CN211998535U - Water conservancy pile foundation handling device - Google Patents

Water conservancy pile foundation handling device Download PDF

Info

Publication number
CN211998535U
CN211998535U CN202020303211.3U CN202020303211U CN211998535U CN 211998535 U CN211998535 U CN 211998535U CN 202020303211 U CN202020303211 U CN 202020303211U CN 211998535 U CN211998535 U CN 211998535U
Authority
CN
China
Prior art keywords
pile foundation
transportation
water conservancy
stationary dog
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202020303211.3U
Other languages
Chinese (zh)
Inventor
高雪平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tianmu Engineering Project Management Co ltd
Original Assignee
Guangde Wanli Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangde Wanli Municipal Engineering Co ltd filed Critical Guangde Wanli Municipal Engineering Co ltd
Priority to CN202020303211.3U priority Critical patent/CN211998535U/en
Application granted granted Critical
Publication of CN211998535U publication Critical patent/CN211998535U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a water conservancy transportation technical field just discloses a water conservancy pile foundation handling device, including transportation stake and grabbing device, grabbing device installs the top position between two transportation stakes, the equal fixedly connected with lifter in top of transportation stake, grabbing device's below fixedly connected with pivot, and the below of pivot is rotated and is connected with the stationary dog, the inboard of transportation stake is all rotated and is connected with the bottom plate, and the bottom of transportation stake is rotated and is connected with the guide pulley. This kind of water conservancy pile foundation handling device, the stationary dog that drives grabbing device lower extreme through control grabbing device and lifter snatchs the pile foundation, then the pivot rotates and drives the stationary dog and open, when the stationary dog snatchs the pile foundation, during the inboard splint contact pile foundation of stationary dog, can press from both sides the pile foundation tightly, prevent the pile foundation landing, the inside expansion plate of stationary dog stretches out by the drive of pulley simultaneously, slide to the below of stationary dog, prevent the pile foundation landing, the effect of firmly transporting the pile foundation has been reached.

Description

Water conservancy pile foundation handling device
Technical Field
The utility model relates to a water conservancy transportation technical field specifically is a water conservancy pile foundation handling device.
Background
Water is one of the indispensable resources of human production and life, and people just know the strength construction water utilization of running water in very early time and be used for preventing the flood calamity to the regulation and the distribution of water yield satisfy people's life and production's needs, and the pile foundation is one of the required base material of building hydraulic engineering, and the handling of pile foundation is also influencing whole hydraulic engineering's progress to a certain extent.
At present, people carry the method of water conservancy pile foundation, the great engineering of engineering volume generally adopts the cable wire on the crane to bind a plurality of pile foundations and load the carrier together and carry, but because the pile foundation surface is smooth cement face, take place the landing easily between cable wire and the pile foundation in handling, not only cause the engineering accident, still can cause the damage to the pile foundation, and the universal wheel of carrier does not have buffering and suspension stabilising arrangement, the structure is fixed, can not normally work in the relatively poor road surface of some road conditions, and the less engineering of engineering volume generally adopts the mode of artifical transport, the inefficiency, the labor intensity is big, influence the engineering progress.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a water conservancy pile foundation handling device possesses convenient transportation, and not fragile advantage such as has solved the problem that the background art provided.
(II) technical scheme
For realizing above-mentioned convenient transportation, not fragile purpose, the utility model provides a following technical scheme: the utility model provides a water conservancy pile foundation handling device, includes transportation stake and grabbing device, grabbing device installs the top position between two transportation stakes, the equal fixedly connected with lifter in top of transportation stake, grabbing device's below fixedly connected with pivot, and the below of pivot is rotated and is connected with the stationary dog, the inboard of transportation stake is all rotated and is connected with the bottom plate, and the bottom of transportation stake is rotated and is connected with the guide pulley.
Preferably, the fixed frame is all installed to grabbing device's the left and right sides, and the bottom fixed connection of fixed frame is in the upper end of lifter, and grabbing device's inboard intermediate position sliding connection has the slide bar, and the both ends fixed connection of slide bar is in the inboard of fixed frame.
Preferably, the bottom end of the inner side of the fixed claw is fixedly connected with a connecting column which is transversely arranged, and the front end of the connecting column is fixedly connected with a clamping plate.
Preferably, the inside sliding connection of front end of stationary dog has the expansion plate, and the terminal both sides of expansion plate rotate and be connected with the pulley, and pulley sliding connection is on the inner wall of stationary dog, the bottom fixedly connected with limiting plate of expansion plate.
Preferably, the bottom end of the bottom plate is rotatably connected with a first rotating column, and the first rotating column is fixedly connected to the bottom end of the inner side of the transportation pile.
Preferably, both sides of the inner side upper surface of the bottom plate are rotatably connected with second rotating columns which are transversely arranged, and the front ends of the second rotating columns are fixedly connected with baffle plates.
(III) advantageous effects
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this kind of water conservancy pile foundation handling device, through setting up grabbing device and fixed melon isotructure, in the time of carrying out the snatching work of pile foundation, can be through the top that the device removed the pile foundation with the guide pulley under the transportation pile, then drive the stationary dog of grabbing device lower extreme through control grabbing device and lifter and snatch the pile foundation, then the pivot rotates and drives the stationary dog and open, when the stationary dog snatchs the pile foundation, when inboard splint contact pile foundation of stationary dog, can press from both sides tightly the pile foundation, prevent the pile foundation landing, the inside expansion plate of stationary dog is stretched out by the drive of pulley simultaneously, slide to the below of stationary dog, prevent the pile foundation landing, the effect of firmly transporting the pile foundation has been reached.
2. This kind of water conservancy pile foundation handling device, through setting up bottom plate isotructure, snatch the pile foundation at the stationary dog after, the first rotary column of accessible drives the bottom plate and rotates to horizontal position, then the lifter drives the stationary dog decline and opens the stationary dog simultaneously and place the pile foundation on the bottom plate, and the baffle of bottom plate both sides passes through the second rotary column simultaneously and rotates to vertical position, prevents the pile foundation landing in the transportation, has reached the effect of convenient transportation.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic side sectional view of the fixing claw of the present invention;
FIG. 3 is an enlarged schematic view of FIG. 2A according to the present invention;
fig. 4 is a schematic view of the three-dimensional structure of the bottom plate of the present invention.
In the figure: 1. transporting the piles; 2. a gripping device; 21. a fixed mount; 22. a slide bar; 3. a lifting rod; 4. a rotating shaft; 5. a fixed jaw; 51. connecting columns; 52. a splint; 53. a retractable plate; 54. a pulley; 55. a limiting plate; 6. a base plate; 61. a first rotating column; 62. a second rotary column; 63. a baffle plate; 7. and (4) a guide wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-3, a water conservancy pile foundation carrying device comprises transporting piles 1 and a gripping device 2, wherein the gripping device 2 is arranged at an upper position between the two transporting piles 1, fixing frames 21 are respectively arranged at the left side and the right side of the gripping device 2, the bottom end of each fixing frame 21 is fixedly connected to the upper end of a lifting rod 3, a sliding rod 22 is slidably connected to the middle position of the inner side of the gripping device 2, two ends of each sliding rod 22 are fixedly connected to the inner side of the corresponding fixing frame 21, the lifting rod 3 is fixedly connected to the upper side of each transporting pile 1, a rotating shaft 4 is fixedly connected to the lower side of the gripping device 2, a fixed claw 5 is rotatably connected to the lower side of each rotating shaft 4, a connecting column 51 transversely arranged is fixedly connected to the bottom end of the inner side of the fixed claw 5, a clamping plate 52 is fixedly connected to the front end of the connecting column 51, a telescopic plate, and the pulley 54 is connected on the inner wall of the fixed jaw 5 in a sliding way, the bottom end of the expansion plate 53 is fixedly connected with a limit plate 55, and the bottom end of the transport pile 1 is rotatably connected with a guide wheel 7, and by arranging the gripping device 2, the fixed melon and other structures, when the pile foundation is gripped, the device can be moved to the upper part of the pile foundation through the guide wheel 7 under the transporting pile 1, then the fixed claw 5 at the lower end of the gripping device 2 is driven to grip the pile foundation through controlling the gripping device 2 and the lifting rod 3, then the rotating shaft 4 rotates to drive the fixed claw 5 to open, when the fixed claw 5 grabs the pile foundation, the clamping plate 52 on the inner side of the fixed claw 5 contacts the pile foundation, the pile foundation can be clamped, the pile foundation is prevented from sliding off, simultaneously the inside expansion plate 53 of stationary dog 5 is stretched out by the drive of pulley 54, slides to the below of stationary dog 5, prevents the pile foundation landing, has reached the effect of firm transportation pile foundation.
Example 2
Based on embodiment 1, as fig. 4, the inboard of transportation stake 1 is all rotated and is connected with bottom plate 6, the bottom of bottom plate 6 is rotated and is connected with first rotary column 61, and first rotary column 61 fixed connection is in the inboard bottom of transportation stake 1, the inboard upper surface both sides of bottom plate 6 are all rotated and are connected with the second rotary column 62 of horizontal setting, and the front end fixedly connected with baffle 63 of second rotary column 62, through setting up bottom plate 6 isotructure, snatch the pile foundation at stationary dog 5, the first rotary column 61 of accessible drives the rotatory to horizontal position of bottom plate 6, then lifter 3 drives 5 descends and opens stationary dog 5 simultaneously and places the pile foundation on bottom plate 6, the baffle 63 of bottom plate 6 both sides passes through the second rotary column 62 and rotates to vertical position simultaneously, prevent the pile foundation landing in the transportation, the effect of convenient transportation has been reached.
The working principle is as follows: when the grabbing work of the pile foundation is carried out, the device can be moved to the upper part of the pile foundation through the guide wheel 7 below the transporting pile 1, then the grabbing device 2 and the lifting rod 3 are controlled to drive the fixed claw 5 at the lower end of the grabbing device 2 to grab the pile foundation, then the rotating shaft 4 rotates to drive the fixed claw 5 to open, when the fixed claw 5 grabs the pile foundation, the clamping plate 52 at the inner side of the fixed claw 5 contacts the pile foundation, the pile foundation can be clamped to prevent the pile foundation from sliding off, meanwhile, the telescopic plate 53 inside the fixed claw 5 is driven by the pulley 54 to extend out and slide to the lower part of the fixed claw 5 to prevent the pile foundation from sliding off, after the fixed claw 5 grabs the pile foundation, the bottom plate 6 can be driven to rotate to the horizontal position through the first rotating column 61, then the lifting rod 3 drives the fixed claw 5 to descend and simultaneously opens the fixed claw 5 to place the pile foundation on the bottom plate 6, prevent the pile foundation landing in the transportation.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A water conservancy pile foundation carrying device comprises transport piles (1) and a gripping device (2), wherein the gripping device (2) is arranged above the position between the two transport piles (1);
the method is characterized in that:
the equal fixedly connected with lifter (3) in top of transportation stake (1), below fixedly connected with pivot (4) of grabbing device (2), and the below of pivot (4) is rotated and is connected with stationary dog (5), the inboard of transportation stake (1) is all rotated and is connected with bottom plate (6), and the bottom of transportation stake (1) is rotated and is connected with guide pulley (7).
2. The water conservancy pile foundation handling device of claim 1, characterized in that: mount (21) are all installed to the left and right sides of grabbing device (2), and the bottom fixed connection of mount (21) is in the upper end of lifter (3), and the inboard intermediate position sliding connection of grabbing device (2) has slide bar (22), and the both ends fixed connection of slide bar (22) is in the inboard of mount (21).
3. The water conservancy pile foundation handling device of claim 1, characterized in that: the inner side bottom end of the fixed claw (5) is fixedly connected with a transversely arranged connecting column (51), and the front end of the connecting column (51) is fixedly connected with a clamping plate (52).
4. The water conservancy pile foundation handling device of claim 1, characterized in that: the inside sliding connection of front end of stationary dog (5) has expansion plate (53), and the terminal both sides of expansion plate (53) rotate and be connected with pulley (54), and pulley (54) sliding connection is on the inner wall of stationary dog (5), the bottom fixedly connected with limiting plate (55) of expansion plate (53).
5. The water conservancy pile foundation handling device of claim 1, characterized in that: the bottom of bottom plate (6) rotates and is connected with first rotary column (61), and just first rotary column (61) fixed connection is in the inboard bottom of transportation stake (1).
6. The water conservancy pile foundation handling device of claim 5, characterized in that: the both sides of the inboard upper surface of bottom plate (6) all rotate and are connected with horizontal second rotary column (62) that set up, and the front end fixedly connected with baffle (63) of second rotary column (62).
CN202020303211.3U 2020-03-12 2020-03-12 Water conservancy pile foundation handling device Withdrawn - After Issue CN211998535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020303211.3U CN211998535U (en) 2020-03-12 2020-03-12 Water conservancy pile foundation handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020303211.3U CN211998535U (en) 2020-03-12 2020-03-12 Water conservancy pile foundation handling device

Publications (1)

Publication Number Publication Date
CN211998535U true CN211998535U (en) 2020-11-24

Family

ID=73432075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020303211.3U Withdrawn - After Issue CN211998535U (en) 2020-03-12 2020-03-12 Water conservancy pile foundation handling device

Country Status (1)

Country Link
CN (1) CN211998535U (en)

Similar Documents

Publication Publication Date Title
CN210828374U (en) Cement partition plate mounting machine
CN115653323B (en) Multifunctional assembled building wallboard lifting device
CN220033777U (en) Hoisting equipment for prefabricated parts of building engineering
CN211998535U (en) Water conservancy pile foundation handling device
CN114476966A (en) Hoisting equipment for building engineering construction and working method thereof
CN106703509B (en) Suspension type fence hoisting equipment and hoisting method thereof
CN110902605B (en) Automatic stacking equipment of lithium battery module for new energy automobile
CN220376168U (en) Multifunctional portal crane
CN218619866U (en) Lifting appliance for producing guide wheels of excavator
CN111704025A (en) Building decoration material hoisting device
CN217675413U (en) Clamping device for grabbing green bricks
CN206886632U (en) A kind of cable channel cover plate handling device
CN212798178U (en) Movable double-beam traveling device
CN113896116B (en) Lifting device for angle steel member of iron tower and operation method thereof
CN212712384U (en) Building templates hoist device
CN211338603U (en) Gantry frame of crawler crane
CN115338966A (en) Caisson manufacturing integrated platform
CN212893566U (en) Anti-swing crane
CN208454365U (en) A kind of lifting apparatus used for steel girder erection
CN112811199A (en) Fragment of brick passes on and uses manipulator
CN218058135U (en) Concrete block finished product hangs and piles equipment
CN216583939U (en) Lifting and transporting equipment for municipal bridge engineering
CN220056040U (en) Hoisting device for prefabricated T beam
CN217708623U (en) Double-crane arm frame bridge crane
CN117699632B (en) Hoisting frame for flexible steel shed tunnel installation and hoisting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240408

Address after: The first business landlord in Building B4, Guanya Xingcheng Phase 4, Jining City, Shandong Province, 272000

Patentee after: Shandong Tianmu Engineering Project Management Co.,Ltd.

Country or region after: China

Address before: No. 1 Xinxing Street, Menkou Tang Community, Qiuchun Town, Guangde City, Xuancheng City, Anhui Province, 242200

Patentee before: Guangde Wanli Municipal Engineering Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20201124

Effective date of abandoning: 20240506

AV01 Patent right actively abandoned

Granted publication date: 20201124

Effective date of abandoning: 20240506

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned