CN210122758U - Integrated assembly type steel structure building - Google Patents

Integrated assembly type steel structure building Download PDF

Info

Publication number
CN210122758U
CN210122758U CN201920847347.8U CN201920847347U CN210122758U CN 210122758 U CN210122758 U CN 210122758U CN 201920847347 U CN201920847347 U CN 201920847347U CN 210122758 U CN210122758 U CN 210122758U
Authority
CN
China
Prior art keywords
screw
hollow square
stand
top plate
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920847347.8U
Other languages
Chinese (zh)
Inventor
徐蕾
徐立军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Institute of Engineering
Original Assignee
Xinjiang Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Institute of Engineering filed Critical Xinjiang Institute of Engineering
Priority to CN201920847347.8U priority Critical patent/CN210122758U/en
Application granted granted Critical
Publication of CN210122758U publication Critical patent/CN210122758U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses an integrated assembled steel construction building, including buried pipe, stand and hollow square tube in advance, the screw hole has been seted up at buried pipe top both ends in advance, the screw hole upper end all is provided with the stand, the inboard hollow square tube that has all welded of stand, hollow square tube one side is run through and is provided with the bar groove, bar groove one side is provided with fastening screw, be fixed with the installation piece through fastening screw in the hollow square tube, there is first roof at installation piece top through first mounting screw, there is the second roof at the stand top through the second mounting screw, install the cotton particle of packing of pearl through the nylon wire net between first roof and the second roof. The utility model discloses conveniently utilize the built-in fitting to fix, it is stable effectual, can conveniently adjust the height of roof, thermal-insulated effect is good, can also conveniently fall and make an uproar, is fit for being extensively promoted and used.

Description

Integrated assembly type steel structure building
Technical Field
The utility model relates to a steel construction building technical field, in particular to integrated assembled steel construction building.
Background
As a novel building method capable of saving manufacturing cost, an integrated assembly type method is widely concerned by people in modern society, the traditional steel structure building is inconvenient to fix by using an embedded part, is poor in stabilizing effect, cannot conveniently adjust the height of a top plate, is poor in heat insulation effect, cannot conveniently reduce noise, and therefore the integrated assembly type steel structure building is provided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides integrated assembled steel construction building, through setting up the pre-buried pipe, conveniently promote the stability of stand, through setting up cavity square pipe and installation piece, make things convenient for personnel to adjust the mounted position of first roof as required, through setting up the cotton packing particle of pearl, can effectively promote the heat-proof quality at this steel construction building top, thereby make the internal environment of this steel construction building more comfortable, through setting up the PET cushion, utilize the PET cushion, can effectively reduce the noise that produces because the vibration of ripple baffle, can effectively solve the problem in the technical background.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
integrated assembled steel construction building, including buried pipe, stand and hollow square tube in advance, buried pipe top both ends set up threaded hole, the screw hole upper end all is provided with the stand, the inboard square tube that has all welded of stand, hollow square tube one side is run through and is provided with the bar groove, bar groove one side is provided with fastening screw, it has the installation piece to be fixed with through fastening screw in the hollow square tube, first roof is installed through first screw in installation piece top, the second roof is installed through the second screw in the stand top, install the cotton particle of packing of pearl through the nylon wire between first roof and the second roof, the preformed hole has been seted up in the stand outside, preformed hole one side has the ripple baffle through third screw installation.
Furthermore, the number of the corrugated baffles is specifically set to be multiple groups, and PET rubber pads are bonded on the inner sides of the corrugated baffles through glue.
Further, the first top plate and the second top plate are both made of thin steel plate materials.
Furthermore, all the welding of stand bottom has the short slab, short slab top both ends run through and are provided with fastening bolt and fastening bolt bottom and lie in the screwed hole.
Further, the surface of the embedded pipe is coated with a galvanized anti-corrosion coating.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. through setting up the pre-buried pipe, utilize the pre-buried pipe to fix in the underground, recycle the cooperation of fastening bolt and screw hole to the convenient short slab and the pre-buried pipe of opposition toe portion fix, thereby conveniently fix stand and pre-buried pipe, and then conveniently promote the stability of stand.
2. Through setting up the square pipe of cavity and installation piece, personnel remove the installation piece in the square intraductal of cavity, recycle the cooperation in fastening screw and bar groove to make things convenient for the position of fixed mounting piece, thereby make things convenient for personnel to adjust the mounted position of first roof as required.
3. Through setting up the cotton filling particle of pearl, utilize the cotton filling particle of pearl in the nylon net, can effectively promote the heat-proof quality at this steel construction building top to make the internal environment of this steel construction building more comfortable.
4. Through setting up the PET cushion, utilize the PET cushion, can effectively reduce the noise that produces because the vibration of ripple baffle when this steel construction building outside wind-force is great.
Drawings
Fig. 1 is the utility model discloses the overall structure schematic diagram of integrated assembled steel construction building.
Fig. 2 is the utility model discloses integrated assembled steel construction building's preformed hole schematic diagram.
Fig. 3 is the utility model discloses the PET cushion schematic diagram of integrated assembled steel construction building.
In the figure: 1. pre-burying a pipe; 2. a column; 3. a hollow square tube; 4. a strip-shaped groove; 5. mounting blocks; 6. fastening screws; 7. a first screw; 8. a first top plate; 9. a second screw; 10. a second top plate; 11. a corrugated baffle; 12. a third screw; 13. a PET rubber cushion; 14. a nylon mesh; 15. filling pearl wool with particles; 16. fastening a bolt; 17. a threaded hole; 18. holes are reserved.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1 to 3, the integrated assembly type steel structure building, which includes a buried pipe 1, a column 2 and a hollow square pipe 3, threaded holes 17 are arranged at two ends of the top of the embedded pipe 1, upright posts 2 are arranged at the upper ends of the threaded holes 17, the inner sides of the upright posts 2 are welded with hollow square tubes 3, one side of each hollow square tube 3 is provided with a strip-shaped groove 4 in a penetrating way, a fastening screw 6 is arranged on one side of the strip-shaped groove 4, a mounting block 5 is fixed in the hollow square tube 3 through the fastening screw 6, a first top plate 8 is arranged at the top of the mounting block 5 through a first screw 7, a second top plate 10 is arranged at the top of the upright post 2 through a second screw 9, pearl wool filling particles 15 are arranged between the first top plate 8 and the second top plate 10 through a nylon net 14, preformed hole 18 has been seted up to the stand 2 outside, preformed hole 18 one side is installed corrugated baffle 11 through third screw 13.
The number of the corrugated baffles 11 is specifically set to be multiple groups, and the inner sides of the corrugated baffles 11 are bonded with PET rubber pads 13 through glue.
In this embodiment, as shown in fig. 1 and 3, the PET rubber mat 13 is used to effectively reduce noise generated by vibration of the corrugated baffle 11 when the external wind force of the steel structure building is large.
Wherein, the first top board 8 and the second top board 10 are made of thin steel plate materials.
In the embodiment, as shown in fig. 1, the thin steel plate has a certain strength, and the material can be saved.
Wherein, all the welding of stand 2 bottom has the short slab, short slab top both ends run through and are provided with fastening bolt 16 and fastening bolt 16 bottom and are located screw hole 17.
As shown in fig. 1 in this embodiment, utilize buried pipe 1 to fix underground, recycle fastening bolt 16 and screw hole 17's cooperation to the convenient short slab and the buried pipe 1 of stand 2 bottom fix, thereby conveniently fix stand 2 and buried pipe 1, and then conveniently promote stand 2's stability.
Wherein, the surface of the pre-buried pipe 1 is coated with a galvanized anti-corrosion coating.
In the embodiment, as shown in fig. 1, the galvanized anti-corrosion coating can effectively prevent the surface of the embedded pipe 1 from being easily corroded, so that the service life is prolonged.
It should be noted that, the utility model relates to an integrated assembly type steel structure building, when working, the embedded pipe 1 is fixed underground, the cooperation of the fastening bolt 16 and the screw hole 17 is reused, thereby the short board at the bottom of the upright post 2 and the embedded pipe 1 are conveniently fixed, thereby the upright post 2 and the embedded pipe 1 are conveniently fixed, further the stability of the upright post 2 is conveniently promoted, the personnel move the installation block 5 in the hollow square pipe 3, the cooperation of the fastening bolt 6 and the strip-shaped groove 4 is reused, thereby the position of the installation block 5 is conveniently fixed, thereby the personnel can conveniently adjust the installation position of the first top board 8 according to the requirement, the utility model is very convenient, the pearl cotton in the nylon net 14 is utilized to fill the particles 15, the performance at the top of the steel structure building can be effectively promoted, thereby the internal environment of the steel structure building is more comfortable, the PET cushion 13 is utilized, when the external wind power of the steel structure building is larger, the noise generated due to the vibration of the corrugated baffle 11 is effectively reduced.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. Integrated assembled steel construction building, including buried pipe (1), stand (2) and hollow square tube (3), its characterized in that: threaded holes (17) are formed in two ends of the top of the embedded pipe (1), a stand column (2) is arranged at the upper end of each threaded hole (17), a hollow square pipe (3) is welded on the inner side of each stand column (2), a strip-shaped groove (4) is arranged on one side of each hollow square pipe (3) in a penetrating mode, a fastening screw (6) is arranged on one side of each strip-shaped groove (4), a mounting block (5) is fixed in each hollow square pipe (3) through the fastening screw (6), a first top plate (8) is mounted at the top of each mounting block (5) through a first screw (7), a second top plate (10) is mounted at the top of each stand column (2) through a second screw (9), pearl cotton filling particles (15) are mounted between each first top plate (8) and the corresponding second top plate (10) through a nylon net (14), a preformed hole (18) is formed in the, and a corrugated baffle (11) is arranged on one side of the preformed hole (18) through a third screw (12).
2. The integrated assembly steel structural building of claim 1, wherein: the number of the corrugated baffles (11) is specifically set to be multiple groups, and PET rubber pads (13) are bonded on the inner sides of the corrugated baffles (11) through glue.
3. The integrated assembly steel structural building of claim 1, wherein: the first top plate (8) and the second top plate (10) are both made of thin steel plate materials.
4. The integrated assembly steel structural building of claim 1, wherein: the upright post is characterized in that short plates are welded at the bottom of the upright post (2), and fastening bolts (16) are arranged at the two ends of the top of each short plate in a penetrating mode and the bottom ends of the two short plates are located in threaded holes (17).
5. The integrated assembly steel structural building of claim 1, wherein: the surface of the embedded pipe (1) is coated with a galvanized anti-corrosion coating.
CN201920847347.8U 2019-06-04 2019-06-04 Integrated assembly type steel structure building Expired - Fee Related CN210122758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920847347.8U CN210122758U (en) 2019-06-04 2019-06-04 Integrated assembly type steel structure building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920847347.8U CN210122758U (en) 2019-06-04 2019-06-04 Integrated assembly type steel structure building

Publications (1)

Publication Number Publication Date
CN210122758U true CN210122758U (en) 2020-03-03

Family

ID=69633731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920847347.8U Expired - Fee Related CN210122758U (en) 2019-06-04 2019-06-04 Integrated assembly type steel structure building

Country Status (1)

Country Link
CN (1) CN210122758U (en)

Similar Documents

Publication Publication Date Title
CN201078035Y (en) Adjustable metal composite type low yield point antivibrator
CN208316656U (en) A kind of integral type tracking bracket solar cell module mounting structure
CN210122758U (en) Integrated assembly type steel structure building
CN201740297U (en) Balcony mounting bracket of flat-panel solar collector
CN108867873B (en) Bolt reinforcing steel bar bolt prefabricated assembly wood structure beam column side node
CN214462400U (en) A bracket structure for fixing double-deck protection frame
CN212317547U (en) Novel shear force wall reinforcing and supporting system
CN210710456U (en) Bearing structure of inner climbing frame of super high-rise tower crane
CN210032841U (en) Novel electronic information engineering communication tower
CN206957117U (en) One kind insulation fast-assembling exterior wall board component
CN213806902U (en) Novel energy-conserving safe reinforced concrete pole of high strength
CN213926972U (en) Prefabricated assembled steel construction floor
CN217054478U (en) Template bottom shore
CN217232976U (en) Steel pipe tower base reinforced structure
CN220580552U (en) Anti-seismic assembly structure of aluminum alloy template
CN211146723U (en) Air conditioner is reserved with supporting outer wall body
CN220703068U (en) Structure of embedded screw rod attached to wall of tower crane
CN221000986U (en) Prestressed anchor rod bearing structure
CN217998599U (en) Flexible connection's prefabricated superimposed sheet of concrete
CN214298987U (en) Simple type tower machine attaches wall device
CN213265226U (en) Construction elevator attaches wall convenient to installation attaches wall device
CN219509143U (en) Wall connecting structure of building external protection frame
CN213174745U (en) Support bracket device for climbing frame
CN218756966U (en) Vibration and noise reduction type bridge Liang Shen contraction structure
CN218346778U (en) Detachable fixing support for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200303

Termination date: 20210604