CN218625704U - Pre-buried installing support of fire-fighting pipeline - Google Patents

Pre-buried installing support of fire-fighting pipeline Download PDF

Info

Publication number
CN218625704U
CN218625704U CN202222190738.1U CN202222190738U CN218625704U CN 218625704 U CN218625704 U CN 218625704U CN 202222190738 U CN202222190738 U CN 202222190738U CN 218625704 U CN218625704 U CN 218625704U
Authority
CN
China
Prior art keywords
bracket
pipeline
placing
wedging
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222190738.1U
Other languages
Chinese (zh)
Inventor
张叶眉
黄建
曹学柱
王剑武
金岳男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Sutong Electromechanical Installation Co ltd
Original Assignee
Nantong Sutong Electromechanical Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Sutong Electromechanical Installation Co ltd filed Critical Nantong Sutong Electromechanical Installation Co ltd
Priority to CN202222190738.1U priority Critical patent/CN218625704U/en
Application granted granted Critical
Publication of CN218625704U publication Critical patent/CN218625704U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a fire-fighting pipeline pre-buried mounting bracket, which comprises a pre-buried bracket body, wherein the pre-buried bracket body comprises a fixed edge, a bracket placing part and a wedging part, the lower end of the bracket placing part is fixedly connected with the upper end of the wedging part, a placing platform is arranged at the joint of the bracket placing part and the wedging part, and the fixed edge is fixedly arranged around the top end of the bracket placing part; the first reinforcing rib is arranged from the lower surface of the fixing edge to the bottom end of the wedging part; a pipeline placing support is arranged on the placing platform; the method has the advantages of improving the pre-buried installation speed, reducing the working strength of workers and the like.

Description

Pre-buried installing support of fire-fighting pipeline
Technical Field
The utility model relates to a fire-fighting pipeline pre-buried support technical field especially relates to a pre-buried installing support of fire-fighting pipeline.
Background
At present, need slot the working face before fire pipeline is pre-buried, then lay into the chase with the pipeline, among the prior art, fire pipeline need pass the sleeve pipe when striding across road structure and set up for improve fire pipeline's compressive capacity, but the installation of sheathed tube setting to long water pipe has caused the puzzlement, leads to the problem of difficult installation easily, and current pre-buried support is mostly the square, needs the complete fluting that carries on, then installs.
Therefore, the problem can be solved by providing the pre-buried mounting bracket for the fire fighting pipeline.
Disclosure of Invention
The utility model aims to solve the technical problem that, among the prior art, fire-fighting pipeline need pass the sleeve pipe and set up when striding across road structure for improve fire-fighting pipeline's compressive capacity, but the sheathed tube setting has caused the puzzlement to the installation of long water pipe, leads to the problem of difficult installation easily, and current pre-buried support is mostly the square, needs the complete fluting that carries on, then installs again, and is very inconvenient, provides a fire-fighting pipeline pre-buried installing support, fire-fighting pipeline pre-buried installing support includes:
the embedded bracket comprises an embedded bracket body, wherein the embedded bracket body comprises a fixed edge, a bracket placing part and a wedging part, the lower end of the bracket placing part is fixedly connected with the upper end of the wedging part, a placing platform is arranged at the joint of the bracket placing part and the wedging part, and the periphery of the top end of the bracket placing part is fixedly provided with the fixed edge;
the first reinforcing rib is arranged from the lower surface of the fixing edge to the bottom end of the wedging part;
the placing platform is provided with a pipeline placing support.
Further, the wedge is an inverted triangle.
Furthermore, one or more second reinforcing ribs are arranged in an inner space formed by the lower surface of the placing platform and the wedging part, and the second reinforcing ribs are vertically arranged.
Further, the pipeline placing support comprises a supporting column and a pipeline placing groove, the supporting column is used for supporting the pipeline placing groove, a fixing hole is formed in the side wall of the pipeline placing groove, and a fixing thread is formed in the fixing hole.
Further, still include fixing bolt, fixing bolt passes the fixed orifices setting, the screw thread on the fixing bolt with fixed screw thread cooperatees.
Further, still include the apron, the apron passes through the bolt with fixed limit fixed connection.
Further, the support placing part is a quadrangular prism, and the width of the inverted triangle is the same as that of the quadrangular prism.
Implement the utility model discloses, following beneficial effect has:
1. the utility model discloses the structure principle is simple, sets up wedging part, and the first strengthening rib of cooperation can be so that realize not slotting on earth face or not dry cement face and place, and it is efficient to place, and the utility model discloses the installation space who provides for the fire-fighting pipeline is great, improves installer's installation effectiveness, and the fire-fighting pipeline can effectively be protected to this support simultaneously.
Drawings
Fig. 1 is a structural view of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Please refer to the attached drawing 1 of the specification, the technical problem to be solved in this embodiment is that, in the prior art, the fire fighting pipeline needs to pass through the casing pipe to be set when crossing a road structure, so as to improve the pressure resistance of the fire fighting pipeline, but the setting of the casing pipe causes troubles to the installation of the long water pipe, which easily causes the problem of difficult installation, and the existing pre-buried support is mostly square, needs to be completely slotted, and then is installed, which is very inconvenient, and provides a fire fighting pipeline pre-buried installing support, which includes:
the embedded bracket comprises an embedded bracket body, wherein the embedded bracket body comprises a fixed edge, a bracket placing part 2 and a wedging part 1, the lower end of the bracket placing part 2 is fixedly connected with the upper end of the wedging part 1, a placing platform is arranged at the joint of the bracket placing part 2 and the wedging part 1, and the periphery of the top end of the bracket placing part 2 is fixedly provided with the fixed edge;
the wedge-shaped part is characterized by further comprising a first reinforcing rib 3, the first reinforcing rib 3 is arranged from the lower surface of the fixed edge to the bottom end of the wedge-shaped part 1, the first reinforcing rib 3 is in an inverted triangle shape, and the arrangement of the first reinforcing rib 3 is used for facilitating downward wedging and is beneficial to accelerating the working efficiency;
the placing platform is provided with a pipeline placing support.
The wedge 1 is an inverted triangle.
The lower surface of place the platform is provided with one or more second strengthening ribs 4 with the inner space that wedging portion 1 formed, and the vertical setting of second strengthening rib 4, first strengthening rib 3 are used for strengthening 1 intensity of wedging portion, prevent to cause 1 deformation of wedging portion when wedging, and in a specific embodiment, wedging portion 1 is solid.
The pipeline placing support comprises a support column 5 and a pipeline placing groove 6, the support column 5 is used for supporting the pipeline placing groove 6, a fixing hole is formed in the side wall of the pipeline placing groove 6, and fixing threads are formed in the fixing hole.
Still include fixing bolt 7, fixing bolt 7 passes the fixed orifices setting, and the screw thread on the fixing bolt 7 cooperatees with fixed screw thread.
Still include apron 8, apron 8 passes through bolt and fixed limit fixed connection.
The support placing part is a quadrangular prism, and the width of the inverted triangle is the same as that of the quadrangular prism.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The fire fighting pipeline pre-buried mounting bracket is characterized by comprising a pre-buried bracket body, wherein the pre-buried bracket body comprises a fixed edge, a bracket placing part and a wedging part, the lower end of the bracket placing part is fixedly connected with the upper end of the wedging part, a placing platform is arranged at the joint of the bracket placing part and the wedging part, and the fixed edge is fixedly arranged on the periphery of the top end of the bracket placing part;
the first reinforcing rib is arranged from the lower surface of the fixing edge to the bottom end of the wedging part;
the placing platform is provided with a pipeline placing support.
2. The fire fighting pipeline embedded mounting bracket as recited in claim 1, wherein the wedging portion is an inverted triangle.
3. The fire fighting pipeline embedded mounting bracket as recited in claim 2, wherein one or more second reinforcing ribs are arranged in an inner space formed by the lower surface of the placing platform and the wedging part, and the second reinforcing ribs are arranged vertically.
4. The fire pipeline embedded mounting bracket according to claim 3, wherein the pipeline installing bracket comprises a support pillar and a pipeline installing groove, the support pillar is used for supporting the pipeline installing groove, a fixing hole is formed in the side wall of the pipeline installing groove, and a fixing thread is formed in the fixing hole.
5. The fire fighting pipeline embedded mounting bracket according to claim 4, further comprising a fixing bolt, wherein the fixing bolt penetrates through the fixing hole, and threads on the fixing bolt are matched with the fixing threads.
6. The fire pipeline embedded mounting bracket of claim 5, further comprising a cover plate, wherein the cover plate is fixedly connected with the fixing edge through a bolt.
CN202222190738.1U 2022-08-19 2022-08-19 Pre-buried installing support of fire-fighting pipeline Active CN218625704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222190738.1U CN218625704U (en) 2022-08-19 2022-08-19 Pre-buried installing support of fire-fighting pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222190738.1U CN218625704U (en) 2022-08-19 2022-08-19 Pre-buried installing support of fire-fighting pipeline

Publications (1)

Publication Number Publication Date
CN218625704U true CN218625704U (en) 2023-03-14

Family

ID=85459771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222190738.1U Active CN218625704U (en) 2022-08-19 2022-08-19 Pre-buried installing support of fire-fighting pipeline

Country Status (1)

Country Link
CN (1) CN218625704U (en)

Similar Documents

Publication Publication Date Title
CN218625704U (en) Pre-buried installing support of fire-fighting pipeline
CN212775988U (en) Pipeline gallows installation device
CN102425254A (en) Keel connecting device based on suspended curtain wall
CN215715360U (en) Foundation pit supporting structure for narrow space
CN210562211U (en) Building foundation ditch bracing supporting construction
CN209767088U (en) Prefabricated wallboard reserved electrical pipe joint
CN202273337U (en) Keel connecting device based on suspension type curtain wall
CN212053345U (en) Concrete pouring device in steel plate shear wall
CN217482140U (en) Draw to one side and connect U type antidetonation tube bank
CN209743786U (en) U-shaped connecting base
CN215105361U (en) Steel support triangle
CN214365422U (en) Enclosure wall device for building
CN218233835U (en) Membrane structure building leans on wall waterproof construction
CN217232784U (en) Pre-positioning support for mounting prefabricated wall panel
CN216665723U (en) Support for fixing double water pipes
CN214695419U (en) Flood control wall device and flood control wall are dismantled in quick installation of socket joint formula
CN219453090U (en) Pipeline bracket
CN218944191U (en) H-shaped steel safety flat net suspension device
CN221073147U (en) Large glass rib hanging connection structure
CN210122758U (en) Integrated assembly type steel structure building
CN212004579U (en) Anti-seismic support structure of square air pipe
CN216242791U (en) Spacing connection structure of outer wall drain pipe for engineering
CN216216660U (en) Photovoltaic supporting assembly for color steel tile
CN215977738U (en) T-shaped connecting structure of building floor and building wallboard
CN211736313U (en) Suspension device for inclined wall surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant