CN211849564U - Wireless frame bolt positioning device - Google Patents

Wireless frame bolt positioning device Download PDF

Info

Publication number
CN211849564U
CN211849564U CN202020360654.6U CN202020360654U CN211849564U CN 211849564 U CN211849564 U CN 211849564U CN 202020360654 U CN202020360654 U CN 202020360654U CN 211849564 U CN211849564 U CN 211849564U
Authority
CN
China
Prior art keywords
bolt
cross
platform
frame
flat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020360654.6U
Other languages
Chinese (zh)
Inventor
沈小兵
秦扬
查广民
郭玉凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202020360654.6U priority Critical patent/CN211849564U/en
Application granted granted Critical
Publication of CN211849564U publication Critical patent/CN211849564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a bolt positioning device without a frame, which comprises a triangular platform, a fine flat platform, a cross-shaped line weight and a bolt fixer, wherein the triangular platform comprises a flat supporting plate and a bracket, a circular hole is arranged in the middle of the flat supporting plate, and the bracket is supported on a basic reinforcing steel bar layer; the surface of the fine flat platform is milled flat, a round hole slightly larger than the embedded bolt is formed in the geometric center of the plate surface, and grooves extending towards the east, west, south and north directions are formed by taking the round hole as a central point; the cross line pendant comprises a cross frame and a line pendant, and the line pendant is connected with the intersection point of the cross frame; the bolt fixer consists of a large nut and a cross wire frame, the cross wire frame is four linear steels which extend towards the east, west, south and north directions by taking the large nut as the center, and the device can simultaneously correct the central line, the verticality and the elevation of the bolt, and has simple structure and convenient operation.

Description

Wireless frame bolt positioning device
Technical Field
The utility model belongs to the pre-buried bolt location construction technology of basis specifically is a no truss bolt positioner.
Background
The foundation embedded bolt is fixed after the foundation steel bar is arranged, and the positioning of the bolt still depends on the pay-off rack at present. The concrete operation steps for completing bolt positioning through the pay-off rack are as follows: before installing the bolt, a wire frame is installed, then a wire is laid on the wire frame, and then a construction wire is pulled to install the bolt. Or firstly manufacturing a steel plate or template mould and then positioning and installing.
This method has certain drawbacks: (1) the workload of installing and removing the wire frame is large, and the construction period is influenced. (2) The wire frame or the steel plate die and the like all need a large amount of materials, so that a large amount of materials are wasted. (3) A large amount of labor is needed for installing and dismantling the wire frame, and labor waste is caused. (4) Error deviation is easily caused by secondary paying-off of the wire frame, and error accumulation is caused by non-straight installation of the wire frame or collision and bending after paying-off of the wire frame. (5) Workers depend too much on the paying-off personnel of the managers and cannot be installed without paying-off. (6) A reliable reference object is not available in the worker installation process to self-adjust the verticality of the wire rack.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a bolt positioner and location installation method convenient to dismouting, can use repeatedly.
In order to achieve the above purpose, the solution proposed by the present invention is:
a wireless frame bolt positioning device comprises a triangular platform, a fine flat platform, a cross-shaped line weight and a bolt fixer, wherein the triangular platform comprises a flat supporting plate and a support, a circular hole is formed in the middle of the flat supporting plate, and the support is supported on a base reinforcing steel bar layer; the surface of the fine flat platform is milled flat, a round hole slightly larger than the embedded bolt is formed in the geometric center of the plate surface, and grooves extending towards the east, west, south and north directions are formed by taking the round hole as a central point; the cross line pendant comprises a cross frame and a line pendant, and the line pendant is connected with the intersection point of the cross frame; the bolt fixer consists of a large nut and a cross wire frame, wherein the cross wire frame is made of four linear steels which extend towards the east, west, south and north directions by taking the large nut as the center.
The device can simultaneously correct the central line, the verticality and the elevation of the bolt, and has the advantages of simple structure and convenient operation.
And one side of the triangular platform is provided with an open notch communicated with the circular hole.
And an opening notch is formed in one of the included angles in the four positive directions of the leveling platform.
The depth of the groove of the fine flat platform is one half of the thickness of the platform, and the linear steel fixed in the east, west, south and north directions of the fine flat platform is positioned at the lower side of the groove.
The groove of the fine flat platform is matched with the cross wire frame and the cross of the cross wire pendant.
The utility model provides a method can finish bolt central line, straightness that hangs down, elevation one-time correction, to the initial setting-out on basis or the bottom plate as bolt positioning standard, has eliminated the line frame error, has simplified bolt installation process, has shortened the time limit for a project, has practiced thrift the material, has improved bolt installation accuracy, and easy operation.
Drawings
FIG. 1: a triangular platform structure;
FIG. 2: a triangular platform elevation view;
FIG. 3: flattening the platform structure;
FIG. 4: a cross wire frame structure;
FIG. 5: a cross wire frame vertical surface structure;
FIG. 6: a bolt fastener arrangement;
FIG. 7: the bolt fixer is screwed into the embedded bolt;
FIG. 8: the center of the device and the bolt position point alignment step are schematically shown;
FIG. 9: the device is schematically shown in the positioning step of a screw rod.
Reference numbers for parts in the figures illustrate:
a triangular platform-1, a flat supporting plate-11, a circular hole-12 and a bracket-13;
a leveling platform-2, a leveling platform plate surface-21, a round hole-22, a groove-23 and a notch-24;
a cross line pendant-3, a cross frame-31 and a line pendant-32;
a bolt fixer-4, a cross wire frame-41, a big nut-42 and a leveling wire weight-43;
and (5) embedding a bolt-5.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings and specific embodiments. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the directional terms "east", "west", "south", "north", and the like are used for simplifying the description based on the positional relationship of the drawings, and do not particularly indicate that a certain component must have a corresponding or specific orientation and a specific configuration, and thus, should not be construed as limiting the present invention.
Structure attached figures 1-6, embodiment 1 of the utility model:
a wireless frame bolt positioning device comprises a triangular platform 1, a fine leveling platform 2, a cross-shaped line weight 3 and a bolt fixer 4.
The triangular platform 1 comprises a flat supporting plate 11 and a bracket 13, wherein a circular hole 12 is formed in the middle of the flat supporting plate 11, and the bracket 13 is supported on a foundation reinforcing steel layer. And an open notch communicated with the circular hole is formed in one side of the triangular platform 1.
The surface of the fine flat platform 2 is milled flat, a round hole 22 slightly larger than the embedded bolt 5 is formed in the geometric center of the surface 21 of the fine flat platform, and four grooves 23 extending towards the east, west, south and north directions are arranged by taking the round hole 22 as the central point. In this embodiment, an opening notch 24 is formed in an included angle between four positive directions of the leveling platform 2. The groove 23 of the fine flat platform matches with the cross 31 of the cross sinker 3. The depth of the groove 23 of the fine flat platform 2 is half of the thickness of the platform.
The cross plummet 3 comprises a cross 31 and a plummet 32, and the plummet 32 is connected with the cross intersection.
The bolt fixer 4 is composed of a large nut 42 and a cross wire frame 41, and the cross wire frame 41 is made of four linear steels which take the large nut as a center and extend towards the east, west, south and north directions.
The device can simultaneously correct the central line, the verticality and the elevation of the bolt, and has the advantages of simple structure and convenient operation.
Referring to fig. 6-9, the positioning and installation of the bolt by using the positioning device for the bolt without the wire frame comprises the following specific operation steps:
1) firstly, a positioning tool is manufactured, wherein the positioning tool comprises a triangular platform 1, a fine flat platform 2 and a cross line pendant 3, a plurality of bolt fixing devices with different grades and sizes are manufactured according to the diameter and the type number of bolts on site, a pre-embedded bolt 5 with the diameter less than or equal to 24mm is taken as an example, a round hole 22 formed in the center of the fine flat platform 2 is larger than 24mm, and a nut 42 in the center of the bolt fixing device 4 is in a nut type matched with the bolt.
2) After the cushion layer and the foundation concrete are poured or the platform bottom film is installed, according to the position of each embedded bolt 5 specified by a drawing, the position point of each bolt is marked on the cushion layer, the foundation concrete or the bottom die, a cross line can be drawn by red paint to make an obvious mark, and then the bolt position is organized for acceptance.
3) After acceptance check is qualified, the paying-off installation is waited for, and bolt position points are staggered in the construction process of the reinforcing steel bar so as to prevent the bolts from being positioned when the bolts are fixed in the later period.
4) The triangular platform 1 is placed on the foundation steel bar according to the approximate position of the bolt position point, and the support 13 at the bottom of the triangular platform 1 is adjusted to enable the flat supporting plate 11 to be stable, namely the flat supporting plate is kept horizontal and stable as much as possible. An open gap is formed in one side of the flat supporting plate 11, and a circular hole 12 in the middle of the platform is communicated with the outside, so that bolts with cranks can be conveniently installed and placed.
5) Placing a fine leveling platform on the triangular platform, placing a cross line pendant 3 on the fine leveling platform 2, clamping a cross 31 of the cross line pendant into the groove 23, enabling the line pendant 32 to be located at the center of the circular hole 22 of the fine leveling platform, slightly moving the triangular platform and adjusting the levelness of the fine leveling platform, enabling the center of the line pendant 32 to be just opposite to the position point of the bolt, and taking out the cross line pendant 3. Horizontal bubbles can be placed on the leveling platform 2 to display the levelness of the leveling platform. In this example, the levelling bench 2 is also provided with a notch 24 opening the central circular hole 22, which notch 24 is positioned in the same direction as the notch of the triangular platform 1 or at least partially coincides therewith.
6) The embedded bolt 5 is arranged in the bolt fixer 4, the square linear steel of the bolt fixer 4 is clamped in the groove 23, and the nut 42 is aligned with the range of the round hole 22; at this time, the position of the embedded bolt 5 replaces the position of the line weight in the previous step, and the position of the original line weight 32 is the position of the bolt center line.
7) Further leveling the bolt holder 4; and positioning and finely adjusting the height of the bottom end of the bolt according to the design height of the bolt to enable the bottom ends of all the embedded bolts to be at the height of the reference line, welding the bolts with the reinforcing steel bar after the bolts are vertical, and finishing the installation of the bolts.
In the method, the specific operation of bolt height positioning is as follows: firstly, a laser level meter is adopted to position a datum line according to the designed height of the bottom end of an embedded bolt 5, the height difference between a leveling platform 2 and the datum line is measured, and the length below a nut 42 is determined according to the difference when the embedded bolt 5 is screwed into a bolt fixer 4. After further leveling of the bolt fixer 4, the bottom of the embedded bolt 5 may have a small amount of deviation or inaccurate position, and the bolt needs to be slowly and slightly rotated so that the bottom ends of all the embedded bolts are at the height determined by the reference line.
The invention positions the bolt perpendicularity through the bolt fixer 4 and the leveling platform 2, and positions the bolt height through the threaded fit of the bolt and the nut and the height of the laser positioning instrument.
The leveling of both the leveling platform 2 and the bolt holder 4 can operate with reference to a level bubble disposed thereon. The leveling of the bolt fixer 4 can be realized by installing leveling line weights 43 on two linear steels which are 90 degrees from each other, the leveling line weights 43 are adjusted to finely adjust the bottom end of the bolt, the embedded bolt 5 is fixedly welded with the steel bar after being determined to be vertical, and the bolt installation is finished.
This wireless frame bolt positioner's manufacture process embodiment:
(1) manufacturing a triangular platform: and cutting a 150X 8mm steel plate, forming a hole with the R being 50mm in the center, and forming a notch on the side surface for conveniently installing the embedded bolt. Three landing legs (phi 12) are installed at the bottom of the plate, the phi 12 long 150mm threaded steel bars are welded in the vertical direction at the bottom of the landing legs, and the threaded steel bars help the device to slide after being placed on a steel bar mesh, so that the position of the device is conveniently adjusted.
(2) Manufacturing a leveling platform: 150X 8mm steel sheet, central point puts and opens R equal to 30 mm's hole, opens the opening in oblique angle department, makes things convenient for the bolt installation, and the four sides vertical direction of board opens 4X 8mm recess to install the spirit level.
(3) Manufacturing the cross line pendant: 8 by 150mm steel bars are made into a vertical cross, and a line pendant is arranged at the center of the cross.
(4) Manufacturing a bolt fixer: 4 8 x 250mm steel bars are installed on the nut by themselves at 90 deg.. Wherein, two become and carve the minor groove on the 90 billet, hang two plumbs and carry out the straightness correction that hangs down of bolt.
The invention has the beneficial effects that: the method is simple to operate, can be operated by a single person, can be repeatedly used, saves two procedures of installing and dismantling the wire frame and greatly shortens the construction period. The waste of materials such as wire frames, construction wires and the like is saved. Links such as secondary paying-off of the wire frame, elevation frying by technicians, wire frame dismounting by workers and the like are omitted, and labor is greatly saved. The installation center position, elevation and perpendicularity of the bolt can be adjusted at one time in the installation process, and the installation precision is greatly improved. The platform has no obstacle when paying off and checking the line, and the error is smaller.

Claims (5)

1. The utility model provides a do not have a wireless frame bolt positioner, characterized by: the device comprises a triangular platform, a fine flat platform, a cross line pendant and a bolt fixer, wherein the triangular platform comprises a flat supporting plate and a bracket, a circular hole is formed in the middle of the flat supporting plate, and the bracket is supported on a base reinforcing steel bar layer; the surface of the fine flat platform is milled flat, a round hole slightly larger than the embedded bolt is formed in the geometric center of the plate surface, and grooves extending towards the east, west, south and north directions are formed by taking the round hole as a central point; the cross line pendant comprises a cross frame and a line pendant, and the line pendant is connected with the intersection point of the cross frame; the bolt fixer consists of a large nut and a cross wire frame, wherein the cross wire frame is made of four linear steels which extend towards the east, west, south and north directions by taking the large nut as the center.
2. The apparatus of claim 1, wherein: the depth of the groove of the fine flat platform is one half of the thickness of the platform.
3. The apparatus of claim 1, wherein: the groove of the fine flat platform is matched with the cross wire frame and the cross of the cross wire pendant.
4. The apparatus of claim 1, wherein: one side of the triangular platform is provided with an open notch communicated with the circular hole.
5. The apparatus as set forth in claim 4, wherein: an opening notch is arranged at one included angle in the four positive directions of the leveling platform.
CN202020360654.6U 2020-03-20 2020-03-20 Wireless frame bolt positioning device Active CN211849564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020360654.6U CN211849564U (en) 2020-03-20 2020-03-20 Wireless frame bolt positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020360654.6U CN211849564U (en) 2020-03-20 2020-03-20 Wireless frame bolt positioning device

Publications (1)

Publication Number Publication Date
CN211849564U true CN211849564U (en) 2020-11-03

Family

ID=73135269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020360654.6U Active CN211849564U (en) 2020-03-20 2020-03-20 Wireless frame bolt positioning device

Country Status (1)

Country Link
CN (1) CN211849564U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254967A (en) * 2020-03-20 2020-06-09 中国二十二冶集团有限公司 Wireless frame bolt positioning device and positioning installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254967A (en) * 2020-03-20 2020-06-09 中国二十二冶集团有限公司 Wireless frame bolt positioning device and positioning installation method

Similar Documents

Publication Publication Date Title
CN106284399B (en) Build the pre-buried locating template of pedestal anchor bolt and construction method
CN109629833B (en) Rapid construction method for binding high-precision high-quality steel bar space net rack
CN112127641A (en) Accurate fixing method for anchor plate foundation bolt
CN211849564U (en) Wireless frame bolt positioning device
CN111254967A (en) Wireless frame bolt positioning device and positioning installation method
CN111364688B (en) Construction steel bar location structure
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN212104166U (en) Accurate positioning device for embedded bolt of safety injection box of nuclear power station
CN112095485A (en) Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof
CN103215968B (en) Embedded construction method of circular large-cross-section track-type equipment anchor bolt
CN213234338U (en) Pre-buried position auxiliary control ware of pre-buried screw rod
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN212983863U (en) Verticality adjusting device
CN109680711B (en) Ring-arranged direct-buried bolt pre-embedding positioning device and construction method
CN114232983A (en) Construction method and system of pool wall template
CN218373356U (en) Quick accurate positioner of bridge anticollision wall built-in fitting
CN104947707A (en) Horizontal embedded part installation method
CN212300317U (en) High-precision measurement platform for controlling concrete finish surface elevation
CN110965791A (en) Accurate positioning method for foundation bolt
CN215801769U (en) Pre-buried fixing device of roll line rag bolt
CN215948257U (en) Operation platform for steel structure group column bolt pre-embedding construction
CN214089548U (en) Concrete base rag bolt positioner
CN216194782U (en) Steel pipe column positioning system
CN211527398U (en) Supporting device of laser level meter in construction control elevation process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant