Temporary isolation device for oil field ground engineering construction Download PDFInfo
- Publication number
- CN211900003U CN211900003U CN201922024658.7U CN201922024658U CN211900003U CN 211900003 U CN211900003 U CN 211900003U CN 201922024658 U CN201922024658 U CN 201922024658U CN 211900003 U CN211900003 U CN 211900003U
- Authority
- CN
- China
- Prior art keywords
- rod
- end sealing
- pin
- pole
- install
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 238000002955 isolation Methods 0.000 title claims description 14
- 238000007789 sealing Methods 0.000 claims abstract description 35
- 230000000903 blocking effect Effects 0.000 claims abstract description 19
- 238000003466 welding Methods 0.000 claims abstract description 4
- 241001397809 Hakea leucoptera Species 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model discloses an oil field ground engineering construction is with interim isolating device, including first end sealing pole and second end sealing pole, pin rod and crosspiece are installed respectively to both sides between first end sealing pole and the second end sealing pole, install the guide pin bushing on the pin rod, install perpendicular grade pole on the guide pin bushing, install the cardboard on the crosspiece, install first fixing clip on the first end sealing pole, install the third fixing clip on the second end sealing pole, the second fixing clip is installed to one side of second support post, the supporting leg is all installed to the bottom of first support post and second support post, the supporting legs is installed to the bottom of supporting leg. The utility model discloses a lean on last position department to install the pin rod between first end blocking pole and the second end blocking pole, install the cotter pin on the pin rod, and erect the shelves pole and install on the cotter pin through the welding mode, can carry out swing control to erecting the shelves pole through it, easy to assemble dismantles, and the flexibility is higher.
Description
Technical Field
The utility model relates to an isolating device field specifically is an oil field ground engineering construction is with interim isolating device.
Background
The temporary isolation device for oilfield ground engineering construction is used for temporarily isolating and protecting a construction area for oilfield ground engineering construction, and the isolation fence is also called a telescopic band railing seat (stainless steel one-meter line) and comprises a rod, a bottom cover plate and a bottom counterweight, wherein a telescopic woven belt is arranged at the top of the rod, can be pulled out when in use and hung on another railing and can be arranged into a row or be enclosed into a square polygon according to actual arrangement to be used as an isolation of exhibits or a dangerous area, and the isolation safety device is a facility for preventing any part of a body from approaching the dangerous area, such as a fixed rotary fence and the like.
The temporary isolating device for engineering construction at the present stage is poor in flexibility, cannot be used for three-dimensional splicing protection, and is inconvenient to install and disassemble.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an oil field ground engineering construction is with interim isolating device to the flexibility of solving among the prior art is poor, can't carry out three-dimensional concatenation protection, and the inconvenient problem of installation dismantlement.
In order to achieve the above object, the utility model provides a following technical scheme: a temporary isolation device for oil field ground engineering construction comprises a first end sealing rod and a second end sealing rod, a pin rod and a transverse baffle rod are respectively arranged on two sides between the first end sealing rod and the second end sealing rod, a pin sleeve is arranged on the pin rod, a vertical baffle rod is arranged on the pin sleeve, a connector is arranged at one end of the vertical baffle rod, a clamping plate is arranged on the transverse baffle rod, a first supporting upright post is arranged on one side of the first end sealing rod, a second supporting upright post is arranged on one side of the second end sealing rod, a first lock sleeve is arranged on the first supporting upright post, a second lock sleeve is arranged on the second supporting upright post, a first fixing clamp is arranged on the first end sealing rod, a third fixing clamp is arranged on the second end sealing rod, a second fixing clamp is arranged on one side of the second supporting upright post, supporting legs are arranged at the bottom ends of the first supporting upright post and the second supporting upright post, supporting legs are installed at the bottom ends of the supporting legs.
Preferably, both sides of the first lock sleeve are provided with fixing lugs, and one side of the second lock sleeve is provided with a fixing lug.
Preferably, the pin bush is rotatably connected with the pin rod, and the connector at one end of the vertical blocking rod is fixed with the clamping plate bolt on the transverse blocking rod.
Preferably, the first fixing clip is fixedly connected with the first lock sleeve, and the third fixing clip is fixedly connected with the second lock sleeve.
Preferably, the second fixing clip is fixedly connected with the fixing lug on the outer side of the first lock sleeve in an embedded mode.
Preferably, the supporting legs are arranged to be of an inverted U-shaped structure, and the supporting legs are connected with the first supporting stand column and the second supporting stand column in a welding mode.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses an lean on last position department to install the pin pole between first end blocking pole and the second end blocking pole, install the cotter pin on the pin pole, and erect the shelves pole and pass through welding mode and install on the cotter pin, can carry out swing control to erecting the shelves pole through it, easy to assemble dismantlement, the flexibility is higher, and when will erect the shelves pole and turn to with ground horizontal position when, two this kind of equipment vertically splice, can make up into spatial structure, carry out scope nature isolation, increase its application range, improve the commonality, and at first end blocking pole and second end blocking pole and the first support post and the second support post of its one side, all inlay through first fixing clip and third fixing clip and first lock sleeve and second lock sleeve and be connected, this kind of design is easy to assemble dismantlement.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a side view of the vertical blocking rod of the present invention.
Fig. 3 is a side view of the support leg of the present invention.
Fig. 4 is a partial view of the horizontal splicing of the present invention.
In the figure: 1. a pin bush; 2. a pin rod; 3. a vertical blocking rod; 4. a first end-capping rod; 5. a first support column; 6. a first fixing clip; 7. a first lock sleeve; 8. fixing the ear; 9. supporting legs; 10. supporting legs; 11. a connector; 12. clamping a plate; 13. a crossbar; 14. a second end-capping rod; 15. a second support column; 16. a second fixing clip; 17. a second lock sleeve; 18. and a third fixing clip.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, in an embodiment of the present invention, a temporary isolation device for oilfield ground engineering construction includes a first end-sealing rod 4 and a second end-sealing rod 14, a pin rod 2 and a transverse bar 13 are respectively installed on two sides between the first end-sealing rod 4 and the second end-sealing rod 14, a pin sleeve 1 is installed on the pin rod 2, the pin sleeve 1 can rotate on the pin rod 2 to drive a vertical bar 3 to swing, the pin sleeve 1 is rotatably connected with the pin rod 2, a connector 11 at one end of the vertical bar 3 is bolted to a catch plate 12 on the transverse bar 13, the design facilitates fixing the vertical bar 3, the vertical bar 3 is installed on the pin sleeve 1, the connector 11 is installed at one end of the vertical bar 3, the catch plate 12 is installed on the transverse bar, a first support pillar 5 is installed on one side of the first end-sealing rod 4, a second support pillar 15 is installed on one side of the second end-sealing rod 14, and the first support pillar 5 are used for supporting the device, the first supporting upright post 5 is provided with a first lock sleeve 7, the first lock sleeve 7 is used for being fixedly connected with a first fixing clamp 6 on one side of a first end sealing rod 4, so that the first supporting upright post 5 is fixed on one side of the first end sealing rod 4, both sides of the first lock sleeve 7 are provided with fixing lugs 8, one side of a second lock sleeve 17 is provided with a fixing lug 8, a second support upright post 15 is provided with a second lock sleeve 17, the second lock sleeve 17 is conveniently and fixedly connected with a third fixing clamp 18 on one side of a second end sealing rod 14, so that the second supporting upright post 15 is fixed on one side of the second end sealing rod 14, the first end sealing rod 4 is provided with the first fixing clamp 6, the first fixing clamp 6 is fixedly connected with the first lock sleeve 7, the third fixing clamp 18 is fixedly connected with the second lock sleeve 17, the second end sealing rod 14 is provided with the third fixing clamp 18, one side of the second supporting upright post 15 is provided with a second fixing clamp 16, the horizontal concatenation combination of a plurality of this kind of equipment of second fixing clip 16 design convenience, fixed connection is inlayed by the fixed ear 8 in the outside to second fixing clip 16 and first lock sleeve 7, and supporting leg 9 is all installed to the bottom of first support post 5 and second support post 15, and supporting leg 9 makes first support post 5 and second support post 15 can stably place, and supporting legs 10 is installed to the bottom of supporting leg 9.
The utility model discloses a theory of operation is: when the device is used, the connector 11 at one end of the vertical blocking rod 3 is fixed with the clamping plate 12 through a bolt, so that the vertical blocking rod 3 is protected between the pin rod 2 and the transverse blocking rod 13, then the first fixing clamp 6 on one side of the first end sealing rod 4 is embedded and fixed with the first lock sleeve 7 on the first supporting upright post 5, the third fixing clamp 18 on one side of the second end sealing rod 14 is embedded and fixed with the second lock sleeve 17 on the second supporting upright post 15, so that the first supporting upright post 5 and the second supporting upright post 15 support the device through the supporting leg 9 at the bottom end of the first supporting upright post 5 and the second supporting upright post 15, and the second fixing clamp 16 on one side of the second supporting upright post 15 is embedded with the first lock sleeve 7, so that a plurality of devices are transversely spliced and combined.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. A temporary isolating device for oil field ground engineering construction comprises a first end sealing rod (4) and a second end sealing rod (14), and is characterized in that a pin rod (2) and a transverse blocking rod (13) are respectively installed on two sides between the first end sealing rod (4) and the second end sealing rod (14), a pin sleeve (1) is installed on the pin rod (2), a vertical blocking rod (3) is installed on the pin sleeve (1), a connector (11) is installed at one end of the vertical blocking rod (3), a clamping plate (12) is installed on the transverse blocking rod, a first supporting upright post (5) is installed on one side of the first end sealing rod (4), a second supporting upright post (15) is installed on one side of the second end sealing rod (14), a first locking sleeve (7) is installed on the first supporting upright post (5), a second locking sleeve (17) is installed on the second supporting upright post (15), a first fixing clamp (6) is installed on the first end sealing rod (4), install third fixing clip (18) on second closed end pole (14), second fixing clip (16) are installed to one side of second support post (15), supporting leg (9) are all installed to the bottom of first support post (5) and second support post (15), supporting legs (10) are installed to the bottom of supporting leg (9).
2. The temporary isolation device for oilfield surface engineering construction according to claim 1, wherein: both sides of the first lock sleeve (7) are provided with fixing lugs (8), and one side of the second lock sleeve (17) is provided with the fixing lugs (8).
3. The temporary isolation device for oilfield surface engineering construction according to claim 1, wherein: the pin bush (1) is rotatably connected with the pin rod (2), and the connector (11) at one end of the vertical blocking rod (3) is fixed with the clamping plate (12) on the transverse blocking rod (13) through bolts.
4. The temporary isolation device for oilfield surface engineering construction according to claim 1, wherein: the first fixing clip (6) is fixedly connected with the first lock sleeve (7), and the third fixing clip (18) is fixedly connected with the second lock sleeve (17).
5. The temporary isolation device for oilfield surface engineering construction according to claim 1, wherein: the second fixing clip (16) is embedded and fixedly connected with the fixing lug (8) close to the outer side of the first lock sleeve (7).
6. The temporary isolation device for oilfield surface engineering construction according to claim 1, wherein: supporting leg (9) set up to the type of falling U structure, and supporting leg (9) all are connected through welding mode with first support post (5) and second support post (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922024658.7U CN211900003U (en) | 2019-11-21 | 2019-11-21 | Temporary isolation device for oil field ground engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922024658.7U CN211900003U (en) | 2019-11-21 | 2019-11-21 | Temporary isolation device for oil field ground engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211900003U true CN211900003U (en) | 2020-11-10 |
Family
ID=73299775
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922024658.7U Expired - Fee Related CN211900003U (en) | 2019-11-21 | 2019-11-21 | Temporary isolation device for oil field ground engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211900003U (en) |
-
2019
- 2019-11-21 CN CN201922024658.7U patent/CN211900003U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205063308U (en) | Outer hanging protection frame and outer hanging protective structure | |
CN203866743U (en) | Protective net preventing car from falling | |
CN101611199A (en) | A kind of improved safety curtain that falls | |
KR102504501B1 (en) | Falling object protection equipment for transmission towers | |
CN207377264U (en) | A kind of spliced foundation pit protective fence | |
CN211900003U (en) | Temporary isolation device for oil field ground engineering construction | |
CN205276911U (en) | Fixing device and contain this fixing device's entrance to a cave safety device | |
CN206769361U (en) | A kind of attachment means of the plug-in expanded metal lath of adhering lifting integral-scaffold | |
CN210917440U (en) | Pile foundation reinforcing apparatus for building site | |
KR100925539B1 (en) | Piton for wall and falling preventer for wall thereby | |
CN216239854U (en) | Subway station foundation pit steel support anti-falling protection device | |
CN214145048U (en) | Town road foundation ditch safety device | |
RU126355U1 (en) | SUPPORT OF TEMPORARY RECOVERY OF THE CONTACT NETWORK | |
CN219654346U (en) | Guardrail device applied to subway civil engineering foundation pit support | |
CN107806016B (en) | A kind of protective device of bridge construction | |
CN213627021U (en) | Prevent building foundation ditch protection rail that topples | |
CN202450535U (en) | Safe suspension device for open cut foundation pit | |
CN111350368A (en) | Steel construction is with high altitude and is faced limit protection safety barrier | |
CN219994557U (en) | Temporary supporting and suspending device for trench excavation underground pipeline | |
CN213063009U (en) | Civil engineering safety scaffold | |
CN216809605U (en) | Folding construction suspension cage for highway partition beam | |
CN215402731U (en) | Manual hole digging pile operation device | |
CN216240103U (en) | Easy-to-disassemble, assemble and carry assembly type construction enclosure | |
KR101276164B1 (en) | A falling rock prevention pence with open type | |
CN215255023U (en) | Lightning protection transmission line steel construction iron tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211223 Address after: 226000 room 705, new view building, 203 Nong Nong Road, Chongchuan District, Nantong, Jiangsu Patentee after: Han Hui Address before: 249, Central Road, Sanguanmiao village, Jinqiu sub district office, Boxing County, Binzhou City, Shandong Province Patentee before: Ruizhi information technology (Binzhou) Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |