheet 1 of also being convenient for simultaneously, steel sheet 2's connection down, the skin weld of clamp plate 8 has last steel sheet 1 and lower steel sheet 2, the both ends fixed connection of clamp plate 8 is on the surface of fixed cardboard 3, fixed cardboard 3 constitutes a set of bearing structure with bracer 7, be provided with adhesive tape 4 between two sets of adjacent bearing structure, adhesive tape 4 is used for reserving certain space between the bracer 7, avoid this packing box room frame to expose and shine under the sunshine inflation in the in-service use.
In conclusion, when the assembly type office packaging box house frame for the construction site is used, firstly, the connecting strip 5 penetrates through one fixing clamping plate 3, the connecting strip 5 is sleeved with a plurality of supporting blocks 7, then, the other end of the connecting strip 5 penetrates through the other fixing clamping plate 3, the other end of the connecting strip 5 is sleeved on the threaded connecting column 504 to be fastened by using the fastening nut 505, the clamping blocks 9 on the surfaces of the two fixing clamping plates 3 are clamped in the upper steel plate 1 and the lower steel plate 2, the fixing clamping plates 3 are connected with the upper steel plate 1 and the lower steel plate 2 by using the fixing screws 10, secondly, the plurality of supporting structures consisting of the fixing clamping plates 3, the connecting strips 5 and the supporting blocks 7 are sequentially fixed on the upper steel plate 1 and the lower steel plate 2, the adhesive tapes 4 are arranged among the plurality of groups of supporting structures, finally, the side hoop plates 6 are welded around the upper steel plate 1 and the lower steel plate 2, the supporting structures are enclosed among the upper steel plate 1, and (4) finishing.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building site is with assembled official working packing case room frame, includes steel sheet (1) and lower steel sheet (2), its characterized in that: go up steel sheet (1) and be located the top of lower steel sheet (2), the both ends of going up steel sheet (1) and lower steel sheet (2) all are provided with fixed cardboard (3), side fixedly connected with adhesive tape (4) of fixed cardboard (3), connecting strip (5) have been cup jointed to the inside of fixed cardboard (3), the side joint of going up steel sheet (1) and lower steel sheet (2) has side hoop board (6), bracer (7) have been placed to one side of fixed cardboard (3), the through-hole has been seted up to the inside of bracer (7), connecting strip (5) run through the through-hole and extend to the outside of through-hole.
2. The modular office packaging box house frame for a worksite according to claim 1, wherein: the two ends of the fixed clamping plate (3) are provided with clamping blocks (9), clamping grooves matched with the clamping blocks (9) are formed in the side faces of the upper steel plate (1) and the lower steel plate (2), the clamping blocks (9) are clamped in the clamping grooves, fixing holes are formed in the clamping blocks (9), and fixing screws (10) are fixedly sleeved in the fixing holes.
3. The modular office packaging box house frame for a worksite according to claim 1, wherein: connecting strip (5) include steel cable (501), spacing ring (502), fixed curb plate (503), screw thread spliced pole (504) and fastening nut (505), spacing ring (502) have been cup jointed to the outer wall of steel cable (501) is fixed, bracer (7) joint is in the middle of two adjacent spacing rings (502), the both ends of steel cable (501) are provided with fixed curb plate (503) and screw thread spliced pole (504) respectively, fastening nut (505) have been cup jointed in the outside rotation of screw thread spliced pole (504), steel cable (501) through connection is in the inside of fixed cardboard (3) and bracer (7).
4. The modular office packaging box house frame for a worksite according to claim 1, wherein: the upper end and the lower end of the supporting block (7) are provided with pressing plates (8), the surface of each pressing plate (8) is welded with an upper steel plate (1) and a lower steel plate (2), and the two ends of each pressing plate (8) are fixedly connected to the surface of the corresponding fixing clamping plate (3).
5. The modular office packaging box house frame for a worksite according to claim 1, wherein: the side hoop plates (6) are positioned on four sides of the upper steel plate (1) and the lower steel plate (2), the side hoop plates (6) are welded with the side edges of the upper steel plate (1) and the lower steel plate (2), and the fixing clamping plates (3) and the supporting blocks (7) are positioned in a space surrounded by the upper steel plate (1), the lower steel plate (2) and the side hoop plates (6).
6. The modular office packaging box house frame for a worksite according to claim 1, wherein: the fixing clamping plate (3) and the supporting block (7) form a group of supporting structures, and an adhesive tape (4) is arranged between the two adjacent groups of supporting structures.
CN202020330451.2U 2020-03-17 2020-03-17 Building site is with assembled official working packing box house frame Active CN212027235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020330451.2U CN212027235U (en) 2020-03-17 2020-03-17 Building site is with assembled official working packing box house frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020330451.2U CN212027235U (en) 2020-03-17 2020-03-17 Building site is with assembled official working packing box house frame

Publications (1)

Publication Number Publication Date
CN212027235U true CN212027235U (en) 2020-11-27

Family

ID=73485185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020330451.2U Active CN212027235U (en) 2020-03-17 2020-03-17 Building site is with assembled official working packing box house frame

Country Status (1)

Country Link
CN (1) CN212027235U (en)

Similar Documents

Publication Publication Date Title
US8973335B2 (en) Modular assembly shelter
CN102003083B (en) Mobile modularized dwelling house
US5491934A (en) Two story building collapsed for shipping
CN104088366A (en) Building module and middle/high-layered modularized building with building module
CN201953090U (en) Movable modularized inhabitation house
CN108277917A (en) A kind of sustainable full module-assembled building system of green and construction method
CN207749678U (en) A kind of assembled arthitecutral structure wall
CN100357156C (en) Shipping cabin unit and mfg. method thereof
CN212027235U (en) Building site is with assembled official working packing box house frame
CN201089977Y (en) Prefabricated steel construction house
CN207905205U (en) A kind of prefabricated floor construction and its structural system
CN201003213Y (en) Mono-layer movable villa
WO2014176710A1 (en) Modular combined house able to be assembled and disassembled
CN215406723U (en) Integrated assembly type building house
CN207905162U (en) A kind of assembled architecture column module
CN205530972U (en) Composite board that building house was used
CN210002662U (en) kinds of assembled floor
CN203856101U (en) Lightgage steel joist frame
CN209895674U (en) Civil engineering colleges and universities modern wood structure teaching model and building teaching model
CN220686867U (en) Assembled container apartment
CN212613936U (en) Passive fabricated building assembly unit
CN216276314U (en) Movable partition wall and house type changeable residential house type structure
CN212897442U (en) Height-adjustable modular three-dimensional suspended ceiling
CN220954047U (en) Thin steel frame concrete partition wall
CN217581445U (en) Wood structure unit room combined high-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant