CN211777500U - Loess tunnel construction strutting arrangement - Google Patents

Loess tunnel construction strutting arrangement Download PDF

Info

Publication number
CN211777500U
CN211777500U CN201922175791.2U CN201922175791U CN211777500U CN 211777500 U CN211777500 U CN 211777500U CN 201922175791 U CN201922175791 U CN 201922175791U CN 211777500 U CN211777500 U CN 211777500U
Authority
CN
China
Prior art keywords
connecting rod
jack
tunnel construction
multiunit
loess tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922175791.2U
Other languages
Chinese (zh)
Inventor
萧飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hanrui Construction Engineering Co ltd
Original Assignee
Shaanxi Maituoke Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Maituoke Energy Technology Co ltd filed Critical Shaanxi Maituoke Energy Technology Co ltd
Priority to CN201922175791.2U priority Critical patent/CN211777500U/en
Application granted granted Critical
Publication of CN211777500U publication Critical patent/CN211777500U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides an loess tunnel construction strutting arrangement, including the roof-rack, the ejector pin, the jack, the diagonal brace, the side vaulting pole, the stabilizer bar, the bracing piece, connecting rod and bearing plate, the bearing plate is installed at the portal up end, the jack is equipped with to the bearing plate up end, the roof-rack is installed to the jack up end, the ejector pin is installed to the roof-rack up end, the connecting rod is installed to the inside left and right sides symmetry of portal, the stabilizer bar is installed to the connecting rod intermediate position, the diagonal brace is installed in the connecting rod outside, the side vaulting pole is installed to portal left and right sides terminal surface symmetry, the bracing piece is installed to side vaulting pole upper and lower bilateral symmetry, the insufficiently stable problem of original loess tunnel construction strutting arrangement has been solved to this design, the utility.

Description

Loess tunnel construction strutting arrangement
Technical Field
The utility model relates to a loess tunnel construction strutting arrangement belongs to tunnel construction technical field.
Background
Tunnels are engineering structures buried in the ground and are a form of human use of underground space. The tunnel can be divided into a traffic tunnel, a hydraulic tunnel, a municipal tunnel and a mine tunnel. In 1970, the international economic cooperation and development organization held a tunnel conference which integrates various factors, and the definition of the tunnel is as follows: "a cavity with a cross section area larger than 2 square meters is built under the ground by any method according to a specified shape and size in a certain application. ".
Loess is the porose yellow mealy soil that has the column joint that forms under dry climatic condition, loess collapsibility indicates that loess can produce great subsidence after soaking by water, be a loess special engineering geology characteristic, loess is under dead weight or external load, the nature of taking place suddenly sinking is destroyed rapidly to the back structure of soaking by water, consequently when excavation tunnel, meet the loess and should increase strutting arrangement, current loess tunnel construction strutting arrangement is not stable enough, can't support the inner wall in all-round support loess tunnel, loess tunnel inner wall unable bearing pressure and collapse, the problem that above-mentioned appearance is solved to a loess tunnel construction strutting arrangement of urgent need now.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a loess tunnel construction strutting arrangement to solve the problem that proposes in the above-mentioned background art, the utility model discloses rational in infrastructure, convenient all-round support supports stably firmly.
In order to achieve the above purpose, the present invention is realized by the following technical solution: a supporting device for loess tunnel construction comprises a portal frame, a bottom plate, a stable supporting mechanism and an outer supporting plate, the bottom plate is arranged on the lower end surface of the portal frame, the outer support plate is arranged on the outer side of the portal frame, the stable support mechanism is arranged on the inner side of the outer support plate, the stable supporting mechanism comprises a top frame, a top rod, a jack, an inclined stay bar, a side stay bar, a stabilizer bar, a support bar, a connecting bar and a bearing plate, the bearing plate is arranged on the upper end surface of the portal frame, the upper end surface of the bearing plate is provided with a jack, the upper end surface of the jack is provided with a top frame, the upper end surface of the top frame is provided with a top rod, the left side and the right side inside the door frame are symmetrically provided with connecting rods, the stabilizing rod is installed in the middle of the connecting rod, the inclined supporting rod is installed on the outer side of the connecting rod, the side supporting rods are symmetrically installed on the left end face and the right end face of the portal frame, and the supporting rods are symmetrically installed on the upper side and the lower side of the side supporting rods.
Furthermore, a first limiting block is arranged at the joint of the connecting rod and the door frame, and a second limiting block is arranged at the joint of the connecting rod and the stabilizing rod.
Furthermore, a uniform force plate is arranged on the upper end face of the jack.
Furthermore, arc-shaped supporting blocks are arranged on the outer sides of the side supporting rods and the inclined supporting rods and are matched with the outer supporting plate.
Furthermore, the door frame, the side stay bars and the support bars form a triangular support structure.
Furthermore, the jack is provided with a plurality of groups, the specifications of the jacks are the same, the ejector rods are provided with a plurality of groups, the specifications of the ejector rods are the same, the inclined stay bars are provided with a plurality of groups, the specifications of the inclined stay bars are the same, the side stay bars are provided with a plurality of groups, and the specifications of the side stay bars are the same.
The utility model has the advantages that: the utility model discloses a loess tunnel construction strutting arrangement, because of the utility model discloses added roof-rack, ejector pin, jack, diagonal brace, side vaulting pole, stabilizer bar, bracing piece, connecting rod and bearing plate, this design has made things convenient for the all-round support in loess tunnel, has solved the problem that original loess tunnel construction strutting arrangement is not stable enough, has improved the utility model discloses a support stability.
Because of the connecting rod is provided with stopper one with the portal frame junction, the connecting rod is provided with stopper two with the stabilizer bar junction, and this design has increased the stability in use of connecting rod and stabilizer bar, installs even power board because of jack up end, and this design increases the homogeneity of atress, all installs the arc bracer because of the side stay and the diagonal brace outside, and arc bracer and outer supporting plate phase-match, this design is convenient for stabilize and support to external supporting plate, the utility model discloses rational in infrastructure, make things convenient for the all-round support, it is firm to support stably.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural view of a loess tunnel construction supporting device of the present invention;
fig. 2 is a schematic structural view of a stable supporting mechanism in the loess tunnel construction supporting device of the present invention;
fig. 3 is an enlarged view of a supporting device a for loess tunnel construction according to the present invention;
in the figure: 1-portal, 2-bottom plate, 3-stable supporting mechanism, 4-outer supporting plate, 31-top frame, 32-top rod, 33-jack, 34-diagonal brace, 35-side brace, 36-stabilizing bar, 37-supporting bar, 38-connecting bar, 39-bearing plate.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a loess tunnel construction strutting arrangement, includes portal 1, bottom plate 2, stabilizing support mechanism 3 and outer backup pad 4, and terminal surface under portal 1 is installed to bottom plate 2, and outer backup pad 4 is installed in the portal 1 outside, and stabilizing support mechanism 3 sets up at 4 inboards of outer backup pad.
Stable supporting mechanism 3 includes roof-rack 31, ejector pin 32, jack 33, diagonal brace 34, side stay 35, stabilizer bar 36, bracing piece 37, connecting rod 38 and bearing plate 39, bearing plate 39 is installed at portal 1 up end, bearing plate 39 up end is equipped with jack 33, roof-rack 31 is installed to jack 33 up end, roof-rack 31 up end is installed to the up end, ejector pin 32 is installed to the roof-rack 31 up end, connecting rod 38 is installed to the inside left and right sides symmetry of portal 1, stabilizer bar 36 is installed to connecting rod 38 intermediate position, diagonal brace 34 is installed in the connecting rod 38 outside, portal 1 left and right sides end symmetry installs side stay 35, support bar 37 is installed to side stay 35 upper and lower bilateral symmetry, the not stable enough problem of original loess tunnel construction strutting arrangement has been solved to this design.
A first limit block is arranged at the joint of the connecting rod 38 and the door frame 1, a second limit block is arranged at the joint of the connecting rod 38 and the stabilizing rod 36, the use stability of the connecting rod 38 and the stabilizing rod 36 is improved, a force-homogenizing plate is arranged on the upper end surface of the jack 33, the uniformity of stress is improved, arc-shaped support blocks are arranged on the outer sides of the side support rods 35 and the inclined support rods 34, the arc-shaped supporting blocks are matched with the outer supporting plate 4, so that the outer supporting plate 4 can be conveniently and stably supported, the portal 1, the side supporting rods 35 and the supporting rods 37 form a triangular supporting structure, the supporting stability is improved, a plurality of groups of jacks 33 are arranged, and the multiple sets of jacks 33 have the same specification, the ejector rods 32 have multiple sets, the multiple sets of ejector rods 32 have the same specification, the diagonal brace 34 has multiple sets, and the same of 34 specifications of multiunit diagonal braces, side vaulting pole 35 is equipped with the multiunit, and multiunit side vaulting pole 35 specifications are the same, has increased the stability that the loess tunnel supported.
As an embodiment of the present invention: the portal frame 1 is arranged on the inner side of the outer support plate 4, the side support rods 35 are respectively arranged on the left end surface and the right end surface of the portal frame 1 and are fixed through the support rods 37, the connecting rods 38 are arranged on the left side and the right side inside the portal frame 1, the stabilizing rods 36 are arranged in the middle of the connecting rods 38, the inclined support rods 34 are symmetrically arranged on the outer sides of the connecting rods 38, the bearing plate 39 is arranged on the upper end surface of the portal frame 1, the jacks 33 upwards support the top frame 31, the top frame 31 supports the outer support plate 4 through the ejector rods 32, and the ejector rods 32, the inclined support rods 34 and the side support rods 35 are connected with the inner wall of the.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a loess tunnel construction strutting arrangement, includes portal, bottom plate, stable supporting mechanism and outer backup pad, its characterized in that: the bottom plate is arranged on the lower end face of the portal frame, the outer support plate is arranged on the outer side of the portal frame, and the stable support mechanism is arranged on the inner side of the outer support plate;
the stabilizing support mechanism comprises a top frame, a top rod, a jack, an inclined stay bar, a side stay bar, a stabilizer bar, a support bar, a connecting rod and a bearing plate, wherein the bearing plate is installed on the upper end face of the portal frame, the jack is assembled on the upper end face of the bearing plate, the top frame is installed on the upper end face of the jack, the top rod is installed on the upper end face of the top frame, the connecting rod is symmetrically installed on the left side and the right side inside the portal frame, the stabilizer bar is installed in the middle of the connecting rod, the inclined stay bar is installed on the outer side of the connecting rod, the side stay bar is symmetrically installed on the left end face.
2. The loess tunnel construction supporting device according to claim 1, wherein: a first limiting block is arranged at the joint of the connecting rod and the door frame, and a second limiting block is arranged at the joint of the connecting rod and the stabilizing rod.
3. The loess tunnel construction supporting device according to claim 1, wherein: and the upper end surface of the jack is provided with a uniform force plate.
4. The loess tunnel construction supporting device according to claim 1, wherein: and arc-shaped supporting blocks are arranged on the outer sides of the side supporting rods and the inclined supporting rods and are matched with the outer supporting plate.
5. The loess tunnel construction supporting device according to claim 1, wherein: the door frame, the side supporting rods and the supporting rods form a triangular supporting structure.
6. The loess tunnel construction supporting device according to claim 1, wherein: the jack is equipped with the multiunit, and multiunit jack specification is the same, the ejector pin is equipped with the multiunit, and multiunit ejector pin specification is the same, the diagonal brace is equipped with the multiunit, and multiunit diagonal brace specification is the same, the side vaulting pole is equipped with the multiunit, and multiunit side vaulting pole specification is the same.
CN201922175791.2U 2019-12-08 2019-12-08 Loess tunnel construction strutting arrangement Active CN211777500U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922175791.2U CN211777500U (en) 2019-12-08 2019-12-08 Loess tunnel construction strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922175791.2U CN211777500U (en) 2019-12-08 2019-12-08 Loess tunnel construction strutting arrangement

Publications (1)

Publication Number Publication Date
CN211777500U true CN211777500U (en) 2020-10-27

Family

ID=72974247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922175791.2U Active CN211777500U (en) 2019-12-08 2019-12-08 Loess tunnel construction strutting arrangement

Country Status (1)

Country Link
CN (1) CN211777500U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114856634A (en) * 2022-05-07 2022-08-05 中国铁建重工集团股份有限公司 Rotary support rod device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114856634A (en) * 2022-05-07 2022-08-05 中国铁建重工集团股份有限公司 Rotary support rod device

Similar Documents

Publication Publication Date Title
CN203796285U (en) Tunnel supporting structure with steel frames
CN211777500U (en) Loess tunnel construction strutting arrangement
CN210684727U (en) Construction safety supporting construction
CN210529713U (en) Deep foundation pit supporting structure
CN206635780U (en) A kind of soil nailed wall retaining structure
CN212803276U (en) Supporting structure of shield interval tunnel
CN211395700U (en) Building foundation pit collapse prevention device
CN221501899U (en) Earth and rockfill dam protection structure
CN202500145U (en) Pile foundation of micro pile group
CN103508339B (en) Mobile tower flap seat
CN202731945U (en) Cable for underground coal mine tunnel U-shaped steel shed locking leg support
CN211816362U (en) Pile foundation securing device for civil engineering
CN201598646U (en) Digging type rod tower base
CN217632517U (en) Stock support is supporting device in coordination suitable for rectangle tunnel
CN213330289U (en) Telegraph pole base
CN220599814U (en) Tunnel portal structure for shield construction
CN219159006U (en) Temporary steel frame supporting structure excavated by side wall pilot pit method
CN221193353U (en) Foundation pit supporting device
CN213806892U (en) Leg-reducing iron tower and erection structure thereof
CN221545641U (en) Foundation pit supporting structure
CN204982909U (en) Be arched underground structure
CN204040436U (en) For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction
CN214696035U (en) Large-scale component installation framed bent of municipal administration highway
CN219011108U (en) Ecological slope protection
CN221118509U (en) Earthwork backfill structure in narrow and small space

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240419

Address after: Facade 19-2, Industrial New City Community, Suncun Town, Fanchang County, Wuhu City, Anhui Province, 241206

Patentee after: Anhui Hanrui Construction Engineering Co.,Ltd.

Country or region after: China

Address before: Room f604, gazelle Valley, No.1, Zone C, venture R & D Park, 69 Jinye Road, high tech Zone, Xi'an City, Shaanxi Province, 710000

Patentee before: SHAANXI MAITUOKE ENERGY TECHNOLOGY Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right