CN211899795U - Historical architecture terrazzo mouth of marking time restores structure - Google Patents
Historical architecture terrazzo mouth of marking time restores structure Download PDFInfo
- Publication number
- CN211899795U CN211899795U CN202020045906.6U CN202020045906U CN211899795U CN 211899795 U CN211899795 U CN 211899795U CN 202020045906 U CN202020045906 U CN 202020045906U CN 211899795 U CN211899795 U CN 211899795U
- Authority
- CN
- China
- Prior art keywords
- terrazzo
- marking time
- time
- restoration
- expansion bolts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000465 moulding Methods 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 239000004575 stone Substances 0.000 claims description 6
- 239000007788 liquid Substances 0.000 claims description 4
- 238000005266 casting Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 2
- 230000008439 repair process Effects 0.000 description 4
- 230000007547 defect Effects 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000003203 everyday effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000005498 polishing Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a historical architecture terrazzo mouth of marking time restores structure belongs to the building field. The utility model discloses a fixed part and restoration portion, the utility model discloses mark time a mouthful basic unit to terrazzo and consolidate and the surface course is restoreed for mark time after the restoration forms a whole with marking time before restoreing, not only resumes original stitch molding, and has fully guaranteed the whole firmness of marking time after the restoration.
Description
Technical Field
The utility model relates to a building field, concretely relates to historical architecture terrazzo structure of restoreing of marking time.
Background
The ancient building scenic spot needs to receive a large number of tourists every day, so the terrazzo step is easy to be damaged, and various potential safety hazards are caused. In the prior art, the defects of the terrazzo stair step openings are generally directly repaired by casting repair mortar, the repair method easily causes hollowing in the steps, the defects can also occur in later use, rework maintenance needs to be carried out again, and a large amount of manpower and material resources are consumed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can improve the whole firm degree of ancient building terrazzo restoration subassembly of marking time of step after restoreing greatly.
The technical scheme of the utility model is that: the utility model provides a historical architecture terrazzo mouth of marking time restores structure, sets up and marks time in treating restoring, includes fixed part and restoration portion, and the fixed part includes a plurality of parallel arrangement's extra long expansion bolts, one with take the restoration round steel of marking time length matching, extra long expansion bolts is 45 degrees angles and inserts and wait to restore and mark time, round steel fixed welding in extra long expansion bolts outstanding tip of marking time of waiting to restore, and restoration portion marks time for the stone thick liquid of casting above the round steel, and the line foot that the stone thick liquid was marked time is the same with the molding die size of the line foot of waiting to restore and marking time.
According to a further technical scheme, the length of the lengthened expansion bolt protruding out of the end part of the step to be repaired is 60-80 mm.
According to the further technical scheme, the lengthened expansion bolts are evenly distributed at intervals along the step to be repaired.
In a further technical scheme, the distance between adjacent lengthened expansion bolts is 200 mm and 250 mm.
In a further technical scheme, the number of the round steel is 2.
The utility model has the advantages that: the utility model discloses combine terrazzo to mark time a mouthful basic unit reinforcement and surface course restoration for mark time after the restoration mouthful and mark time before restoreing and form a whole, not only resume original stitch molding, and guarantee the whole firmness of marking time after the restoration.
Drawings
FIG. 1 is a schematic structural view of the present invention,
FIG. 2 is a schematic structural view of the fixing portion of the present invention,
wherein, 1, waiting to restore and 2, lengthening the expansion bolts and 3, round steel and 4, and pebble slurry are used for stepping.
Detailed Description
The invention will be further elucidated below by means of non-limiting examples, with the understanding that the invention is not limited thereto.
As shown in FIGS. 1-2, the utility model relates to a historical architecture terrazzo mark time mouth repair structure, which is arranged on a mark time 1 to be repaired, and realizes the repair of the defect of the worn terrazzo stair mark time mouth. Treat at first that to restore the step and carry out unified excision, the incision is perpendicular incision, then is waiting to restore the installation on the step the utility model discloses.
The utility model discloses a fixed part and restoration portion, the fixed part include 7 parallel arrangement's extension expansion bolts 2, 2 and take the restoration round steel 3 of marking time length matching, and extension expansion bolts 2 evenly sets up along waiting to restore 1 every 220mm of marking time, and extension expansion bolts 2 is 45 degrees angles and inserts and wait to restore 1 of marking time, and extension expansion bolts 2 outstanding length in waiting to restore 1 of marking time's tip is 60 mm. The round steel 3 is fixedly welded at the end part of the lengthened expansion bolt 2 protruding out of the step 1 to be repaired, so that the base layer reinforcement of the opening of the step 1 to be repaired is formed. And then, a mould is copied according to the modeling of the line foot with the reinforcing mark time, and the stone slurry is poured according to the copied mould integrally to form a repairing part, so that the size of the line foot of the stone slurry mark time 4 is the same as that of the modeling mould of the line foot of the mark time 1 to be repaired.
And finally, polishing the repaired step according to the process requirements of the terrazzo step.
To sum up, the utility model discloses simple structure will the utility model discloses install in treating prosthetic back of marking time for newly prosthetic marking time can with treat prosthetic marking time and form a whole, and avoided directly pour the problem that appears the hollowing phenomenon in marking time that arouses, guaranteed the whole firmness of marking time after the restoration.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. The utility model provides a historical architecture terrazzo is marked time mouthful and is restoreed structure, sets up on waiting to restore and marking time its characterized in that: including fixed part and restoration portion, the fixed part includes a plurality of parallel arrangement's extension expansion bolts, with take the restoration round steel of marking time length matching, extension expansion bolts is 45 degrees angle inserts and treats the restoration and mark time, round steel fixed welding in extension expansion bolts salient in the tip of waiting to restore and marking time, the restoration portion is marked time for the stone thick liquid of casting in the round steel top, the line foot that the stone thick liquid was marked time is the same with the molding die size of the line foot of waiting to restore and marking time.
2. The terrazzo step mouth repairing structure for historical buildings as claimed in claim 1, wherein: the length of the lengthened expansion bolt protruding out of the end part of the step to be repaired is 60-80 mm.
3. The terrazzo step mouth repairing structure for historical buildings as claimed in claim 1, wherein: the lengthened expansion bolts are evenly distributed at intervals along the step to be repaired.
4. The terrazzo step mouth repairing structure for historical buildings as claimed in claim 1, wherein: the distance between the adjacent lengthened expansion bolts is 200 mm and 250 mm.
5. The terrazzo step mouth repairing structure for historical buildings as claimed in claim 1, wherein: the number of the round steel is 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020045906.6U CN211899795U (en) | 2020-01-10 | 2020-01-10 | Historical architecture terrazzo mouth of marking time restores structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020045906.6U CN211899795U (en) | 2020-01-10 | 2020-01-10 | Historical architecture terrazzo mouth of marking time restores structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211899795U true CN211899795U (en) | 2020-11-10 |
Family
ID=73298305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020045906.6U Active CN211899795U (en) | 2020-01-10 | 2020-01-10 | Historical architecture terrazzo mouth of marking time restores structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211899795U (en) |
-
2020
- 2020-01-10 CN CN202020045906.6U patent/CN211899795U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103088844B (en) | Reinforced concrete inspection well whole prefabricated hoisting construction method | |
CN101476382B (en) | Construction method for large area concrete terrace angle steel corner protector dividing joint | |
CN108755333B (en) | Road and bridge crack repairing device and method | |
CN105755954B (en) | A kind of construction technology of intercommunication clear-water concrete anticollision barrier | |
CN108086113A (en) | A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area | |
CN104372952A (en) | Unstressed permeating washing scabbling technology | |
CN105332510A (en) | Construction method of complicated beam column joint core area | |
CN101446073A (en) | Reinforced concrete pier stud with capping beam or irregular Y-shaped reinforced concrete pier stud once-forming construction method | |
CN110039635A (en) | PC component production technology | |
CN104594633B (en) | The construction method and its formwork structure of umbrella shape space curved surface clear-water concrete | |
CN206902499U (en) | Prefabricated assembled concrete road surface | |
CN202519978U (en) | Template supporting structure for post-poured belt serving as construction joint | |
CN206189279U (en) | Structure is assembled with bent cap to stand | |
CN111677275A (en) | Adjustable column template | |
CN101906858B (en) | Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board | |
CN211899795U (en) | Historical architecture terrazzo mouth of marking time restores structure | |
CN105088914B (en) | A kind of prefabricated and installation method of cobble pattern prefabricated board | |
CN106381999A (en) | Fair-faced concrete wall intaglio character die plate construction method | |
CN111779226A (en) | Large stone parquet floor and construction method thereof | |
CN208702139U (en) | A kind of construction template structure of toilet wall | |
CN109162451B (en) | Template positioning tool and method for exterior wall concrete cornice pouring | |
CN105908883A (en) | Construction method for preventing upward floating of composite floor system lightweight core formwork | |
CN115613398A (en) | Prefabricated track structure for built-in pump house section of track traffic and construction method | |
CN114412168A (en) | Construction method of post-cast strip for supporting and settling reinforced concrete column | |
CN103541543B (en) | Cone curvilinear plane structure resin interlining steel form and preparation method thereof can not be opened up |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |