CN211853006U - Installation device for installing main pipe into sleeve - Google Patents

Installation device for installing main pipe into sleeve Download PDF

Info

Publication number
CN211853006U
CN211853006U CN201922375916.6U CN201922375916U CN211853006U CN 211853006 U CN211853006 U CN 211853006U CN 201922375916 U CN201922375916 U CN 201922375916U CN 211853006 U CN211853006 U CN 211853006U
Authority
CN
China
Prior art keywords
clamp
supporting piece
sleeve
main pipe
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922375916.6U
Other languages
Chinese (zh)
Inventor
李明
赵建
邢海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp filed Critical China National Petroleum Corp
Priority to CN201922375916.6U priority Critical patent/CN211853006U/en
Application granted granted Critical
Publication of CN211853006U publication Critical patent/CN211853006U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The application discloses be responsible for and install into sheathed tube installation device belongs to petroleum pipeline technical field. The device comprises: the device comprises an upper half clamp, a lower half clamp, a first supporting piece, a second supporting piece and a roller; one end of the first supporting piece is connected with the outer wall of the upper half hoop, the other end of the first supporting piece is used for abutting against the inner wall of the sleeve, one end of the second supporting piece is connected with the outer wall of the lower half hoop, the other end of the second supporting piece is connected with the roller, and the roller is used for rolling in the sleeve; first clamp be used for with half clamp connection down, first clamp with form spacing space between the half clamp down, spacing space is used for placing the person in charge. The method and the device reduce the difficulty of putting the main pipe into the sleeve and the difficulty of pulling the main pipe out when the main pipe needs to be overhauled, and improve the operation efficiency; the first supporting piece and the second supporting piece are prevented from being damaged, and the manufacturing cost of the device is reduced.

Description

Installation device for installing main pipe into sleeve
Technical Field
The application relates to the technical field of petroleum pipelines, in particular to a mounting device for mounting a main pipe into a sleeve.
Background
In oil production operation, the main pipe is used for oil and gas production, namely a commonly known oil pipe. The production of oil and gas in the main pipe is affected by temperature changes and pressure changes in the oil well. Therefore, establish the one deck sleeve pipe at the person in charge overcoat, can protect the person in charge on the one hand, on the other hand, for the interior oil gas of person in charge provides stable environment, avoid influencing the production of oil gas because of the change of temperature and pressure.
The main pipe of the oil and gas pipeline is used for conveying oil or gas, and inevitably intersects with a road. At oil gas pipeline and road crossing department, the person in charge overcoat establishes the one deck sleeve pipe, can protect on the one hand to be responsible for, and on the other hand provides stable environment for the interior oil gas of main pipe and carries, avoids because the change of carrying medium temperature and pressure in the pipeline, perhaps the change of ground water level produces the influence to oil gas pipeline.
SUMMERY OF THE UTILITY MODEL
The embodiment of the application provides a be responsible for and install into sheathed tube installation device, can solve among the correlation technique and install into the sheathed tube degree of difficulty and will be responsible for and put into the intraductal degree of difficulty of cover greatly with the supporting shoe, and need be responsible for when overhauing the person in charge take out comparatively difficultly to at the in-process of taking out because supporting shoe and cover intervascular frictional force are too big, can damage the problem of supporting shoe. The technical scheme is as follows:
a mounting device for mounting a host pipe into a casing, the device comprising: the device comprises an upper half clamp, a lower half clamp, a first supporting piece, a second supporting piece and a roller;
one end of the first supporting piece is connected with the outer wall of the upper half hoop, the other end of the first supporting piece is used for abutting against the inner wall of the sleeve, one end of the second supporting piece is connected with the outer wall of the lower half hoop, the other end of the second supporting piece is connected with the roller, and the roller is used for rolling in the sleeve;
first clamp be used for with half clamp connection down, first clamp with form spacing space between the half clamp down, spacing space is used for placing the person in charge.
Optionally, the apparatus further comprises: the bed course, the bed course sets up first clamp with the inner wall of second clamp, the bed course be used for with the outer wall of being responsible for offsets.
Optionally, the apparatus further comprises: and one end of the first fixed support is connected with the upper half clamp, and the other end of the first fixed support is connected with the first supporting piece.
Optionally, the apparatus further comprises: the first connecting piece is provided with a connecting hole and connected with the first fixed support and the first supporting piece through the connecting hole.
Optionally, the apparatus further comprises: and the waterproof cap is used for plugging the opening end of the connecting hole.
Optionally, the apparatus further comprises: and one end of the second fixed support is connected with the lower half clamp, and the other end of the second fixed support is connected with the roller.
Optionally, the apparatus further comprises: and the second connecting piece is used for connecting the upper half hoop with the lower half hoop.
Optionally, the apparatus further comprises: the first fixing rib plate is used for connecting the plurality of upper half hoops when the plurality of main pipes are installed in one sleeve.
Optionally, the apparatus further comprises: and the second fixing rib plate is used for connecting the plurality of lower half hoops when the plurality of main pipes are installed in one sleeve.
Optionally, the insulation strength of the pad layer is not less than 60000V/m.
The beneficial effects brought by the technical scheme provided by the embodiment of the application at least comprise:
when the main pipe needs to be placed in the sleeve, the main pipe is placed in a limiting space between the upper half clamp and the lower half clamp through connection of the upper half clamp and the lower half clamp, and the upper end of the main pipe is prevented from shaking through the fact that the first supporting piece on the upper half clamp abuts against the inner wall of the first end of the sleeve; the main pipe is conveyed into the sleeve by rolling at the second end of the sleeve through a roller connected with the second supporting piece; when the main pipe needs to be taken out, the roller is pulled to slide in the sleeve, and the main pipe is pulled out of the sleeve. The device provided by the embodiment of the application reduces the difficulty of putting the main pipe into the sleeve and the difficulty of pulling the main pipe out when the main pipe needs to be overhauled, and improves the operation efficiency; the first supporting piece and the second supporting piece are prevented from being damaged, and the manufacturing cost of the device is reduced.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a mounting device for mounting a main pipe into a casing according to an embodiment of the present application;
FIG. 2 is a schematic diagram of a cross-sectional structure A-A of FIG. 1 according to an embodiment of the present disclosure;
FIG. 3 is a schematic diagram of a cross-sectional structure A-A of FIG. 1 according to an embodiment of the present disclosure;
fig. 4 is a schematic structural diagram of a mounting device for mounting two main pipes into a sleeve according to an embodiment of the present application.
The reference numerals denote:
1-upper half hoop, 100-sleeve, 2-lower half hoop, 3-first supporting piece, 4-second supporting piece, 5-roller, 6-cushion layer, 7-first fixing support, 8-first connecting piece, 9-second connecting piece and 10-first fixing rib plate.
Detailed Description
Unless defined otherwise, all technical terms used in the examples of the present application have the same meaning as commonly understood by one of ordinary skill in the art.
To make the objects, technical solutions and advantages of the present application more clear, embodiments of the present application will be described in further detail below with reference to the accompanying drawings.
The embodiment of the present application provides an installation apparatus for installing a main pipe into a casing 100, as shown in fig. 1, the apparatus including: an upper half yoke 1, a lower half yoke 2, a first support member 3, a second support member 4, and a roller 5.
One end of the first support member 3 is connected with the outer wall of the upper half hoop 1, the other end of the first support member is used for abutting against the inner wall of the sleeve 100, one end of the second support member 4 is connected with the outer wall of the lower half hoop 2, the other end of the second support member is connected with the roller 5, and the roller 5 is used for rolling in the sleeve 100.
First clamp 1 is used for being connected with second clamp 2, forms spacing space between first clamp 1 and the second clamp 2, and spacing space is used for placing the person in charge.
The device provided by the embodiment of the application has the following technical effects:
according to the device provided by the embodiment of the application, when a main pipe needs to be placed in the sleeve 100, the upper half hoop 1 is connected with the lower half hoop 2, the main pipe is placed in the limiting space between the upper half hoop 1 and the lower half hoop 2, and the first supporting piece 3 on the upper half hoop 1 abuts against the inner wall of the first end of the sleeve 100, so that the upper end of the main pipe is prevented from shaking; the main pipe is fed into the casing 100 by rolling at the second end of the casing 100 by means of the roller 5 connected to the second support 4; when it is desired to remove the main pipe, the pulling roller 5 slides within the sleeve 100, pulling the main pipe out of the sleeve 100. The device provided by the embodiment of the application reduces the difficulty of placing the main pipe into the sleeve 100 and the difficulty of pulling out the main pipe when the main pipe needs to be overhauled, thereby improving the operation efficiency; the damage to the first supporting piece 3 and the second supporting piece 4 is avoided, and the manufacturing cost of the device is reduced.
The apparatus provided by the embodiments of the present application will be further described below by way of alternative embodiments.
As an example, the size of the upper half hoop 1 and the lower half hoop 2 provided by the embodiment of the present application is matched with the size of the main pipe. The material of the upper clamp half 1 and the lower clamp half 2 may be the same as the material of the main pipe.
It should be noted that, because the size of the main pipe is smaller than the size of the sleeve 100, after the main pipe is placed in the sleeve 100, the main pipe needs to be fixed, that is, the main pipe cannot move, and therefore, the length of the first support 3 provided in the embodiment of the present application may be adjusted according to actual needs. As an example, when the diameter of the main pipe to be placed is small, the distance between the outer wall of the main pipe and the inner wall of the casing 100 is large, and the length of the first support 3 is required to be short, the first support 3 having a length matching the distance between the outer wall of the main pipe and the inner wall of the casing 100 may be selected. It should be noted that, the operator can manufacture the first supporting members 3 with different sizes according to the requirement, so as to be selected for use during the operation.
As an example, the first support 3 may be in the shape of a trapezoid support, an upper base of which abuts against an inner wall of the sleeve 100 and a lower base of which is connected to an outer wall of the main pipe. The first supporting member 3 may be made of polyvinyl chloride (PVC). The material of the first supporting member 3 is only required to be capable of fixing the main pipe, and the material of the first supporting member 3 is not limited thereto in the embodiment of the present application.
It is understood that the number of the first supports 3 may be set as required, and for example, the number of the first supports 3 may be 2, 3, or 4, etc.
As shown in fig. 2, one end of the second supporting member 4 is connected to the roller 5, on one hand, to provide support for the main pipe, and on the other hand, one end of the second supporting member 4 is connected to the roller 5, and the main pipe is put into the sleeve 100 by sliding of the roller 5. Therefore, the material of the second supporting member 4 should have certain strength and hardness to support the weight of the main pipe. For example, the second support 4 may be a stainless steel support.
It should be noted that the second support member 4 needs to support most of the weight of the main pipe, and therefore, the connection stability between the second support member 4 and the lower clamp half 2 is ensured, and for example, the second support member 4 and the lower clamp half 2 may be welded or the like.
The number of the second support members 4 may be set according to the number of the main pipes required to be fed into the casing 100, and for example, when the number of the main pipes required to be fed into the casing 100 is 2, the number of the second support members 4 may be set to 2 or 3, and thus, the support stability of each main pipe may be ensured. The number of the second supports 4 may be defined as needed, and the application is not limited to this number of the second supports 4.
Optionally, the apparatus further comprises: and the cushion layer 6 is arranged on the inner walls of the upper half hoop 1 and the lower half hoop 2, and the cushion layer 6 is used for abutting against the outer wall of the main pipe.
First clamp 1 and second clamp 2 cover when being responsible for on, can and be responsible for between producing the friction, can produce the damage to being responsible for when frictional force is great, consequently sets up bed course 6 through the inner wall of facility at first clamp 1 and second clamp 2, can avoid leading to the fact wearing and tearing to being responsible for. As an example, the cushion layer 6 may be made of PVC cushion layer 6.
The bed course 6 can be connected with the inner wall of half clamp 1 and half clamp 2 can be dismantled with first, when 6 live time overlengths of bed course cause wearing and tearing, can change it. The cushion layer 6 may be bonded to the inner walls of the upper band half 1 and the lower band half 2.
Optionally, the dielectric strength of the pad layer 6 is not less than 60000V/m.
Optionally, the apparatus further comprises: and one end of the first fixed support 7 is connected with the upper half hoop 1, and the other end of the first fixed support 7 is connected with the first supporting piece 3.
The first fixing bracket 7 and the first supporting part 3 can be detachably connected, so that the first supporting part 3 can be conveniently detached and replaced. For example, the first fixing bracket 7 and the first support 3 may be hinged or screwed.
It should be noted that the number of the first fixing brackets 7 is adapted to the number of the first supporting members 3, and when the number of the first supporting members 3 is plural, the number of the first fixing brackets 7 is also plural. For example, the first fixing bracket 7 may be a fixing block matched with the shape of the first supporting bracket. For example, the first fixed block may be a rectangular fixed block.
Optionally, as shown in fig. 3, the apparatus further includes: the first connecting piece 8 is provided with a connecting hole on the first supporting piece 3, and the first connecting piece 8 is connected with the first fixing support 7 and the first supporting piece 3 through the connecting hole.
As an example, the first connecting member 8 may be a bolt, and the connecting hole may be a bolt hole.
It should be noted that the attachment hole may be provided at the center of the first support 3, and thus, a position other than the first support 3 may not be occupied.
Optionally, the apparatus further comprises: and the waterproof cap is used for plugging the opening end of the connecting hole.
By providing the waterproof cap, it is possible to prevent liquid from entering the connection hole and corroding the first connecting member 8.
Optionally, the apparatus further comprises: and one end of the second fixed support is connected with the lower half hoop 2, and the other end of the second fixed support is connected with the roller 5.
Through setting up the second fixed bolster for providing the transition between first support piece 3 and the gyro wheel 5, can be for dismantling between gyro wheel 5 and the second fixed bolster to be connected, convenient dismantlement when gyro wheel 5 appears damaging needs to be changed.
Optionally, the apparatus further comprises: and a second connecting piece 9, wherein the second connecting piece 9 is used for connecting the upper half hoop 1 and the lower half hoop 2.
As an example, the first connecting element 8 can be a snap, and the upper clamp half 1 can be detachably connected to the lower clamp half 2.
Optionally, as shown in fig. 4, the apparatus further includes: referring to the first fixing rib 10, the first fixing rib 10 is used to connect a plurality of upper half yokes 1 when a plurality of main pipes are installed in one sleeve 100.
It should be noted that, when two main pipes or more than two main pipes need to be put into the sleeve 100, the upper half hoops 1 sleeved on the main pipes are connected by the first fixing rib plates 10, so that the upper half hoops 1 are not loosened, and the stability of the upper parts of the main pipes is ensured.
It can be understood that the number of the first fixing rib plates 10 can be multiple, so that the connection stability between multiple upper half hoops can be ensured, and the stability between multiple main pipes in the sleeve can be further ensured.
Optionally, the apparatus further comprises: and a second fixing rib plate 11, wherein the second fixing rib plate 11 is used for connecting a plurality of lower half hoops 2 when a plurality of main pipes are installed in one sleeve 100.
It should be noted that, when two main pipes or more than two main pipes need to be put into the sleeve 100, the second fixing rib plates 11 are connected to the lower half hoops 2 sleeved on the main pipes, so that the lower half hoops 2 are not loosened, and the stability of the lower parts of the main pipes is ensured.
It can be understood that the number of the second fixing rib plates 11 can be multiple, so that the connection stability between the lower half hoops can be ensured, and the stability between the main pipes in the sleeve can be further ensured.
All the above optional technical solutions may be combined arbitrarily to form the optional embodiments of the present disclosure, and are not described herein again.
The above description is only exemplary of the present application and should not be taken as limiting the scope of the present application, and any modifications, equivalents, improvements and the like that are within the spirit and principle of the present application should be included in the scope of the present application.

Claims (10)

1. A mounting device for mounting a host pipe into a casing, the device comprising: the clamp comprises an upper half clamp (1), a lower half clamp (2), a first supporting piece (3), a second supporting piece (4) and a roller (5);
one end of the first supporting piece (3) is connected with the outer wall of the upper half hoop (1), the other end of the first supporting piece is used for abutting against the inner wall of the sleeve (100), one end of the second supporting piece (4) is connected with the outer wall of the lower half hoop (2), the other end of the second supporting piece is connected with the roller (5), and the roller (5) is used for rolling in the sleeve (100);
last half clamp (1) be used for with half clamp (2) are connected down, last half clamp (1) with form spacing space between half clamp (2) down, spacing space is used for placing the person in charge.
2. The apparatus of claim 1, further comprising: cushion course (6), cushion course (6) set up first clamp (1) with the inner wall of second clamp (2), cushion course (6) be used for with the outer wall of being responsible for offsets.
3. The apparatus of claim 1, further comprising: the first fixing support (7), first fixing support (7) one end with half clamp (1) is connected, the other end with first support piece (3) are connected.
4. The apparatus of claim 3, further comprising: the first supporting piece (3) is provided with a connecting hole, and the first connecting piece (8) is connected with the first fixing support (7) and the first supporting piece (3) through the connecting hole.
5. The apparatus of claim 4, further comprising: and the waterproof cap is used for plugging the opening end of the connecting hole.
6. The apparatus of claim 1, further comprising: and one end of the second fixed support is connected with the lower half hoop (2), and the other end of the second fixed support is connected with the roller (5).
7. The apparatus of claim 1, further comprising: a second connecting piece (9), the second connecting piece (9) is used for connecting the upper half hoop (1) and the lower half hoop (2).
8. The apparatus of claim 1, further comprising: the first fixing rib plate (10) is used for connecting a plurality of upper half clamping hoops (1) when a plurality of main pipes are installed in one sleeve (100).
9. The apparatus of claim 1, further comprising: and the second fixing rib plate (11) is used for connecting a plurality of lower half hoops (2) when a plurality of main pipes are installed in one sleeve (100).
10. The device according to claim 2, characterized in that the insulating strength of the underlayer (6) is not less than 60000V/m.
CN201922375916.6U 2019-12-25 2019-12-25 Installation device for installing main pipe into sleeve Active CN211853006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922375916.6U CN211853006U (en) 2019-12-25 2019-12-25 Installation device for installing main pipe into sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922375916.6U CN211853006U (en) 2019-12-25 2019-12-25 Installation device for installing main pipe into sleeve

Publications (1)

Publication Number Publication Date
CN211853006U true CN211853006U (en) 2020-11-03

Family

ID=73216341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922375916.6U Active CN211853006U (en) 2019-12-25 2019-12-25 Installation device for installing main pipe into sleeve

Country Status (1)

Country Link
CN (1) CN211853006U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113334268A (en) * 2021-05-10 2021-09-03 哈尔滨玻璃钢研究院有限公司 Hinge soft matching positioning tool and using method thereof
CN114542801A (en) * 2022-01-24 2022-05-27 中铁四局集团有限公司 Slidable bracket clamp for internally-penetrated pipeline

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113334268A (en) * 2021-05-10 2021-09-03 哈尔滨玻璃钢研究院有限公司 Hinge soft matching positioning tool and using method thereof
CN114542801A (en) * 2022-01-24 2022-05-27 中铁四局集团有限公司 Slidable bracket clamp for internally-penetrated pipeline
CN114542801B (en) * 2022-01-24 2024-01-26 中铁四局集团有限公司 Inner-penetrating pipeline slidable support clamp

Similar Documents

Publication Publication Date Title
CN211853006U (en) Installation device for installing main pipe into sleeve
CN206091023U (en) A assembled furred ceiling for exhibition
CN210482377U (en) Assembled gallows of utility tunnel pipeline
CN103958821B (en) For installing the method and apparatus of Energy Chain
CN209083149U (en) A kind of pipeline construction is with can flexibly dismantle suspension device
CN105033931A (en) Disassembly and assembly tool of temperature probe for water pressure test of evaporator of nuclear power station
CN207170588U (en) A kind of bending machine
CN108506576A (en) A kind of para-seismic support being easily installed
CN211249097U (en) Portable return bend and drilling equipment for building
CN204239897U (en) A kind of conduit saddle structure
CN111059361B (en) Tube assembly with protective sleeve and manufacturing method
CN210034644U (en) Pipeline support for municipal construction
CN207599253U (en) A kind of vacuum heat-preserving tube
CN212271582U (en) Placing support for building
CN214940838U (en) A quick installation device for municipal pipeline
CN210256020U (en) Indoor water supply and drainage pipeline installation device
CN219571077U (en) Pipe gallery prefabricated member
CN220505989U (en) Combined sleeve for pipeline well
GB2023692A (en) Connection-disconnection device between tubing and underwater wellhead for use with articulated production installations
CN220082310U (en) Natural gas pipeline fixer
CN216713276U (en) Inspection well for environment-friendly drainage type sewage pipeline
CN210315660U (en) Utility tunnel supporting structure
CN214425357U (en) Oil gas conveying metal hose convenient to install
CN210531770U (en) Assembled pipeline bracket structure
CN217272343U (en) Gas pipeline protection device is used in gas engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant