CN211838198U - Building engineering construction waste treatment facility - Google Patents

Building engineering construction waste treatment facility Download PDF

Info

Publication number
CN211838198U
CN211838198U CN201922007137.0U CN201922007137U CN211838198U CN 211838198 U CN211838198 U CN 211838198U CN 201922007137 U CN201922007137 U CN 201922007137U CN 211838198 U CN211838198 U CN 211838198U
Authority
CN
China
Prior art keywords
fixedly connected
box
crushing
waste treatment
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922007137.0U
Other languages
Chinese (zh)
Inventor
修琰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922007137.0U priority Critical patent/CN211838198U/en
Application granted granted Critical
Publication of CN211838198U publication Critical patent/CN211838198U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model belongs to the technical field of waste material treatment facility, especially, be a building engineering construction waste material treatment facility, the power distribution box comprises a box body, the top fixedly connected with feed inlet of box, one side fixedly connected with fixed case of box, the inside wall of fixed case rotates through the bearing respectively and is connected with first crushing pole and the crushing pole of second, the fixed surface of first crushing pole is connected with the action wheel, the fixed surface of the crushing pole of second is connected with from the driving wheel, action wheel and the fixed surface from the driving wheel are connected with the belt. The utility model discloses a set up the water pipe, the water pipe can connect on the water tap, through the water pump with water take out the inlet tube, rivers in the water pipe advance in the triangle water spray plate, then spout first crushing pole and the second crushing pole through the shower nozzle on for first crushing pole and second crushing pole have obtained the washing, can not be because of blockking up at the crushing in-process of material, and lead to the machine out of work, thereby improved work efficiency.

Description

Building engineering construction waste treatment facility
Technical Field
The utility model relates to a waste material treatment facility technical field specifically is a building engineering construction waste material treatment facility.
Background
A lot of construction materials are present in construction sites, which are accumulated and cause environmental impact if not disposed in time, so that a construction waste disposal apparatus is required for waste disposal.
However, the following problems exist:
1. the existing construction waste treatment equipment has a plurality of ash layers in the crushing process, so that the influence on the body of people can be caused;
2. the existing construction waste treatment equipment cannot be better cleaned in the crushing process, and is easy to block in the process of crushing waste materials, so that the working efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering construction waste treatment facility has solved current building waste treatment facility and has had the ash bed of many and can not carry out better abluent problem at crushing in-process.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a construction engineering construction waste treatment device comprises a box body, wherein a feed inlet is fixedly connected to the top of the box body, a fixed box is fixedly connected to one side of the box body, the inner side wall of the fixed box is respectively and rotatably connected with a first crushing rod and a second crushing rod through bearings, the surface of the first crushing rod is fixedly connected with a driving wheel, the surface of the second crushing rod is fixedly connected with a driven wheel, the surfaces of the driving wheel and the driven wheel are fixedly connected with a belt, the other side of the box body is fixedly connected with a motor, the output end of the motor is fixedly connected with one end of the first crushing rod, the inner bottom wall of the box body is fixedly connected with a funnel, the bottom of the box body is fixedly connected with a discharge port, the top of the discharge port is fixedly connected with the bottom of the funnel, a water pipe is fixedly connected to the top of the box body, the bottom fixedly connected with triangle water spray plate of water pipe, one side fixedly connected with dust removal case of box, the interior diapire fixedly connected with air pump of dust removal case, the top fixedly connected with intake pipe of air pump, the intake pipe runs through the inside of box, one side fixedly connected with outlet duct of air pump, the inner wall fixedly connected with of dust removal case filters the swash plate, filter one side fixedly connected with electromagnetic shaker of swash plate.
As an optimized technical scheme of the utility model, the bottom of triangle water spray plate is equipped with a plurality of shower nozzles.
As a preferred technical scheme of the utility model, one side fixedly connected with blast pipe of dust removal case, the bottom fixedly connected with case of dust removal case, the ash discharge pipe has been seted up at the top of case, the ash discharge pipe runs through to the inside of dust removal case.
As a preferred technical scheme of the utility model, the inside wall fixedly connected with stock guide of box, the stock guide sets up for the slope, the bottom fixedly connected with filter of stock guide, the both sides of filter and the equal fixed connection of inside wall of box.
As a preferred technical scheme of the utility model, the bottom fixedly connected with supporting leg of box, the bottom fixedly connected with shock pad of supporting leg.
As an optimized technical scheme of the utility model, one side of discharge gate is equipped with the solenoid valve, the inner wall sliding connection of case has the drawer.
(III) advantageous effects
Compared with the prior art, the utility model provides a building engineering construction waste treatment facility possesses following beneficial effect:
1. this building engineering construction waste treatment equipment, through setting up the dust removal case, the air pump in the dust removal case passes through the intake pipe and inhales the gaseous ash bed of box inside, arrange through the outlet duct and filter in filtering the swash plate, then discharge gas through the gas vent, can improve the waste material like this at crushing in-process, make the gas of box obtain purifying, the shake of electromagnetic shaker is passed through to the ash bed in the filtration swash plate, make the ash bed fall into the case, can guarantee like this that the ash bed does not get into in the air, thereby can not influence the environment, make people's health also can not receive the influence.
2. This building engineering construction waste treatment equipment, through setting up the water pipe, the water pipe can connect on the water tap, through the water pump with water take out the inlet tube in, rivers in the water pipe advance in the triangle water spray plate, then spout first crushing pole and the second through the shower nozzle on crushing the pole for first crushing pole and second crushing pole have obtained the washing, can not be because of blockking up at the crushing in-process of material, and lead to the machine out of work, thereby improved work efficiency.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the fixing box of the present invention;
fig. 3 is the schematic view of the dust removing box structure of the present invention.
In the figure: 1. a box body; 2. a feed inlet; 3. a fixed box; 4. a first crushing bar; 5. a second crushing bar; 6. a driving wheel; 7. a driven wheel; 8. a belt; 9. a motor; 10. a funnel; 11. a discharge port; 12. a water pipe; 13. a water pump; 14. a triangular water spraying plate; 15. a spray head; 16. a dust removal box; 17. an air pump; 18. An air inlet pipe; 19. an air outlet pipe; 20. a filtering inclined plate; 21. a vibrator; 22. an exhaust pipe; 23. an ash discharge pipe; 24. a storage box; 25. a material guide plate; 26. a filter plate; 27. supporting legs; 28. a shock-absorbing pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: a construction engineering construction waste treatment device comprises a box body 1, a feed inlet 2 is fixedly connected to the top of the box body 1, a fixed box 3 is fixedly connected to one side of the box body 1, the inner side wall of the fixed box 3 is respectively and rotatably connected with a first crushing rod 4 and a second crushing rod 5 through bearings, a driving wheel 6 is fixedly connected to the surface of the first crushing rod 4, a driven wheel 7 is fixedly connected to the surface of the second crushing rod 5, a belt 8 is fixedly connected to the surfaces of the driving wheel 6 and the driven wheel 7, a motor 9 is fixedly connected to the other side of the box body 1, the output end of the motor 9 is fixedly connected with one end of the first crushing rod 4, a funnel 10 is fixedly connected to the inner bottom wall of the box body 1, a discharge outlet 11 is fixedly connected to the bottom of the box body 1, the top of the discharge outlet 11 is fixedly connected with the bottom of the funnel 10, a water pipe 12 is, the bottom fixedly connected with triangle water spray plate 14 of water pipe 12, one side fixedly connected with dust removal case 16 of box 1, the interior diapire fixedly connected with air pump 17 of dust removal case 16, the top fixedly connected with intake pipe 18 of air pump 17, intake pipe 18 runs through the inside of box 1, one side fixedly connected with outlet duct 19 of air pump 17, the inner wall fixedly connected with of dust removal case 16 filters swash plate 20, filters one side fixedly connected with electromagnetic shaker 21 of swash plate 20.
In this embodiment, the start-up of motor 9 drives first crushing pole 4 and rotates, through action wheel 6, from the cooperation of driving wheel 7 and belt 8 for first crushing pole 4 and second crushing pole 5 rotate simultaneously, set up first crushing pole 4 and second crushing pole 5 and be in order to better, more even crushing effect at crushing in-process to the waste material.
Specifically, the bottom of the triangular water spraying plate 14 is provided with a plurality of spray heads 15.
In this embodiment, water pipe 12 can connect on the water tap, through the suction of water pump 13, makes water enter into triangle water spray plate 14, and triangle water spray plate 14 is for what the slope set up that makes water spout through shower nozzle 15 is more even, and it is more even to wash first crushing pole 4 and second crushing pole 5, and the cleaning performance is better.
Specifically, one side fixedly connected with blast pipe 22 of dust removal case 16, the bottom fixedly connected with case 24 of dust removal case 16, ash discharge pipe 23 has been seted up at the top of case 24, and ash discharge pipe 23 runs through to the inside of dust removal case 16.
In this embodiment, use through air pump 17, make intake pipe 18 inhale the inside ash layer of box 1, it filters to arrange in filtering swash plate 20 through blast pipe 22, rethread blast pipe 22 discharges, can improve the waste material like this and smash the in-process, make the gas of box 1 obtain purifying, the shake of electromagnetic shaker 21 is passed through to the ash layer in the filtering swash plate 20, make the ash layer fall into in the case 24, can guarantee like this that the ash layer does not get into in the air, thereby can not influence the environment, make people's health also can not receive the influence.
Specifically, the inside wall fixedly connected with stock guide 25 of box 1, stock guide 25 are the slope setting, the bottom fixedly connected with filter 26 of stock guide 25, the both sides of filter 26 and the equal fixed connection of inside wall of box 1.
In this embodiment, the material guide plate 25 is inclined so that the material does not enter the corners of the box 1, which is inconvenient to clean, and the filter plate 26 is arranged so that the material enters the hopper 10 for further filtering.
Specifically, the bottom of the box body 1 is fixedly connected with a supporting leg 27, and the bottom of the supporting leg 27 is fixedly connected with a shock pad 28.
In this embodiment, the support legs 27 are provided to improve the stability of the construction waste treatment apparatus, and the shock absorbing pad 28 is provided to prevent the construction waste treatment apparatus from shaking.
Specifically, one side of the discharge port 11 is provided with an electromagnetic valve, and the inner wall of the storage box 24 is slidably connected with a drawer.
In this embodiment, the solenoid valve is for the convenience of the opening and closing of material, and the drawer is for the convenience of clearing up the dust.
The utility model discloses a theory of operation and use flow: firstly, the first crushing rod 4 is driven to rotate by starting the motor 9, the first crushing rod 4 and the second crushing rod 5 are enabled to rotate simultaneously by the matching of the driving wheel 6, the driven wheel 7 and the belt 8, then materials are put into the box body 1 through the feeding hole 2 to be crushed, the first crushing rod 4 and the second crushing rod 5 are arranged to have better crushing effect on waste materials in the crushing process and are more uniform, the air pump 17 is used to enable the air inlet pipe 18 to suck the ash layer in the box body 1, the ash layer is discharged into the filtering inclined plate 20 through the exhaust pipe 22 to be filtered and then discharged through the exhaust pipe 22, so that the gas of the box body 1 is purified in the crushing process, the ash layer in the filtering inclined plate 20 is shaken through the shaker 21 to enable the ash layer to fall into the storage box 24, and the ash layer is prevented from entering the air, thereby can not influence the environment, make people's health also can not receive the influence, water pipe 12 can connect on the water tap, suction through water pump 13 makes during water enters into triangle water spray plate 14, triangle water spray plate 14 sets up for the slope is more even in order to make water spout through shower nozzle 15, it is more even to wash first crushing pole 4 and second crushing pole 5, the cleaning performance is better, can not be because of blockking up to the material crushing in-process, and lead to the machine out of work, thereby work efficiency has been improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a building engineering construction waste treatment equipment, includes box (1), its characterized in that: the top of the box body (1) is fixedly connected with a feed inlet (2), one side of the box body (1) is fixedly connected with a fixed box (3), the inner side wall of the fixed box (3) is respectively connected with a first crushing rod (4) and a second crushing rod (5) in a rotating way through a bearing, the surface of the first crushing rod (4) is fixedly connected with a driving wheel (6), the surface of the second crushing rod (5) is fixedly connected with a driven wheel (7), the driving wheel (6) and the surface of the driven wheel (7) are fixedly connected with a belt (8), the other side of the box body (1) is fixedly connected with a motor (9), the output end of the motor (9) is fixedly connected with one end of the first crushing rod (4), the inner bottom wall of the box body (1) is fixedly connected with a funnel (10), and the bottom of the box body (1) is fixedly connected with a discharge outlet (, the top of discharge gate (11) and the bottom fixed connection of funnel (10), the top fixedly connected with water pipe (12) of box (1), the top fixedly connected with water pump (13) of water pipe (12), the bottom fixedly connected with triangle water spray board (14) of water pipe (12), one side fixedly connected with dust removal case (16) of box (1), interior diapire fixedly connected with air pump (17) of dust removal case (16), the top fixedly connected with intake pipe (18) of air pump (17), intake pipe (18) run through the inside of box (1), one side fixedly connected with outlet duct (19) of air pump (17), the inner wall fixedly connected with of dust removal case (16) filters swash plate (20), filter one side fixedly connected with electromagnetic shaker (21) of swash plate (20).
2. The construction engineering and construction waste treatment apparatus according to claim 1, wherein: the bottom of the triangular water spraying plate (14) is provided with a plurality of spray heads (15).
3. The construction engineering and construction waste treatment apparatus according to claim 1, wherein: one side fixedly connected with blast pipe (22) of dust removal case (16), the bottom fixedly connected with case (24) of dust removal case (16), ash discharge pipe (23) have been seted up at the top of case (24), ash discharge pipe (23) run through to the inside of dust removal case (16).
4. The construction engineering and construction waste treatment apparatus according to claim 1, wherein: the utility model discloses a solar energy collection box, including box (1), the inside wall fixedly connected with stock guide (25) of box (1), stock guide (25) are the slope setting, the bottom fixedly connected with filter (26) of stock guide (25), the both sides of filter (26) and the equal fixed connection of inside wall of box (1).
5. The construction engineering and construction waste treatment apparatus according to claim 1, wherein: the bottom fixedly connected with supporting leg (27) of box (1), the bottom fixedly connected with shock pad (28) of supporting leg (27).
6. The construction engineering and construction waste treatment apparatus according to claim 3, wherein: an electromagnetic valve is arranged on one side of the discharge port (11), and a drawer is connected to the inner wall of the storage box (24) in a sliding mode.
CN201922007137.0U 2019-11-19 2019-11-19 Building engineering construction waste treatment facility Expired - Fee Related CN211838198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922007137.0U CN211838198U (en) 2019-11-19 2019-11-19 Building engineering construction waste treatment facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922007137.0U CN211838198U (en) 2019-11-19 2019-11-19 Building engineering construction waste treatment facility

Publications (1)

Publication Number Publication Date
CN211838198U true CN211838198U (en) 2020-11-03

Family

ID=73218957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922007137.0U Expired - Fee Related CN211838198U (en) 2019-11-19 2019-11-19 Building engineering construction waste treatment facility

Country Status (1)

Country Link
CN (1) CN211838198U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112657590A (en) * 2020-12-04 2021-04-16 安徽华创环保设备科技有限公司 Traditional chinese medicine is smashed and is used dust collector

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112657590A (en) * 2020-12-04 2021-04-16 安徽华创环保设备科技有限公司 Traditional chinese medicine is smashed and is used dust collector

Similar Documents

Publication Publication Date Title
CN108043156A (en) A kind of dust-laden exhaust gas energy-efficient treatment device
CN211616255U (en) Plastic product recycling and crushing device
CN212550833U (en) Premixed concrete raw materials crushing and screening device
CN111467921A (en) Flue gas deep dust removal device based on environmental protection and environmental technology
CN211838198U (en) Building engineering construction waste treatment facility
CN211676947U (en) Dust collector of production premixed concrete
CN211838125U (en) Reducing mechanism is used in powder coating production
CN219097657U (en) Do benefit to building rubbish sorter of environmental protection
CN208493609U (en) A kind of environmental protection air purifier
CN208177159U (en) A kind of air deduster
CN216459378U (en) A dust keeper for calcium oxide production
CN215128027U (en) Hand-push type industrial dust collector
CN213610539U (en) Dust fall equipment is used to green building construction scene
CN215610285U (en) Industrial dust collector convenient to clean
CN215196125U (en) Dust collector is used in production of fire-resistant prefabricated section
CN211027006U (en) Smoke dust filter device with double filtering functions
CN214234248U (en) Building rubbish handles dust keeper
CN212824770U (en) Automatic dust collector of jade processing
CN213049948U (en) Dust collector for slag treatment
CN211202038U (en) Colliery is dust collector in pit
CN211026467U (en) Negative pressure dust absorption type coarse crusher
CN209453914U (en) A kind of concrete segment surface dust cleaning plant
CN209107226U (en) A kind of floor suction device of dust-free workshop
CN112090214A (en) Dust removal device for furniture production workshop
CN218981401U (en) Environment-friendly and low-dust plugging agent production device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201103

Termination date: 20211119