CN211877111U - Construction site management system - Google Patents
Construction site management system Download PDFInfo
- Publication number
- CN211877111U CN211877111U CN202020883053.3U CN202020883053U CN211877111U CN 211877111 U CN211877111 U CN 211877111U CN 202020883053 U CN202020883053 U CN 202020883053U CN 211877111 U CN211877111 U CN 211877111U
- Authority
- CN
- China
- Prior art keywords
- module
- monitoring
- data processing
- local data
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Position Fixing By Use Of Radio Waves (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The utility model is suitable for a remote control technical field especially relates to a construction site management system, including control center, local data processing module, local communication module, monitoring module and attendance module, the attendance module includes fingerprint and beats one or more of card, face identification module and GPS location and beats the card module; the monitoring module comprises a video monitoring module, a GPS module and a sensor monitoring module, and the monitoring module also comprises a local alarm module; the local data processing module also comprises a project longitude and latitude positioning module. Adopt the technical scheme of the utility model personnel of each item in can conveniently carrying out the attendance and mastering the engineering in real time are equipped with the condition and the progress, in time carry out personnel's allotment according to engineering progress target to each monitoring point discovers the safety problem in real time and in time reports to the police, thereby avoids taking place the incident.
Description
Technical Field
The utility model belongs to the technical field of remote control system and specifically relates to a construction site management system is related to.
Background
With the rapid development of city construction and public infrastructure construction, the scale of construction projects is continuously enlarged, the importance of safety production is more prominent, and a construction site is a place with multiple safety accidents. Construction sites are generally scattered, personnel of the construction sites are complicated, stockyard is large, enough manpower is difficult to frequently monitor and check on the site of the construction sites, so that management is difficult, and the safety quality of project engineering cannot be effectively guaranteed. Due to the technical management insufficiency, the phenomena of overload and overspeed operation violations of the concrete mixer truck are serious, the management of a stock yard is imperfect, and safety accidents frequently occur.
At present, some construction sites utilize monitoring system to monitor the construction condition, thereby more convenient and fast learning the site condition. However, the existing construction site monitoring means is single, only has a site picture monitoring function, needs monitoring personnel to watch the monitoring picture in real time, and is easy to miss and cannot carry out all-around work and safety monitoring; and the existing monitoring equipment can not monitor the attendance condition of workers and the personnel distribution condition, the construction progress of each part of the project can not be regulated and controlled in real time, and the regulation and control among the projects are more difficult.
SUMMERY OF THE UTILITY MODEL
In order to solve the defects of the prior art, the utility model provides a construction site management system, which comprises a control center, a local data processing module, a local communication module, a monitoring module and an attendance module, wherein the control center is in two-way communication connection with the local data processing module, the local data processing module is in two-way communication connection with the local communication module, and the local communication module is also respectively connected with the attendance module and the monitoring module;
the attendance checking module comprises one or more of a fingerprint card punching module, a face recognition module and a GPS module;
the monitoring module comprises a plurality of video monitoring modules, a plurality of GPS modules and a plurality of sensor monitoring points;
each video monitoring module and each sensor monitoring point are connected with a local alarm module;
the local data processing module is also connected with the project longitude and latitude positioning module.
Further, the project longitude and latitude positioning module also comprises a project effective position database.
Furthermore, the sensor monitoring point is provided with a sensor which comprises a smoke sensor, a decibel meter, a temperature sensor and a vehicle speed sensor.
Furthermore, the local data processing module is also connected with a human-computer interface and a display screen.
Adopt the technical scheme of the utility model, following beneficial effect has at least:
1. the project longitude and latitude positioning module can form a project effective position database according to the actual area of the project, so that the work staff can punch the card only by holding the mobile terminal with the GPS positioning function in the effective position area, and the attendance checking of the staff is more convenient;
2. the project longitude and latitude positioning module positions the actual position of a project, and transmits the actual position to the control center through the local data processing module, and the control center receives effective position information of multiple project points and marks the effective position information on a map to form an electronic sand table, so that a manager can analyze a project area conveniently and provide reference for material and personnel allocation among the multiple project points;
3. by utilizing the GPS positioning function of the mobile terminal of the operator and combining video monitoring, the distribution situation of the operator in a construction site is known, so that the personnel allocation situation of each operation is mastered, and the personnel allocation quantity of each operation is adjusted in time according to the construction period and the progress of each operation;
4. the information that the sensor control point gathered is directly handled and the dangerous condition of discovery in time at the sensor control point, sends alarm information the very first time to shorten signal processing's time, effectively avoided the emergence of incident.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments of the present invention or the description of the prior art will be briefly described below, and it is obvious that the drawings described below are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a block diagram of the management system of the present invention.
Detailed Description
The following description provides many different embodiments, or examples, for implementing different features of the invention. The particular examples set forth below are illustrative only and are not intended to be limiting.
As shown in fig. 1, the utility model provides a construction site management system, which comprises a control center, a local data processing module, a local communication module, a monitoring module and an attendance module, wherein the control center is in bidirectional communication connection with the local data processing module, the local data processing module is in bidirectional communication connection with the local communication module, and the local communication module is also respectively connected with the attendance module and the monitoring module;
the control center is a control center of a project headquarter and can monitor the construction progress of a plurality of projects at the same time; the local data processing center is a local monitoring command center of each project department, is in communication connection with the monitoring module and the attendance module through the local communication module, and transmits the information acquired by the monitoring module and the attendance module to the local data processing module for data processing, storage and display; the local data processing module is also connected with the project longitude and latitude positioning module.
The project longitude and latitude positioning module can realize project position point positioning in a system background by utilizing a Baidu map api, and obtains the longitude and latitude of the project positioning module after positioning and stores the longitude and latitude in a database; and forming an item effective position area according to the actual position of the item, and setting up an item effective position database, wherein the effective position area covers the whole item point. The project longitude and latitude positioning module transmits the effective position information of the project to the local data processing module, and the local data processing module transmits the effective position information to the control center. The control center receives effective position information of a plurality of projects, marks the effective position information on a map, forms an electronic sand table, is convenient for a manager to analyze project areas, and provides reference for material and personnel allocation among a plurality of project points.
The attendance checking module comprises one or more of a fingerprint card punching module, a face recognition module and a GPS module, wherein the GPS module receives GPS positioning information of the mobile terminal of the operator, and the automatic card punching is successful as long as the GPS positioning of the mobile terminal of the operator is in an effective project position area, so that the rapid work-on and work-off card punching is realized;
fingerprint is checked card and face identification is checked card and also can intelligent record personnel's condition of attendance, has avoided the mistake of the few notes of present artifical attendance to miss notes, also can reduce personnel's demand, practices thrift the manpower spending.
The monitoring module comprises a video monitoring module, a GPS module and a sensor monitoring module; the video monitoring module shoots images of a construction site in real time through a camera to monitor the construction progress of the construction site and operators; the GPS module receives GPS positioning information of a mobile terminal of an operator, so that the distribution condition of the operator on a construction site can be conveniently known, the personnel allocation condition of each operation can be conveniently mastered, and the personnel allocation quantity of each operation can be conveniently adjusted in time according to the construction period and the progress of each operation.
The mobile terminal of the operator can be a mobile phone of the operator, a safety helmet with a GPS positioning function and the like.
This explains that the GPS module that attendance module connects and the GPS module that monitoring module is connected can be that two functions are realized to same module, also can be two modules, realize a function respectively the technical scheme in the utility model in do not limit.
The sensor monitoring module is used for acquiring sensor information arranged at different monitoring points in a construction site, installing sensors at operation points with potential safety hazards, installing different sensors according to the types of the potential safety hazards, installing a vehicle speed sensor at a roadside where a vehicle runs, installing a decibel meter at a position with larger noise, installing a smoke sensor, a temperature sensor and the like at a position with potential fire hazards.
The sensor monitoring point can also be provided with an alarm module which generates an alarm signal when danger is detected, and sends alarm information when a vehicle speed sensor detects that the speed of a running vehicle exceeds a set value; when the temperature sensor detects that the temperature of the equipment is higher than a set value, alarm information is generated; when the decibel instrument detects that the noise exceeds a set value, alarm information and the like are generated, and the set value can be set manually; the alarm information can be one or two of sound or signal light. Because the sensor monitoring point automatically collects signals, processes and judges the dangerous information immediately and generates an alarm signal immediately, the collected signals do not need to be transmitted back to the local data processing module or the control center for signal processing, so that the time is saved, the dangerous signals can be sent out in time, and safety reminding is carried out, thereby effectively avoiding safety accidents.
The local data processing module is also provided with a human-computer interface and a display screen, can receive human control information and display and check monitoring information, and transmits the received control information to the monitoring module to start the alarm module to work.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.
Claims (4)
1. A construction site management system is characterized by comprising a control center, a local data processing module, a local communication module, a monitoring module and an attendance module, wherein the control center is in bidirectional communication connection with the local data processing module;
the attendance checking module comprises one or more of a fingerprint card punching module, a face recognition module and a GPS module;
the monitoring module comprises a plurality of video monitoring modules, a plurality of GPS modules and a plurality of sensor monitoring points;
each video monitoring module and each sensor monitoring point are connected with a local alarm module; the local data processing module is also connected with the project longitude and latitude positioning module.
2. The construction site management system of claim 1, wherein said project latitude and longitude location module further comprises a project effective location database.
3. The construction site management system according to claim 1, wherein the sensor monitoring point is provided with sensors including a smoke sensor, a decibel meter, a temperature sensor and a vehicle speed sensor.
4. A construction site management system according to claim 1, wherein said local data processing module is further connected to a human machine interface and a display screen.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020883053.3U CN211877111U (en) | 2020-05-22 | 2020-05-22 | Construction site management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020883053.3U CN211877111U (en) | 2020-05-22 | 2020-05-22 | Construction site management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211877111U true CN211877111U (en) | 2020-11-06 |
Family
ID=73234593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020883053.3U Active CN211877111U (en) | 2020-05-22 | 2020-05-22 | Construction site management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211877111U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115497185A (en) * | 2022-07-27 | 2022-12-20 | 保利长大工程有限公司 | Attendance checking method based on intelligent safety helmet and electronic fence |
-
2020
- 2020-05-22 CN CN202020883053.3U patent/CN211877111U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115497185A (en) * | 2022-07-27 | 2022-12-20 | 保利长大工程有限公司 | Attendance checking method based on intelligent safety helmet and electronic fence |
CN115497185B (en) * | 2022-07-27 | 2023-11-07 | 保利长大工程有限公司 | Attendance checking method based on intelligent safety helmet and electronic fence |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109375594B (en) | City safety wisdom management and control platform | |
CN111615059A (en) | Positioning equipment and system for monitoring information of building site personnel in real time | |
CN115278543A (en) | Intelligent building site system based on BIM | |
CN112291735A (en) | UWB-based visual engineering intelligent monitoring system and method | |
CN209231777U (en) | Wisdom building site management system | |
CN108596503B (en) | Abnormal working hour judgment method based on non-inductive card punching | |
CN108182738A (en) | A kind of Urban Underground pipe gallery method for inspecting based on WI-FI positioning | |
CN109388115A (en) | Mining intelligent individual soldier operation and safeguards system, method and intelligent polling method | |
CN112565694A (en) | On-spot safety monitoring management system of building engineering | |
KR20110109621A (en) | Safety management system and method | |
CN211877111U (en) | Construction site management system | |
CN115497185A (en) | Attendance checking method based on intelligent safety helmet and electronic fence | |
TWM607740U (en) | Smart construction site management equipment | |
CN110471028B (en) | Personnel positioning method, device and system for construction site | |
CN210912457U (en) | Intelligent protection communication system for railway construction | |
CN116502886A (en) | Burn power plant wisdom security protection system | |
CN115497268A (en) | Personnel positioning management system based on intelligent construction site and application | |
CN215905729U (en) | Multi-terminal engineering progress monitoring system | |
CN115879764A (en) | Transformer substation maintenance operation risk early warning and prevention system and method | |
CN214955057U (en) | Wisdom tunnel system | |
CN213303289U (en) | Building garbage vehicle operation management system based on satellite positioning | |
CN213442573U (en) | Railway line construction safety protection system | |
CN115086604A (en) | Intelligent management system for shipyard | |
CN211427131U (en) | Gridding monitoring management system | |
CN110263208B (en) | Park land use detail and state monitoring management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |