CN211930101U - Adjusting device for electric power overhaul operation - Google Patents

Adjusting device for electric power overhaul operation Download PDF

Info

Publication number
CN211930101U
CN211930101U CN202020397482.XU CN202020397482U CN211930101U CN 211930101 U CN211930101 U CN 211930101U CN 202020397482 U CN202020397482 U CN 202020397482U CN 211930101 U CN211930101 U CN 211930101U
Authority
CN
China
Prior art keywords
bearing
adjusting device
electric power
fixed platform
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020397482.XU
Other languages
Chinese (zh)
Inventor
季仁芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Leidun Electric Power Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020397482.XU priority Critical patent/CN211930101U/en
Application granted granted Critical
Publication of CN211930101U publication Critical patent/CN211930101U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an electric power overhauls adjusting device for operation, including fixed platform, fixed platform's bottom all fixed mounting all around has the bearing stabilizer blade, fixed platform's preceding terminal surface fixed mounting has the installation handrail, fixed platform's bottom right side fixed mounting has the elevator pump, the top fixed mounting of elevator pump has first bearing bar, the inside from the bottom up of first bearing bar has second bearing bar and third bearing bar movable mounting in proper order. This adjusting device for electric power overhaul operation, the bearing stabilizer blade can also remove this device when carrying out the bearing, and the help increases the swift effect of removal, and the removal in the convenient in-process that overhauls is convenient, and first bearing bar can stretch out and draw back, has guaranteed electric power overhaul time high altitude construction's normal demand, and such flexible effect has also increased the different power accessories of maintenance under the different situation moreover, and help has improved this adjusting device's application scope.

Description

Adjusting device for electric power overhaul operation
Technical Field
The utility model relates to an electric power overhauls technical field, specifically is an electric power overhauls adjusting device for operation.
Background
The electric power overhaul is mainly divided into the following overhaul parts: the power generation system comprises a power generation part, a power supply part, a power transformation part and a power distribution part, wherein each part is responsible for special personnel. The system is mainly responsible for installation and maintenance of daily equipment, troubleshooting, line patrol and the like, is an occupation for maintenance of a power grid and accessory equipment thereof, has high professional requirements and has certain dangers.
However, the height of the existing adjusting device cannot be adjusted by itself, so that the using effect is reduced, the application range cannot be well increased, the stability of the general electric power overhauling device is insufficient, and the potential safety hazard is easily caused under the condition of high-altitude operation, so that the normal operation of workers is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power overhauls adjusting device for operation to solve current adjusting device can not be by oneself height-adjusting in the above-mentioned background art, cause the result of use to descend, increase application scope that can not be fine, the stability of general electric power maintenance device is not enough moreover, under the circumstances of high altitude construction, easily causes the potential safety hazard, influences the problem of staff normal operation.
In order to achieve the above object, the utility model provides a following technical scheme: an adjusting device for electric power overhaul operation comprises a fixed platform, wherein bearing support legs are fixedly arranged on the periphery of the bottom end of the fixed platform, an installation handrail is fixedly arranged on the front end face of the fixed platform, a lifting pump is fixedly arranged on the right side of the bottom end of the fixed platform, a first bearing rod is fixedly arranged at the top end of the lifting pump, a second bearing rod and a third bearing rod are sequentially and movably arranged in the first bearing rod from bottom to top, an aerial work frame is fixedly arranged at the top end of the third bearing rod, an overturning portal frame is movably arranged on the front end face of the aerial work frame, a movable installation clamp is movably arranged on the rear end face of the top end of the aerial work frame, a clamping rod is movably connected in the movable installation clamp, movable idler wheels are movably arranged in the inner wall of the movable installation clamp, and telescopic connecting rods are fixedly arranged on the left side and the right side of, the inner wall of the top end of the telescopic connecting rod is fixedly provided with a connecting fixing rod, and the inner wall of the third bearing rod is fixedly provided with a connecting cross rod.
Preferably, the bottom ends of the bearing support legs are designed as pulleys, the number of the bearing support legs is four, and the four bearing support legs are integrally connected with the fixed platform.
Preferably, the number that first bearing bar set up is two, and first bearing bar is connected as an organic whole with the elevator pump, the diameter of first bearing bar, second bearing bar and third bearing bar decreases progressively in proper order, and establishes the connection for the cover each other.
Preferably, the aerial work frame is in a cylindrical open design, the aerial work frame is connected with the turnover portal frame through a rotating shaft, and the aerial work frame is connected with the movable mounting clamp through the rotating shaft.
Preferably, the number of the movable mounting clamps is two, the movable mounting clamps are connected with the clamping rods in a clamping mode, the movable mounting clamps are connected with the movable idler wheels in a rotating clamping mode, and the number of the movable idler wheels is two.
Preferably, the number and the positions of the telescopic connecting rods correspond to those of the third bearing rods one by one, and the telescopic connecting rods are integrally connected with the connecting and fixing rod.
Compared with the prior art, the beneficial effects of the utility model are that: the adjusting device for electric power overhaul operation has the advantages that the bearing support legs can move while bearing, the quick moving effect is increased, the moving in the overhaul process is convenient, the first bearing rod can stretch out and draw back, the normal requirement of high-altitude operation during electric power overhaul is guaranteed, different electric power accessories can be maintained under different conditions due to the stretching effect, the application range of the adjusting device is improved, the high-altitude operation frame can be used for carrying workers, the safety of the workers during operation is guaranteed, potential safety hazards of the workers under shaking or accidental conditions can be avoided due to the fence outside, the movable mounting clamp can be fixedly clamped with a telegraph pole, telegraph poles with different specifications are clamped firstly, the adjusting device can be used normally under various conditions, and on the other hand, the movable mounting clamp can roll, the convenience of installation is improved, the stability of high altitude construction frame has also been increased, further reduces high altitude construction's risk, and telescopic link rod can be synchronous flexible with the bearing bar from top to bottom, has guaranteed telescopic link rod's practicality and this adjusting device stability in each side.
Drawings
FIG. 1 is an overall structure diagram of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a top view of the structure of the present invention;
fig. 4 is the whole structure diagram of the movable mounting clip of the utility model.
In the figure: 1. a fixed platform; 2. a load-bearing leg; 3. installing a handrail; 4. a lift pump; 5. a first bearing bar; 6. a second bearing bar; 7. a third bearing bar; 8. a high-altitude operation frame; 9. turning over the portal frame; 10. a movable mounting clip; 11. a clamping rod; 12. a movable roller; 13. a telescopic connecting rod; 14. connecting a fixed rod; 15. the cross bars are connected.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an adjusting device for electric power overhaul operation comprises a fixed platform 1, wherein bearing support legs 2 are fixedly arranged on the periphery of the bottom end of the fixed platform 1, an installation handrail 3 is fixedly arranged on the front end face of the fixed platform 1, a lifting pump 4 is fixedly arranged on the right side of the bottom end of the fixed platform 1, a first bearing rod 5 is fixedly arranged on the top end of the lifting pump 4, a second bearing rod 6 and a third bearing rod 7 are sequentially and movably arranged in the first bearing rod 5 from bottom to top, an aerial work frame 8 is fixedly arranged on the top end of the third bearing rod 7, an overturning portal frame 9 is movably arranged on the front end face of the aerial work frame 8, a movable installation clamp 10 is movably arranged on the rear end face of the top end of the aerial work frame 8, a clamping rod 11 is movably connected inside the movable installation clamp 10, movable idler wheels 12 are movably arranged inside the inner wall of the movable installation clamp 10, and telescopic connecting rods 13 are, a connecting and fixing rod 14 is fixedly installed on the inner wall of the top end of the telescopic connecting rod 13, and a connecting cross rod 15 is fixedly installed on the inner wall of the third bearing rod 7.
The utility model discloses in: the bottom ends of the bearing support legs 2 are designed as pulleys, the number of the bearing support legs 2 is four, and four bearing support legs 2 are integrally connected with the fixed platform 1; bearing stabilizer blade 2 can also remove this device when carrying out the bearing, and the help increases the swift effect of removal, and the removal that conveniently overhauls the in-process is convenient.
The utility model discloses in: the number of the first bearing rods 5 is two, the first bearing rods 5 are integrally connected with the lifting pump 4, and the diameters of the first bearing rods 5, the second bearing rods 6 and the third bearing rods 7 are sequentially reduced and are in sleeved connection with one another; first bearing bar 5 can stretch out and draw back, has guaranteed the normal demand of high altitude construction when electric power overhauls, and such flexible effect has also increased the different electric power accessories of maintenance under the different situation moreover, and help has improved this adjusting device's application scope.
The utility model discloses in: the high-altitude operation frame 8 is in a cylindrical open design, the high-altitude operation frame 8 is connected with the turnover portal frame 9 through a rotating shaft, and the high-altitude operation frame 8 is connected with the movable mounting clamp 10 through a rotating shaft; high altitude construction frame 8 can be used for taking and carry the staff, guarantees the security of staff at the during operation, and the rail in the outside can avoid rocking or staff's potential safety hazard under the unexpected condition.
The utility model discloses in: the number of the movable mounting clips 10 is two, the movable mounting clips 10 are connected with the clamping rods 11 in a clamping mode, the movable mounting clips 10 are connected with the movable rollers 12 in a rotating clamping mode, and the number of the movable rollers 12 is two; the movable mounting clamp 10 can be fixedly clamped with the telegraph pole, the telegraph poles of different specifications are clamped at first, normal use of the adjusting device under various conditions is facilitated, on the other hand, the movable mounting clamp 10 can also roll, convenience in mounting is improved, stability of the aerial work frame 8 is improved, and risks of aerial work are further reduced.
The utility model discloses in: the number and the positions of the telescopic connecting rods 13 correspond to those of the third bearing rods 7 one by one, and the telescopic connecting rods 13 are integrally connected with the connecting fixing rod 14; the telescopic connecting rod 13 can be synchronously telescopic with the bearing rod from top to bottom, and the practicability of the telescopic connecting rod 13 and the stability of the adjusting device in all directions are guaranteed.
The working principle is as follows: when in use, the adjusting device can be moved to a maintenance point needing operation, firstly, the loose block of the movable mounting clamp 10 is arranged outside the telegraph pole, a worker can bring a maintenance toolbox into the overhead working frame 8, the adjusting device is opened after the turnover portal frame 9 is closed, the first bearing rod 5, the second bearing rod 6 and the third bearing rod 7 are lifted upwards slowly by the lifting pump 4, meanwhile, the telescopic connecting rods 13 connected with the lifting pump 4 synchronously move to help to keep the stability of the bearing rods and the overhead working frame 8 at the top end, the lifting pump 4 is closed after the lifting pump is lifted to a proper maintenance height, the movable mounting clamp 10 is clamped tightly, then, normal maintenance can be carried out, after the use is finished, the first bearing rod 5, the second bearing rod 6 and the third bearing rod 7 are retracted downwards by the lifting pump 4 on various rods at the whole bottom end, this completes the normal use of the adjustment device.
In summary, the following steps: the adjusting device for electric power overhaul operation has the advantages that the bearing support legs 2 can move while bearing, the fast moving effect is increased, the moving in the overhaul process is convenient, the first bearing rods 5 can stretch out and draw back, the normal requirement of high-altitude operation during electric power overhaul is guaranteed, different electric power accessories can be maintained under different conditions due to the stretching effect, the application range of the adjusting device is improved, the high-altitude operation frame 8 can be used for carrying workers, the safety of the workers during operation is guaranteed, potential safety hazards of the workers under shaking or accidental conditions can be avoided due to the outer fence, the movable mounting clamp 10 can be fixedly clamped with a telegraph pole, telegraph poles with different specifications are clamped firstly, the adjusting device can be used normally under various conditions, and on the other hand, the movable mounting clamp 10 can also roll, the convenience of installation is improved, the stability of high altitude construction frame 8 is also increased, the risk of high altitude construction is further reduced, telescopic connecting rod 13 can stretch out and draw back with the bearing bar in step from top to bottom, the practicality of telescopic connecting rod 13 and the stability of this adjusting device in each side have been guaranteed.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an electric power overhauls adjusting device for operation, includes fixed platform (1), its characterized in that: the movable mounting device is characterized in that bearing support legs (2) are fixedly mounted on the periphery of the bottom of the fixed platform (1), a mounting handrail (3) is fixedly mounted on the front end face of the fixed platform (1), a lifting pump (4) is fixedly mounted on the right side of the bottom of the fixed platform (1), a first bearing rod (5) is fixedly mounted on the top end of the lifting pump (4), a second bearing rod (6) and a third bearing rod (7) are sequentially and movably mounted inside the first bearing rod (5) from bottom to top, an aerial work frame (8) is fixedly mounted on the top end of the third bearing rod (7), an overturning portal frame (9) is movably mounted on the front end face of the aerial work frame (8), a movable mounting clamp (10) is movably mounted on the rear end face of the top end of the aerial work frame (8), a clamping rod (11) is movably connected inside the movable mounting clamp (10), and movable idler wheels (12) are movably mounted inside the inner wall of the movable mounting, the utility model discloses a fixed platform, including fixed platform (1), the top left and right sides fixed mounting of fixed platform (1) has flexible connecting rod (13), the top inner wall department fixed mounting of flexible connecting rod (13) has connection dead lever (14), the inner wall department fixed mounting of third bearing bar (7) has connection horizontal pole (15).
2. The adjusting device for electric power overhaul work according to claim 1, characterized in that: the bottom of the bearing support leg (2) is designed as a pulley, the number of the bearing support legs (2) is four, and the four bearing support legs (2) are integrally connected with the fixed platform (1).
3. The adjusting device for electric power overhaul work according to claim 1, characterized in that: the number that first bearing bar (5) set up is two, and first bearing bar (5) are connected as an organic whole with elevator pump (4), the diameter of first bearing bar (5), second bearing bar (6) and third bearing bar (7) diminishes in proper order, and establishes the connection for the cover each other.
4. The adjusting device for electric power overhaul work according to claim 1, characterized in that: high altitude construction frame (8) are columniform open design, high altitude construction frame (8) are connected for the pivot with upset portal (9), high altitude construction frame (8) are connected for the pivot with movable mounting clamp (10).
5. The adjusting device for electric power overhaul work according to claim 1, characterized in that: the movable mounting clamp (10) is connected with the clamping rod (11) in a clamping mode, the movable mounting clamp (10) is connected with the movable roller (12) in a rotating clamping mode, and the movable roller (12) is arranged in two modes.
6. The adjusting device for electric power overhaul work according to claim 1, characterized in that: the number and the positions of the telescopic connecting rods (13) are in one-to-one correspondence with the third bearing rods (7), and the telescopic connecting rods (13) are integrally connected with the connecting fixing rods (14).
CN202020397482.XU 2020-03-25 2020-03-25 Adjusting device for electric power overhaul operation Active CN211930101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020397482.XU CN211930101U (en) 2020-03-25 2020-03-25 Adjusting device for electric power overhaul operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020397482.XU CN211930101U (en) 2020-03-25 2020-03-25 Adjusting device for electric power overhaul operation

Publications (1)

Publication Number Publication Date
CN211930101U true CN211930101U (en) 2020-11-13

Family

ID=73348401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020397482.XU Active CN211930101U (en) 2020-03-25 2020-03-25 Adjusting device for electric power overhaul operation

Country Status (1)

Country Link
CN (1) CN211930101U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112897419A (en) * 2021-02-04 2021-06-04 陈林 Multifunctional lifting protection device for high-altitude operation
CN112919378A (en) * 2021-01-25 2021-06-08 武汉焱集科技有限公司 Safety device is used in electric power engineering operation construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919378A (en) * 2021-01-25 2021-06-08 武汉焱集科技有限公司 Safety device is used in electric power engineering operation construction
CN112897419A (en) * 2021-02-04 2021-06-04 陈林 Multifunctional lifting protection device for high-altitude operation

Similar Documents

Publication Publication Date Title
CN211930101U (en) Adjusting device for electric power overhaul operation
CN108462112A (en) A kind of power equipment maintaining climbing case
CN110748138A (en) Labor-saving pole climbing device for telegraph pole
CN201762069U (en) Insulated ladder for lifting maintenance platform
CN215443411U (en) Inclination correcting device for electric power engineering construction
CN208631793U (en) A kind of cable unwinding device
CN212224199U (en) Scaffold convenient to adjust for power equipment overhaul
CN206712336U (en) Shaft tower cable platform work protective cradle
CN116161587A (en) Ascending device for electric power detection and maintenance
CN214762961U (en) Movable telescopic device for hanging safety belt
CN202550348U (en) Folding multifunctional overhauling frame for overhauling isolating switch
CN205846663U (en) A kind of height-adjustable overhead line structures
CN114221260A (en) Insulator maintenance frame of electric power pylon
CN112265946A (en) Electric pole climbing device for field electric power overhaul
CN110700751A (en) Novel ladder stand for circular telegraph pole
CN115173297B (en) Movable high-altitude suspension insulator replacement device and use method
CN218879393U (en) Comprehensive operation platform for oil well workover
CN214935810U (en) Lifting support for power equipment installation
CN213175029U (en) Angle steel tower of high strength 5G power transmission tower
CN212583175U (en) Shear force crane is removed in house wall fitment construction
CN220267187U (en) Building curtain installs safety device
CN220599080U (en) Building construction frame
CN220098312U (en) GIL bus overhaul and installation operation platform
CN211545492U (en) Communication base station cable installation climbing device
CN220245423U (en) Lifting device for pole-mounted switch installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221011

Address after: No. 1, Cement Factory Dormitory, Jiawang District, Xuzhou City, Jiangsu Province 221000

Patentee after: Shi Xiaohui

Address before: 323700 NO.175, Anfu village, Anren Town, Longquan City, Lishui City, Zhejiang Province

Patentee before: Ji Renzhi

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221025

Address after: 221113 Dapeng Town Industrial Park, Tongshan District, Xuzhou City, Jiangsu Province

Patentee after: Jiangsu Leidun Electric Power Construction Co.,Ltd.

Address before: No. 1, Cement Factory Dormitory, Jiawang District, Xuzhou City, Jiangsu Province 221000

Patentee before: Shi Xiaohui

TR01 Transfer of patent right