CN211830101U - Pre-buried fixed anti-drop structure of wall pipeline is built in room - Google Patents

Pre-buried fixed anti-drop structure of wall pipeline is built in room Download PDF

Info

Publication number
CN211830101U
CN211830101U CN202020650598.XU CN202020650598U CN211830101U CN 211830101 U CN211830101 U CN 211830101U CN 202020650598 U CN202020650598 U CN 202020650598U CN 211830101 U CN211830101 U CN 211830101U
Authority
CN
China
Prior art keywords
plate
fixedly connected
plates
drop structure
fixed anti
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020650598.XU
Other languages
Chinese (zh)
Inventor
薛敬波
尹金坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Golden Beach Construction Group Co ltd
Original Assignee
Qingdao Golden Beach Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Golden Beach Construction Group Co ltd filed Critical Qingdao Golden Beach Construction Group Co ltd
Priority to CN202020650598.XU priority Critical patent/CN211830101U/en
Application granted granted Critical
Publication of CN211830101U publication Critical patent/CN211830101U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a pre-buried fixed anti-drop structure of a house building wall pipeline, which comprises a bottom plate, a connecting plate vertically and fixedly connected on the bottom plate, a supporting plate fixedly connected on the connecting plate, an arc-shaped plate and a connecting plate fixedly connected on the outer arc surface of the supporting plate; the mounting plate is fixedly connected to two sides of the supporting plate, a pressing plate is arranged on the supporting plate and is also an arc-shaped plate, the pressing plate and the supporting plate are arranged oppositely, the arrangement plates are fixedly connected to two sides of the pressing plate, and the pressing plate and the supporting plate are mounted together. The utility model discloses have the firm effect of arranging the spool in the reservation groove.

Description

Pre-buried fixed anti-drop structure of wall pipeline is built in room
Technical Field
The utility model belongs to the technical field of the technique of wall body pipeline embedded structure and specifically relates to a pre-buried fixed anti-drop structure of wall body pipeline is built in room is related to.
Background
The wiring mode of the existing house building basically adopts the mode of embedding pipelines, namely arranging hidden lines, wherein the hidden lines mean that lines are embedded in grooves which are removed in walls or the ground.
As shown in fig. 1, a wall 1 is provided with a preformed groove 2, a conduit 3 is placed in the preformed groove 2, and an electric wire is inserted in the conduit 3. After arranging spool 3 with wearing to be equipped with the electric wire in reserve tank 2, the staff fills the gypsum in reserve tank 2, as sealing layer 4, with electric wire together with spool 3 fixed connection in reserve tank 2.
The above prior art solutions have the following drawbacks: the existing sealing layer 4 is mostly made of concrete, in a kitchen or a toilet and other areas, water vapor may contact the sealing layer 4, the sealing layer 4 is corroded by water after absorbing the water vapor, the sealing layer 4 is loose due to expansion, and then the pipeline is not firmly fixed, and the pipeline may fall off.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a not enough to prior art exists, the utility model aims at providing a pre-buried fixed anti-drop structure of wall body pipeline is built in room reinforces the spool of arranging in the reservation groove for the spool also can be stable arrange in the reservation groove when the seal comes off.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
a building wall pipeline pre-buried fixing anti-drop structure comprises a bottom plate, a connecting plate vertically and fixedly connected to the bottom plate, a supporting plate fixedly connected to the connecting plate, wherein the supporting plate is an arc-shaped plate and is fixedly connected to the outer arc surface of the supporting plate;
the mounting plates are fixedly connected to two sides of the supporting plate, a pressing plate is arranged on the supporting plate and is also an arc-shaped plate, the pressing plate and the supporting plate are arranged oppositely, the arrangement plates are fixedly connected to two sides of the pressing plate, and the pressing plate and the supporting plate are mounted together;
the bottom plate is fixedly connected in the preformed groove.
Through adopting above-mentioned technical scheme, when installing, the staff fixes the bottom plate in the reservation tank earlier, fixes the position of anti-drop structure, then installs the spool on the layer board, coordinates fixedly with clamp plate and layer board for the spool passes through the anti-drop structure to be fixed on the wall body, and is consolidated by the anti-drop structure, follow-up packing of carrying out the sealing layer. When the sealing layer is loosened or falls off, the line pipe can be limited by the anti-falling structure and is firmly arranged in the preformed groove.
The present invention may be further configured in a preferred embodiment as: the mounting plate and the arrangement plate are provided with fixing bolts in a penetrating mode, and the mounting plate and the arrangement plate are provided with strip-shaped grooves.
Through adopting above-mentioned technical scheme, when the layer board is different with the spool diameter size that the clamp plate was fixed, the staff can be through changing the position of wearing to establish of fixing bolt on the bar groove to the spool carries out the dislocation, when letting the spool of different diameters arrange on the layer board, can not receive the interference that fixing bolt wore to establish the position.
The present invention may be further configured in a preferred embodiment as: the two sides of the bottom plate are fixedly connected with side plates, the side plates are fixedly connected with L-shaped plates, the L-shaped plates are divided into transverse plates and vertical plates, the transverse plates are in contact with the bottom of the preformed groove, and the vertical plates are in contact with the wall of the preformed groove; the L-shaped plate is fixedly connected in the preformed groove.
Through adopting above-mentioned technical scheme, when arranging the bottom plate in the reservation tank, bottom plate and diaphragm contact with the tank bottom of reservation tank, the riser contacts with the cell wall of reservation tank, can play the effect of location to the installation of anti-drop structure.
The present invention may be further configured in a preferred embodiment as: and an expansion screw penetrates through the transverse plate.
Through adopting above-mentioned technical scheme, can let the diaphragm fix in the reservation groove, fix together with the bottom plate moreover.
The present invention may be further configured in a preferred embodiment as: expansion screws penetrate through the vertical plates.
Through adopting above-mentioned technical scheme, also wear to establish the inflation screw on the riser for the L template receives the fixed of two directions, improves fixed firm degree.
The present invention may be further configured in a preferred embodiment as: the side plates are also provided with cover plates for shielding the supporting plates, and the cover plates are fixed on the wall body; and two sides of the cover plate are vertically and fixedly connected with baffle plates.
Through adopting above-mentioned technical scheme, stop the seal with apron and baffle, reduce seal and layer board direct contact, in case the problem of circuit appears, the staff can pull down the apron and demolish the spool on the layer board, maintains the circuit
The present invention may be further configured in a preferred embodiment as: two inserts are fixedly connected to the cover plate, the two inserts are inserted between the side plate and the vertical plate, and the insert plate is in contact with the side plate and the vertical plate.
Through adopting above-mentioned technical scheme, the location of the apron of being convenient for.
The present invention may be further configured in a preferred embodiment as: and a plurality of bottom plates are arranged in the preformed groove.
Through adopting above-mentioned technical scheme, the arrangement of staff in the reservation groove of being convenient for.
The present invention may be further configured in a preferred embodiment as: the baffle is provided with a holding tank, and the baffle and the insert block are fixed on the same side of the cover plate.
Through adopting above-mentioned technical scheme, the holding tank is used for holding the pipeline, reduces the interference between pipeline and the baffle.
The present invention may be further configured in a preferred embodiment as: the baffle is fixedly connected with a barrier strip, and the barrier strip is an arc-shaped plate.
Through adopting above-mentioned technical scheme, can protect the pipeline between the adjacent bottom plate.
To sum up, the utility model discloses a following at least one useful technological effect:
1. when the sealing layer is loosened or falls off, the line pipe can be limited by the anti-falling structure and is firmly arranged in the reserved groove;
2. the L-shaped plate is arranged and the expansion screw penetrates through the L-shaped plate, so that the anti-falling device can be fixed in two different directions, and the fixing effect is improved;
3. through setting up the baffle of apron, reduce the contact of seal coat and layer board.
Drawings
FIG. 1 is a schematic diagram of a prior art conduit on a wall;
FIG. 2 is a schematic view of a conduit arranged on a wall in the embodiment;
fig. 3 is a schematic view illustrating that the wire tube is fixed by the anti-falling structure in the embodiment;
fig. 4 is an exploded view of the anti-falling structure in the present embodiment;
fig. 5 is a schematic view illustrating the anti-falling structure of the present embodiment without a cover plate.
In the figure, 1, a wall body; 2. reserving a groove; 3. a conduit; 4. a sealing layer; 5. a base plate; 6. a side plate; 7. a connecting plate; 8. a support plate; 9. mounting a plate; 10. pressing a plate; 11. arranging a plate; 12. fixing the bolt; 13. a strip-shaped groove; 14. an L-shaped plate; 141. a transverse plate; 142. a vertical plate; 15. an expansion screw; 16. a cover plate; 17. inserting a block; 18. a baffle plate; 19. blocking strips; 20. and (6) accommodating the tank.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Refer to fig. 3, fig. 4, for the utility model discloses a pre-buried fixed anti-drop structure of wall body pipeline is built in room, including bottom plate 5 and two curb plates 6 with the 5 perpendicular fixed connection of bottom plate, curb plate 6 and bottom plate 5 transversal personally submit the U type. Referring to fig. 2, the falling off prevention structure is disposed in the reserve tank 2.
Referring to fig. 4 and 5, a connecting plate 7 is vertically and fixedly connected to the bottom plate 5, and the connecting plate 7 is parallel to the side plates 6 and arranged between the two side plates 6 at the same interval as the side plates 6 on the two sides.
Fixedly connected with layer board 8 on connecting plate 7, layer board 8 is the arc, and connecting plate 7 fixed connection is on the extrados of layer board 8, at layer board 8 both sides fixedly connected with mounting panel 9. And a pressing plate 10 is arranged on the supporting plate 8, the pressing plate 10 is also an arc-shaped plate, the pressing plate 10 and the supporting plate 8 are oppositely arranged, the arrangement plates 11 are fixedly connected to two sides of the pressing plate 10, and the pressing plate 10 and the supporting plate 8 are installed together. When the pressing plate 10 and the supporting plate 8 are installed together, a worker wears fixing bolts 12 on the installation plate 9 and the arrangement plate 11, so that the pressing plate 10 and the supporting plate 8 are installed together in a bolt connection mode. The line pipe 3 is installed between the pressing plate 10 and the pallet 8 and fixed by the pressing plate 10 and the pallet 8. A strip-shaped groove 13 is formed in the mounting plate 9 and the arrangement plate 11 and is used as a penetrating position for fixing the bolt 12.
The side plate 6 is fixedly connected with an L-shaped plate 14, the L-shaped plate 14 is divided into a transverse plate 141 and a vertical plate 142, the transverse plate 141 is fixedly connected with the side plate 6, and the vertical plate 142 is fixedly connected with the transverse plate 141 and parallel to the side plate 6. The horizontal plate 141 is flush with the bottom plate 5, and the side plate 6 and the vertical plate 142 are arranged on the same side of the horizontal plate 141. The expansion screws 15 are arranged on the horizontal plate 141 and the vertical plate 142 in a penetrating way, and the expansion screws 15 arranged on the vertical plate 142 of the horizontal plate 141 penetrate into the wall body 1 and are fixedly connected with the wall body 1. And under the action of the L-shaped plate 14, the bottom plate 5 and the line pipe 3 are fixedly connected to the wall body 1.
In addition, when the bottom plate 5 is arranged in the reserve tank 2, the bottom plate 5 and the horizontal plate 141 are in contact with the bottom of the reserve tank 2, and the vertical plate 142 is in contact with the wall of the reserve tank 2, so that the anti-falling structure can be positioned when being installed.
Still install the apron 16 that is used for sheltering from layer board 8 on two curb plates 6, under the effect of apron 16, apron 16 blocks sealing layer 4 and layer board 8 direct contact, in case the problem of circuit appears, the staff can pull down apron 16 and demolish spool 3 on the layer board 8, maintains the circuit.
Specifically, two insert blocks 17 are fixedly connected to the cover plate 16, when the cover plate 16 is installed on the side plate 6, screws penetrate through the cover plate 16 and are fixed to the wall body 1, the two insert blocks 17 are inserted between the side plate 6 and the vertical plate 142, and the insert plates are in contact with the side plate 6 and the vertical plate 142 and used for positioning the installation of the cover plate 16.
In order to facilitate arrangement of workers and save cost, a plurality of bottom plates 5 are arranged in the preformed groove 2, and the wire pipes 3 are fixed together by the supporting plates 8 on the bottom plates 5.
Perpendicular fixedly connected with baffle 18 in the both sides of apron 16, seted up holding tank 20 on the baffle 18, baffle 18 is fixed in the same one side of apron 16 with inserted block 17, installs apron 16 on curb plate 6 after, and the part that the spool 3 wore out from layer board 8 passes in holding tank 20, and baffle 18 shelters from the both sides of curb plate 6, and when reducing the filling seal 4, the gypsum gets into the volume on the bottom plate 5.
Install blend stop 19 between the baffle 18 on two adjacent bottom plates 5 in reserve groove 2, blend stop 19 is the arc, and apron 16 installation back, blend stop 19 and spool 3 contact block spool 3 part, reduce the area of spool 3 and gypsum contact to when maintaining, can strictly take off apron 16, expose the part of spool 3, the staff of being convenient for finds spool 3, confirms the damage position. The barrier strip 19 is fixedly connected with the baffle 18.
The implementation principle of the embodiment is as follows: when installing, the staff fixes bottom plate 5 and curb plate 6 in preformed groove 2 earlier, fixes the position of anti-drop structure, then installs spool 3 on layer board 8 again, cooperates fixedly with clamp plate 10 and layer board 8 for spool 3 is fixed on wall body 1 through the anti-drop structure, and is consolidated by the anti-drop structure, follow-up packing of carrying out seal coat 4. When the sealing layer 4 is loosened or falls off, the line pipe 3 can be limited by the anti-falling structure and is firmly arranged in the preformed groove 2.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (10)

1. The utility model provides a pre-buried fixed anti-drop structure of wall body pipeline is built in room, its characterized in that: the device comprises a bottom plate (5), wherein a connecting plate (7) is vertically and fixedly connected to the bottom plate (5), a supporting plate (8) is fixedly connected to the connecting plate (7), the supporting plate (8) is an arc-shaped plate, and the connecting plate (7) is fixedly connected to the outer arc surface of the supporting plate (8);
mounting plates (9) are fixedly connected to two sides of the supporting plate (8), a pressing plate (10) is arranged on the supporting plate (8), the pressing plate (10) is also an arc-shaped plate, the pressing plate (10) is arranged opposite to the supporting plate (8), arranging plates (11) are fixedly connected to two sides of the pressing plate (10), and the pressing plate (10) and the supporting plate (8) are mounted together;
the bottom plate (5) is fixedly connected in the preformed groove (2).
2. The embedded fixed anti-drop structure of building wall pipeline of claim 1, characterized in that: the mounting plate (9) and the arrangement plate (11) are provided with fixing bolts (12) in a penetrating mode, and the mounting plate (9) and the arrangement plate (11) are provided with strip-shaped grooves (13).
3. The embedded fixed anti-drop structure of building wall pipeline of claim 1, characterized in that: the two sides of the bottom plate (5) are fixedly connected with side plates (6), the side plates (6) are fixedly connected with L-shaped plates (14), the L-shaped plates (14) are divided into transverse plates (141) and vertical plates (142), the transverse plates (141) are in contact with the bottom of the preformed groove (2), and the vertical plates (142) are in contact with the wall of the preformed groove (2); the L-shaped plate (14) is fixedly connected in the preformed groove (2).
4. The pre-buried fixed anti-drop structure of wall pipeline is built in room according to claim 3, its characterized in that: the transverse plate (141) is provided with an expansion screw (15) in a penetrating way.
5. The pre-buried fixed anti-drop structure of wall pipeline is built in room according to claim 4, its characterized in that: expansion screws (15) penetrate through the vertical plates (142).
6. The pre-buried fixed anti-drop structure of wall pipeline is built in room according to claim 3, its characterized in that: and a cover plate (16) used for shielding the supporting plate (8) is further installed on the side plate (6), and the cover plate (16) is fixed on the wall body (1).
7. The pre-buried fixed anti-drop structure of wall pipeline is built in room according to claim 6, its characterized in that: two inserting blocks (17) are fixedly connected to the cover plate (16), the two inserting blocks (17) are inserted between the side plate (6) and the vertical plate (142), and the inserting plate is in contact with the side plate (6) and the vertical plate (142).
8. The embedded fixed anti-drop structure of building wall pipeline of claim 1, characterized in that: a plurality of bottom plates (5) are arranged in the preformed groove (2).
9. The embedded fixed anti-drop structure of building wall pipeline of claim 7, characterized in that: the two sides of the cover plate (16) are vertically and fixedly connected with baffle plates (18), the baffle plates (18) are provided with accommodating grooves (20), and the baffle plates (18) and the inserting blocks (17) are fixed on the same side of the cover plate (16).
10. The embedded fixed anti-drop structure of wall pipeline is built in room of claim 9, its characterized in that: the baffle (18) is fixedly connected with a barrier strip (19), and the barrier strip (19) is an arc-shaped plate.
CN202020650598.XU 2020-04-26 2020-04-26 Pre-buried fixed anti-drop structure of wall pipeline is built in room Expired - Fee Related CN211830101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020650598.XU CN211830101U (en) 2020-04-26 2020-04-26 Pre-buried fixed anti-drop structure of wall pipeline is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020650598.XU CN211830101U (en) 2020-04-26 2020-04-26 Pre-buried fixed anti-drop structure of wall pipeline is built in room

Publications (1)

Publication Number Publication Date
CN211830101U true CN211830101U (en) 2020-10-30

Family

ID=73021500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020650598.XU Expired - Fee Related CN211830101U (en) 2020-04-26 2020-04-26 Pre-buried fixed anti-drop structure of wall pipeline is built in room

Country Status (1)

Country Link
CN (1) CN211830101U (en)

Similar Documents

Publication Publication Date Title
CA2476898C (en) Ceiling leak capture and drainage system
CN211655701U (en) Municipal administration underground pipe gallery
CN211830101U (en) Pre-buried fixed anti-drop structure of wall pipeline is built in room
CN210946894U (en) Power cable calandria worker well
CN110578341A (en) Power cable pipe arrangement working well and construction method thereof
CN214402328U (en) Curtain wall side top structure
CN212908935U (en) Cable trench assembly unit and assembly body
CN214402329U (en) Curtain wall structure
CN209817089U (en) High-rise building basement waterproof construction
CN218323229U (en) Automatic drainage structure for expansion joint
CN213937392U (en) Cable trench structure
CN216305276U (en) Fixing structure for external skirting board of off-wall ditch
KR20100041095A (en) Apparatus for draining subsurface water
CN115822097B (en) Assembled building pipeline embedded part and embedded method thereof
CN211548452U (en) Detachable roof waterproof component
CN210887818U (en) Be used for interim external gutter mounting structure of building
CN218625704U (en) Pre-buried installing support of fire-fighting pipeline
CN214363943U (en) Pipe network fluting pipe laying device for municipal construction
CN212224754U (en) Assembled bathroom
CN214994073U (en) Double-deck waterproof concrete wall of basement
CN219886930U (en) Indoor GIS secondary cable trench structure
CN217522506U (en) Single-hole bridge frame wire hanging structure
CN215562789U (en) Intensive utility tunnel
CN210007309U (en) structure for outdoor slot box to enter indoor
CN211958722U (en) Prefabricated prepackage type cable channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030