CN215562789U - Intensive utility tunnel - Google Patents
Intensive utility tunnel Download PDFInfo
- Publication number
- CN215562789U CN215562789U CN202121225593.3U CN202121225593U CN215562789U CN 215562789 U CN215562789 U CN 215562789U CN 202121225593 U CN202121225593 U CN 202121225593U CN 215562789 U CN215562789 U CN 215562789U
- Authority
- CN
- China
- Prior art keywords
- support
- fixedly connected
- intensive
- utility
- utility tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 11
- 238000002955 isolation Methods 0.000 claims abstract description 8
- 238000010438 heat treatment Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 7
- 239000010865 sewage Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 241000272165 Charadriidae Species 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
Abstract
The utility model provides an intensive comprehensive pipe gallery, which belongs to the technical field of pipe galleries, and comprises a pipe gallery main body, wherein the inner side wall of the pipe gallery main body is fixedly connected with a mounting plate, the upper surface of the mounting plate is fixedly connected with a first isolation plate, the lower surface of the mounting plate is fixedly connected with a second isolation plate, the upper surface of the mounting plate is fixedly connected with a fixed seat, the upper surface of the fixed seat is provided with a heat distribution pipeline, one side of the outer surface of the first isolation plate is fixedly connected with a first support, and a communication line is arranged inside the first support. This intensive utility tunnel through the setting of mounting panel, fixing base, first support and second support, installs the fixing base on the mounting panel earlier during the use, fixes thermal power pipeline on the fixing base again, and communication line fixes on first support, and water supply pipe fixes on the second support, can make the pipeline fixed compacter, and the security is better, and then has reduced construction and cost of maintenance.
Description
Technical Field
The utility model belongs to the technical field of pipe galleries, and particularly relates to an intensive comprehensive pipe gallery.
Background
Utility tunnel means builds in the city underground and is used for holding the structure and the affiliated facilities of two kinds and above city engineering pipeline, brings into utility tunnel with all kinds of pipelines such as power cable, communication cable, can not only improve city appearance, has huge benefit to the maintenance and the change of pipeline moreover, however in the limited region of road width condition such as some old cities, because of the limited unable utility tunnel of normal size of building of space, mainly adopt modes such as pipeline direct burial and built on stilts at present to solve old cities municipal demands.
Through the retrieval, in chinese published utility model patent application number CN202010337950.9, an intensive utility tunnel is published, include the piping lane main part that is used for holding the pipeline and locate rainwater box culvert outside the piping lane main part, rainwater box culvert hangs and locates on the lateral wall of piping lane main part, as above intensive utility tunnel, wherein, the earthing depth of piping lane main part is 0 ~ 0.5m, the buried depth of piping lane main part is 1.5m ~ 2 m.
The above prior art solutions have the following drawbacks: the pipeline laying is not concentrated enough, so that the space utilization rate is low, and the construction cost is increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an intensive comprehensive pipe gallery, and aims to solve the problem that in the prior art, the pipeline laying is not concentrated enough, so that the space utilization rate is low.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides an intensive utility tunnel, includes the piping lane main part, the inside wall fixedly connected with mounting panel of piping lane main part, the first division board of last fixed surface of mounting panel is connected with, the lower fixed surface of mounting panel is connected with the second division board, the last fixed surface of mounting panel is connected with the fixing base, the upper surface of fixing base is provided with heating power pipeline, the first support of one side fixedly connected with of first division board surface, the inside of first support is provided with communication line.
In order to make this intensive utility tunnel, as a preferred choice of the utility model, one side of the second isolation plate is fixedly connected with a supporting seat, the upper surface of the supporting seat is fixedly connected with a sewage pipeline, one side of the outer surface of the second isolation plate is fixedly connected with a second bracket, and a water supply pipeline is arranged inside the second bracket.
In order to make this kind of intensive utility tunnel, as a preferred aspect of the present invention, a cable support is fixedly connected to one side of the second partition plate.
In order to make this kind of intensive utility tunnel, it is preferable that the cable support is internally provided with a power cable as a preferred aspect of the present invention.
In order to make this kind of intensive utility tunnel, as a preferred aspect of the present invention, the inside of the cable holder is provided with a reserved cable.
In order to make this kind of intensive utility tunnel, as a preferred of this invention, the upper surface of fixing base is provided with directly buried sleeve pipe.
Compared with the prior art, the utility model has the beneficial effects that:
1. this intensive utility tunnel through the setting of mounting panel, fixing base, first support and second support, installs the fixing base on the mounting panel earlier during the use, fixes thermal power pipeline on the fixing base again, and communication line fixes on first support, and water supply pipe fixes on the second support, can make the pipeline fixed compacter, and the security is better, and then has reduced construction and cost of maintenance.
2. This intensive utility tunnel through the setting of first division board and second division board, fixes the pipeline inside the piping lane earlier during the use, can be isolated thermal power pipeline and communication line through first division board, has avoided the pipeline to receive the influence in the use, makes water supply pipe and power cable keep apart through the second division board to the utilization ratio of piping lane inner space has been improved greatly.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model. In the drawings:
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the mounting plate structure of the present invention;
FIG. 3 is a schematic view of the front plan structure of the present invention;
fig. 4 is a right-view structural diagram of the present invention.
In the figure: 1. a tube lane body; 2. mounting a plate; 3. a first separator plate; 4. a second separator plate; 5. a fixed seat; 6. a thermal conduit; 7. a first bracket; 8. a communication line; 9. a supporting seat; 10. a sewage conduit; 11. a second bracket; 12. a water supply pipe; 13. a cable holder; 14. a power cable; 15. reserving a cable; 16. a direct-buried sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides the following technical solutions: the utility model provides an intensive utility tunnel, including piping lane main part 1, the inside wall fixedly connected with mounting panel 2 of piping lane main part 1, the last fixed surface of mounting panel 2 is connected with first division board 3, the lower fixed surface of mounting panel 2 is connected with second division board 4, the last fixed surface of mounting panel 2 is connected with fixing base 5, the upper surface of fixing base 5 is provided with heating power pipeline 6, the first support 7 of one side fixedly connected with of 3 surfaces of first division board, the inside of first support 7 is provided with communication line 8.
In the specific embodiment of the utility model, when in use, the fixed seat 5 is firstly installed on the installation plate 2, then the heat distribution pipeline 6 is fixed on the fixed seat 5, the communication line 8 is fixed on the first bracket 7, and the water supply pipeline 12 is fixed on the second bracket 11, so that the pipeline can be fixed more compactly, the safety is better, and the construction and maintenance cost is further reduced.
Specifically, one side of second division board 4 fixedly connected with supporting seat 9, the last fixed surface of supporting seat 9 is connected with sewer line 10, one side fixedly connected with second support 11 of second division board 4 surface, and the inside of second support 11 is provided with water supply pipe 12.
In this embodiment: when in use, the sewage pipeline 10 is fixed on the supporting seat 9, and the water supply pipeline 12 and the power cable 14 are isolated by the second isolation plate 4, so that the utilization rate of the inner space of the pipe gallery is greatly improved. .
Specifically, a cable holder 13 is fixedly connected to one side of the second isolation plate 4.
In this embodiment: in use, the cable holder 13 makes the fixation more stable, thereby increasing the service life.
Specifically, the power cable 14 is provided inside the cable holder 13.
In this embodiment: when in use, the power cable 14 is fixed on the cable bracket 13, and is convenient to maintain and fix in the using process.
Specifically, the cable holder 13 is provided with a reserve cable 15 inside.
In this embodiment: when the cable is used, the reserved cable 15 is convenient for later maintenance and replacement, and construction cost is reduced.
Specifically, the upper surface of the fixed seat 5 is provided with a direct-buried sleeve 16.
In this embodiment: when in use, the direct-buried sleeve 16 is convenient to install, so that the construction efficiency is higher and the use is convenient.
The working principle and the using process of the utility model are as follows: this intensive utility tunnel is when using, install fixing base 5 on mounting panel 2 earlier, fix thermal power pipeline 6 on fixing base 5 again, communication lines 8 fixes on first support 7, water supply pipeline 12 fixes on second support 11, can make the pipeline fixed compacter, the security is better, and then construction and cost of maintenance have been reduced, can completely cut off thermal power pipeline 6 and communication lines 8 through first division board 3, avoided the pipeline to receive the influence in the use, make water supply pipeline 12 and power cable 14 keep apart through second division board 4, thereby the utilization ratio of piping lane inner space has been improved greatly.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides an intensive utility tunnel, includes piping lane main part (1), its characterized in that: inside wall fixedly connected with mounting panel (2) of piping lane main part (1), the first division board (3) of last fixed surface of mounting panel (2) is connected with, the lower fixed surface of mounting panel (2) is connected with second division board (4), the last fixed surface of mounting panel (2) is connected with fixing base (5), the upper surface of fixing base (5) is provided with heating power pipeline (6), the first support (7) of one side fixedly connected with of first division board (3) surface, the inside of first support (7) is provided with communication line (8).
2. The intensive utility tunnel of claim 1, wherein: one side fixedly connected with supporting seat (9) of second division board (4), the last fixed surface of supporting seat (9) is connected with sewer line (10), one side fixedly connected with second support (11) of second division board (4) surface, the inside of second support (11) is provided with water supply pipe (12).
3. The intensive utility tunnel of claim 1, wherein: and one side of the second isolation plate (4) is fixedly connected with a cable support (13).
4. An intensive utility tunnel according to claim 3, characterized in that: and a power cable (14) is arranged in the cable bracket (13).
5. An intensive utility tunnel according to claim 3, characterized in that: and a reserved cable (15) is arranged in the cable bracket (13).
6. The intensive utility tunnel of claim 1, wherein: the upper surface of the fixed seat (5) is provided with a direct-buried sleeve (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121225593.3U CN215562789U (en) | 2021-06-02 | 2021-06-02 | Intensive utility tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121225593.3U CN215562789U (en) | 2021-06-02 | 2021-06-02 | Intensive utility tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215562789U true CN215562789U (en) | 2022-01-18 |
Family
ID=79865810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121225593.3U Active CN215562789U (en) | 2021-06-02 | 2021-06-02 | Intensive utility tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215562789U (en) |
-
2021
- 2021-06-02 CN CN202121225593.3U patent/CN215562789U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202969415U (en) | Multifunctional assembled comprehensive pipe gallery | |
CN204898721U (en) | Steel construction city utility tunnel | |
CN211655701U (en) | Municipal administration underground pipe gallery | |
CN100564774C (en) | Convenient environment protection energy-saving public bathing device | |
CN215562789U (en) | Intensive utility tunnel | |
CN202194159U (en) | Square pipe gallery bracket and square pipe gallery | |
CN205742269U (en) | A kind of segmented electro-thermal road being applied in piping lane | |
CN207268009U (en) | A kind of underground pipe gallery drainage system based on existing blowdown canal | |
CN212613999U (en) | Reduce interior equipment tuber pipe of underground garage layer height and lay structure | |
CN203498866U (en) | Integrated-type plastic common pipe for cities | |
CN210529750U (en) | Cable type utility tunnel system | |
CN210397920U (en) | Horizontal sliding support system for transporting and supporting pipelines inside underground comprehensive pipe gallery | |
CN208830354U (en) | A kind of underground pipe gallery for municipal integration engineering | |
CN206189462U (en) | Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line | |
CN210177538U (en) | Cable type pipe gallery with bottom plate with cantilever plate | |
CN212336092U (en) | Underground pipe gallery | |
CN205171548U (en) | Novel plastics piping lane | |
CN207934166U (en) | A kind of structure of superstructure of the outdoor drainage Pipeline Crossing Program without basement | |
CN217267619U (en) | Old district reforms transform and uses piping lane structure | |
CN213027395U (en) | Supporting structure system is laid to utility tunnel cable | |
CN210369045U (en) | Underground comprehensive pipe gallery structure | |
CN217656404U (en) | Can splice formula piping lane pipeline fixed bolster | |
CN209339184U (en) | A kind of pre-groove formula cable type pipe gallery | |
CN213773456U (en) | Cable utility tunnel who combines drainage box culvert | |
CN211774409U (en) | Drainage inspection shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |