CN211923546U - Construction elevator instrument formula safety device - Google Patents

Construction elevator instrument formula safety device Download PDF

Info

Publication number
CN211923546U
CN211923546U CN202020315476.5U CN202020315476U CN211923546U CN 211923546 U CN211923546 U CN 211923546U CN 202020315476 U CN202020315476 U CN 202020315476U CN 211923546 U CN211923546 U CN 211923546U
Authority
CN
China
Prior art keywords
frame
construction elevator
scaffold
steel
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020315476.5U
Other languages
Chinese (zh)
Inventor
韩宝宝
张志远
王东荣
崔彩霞
杜鹏程
郭晓琴
韩栋
曹志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN202020315476.5U priority Critical patent/CN211923546U/en
Application granted granted Critical
Publication of CN211923546U publication Critical patent/CN211923546U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a construction elevator instrument formula safety device, belongs to construction technical field, can solve traditional construction elevator support body protection and adopt the green net of safety net basically and protect, because green net uses easy damage and morals and manners for a long time, make factor of safety reduce, and need change the new net many times, also brought the problem of potential safety hazard for the shelf worker operation, including scaffold frame and a plurality of protection network, the protection network includes the frame of rectangle, is equipped with two criss-cross bracing in the frame, and the both ends of bracing are connected with the apex angle of frame respectively, and the surface of frame is equipped with the steel mesh piece, and one side of the steel pipe of scaffold frame is equipped with the connecting rod, and the one end and the scaffold connection of connecting rod, the other end are equipped with H shaped steel, are connected with the one end of protection network. Through using the utility model discloses, the security of construction elevator steel pipe scaffold puts up outrigger protection has been improved.

Description

Construction elevator instrument formula safety device
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to construction elevator instrument formula safety device.
Background
Traditional construction elevator support body protection adopts the green net of safety net basically to protect, because green net long-time use can be damaged easily and the morals and manners for factor of safety reduces, and need change new net many times, has also brought the potential safety hazard for the scaffold worker operation.
The invention discloses an aerial assembly type platform mounting structure, and particularly relates to an aerial assembly type platform mounting structure, which is named as CN 201721735122.0. The problem of capping the hollowed-out part of the building is solved, the capping device comprises a hollowed-out structure area, I-shaped steels are transversely arranged in parallel in the hollowed-out structure area, the I-shaped steels are fixed transversely through fasteners and steel pipes, a phi 20 round steel pull ring is pre-embedded in a beam on the ground at the top layer, a steel wire rope is arranged on the phi 20 round steel pull ring, the lower end of the steel wire rope is connected to one third of the length of the I-shaped steel, and a high-altitude stable platform is; and a plate bottom upright post and a beam bottom upright post are arranged on the I-shaped steel, and a beam and a plate are respectively arranged on the plate bottom upright post and the beam bottom upright post. And finally, finishing the capping construction of the top layer structure. Construction method set up assembled high altitude platform at the structural ground, then put up with the full hall of standard and combine together, can practice thrift the full hall frame structure in the fretwork district downside. This scheme is not applicable to elevator installation protection.
Disclosure of Invention
The utility model discloses to the green net of traditional construction elevator support body protection adoption safety net basically protects, because green net uses easily damaged and morals and manners for a long time for factor of safety reduces, and needs change the new net many times, also brought the problem of potential safety hazard for the shelf worker operation, provides a construction elevator instrument formula safety device.
The utility model adopts the following technical scheme:
the utility model provides a construction elevator instrument formula safety device, includes scaffold frame and a plurality of protection network, the protection network includes the frame of rectangle, is equipped with two criss-cross bracing in the frame, and the both ends of bracing are connected with the apex angle of frame respectively, and the surface of frame is equipped with the steel mesh piece, and one side of the steel pipe of scaffold frame is equipped with the connecting rod, and the one end and the scaffold connection of connecting rod, the other end are equipped with H shaped steel, are connected with the one end of protection network respectively in two upper and lower recesses of H shaped steel.
The protective net comprises a middle protective net positioned between elevator doors of the elevator, side protective nets positioned on two sides of the elevator doors and an upper protective net positioned above the elevator doors.
The thickness of the steel mesh sheet is 3 mm.
The aperture of the steel mesh sheet is 5 mm.
And a steel wire with a fixing function is arranged between the protective net and the scaffold.
The utility model has the advantages as follows:
the utility model discloses simple structure, through using the utility model discloses, improved the security of construction elevator steel pipe scaffold frame outrigger protection, ann tears the convenience open, swift, can have enough to meet the need for a long time to utilize many times, effectively reduces construction cost, improves work efficiency.
Drawings
Fig. 1 is a schematic structural view of a protective net of the present invention;
fig. 2 is a schematic connection diagram of the scaffold and the protective net of the present invention;
wherein: 1-a frame; 2-diagonal bracing; 3-a steel mesh sheet; 4-a steel pipe; 5-a connecting rod; 6-H section steel.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
The utility model provides a construction elevator instrument formula safety device, includes scaffold frame and a plurality of protection network, the protection network includes the frame 1 of rectangle, is equipped with two criss-cross bracing 2 in the frame 1, and the both ends of bracing 2 are connected with the apex angle of frame 1 respectively, and the surface of frame 1 is equipped with steel mesh piece 3, and one side of the steel pipe 4 of scaffold frame is equipped with connecting rod 5, and the one end and the scaffold connection of connecting rod 5, the other end are equipped with H shaped steel 6, are connected with the one end of protection network respectively in two upper and lower recesses of H shaped steel 6.
The protective net comprises a middle protective net positioned between elevator doors of the elevator, side protective nets positioned on two sides of the elevator doors and an upper protective net positioned above the elevator doors.
The thickness of the steel mesh 3 is 3 mm.
The aperture of the steel mesh 3 is 5 mm.
And a steel wire with a fixing function is arranged between the protective net and the scaffold.
The method comprises the steps of firstly welding square pipes of 30 x 3mm into square pipes of a square shape with a mouth and a middle diagonal brace to form a frame, welding a steel mesh piece with the thickness of 3mm and the aperture of 5mm with the square pipe frame, fixing an H-shaped steel connecting piece at the corresponding position of a steel pipe scaffold, and finally firmly fixing the whole tool type safety protection mesh piece with the steel pipe scaffold (the safety protection mesh piece is divided into three specifications of the upper part, the middle part and the side surface of an elevator door opening).
The method comprises the following specific steps:
firstly, welding square tubes into a square shape, and performing cross welding on the square tubes inside the square tubes to form a frame;
and then the steel mesh sheet and the square tube frame are welded (the blanking size of the square tube and the steel mesh sheet body is based on the size of the on-site construction elevator protection frame), so that a safety protection mesh sheet is formed.
Before the net sheets are installed, short steel pipes are welded on a scaffold body of a construction elevator scaffold, one end of each short steel pipe is fixed with the scaffold body, H-shaped steel is welded at the end part of the other end of each short steel pipe, an upper safety protection net and a lower safety protection net are embedded into grooves of the H-shaped steel, and the H-shaped steel is used as supporting points and separating points of each safety net, so that the safety protection nets are effectively fixed;
and the 22# iron wire is used for firmly binding the protective net sheets with the steel pipe scaffold body, the installation sequence is sequentially carried out from bottom to top, and the synchronization with the engineering is kept. The construction elevator is installed according to the sizes of the construction elevator outer frame and the opening of the elevator, the installation sequence is consistent with the erection sequence of the construction elevator scaffold body from low to high, the construction elevator is installed according to the specific size of the steel pipe scaffold body in a slicing mode, and except that the positions of two construction elevator doors are not installed, other positions are all installed (the front and the side of the scaffold are installed).
Before the installation of the net sheets, the H-shaped steel connecting pieces are fixed at corresponding positions on the outer protective frame of the construction elevator. H-shaped steel connecting pieces are arranged on the upper portion, the lower portion and the two sides of the construction elevator door opening and used for fixing the safety net piece and the construction elevator door frame. A connecting piece (a connecting piece formed by welding H-shaped steel and a short steel pipe) is arranged between every two pieces of safety protection nets and is fixed on the outer protection steel pipe scaffold to form a whole with the scaffold body.
During installation, the safety protection net piece is installed from bottom to top and is divided into a front safety protection net piece and a side safety protection net piece, wherein the front safety protection net piece is divided into a middle net piece (a middle safety protection net is arranged between two construction elevator doors), side net pieces (side net pieces are arranged on two sides of the construction elevator doors) and an upper net piece (an upper safety protection net piece is arranged on the upper portion of the construction elevator doors). Utilize 22# iron wire firmly with safety protection net and steel pipe scaffold ligature, and every safety protection ligature fixed point is no less than 5 (four angles and central point all will ligature one).
When the construction elevator is dismantled, the construction elevator is dismantled according to the principle of 'taking before dismantling, taking after dismantling before dismantling, from top to bottom', so that the safety protection net is dismantled before the platform and the steel pipe scaffold are dismantled, the platform and the steel pipe scaffold are dismantled layer by layer in sequence, and the platform and the steel pipe scaffold are stacked orderly according to specification and size so as to be convenient to transport to other projects for use.

Claims (5)

1. The utility model provides a construction elevator instrument formula safety device which characterized in that: including scaffold frame and a plurality of protection network, the protection network includes frame (1) of rectangle, is equipped with two criss-cross bracing (2) in frame (1), and the both ends of bracing (2) are connected with the apex angle of frame (1) respectively, and the surface of frame (1) is equipped with steel mesh piece (3), and one side of steel pipe (4) of scaffold frame is equipped with connecting rod (5), and the one end and the scaffold frame of connecting rod (5) are connected, and the other end is equipped with H shaped steel (6), is connected with the one end of protection network in two upper and lower recesses of H shaped steel (6) respectively.
2. The construction elevator tool type safety guard according to claim 1, wherein: the protective net comprises a middle protective net positioned between elevator doors of the elevator, side protective nets positioned on two sides of the elevator doors and an upper protective net positioned above the elevator doors.
3. The construction elevator tool type safety guard according to claim 1, wherein: the thickness of the steel mesh sheet (3) is 3 mm.
4. The construction elevator tool type safety guard according to claim 1, wherein: the aperture of the steel mesh (3) is 5 mm.
5. The construction elevator tool type safety guard according to claim 1, wherein: and a steel wire with a fixing function is arranged between the protective net and the scaffold.
CN202020315476.5U 2020-03-14 2020-03-14 Construction elevator instrument formula safety device Active CN211923546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020315476.5U CN211923546U (en) 2020-03-14 2020-03-14 Construction elevator instrument formula safety device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020315476.5U CN211923546U (en) 2020-03-14 2020-03-14 Construction elevator instrument formula safety device

Publications (1)

Publication Number Publication Date
CN211923546U true CN211923546U (en) 2020-11-13

Family

ID=73347692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020315476.5U Active CN211923546U (en) 2020-03-14 2020-03-14 Construction elevator instrument formula safety device

Country Status (1)

Country Link
CN (1) CN211923546U (en)

Similar Documents

Publication Publication Date Title
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN107100358A (en) Without the special bracket of encorbelmenting of off-load industrialization security protection, support body and its construction method
CN215564558U (en) Retractable platform of unloading of encorbelmenting
CN211923546U (en) Construction elevator instrument formula safety device
CN108118885B (en) vertical moving type protection platform and application thereof in steel structure column butt joint construction
CN107795133B (en) Integral protective frame platform and construction method thereof
CN211447860U (en) Tool type outer cantilever protection device
CN109205455A (en) A kind of air-conditioner set integral hoisting platform and its construction method
CN211369459U (en) Soft platform of steel construction
CN210459260U (en) High pile cap construction platform of encorbelmenting
CN209797236U (en) Box girder external mold hoisting device
CN107130783B (en) The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method
CN207109803U (en) A kind of pile foundation steel bar cage prop
CN202324673U (en) Protection fence
CN111305433A (en) Construction structure and construction method of inclined glass curtain wall of roof steel structure platform
CN217810514U (en) Pier inner supporting frame capable of being used for binding pier body steel bars and being used for turnover
CN216840517U (en) A passageway platform of going up people that is used for super high-rise building creeping formwork to be connected with swing arm tower
CN220487257U (en) A device for facing limit protection
CN211622551U (en) Scaffold protection shed and scaffold protection shed mounting structure
CN216787105U (en) Operation platform of pile foundation
CN219710941U (en) Lifting type spreader operating platform used in elevator hoistway
CN212837557U (en) Combined crawling ladder convenient for installing and welding double-steel-plate box type steel plate wall steel beams
CN215055153U (en) Rain shed lifting platform
CN213806524U (en) Protective net frame for scaffold
CN215052132U (en) Mounting bracket platform for cable-stayed bridge of arc steel tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant