Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922331055.1U
Other languages
Chinese (zh)
Inventor
严斌
黄侦
潘雪明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201922331055.1U priority Critical patent/CN211873792U/en
Application granted granted Critical
Publication of CN211873792U publication Critical patent/CN211873792U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a construction technical field especially relates to an outer wall scaffold puts up strutting arrangement for building. The to-be-solved technical problem of the utility model is that the vertical scaffold steel pipe in bottommost does not have fixing device. In order to solve the technical problem, the utility model provides an outer wall scaffold for building strutting arrangement, including the fixed case of equidistant fixed connection such as master control case and master control case right side, the activity interlude has the master control pole between the top of master control case inner wall and the bottom, the equidistant fixedly connected with connecting slot pole in the right side of master control pole, the bottom fixedly connected with handle of master control pole, the left side activity interlude of fixed case has the connection cross pole, the left side of connecting the cross pole is blocked with the right side of connecting the slot pole mutually, the left side cover of connecting the cross pole is equipped with powerful spring, the right side fixedly connected with connection pinion rack of connecting the cross pole, the top and the bottom on connection pinion rack right side all mesh there is a gear section of thick bamboo, gear section of thick bamboo fixedly connected with supporting rod.

Description

Outer wall scaffold strutting arrangement for building
Technical Field
The utility model relates to a construction technical field specifically is an outer wall scaffold puts up strutting arrangement for building.
Background
The scaffold refers to various supports erected for workers to operate and solve vertical and horizontal transportation on a construction site, and is mainly used for maintenance of safety nets of the upper and lower parts of the constructors or peripheral safety nets, high-altitude installation of components and the like.
If chinese patent 2017213238549 discloses an outer wall scaffold puts up strutting arrangement for building, including L type connecting piece, pole setting, horizontal pole, fixed pulley, discharge tube, vertical pole and scaffold board, the vertical pole passes through the fastener and installs on parallel distribution's horizontal pole, has realized that required building material can be convenient transport destination in the workman work progress, and the clearance problem of the building rubbish that each layer produced in the workman work progress can be solved, can fasten the connection between the scaffold board and reduced the potential safety hazard, and the result of use is compared in traditional product function more comprehensively.
But above-mentioned technique does not have fixing device to the vertical scaffold steel pipe in bottommost for scaffold is inconvenient in the installation initial stage installation, has reduced the scaffold and has built efficiency, so need urgently now can solve an outer wall scaffold strutting arrangement for building of above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides an outer wall scaffold strutting arrangement for building has solved the problem that the vertical scaffold steel pipe in bottommost does not have fixing device.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides an outer wall scaffold puts up strutting arrangement for building, includes the fixed box of the equidistant fixed connection of master control box and master control box right side, the activity interlude has the master control pole between the top of master control box inner wall and the bottom, the equidistant fixedly connected with connecting slot pole in the right side of master control pole, the bottom fixedly connected with handle of master control pole.
The left side activity interlude of fixed case has the connection cross rod, the left side of connecting the cross rod is blocked mutually with the right side of connecting the grooved bar, the left side cover of connecting the cross rod is equipped with powerful spring, the right side fixedly connected with connection pinion rack of connecting the cross rod, the top and the bottom on connection pinion rack right side all mesh and have a gear section of thick bamboo, the equal fixedly connected with supporting rod in front and the back of gear section of thick bamboo, the right side fixedly connected with semicircle grip block of supporting rod, the fixed grip block of fixedly connected with between the front and the back of fixed case.
Further preferably, the two sides of the top and the bottom of the fixed box are fixedly connected with main grounding plates, and the front surfaces of the main grounding plates are provided with expansion screw holes.
Preferably, the left side of the master control box is fixedly connected with an auxiliary grounding plate at equal intervals, and the front surface of the auxiliary grounding plate is provided with expansion screw holes.
Further preferably, the left side of the inner wall of the fixed box is fixedly connected with reinforcing rods at equal intervals, and the master control rod is movably inserted in the inner wall of the reinforcing rods.
Preferably, the front surface of the fixed box is provided with a vertical pipe groove, and the left side of the strong spring is fixedly connected with the right side of the inner wall of the fixed box.
Further preferably, the front face of the gear cylinder is movably penetrated and provided with a gear shaft, the outer sides of the front face and the back face of the gear shaft are connected with a gear bearing in an interference fit mode, and the other side of the gear bearing is movably penetrated and inserted with the front face and the back face of the inner wall of the fixed box.
(III) advantageous effects
The utility model provides an outer wall scaffold for building strutting arrangement possesses following beneficial effect:
(1) the steel pipe pushes the fixing box through the vertical pipe groove when the device is used, the semicircular clamping plate is matched with the fixing clamping block to complete clamping of the steel pipe, and the problem that the bottommost vertical scaffold steel pipe does not have a fixing device is solved.
(2) The pulling handle is pulled when the bottommost vertical scaffold steel pipe is dismantled as required, and the clamping rod drives the semicircular clamping plate to not carry out the centre gripping to the steel pipe to release the steel pipe through the connecting tooth plate, realize the convenient dismantlement to the steel pipe promptly.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of the fixing box of the present invention;
fig. 3 is a sectional view of the structural connection slot rod of the present invention.
In the figure: the device comprises a main control box 1, a fixed box 2, a main control rod 3, a connecting groove rod 4, a handle 5, a connecting cross rod 6, a strong spring 7, a connecting toothed plate 8, a gear cylinder 9, a clamping rod 10, a semicircular clamping plate 11, a fixed clamping block 12, a main grounding plate 13, an auxiliary grounding plate 14 and a vertical pipe groove 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides an outer wall scaffold puts up strutting arrangement for building, including total control case 1 and the fixed case 2 of the equidistant fixed connection in total control case 1 right side, riser groove 15 has been seted up in the front of fixed case 2, the vice ground plate 14 of the equidistant fixedly connected with in left side of total control case 1, the inflation screw hole has been seted up in the front of vice ground plate 14, the equal fixedly connected with owner ground plate 13 in both sides of fixed case 2 top and bottom, the inflation screw hole has been seted up in the front of owner ground plate 13, the activity interlude has total control pole 3 between the top of total control case 1 inner wall and the bottom, the equidistant fixedly connected with stiffener in left side of fixed case 2 inner wall, the inner wall at the stiffener is interpenetrated in the activity of total control pole 3, the equidistant fixedly connected with connecting slot pole 4 in the right side of total control pole 3, the bottom fixedly connected with handle 5.
Fixed case 2's left side activity interlude has connection cross rod 6, connect the left side of cross rod 6 and the right side looks block of connecting groove pole 4, the left side cover of connecting cross rod 6 is equipped with powerful spring 7, the left side of powerful spring 7 and the right side fixed connection of fixed case 2 inner wall, the right side fixedly connected with connection pinion rack 8 of connecting cross rod 6, the top and the bottom on connection pinion rack 8 right side all mesh and have a gear section of thick bamboo 9, the positive activity of gear section of thick bamboo 9 is run through and is provided with the gear shaft, the outside at the front and the back of gear shaft all is connected with gear bearing through interference fit's mode, gear bearing's opposite side and the front and the back activity interlude of fixed case 2 inner wall, the front and the equal fixedly connected with clamping rod 10 in the back of gear section of thick bamboo 9, clamping rod 10's right side fixedly connected with semicircle clamping plate 11, fixedly connected with.
When the device is used, a steel pipe is pushed into the fixed box 2 through the vertical pipe groove 15, the semicircular clamping plates 11 are matched with the fixed clamping blocks 12 to clamp the steel pipe, and the problem that the bottommost vertical scaffold steel pipe does not have a fixing device is solved.
Pulling handle 5 when the vertical scaffold steel pipe of bottommost is demolishd to needs, clamping rod 10 drives semicircle grip block 11 and is not carrying out the centre gripping to the steel pipe to release the steel pipe through fishback 8, realize the convenient dismantlement to the steel pipe promptly.
The working principle is as follows: in use, the device fixes the fixed box 2 and the main control box 1 on the ground through the main ground plate 13 and the auxiliary ground plate 14.
Then, the vertical steel pipe at the bottommost layer is pushed into the fixing box 2 through the vertical pipe groove 15, the connecting toothed plate 8 is pressed to move rightwards, the gear cylinder 9 rotates, the clamping rod 10 is driven to rotate, and the semicircular clamping plate 11 is matched with the fixing clamping block 12 to complete clamping of the steel pipe.
Promote to connect cross rod 6 and the contact of connecting groove pole 4 and take place slight deformation, continue to promote the steel pipe and make and connect cross rod 6 and the mutual block of connecting groove pole 4 for the device continuously carries out the centre gripping to the steel pipe, has solved the vertical scaffold steel pipe of bottommost and has not had fixing device.
When the vertical scaffold steel pipe of bottommost is demolishd to needs, only need pulling handle 5 for connect cross rod 6 and connecting slot pole 4 not at the block, powerful spring 7 promotes right and connects cross rod 6, makes supporting rod 10 drive semicircle grip block 11 and is not carrying out the centre gripping to the steel pipe, and releases the steel pipe through connecting toothed plate 8, realizes the convenient dismantlement to the steel pipe promptly.

Claims (6)

1. The utility model provides an outer wall scaffold puts up strutting arrangement for building, includes that master control case (1) and master control case (1) right side are equidistant fixed connection's fixed case (2), its characterized in that: a master control rod (3) is movably inserted between the top and the bottom of the inner wall of the master control box (1), connecting groove rods (4) are fixedly connected to the right side of the master control rod (3) at equal intervals, and a handle (5) is fixedly connected to the bottom of the master control rod (3);
the left side activity interlude of fixed case (2) has connection cross rod (6), the left side of connecting cross rod (6) and the right side looks block of connecting grooved bar (4), the left side cover of connecting cross rod (6) is equipped with powerful spring (7), the right side fixedly connected with of connecting cross rod (6) connects pinion rack (8), the top and the bottom on connecting pinion rack (8) right side all mesh have gear section of thick bamboo (9), the front and the equal fixedly connected with supporting rod (10) in the back of gear section of thick bamboo (9), the right side fixedly connected with semicircle grip block (11) of supporting rod (10), fixedly connected with fixed grip block (12) between the front and the back of fixed case (2).
2. An exterior wall scaffold support device for building according to claim 1, wherein: the two sides of the top and the bottom of the fixed box (2) are fixedly connected with a main grounding plate (13), and the front of the main grounding plate (13) is provided with an expansion screw hole.
3. An exterior wall scaffold support device for building according to claim 1, wherein: the left side of the master control box (1) is fixedly connected with an auxiliary grounding plate (14) at equal intervals, and the front of the auxiliary grounding plate (14) is provided with expansion screw holes.
4. An exterior wall scaffold support device for building according to claim 1, wherein: the left side of the inner wall of the fixed box (2) is fixedly connected with reinforcing rods at equal intervals, and the master control rod (3) is movably inserted into the inner wall of the reinforcing rods.
5. An exterior wall scaffold support device for building according to claim 1, wherein: the front of the fixed box (2) is provided with a vertical pipe groove (15), and the left side of the strong spring (7) is fixedly connected with the right side of the inner wall of the fixed box (2).
6. An exterior wall scaffold support device for building according to claim 1, wherein: the front face of the gear cylinder (9) is movably penetrated with a gear shaft, the outer sides of the front face and the back face of the gear shaft are connected with a gear bearing in an interference fit mode, and the other side of the gear bearing is movably inserted into the front face and the back face of the inner wall of the fixed box (2).
CN201922331055.1U 2019-12-23 2019-12-23 Outer wall scaffold strutting arrangement for building Expired - Fee Related CN211873792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922331055.1U CN211873792U (en) 2019-12-23 2019-12-23 Outer wall scaffold strutting arrangement for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922331055.1U CN211873792U (en) 2019-12-23 2019-12-23 Outer wall scaffold strutting arrangement for building

Publications (1)

Publication Number Publication Date
CN211873792U true CN211873792U (en) 2020-11-06

Family

ID=73263629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922331055.1U Expired - Fee Related CN211873792U (en) 2019-12-23 2019-12-23 Outer wall scaffold strutting arrangement for building

Country Status (1)

Country Link
CN (1) CN211873792U (en)

Similar Documents

Publication Publication Date Title
CN201474292U (en) Midsize template assembled large template
CN212336660U (en) Building construction platform with safeguard function
CN202500336U (en) Tooth clasping steel moulding plate fixing fixture
CN2255468Y (en) External basket for building construction
CN206487126U (en) A kind of scaffold for the architectural engineering being easily installed
CN211873792U (en) Outer wall scaffold strutting arrangement for building
CN207079899U (en) A kind of construction coherent-wall scaffolding suspending apparatus
CN202023343U (en) Full-automatic wall plasterer
CN216034591U (en) Simple hoisting trolley for constructional engineering
CN212957617U (en) Ratchet type template sliding device
CN201339311Y (en) Turning plate device of hanging rack
CN212641448U (en) Constructional engineering pile device
CN214117454U (en) Scaffold for building construction
CN212609232U (en) Tool for assisting installation of light partition board
CN212053828U (en) Steel construction engineering component rotating device
CN111042521B (en) Building templates link for civil engineering
CN208456101U (en) A kind of housing construction scaffold
CN210888118U (en) Building faces limit structure post construction protection frame
CN202788018U (en) Storey near edge temporary guard rail
CN210418809U (en) Membrane frame for construction convenient to carry
CN205189390U (en) H shaped steel post operation platform
CN212453622U (en) Constructional column template device convenient to construction and be convenient for connect pump line
CN210152275U (en) Platform of unloading for building
CN211770064U (en) Novel observation well
CN219794391U (en) Assembled steel skeleton light board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant