CN211775903U - Fixing clamp for steel column installation cable rope - Google Patents

Fixing clamp for steel column installation cable rope Download PDF

Info

Publication number
CN211775903U
CN211775903U CN202020218201.XU CN202020218201U CN211775903U CN 211775903 U CN211775903 U CN 211775903U CN 202020218201 U CN202020218201 U CN 202020218201U CN 211775903 U CN211775903 U CN 211775903U
Authority
CN
China
Prior art keywords
plate
side wall
fixedly connected
side plates
steel column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020218201.XU
Other languages
Chinese (zh)
Inventor
王代发
查广民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202020218201.XU priority Critical patent/CN211775903U/en
Application granted granted Critical
Publication of CN211775903U publication Critical patent/CN211775903U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a steel column installation guy rope fixing fixture, which comprises a lifting lug for fixing a guy rope, wherein the fixing fixture comprises a clamping plate which is integrally welded by a top plate and two side plates; the width of the top plate is 10-50mm larger than the thickness of the base side wall of the cup opening; a lifting lug is fixedly connected above the top plate; two end parts of the top plate are fixedly connected with side plates, and the side plates extend downwards; one of the two side plates is a baffle plate, and the other side plate is an adjusting plate; the adjusting plate is provided with a hole, and a nut which is coaxially arranged is fixedly connected to the outer side of the hole; a horizontally arranged bolt is arranged in the nut, a screw rod of the bolt penetrates through the adjusting plate, and a base plate is arranged at the end of the screw rod; the clamping plate is arranged at the top of the side wall of the cup rim foundation, the side wall of the cup rim foundation is positioned between the backing plate and the baffle plate, and the clamping plate can be made of main materials, so that the construction cost is effectively saved; the drilling is not needed to damage the foundation and damage the embedded part and the flat iron, the operation is convenient, the repeated use is realized, the labor cost is effectively reduced, and the construction period is shortened.

Description

Fixing clamp for steel column installation cable rope
Technical Field
The utility model relates to a guy rope fixing device, concretely relates to fixed fixture for steel column guy rope.
Background
At present, the steel structure factory building column foundation in the metallurgical industry is basically in a cup mouth form, and the lower limbs of a steel column are mostly H-shaped double-limb lattice columns. In the installation adjustment process, the verticality adjustment and temporary fixation of the two sides of the column are required to be performed by using a guy rope, and the secondary grouting of the cup mouth is prevented from shifting and the like. At present, lightning protection grounding flat iron or grounding embedded parts on a base cup mouth are often used as cable wind rope fixing points, and the fixing points are not firm, and the flat iron or the embedded parts are easily damaged; another method is to drill holes above the foundation and insert hook anchors, which requires drilling holes in each foundation, damages the foundation, wastes time and labor, and is easy to pull out.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a fixed knot of cable wind rope constructs among the solution prior art and produces self easily and damages, or destroys original foundation structure's problem. The utility model provides a fix firm, do not destroy cable wind rope fixing tool of current basis.
In order to solve the technical problem, the utility model discloses a technical means is:
a steel column installation guy rope fixing clamp comprises a lifting lug for fixing a guy rope, and the fixing clamp comprises a clamping plate which is formed by welding a top plate and two side plates into a whole; the width of the top plate is 10-50mm larger than the thickness of the base side wall of the cup opening; a lifting lug is fixedly connected above the top plate; two end parts of the top plate are fixedly connected with side plates, and the side plates extend downwards; one of the two side plates is a baffle plate, and the other side plate is an adjusting plate; the adjusting plate is provided with a hole, and a nut which is coaxially arranged is fixedly connected to the outer side of the hole; a horizontally arranged bolt is arranged in the nut, a screw rod of the bolt penetrates through the adjusting plate, and a base plate is arranged at the end of the screw rod; the clamping plate is arranged at the top of the side wall of the cup opening base, and the side wall of the cup opening base is located between the base plate and the baffle.
The base plate is paved between the front end of the bolt and the side wall of the cup opening foundation.
The backing plate can also be directly fixedly connected with the end of the screw rod of the bolt.
The utility model provides a fixture is fixed to guy rope, need not drill hole damage basis, destroy and bury piece, band iron, its simple structure, convenient operation, repeatedly usable. The main material of the fixture can use leftover bits and pieces, effectively saves construction cost, effectively reduces labor cost, shortens construction period and meets the requirements of green and environment-friendly construction.
Drawings
FIG. 1 is a schematic view of the installation of the present invention;
fig. 2 is a structural diagram of the present invention.
In the figure: the novel cup mouth foundation comprises a cup mouth foundation side wall 1, a steel column 2, a fixture 3, a baffle 3-1, a top plate 3-2, a lifting lug 3-3, an adjusting plate 3-4, a nut 3-5, a bolt 3-6, a backing plate 3-7, a chain block 4 and a guy rope 5.
Detailed Description
The technical solution of the present invention will be clearly and completely described with reference to the accompanying drawings. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-2, a preferred embodiment of the present invention, a steel column installation guy rope fixing fixture, includes a lifting lug 3-3 for fixing guy rope 5, the fixing fixture includes a clamping plate welded by a top plate 3-2 and two side plates; the width of the top plate 3-2 is 10-50mm larger than the thickness of the side wall 1 of the cup opening base; a lifting lug 3-3 is fixedly connected above the top plate 3-2; two end parts of the top plate 3-2 are fixedly connected with side plates, and the side plates extend downwards; one of the two side plates is a baffle plate 3-1, and the other is an adjusting plate 3-4; the adjusting plate 3-4 is provided with a hole, and the outer side of the hole is fixedly connected with a nut 3-5 which is coaxially arranged; a horizontally arranged bolt 3-6 is arranged in the nut 3-5, a screw rod of the bolt 3-6 penetrates through the adjusting plate 3-4, and a backing plate 3-7 is arranged at the end of the screw rod; the clamping plate is arranged at the top of the cup opening base side wall 1, and the cup opening base side wall 1 is located between the backing plate 3-7 and the baffle 3-1.
When the fixture is specifically structured and implemented, the width of the top plate 3-2 is firstly set according to the thickness of the side wall 1 of the cup opening foundation, and then the two ends are fixedly connected with the side plates to manufacture the [ -shaped fixture 3. The width of the fixture 3 is slightly wider than the thickness of the side wall 1 of the cup opening base, the fixture 3 is provided with an adjusting plate with an opening, and nuts 3-5 are welded outside the opening. It is also possible to thread directly in the opening if the thickness of the adjusting plate 3-4 is sufficient. Bolts 3-6 are installed in the adjusting plates 3-4. The diameter of the opening on the adjusting plate 3-4 is preferably larger than the diameter of the bolt 3-6 by 3-5 mm.
When the fixture is used, the [ -shaped fixture 3 is reversely buckled on the side wall 1 of the cup opening foundation, and the end of the screw rod of the [ -shaped fixture is pressed against the surface of the side wall 1 of the cup opening foundation by screwing the bolts 3-6. And continuously screwing the bolts inwards to ensure that the baffle 3-1 is also tightly attached to the side wall of the foundation. The clamp can firmly lock the foundation by using the friction force and the pretightening force with the side wall of the foundation.
In order to prevent the local damage of the foundation and adjust the wall thickness of different foundations, protective backing plates 3-7 with different thicknesses are arranged between the bolts and the side wall 1 of the cup foundation.
And when the steel column is installed and adjusted, and the cup mouth is subjected to secondary grouting, the bolt is unscrewed, and the clamp is taken down for recycling.
With reference to the above example, the specific operation steps are as follows:
the first step is as follows: according to basic rim of a cup lateral wall thickness, make certain quantity according to above-mentioned requirement the utility model provides a fixture 3.
The second step is that: when the steel column 2 is installed, the cup opening foundation side walls 1 on two sides of the adjacent installed steel column 2 are respectively provided with a set of fixture 3, and the fixture is tightly attached and firmly locked on the foundation side walls by screwing the adjusting bolts 3-6 and matching with the backing plates 3-7 with certain thicknesses.
The third step: and taking a lifting lug 3-3 above the clamping apparatus 3 as a fixed stress point, and matching with a cable rope 5 and a chain block 4 to perform perpendicularity and temporary fixing adjustment on the steel column.
The fourth step: and after the adjustment is finished, secondary grouting is carried out on the cup mouth, and the fixture is dismantled after certain strength is reached.
The fifth step: and repeating the operation, and installing and adjusting the next steel column 2.
The utility model provides a fixture is fixed to guy rope, need not drill hole damage basis, destroy and bury piece, band iron, its simple structure, convenient operation, repeatedly usable. The main material of the fixture can use leftover bits and pieces, effectively saves construction cost, effectively reduces labor cost, shortens construction period and meets the requirements of green and environment-friendly construction.

Claims (3)

1. The utility model provides a steel column installation guy rope fixed fixture, includes lug (3-3) that are used for fixed guy rope, characterized by: the fixing clamp comprises a clamping plate which is formed by welding a top plate (3-2) and two side plates into a whole; the width of the top plate (3-2) is 10-50mm larger than the thickness of the cup opening base side wall (1); lifting lugs (3-3) are fixedly connected above the top plate; two end parts of the top plate are fixedly connected with side plates, and the side plates extend downwards; one of the two side plates is a baffle plate (3-1), and the other side plate is an adjusting plate (3-4); the adjusting plate (3-4) is provided with a hole, and a nut (3-5) which is coaxially arranged is fixedly connected to the outer side of the hole; a horizontally arranged bolt (3-6) is arranged in the nut (3-5), a screw rod of the bolt (3-6) passes through the adjusting plate (3-4), and a backing plate (3-7) is arranged at the end of the screw rod; the clamping plate is arranged at the top of the cup opening base side wall (1), and the cup opening base side wall (1) is located between the backing plate (3-7) and the baffle (3-1).
2. The steel column installation guy rope fixed fixture of claim 1, which is characterized in that: the backing plate (3-7) is paved between the front end of the bolt (3-6) and the side wall (1) of the cup opening foundation.
3. The steel column installation guy rope fixed fixture of claim 1, which is characterized in that: the backing plate (3-7) is fixedly connected with the screw rod end of the bolt (3-6).
CN202020218201.XU 2020-02-27 2020-02-27 Fixing clamp for steel column installation cable rope Active CN211775903U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020218201.XU CN211775903U (en) 2020-02-27 2020-02-27 Fixing clamp for steel column installation cable rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020218201.XU CN211775903U (en) 2020-02-27 2020-02-27 Fixing clamp for steel column installation cable rope

Publications (1)

Publication Number Publication Date
CN211775903U true CN211775903U (en) 2020-10-27

Family

ID=72909851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020218201.XU Active CN211775903U (en) 2020-02-27 2020-02-27 Fixing clamp for steel column installation cable rope

Country Status (1)

Country Link
CN (1) CN211775903U (en)

Similar Documents

Publication Publication Date Title
US9739070B2 (en) Methods and apparatuses of supporting and bracing a utility pole
JP5483912B2 (en) Pile locking device and pile locking method
CN211775903U (en) Fixing clamp for steel column installation cable rope
CA2252115C (en) Methods of raising the transmission cables and other electrical equipment carried by a utility pole without disturbing the pole foundation or disconnecting the cables and equipment
CN204000972U (en) A kind of fixture of pile for prestressed pipe resistance to plucking test
CN110821147A (en) Expansion joint shear wall combination template capable of being assembled and disassembled quickly
CN211143785U (en) Tension anchor device for finish rolling deformed steel bar
CN209891066U (en) Safety protection device in high tower crossbeam steel web construction
CN210104823U (en) Load conversion device for pile foundation torsion test
CN209837021U (en) Recoverable anchor rope device
CN108643550B (en) Overhanging scaffold limiting device and construction method
CN110700596A (en) Finish-rolled deformed steel bar tensioning anchor device and construction method thereof
CN218914180U (en) Temporary plugging device for pipe orifice of embedded pipe of power station house
CN211472507U (en) Bolt type anchor cable secondary tensioning device
CN107060470B (en) Extra-high voltage transmission line guy tower guy final tightening auxiliary device, method and application
CN211396285U (en) Round anchor assembly
KR200263625Y1 (en) Structure of concrete driving depth-adjustabled cover for head of steel pile
CN210858763U (en) Auxiliary device for mounting anchor rod
CN217679230U (en) Mobilizable environment-friendly tower crane basis
CN210857189U (en) Butt joint device for I-shaped steel in SMW construction method pile
CN216664961U (en) Scaffold board fixing device
CN217759397U (en) External assembled concrete wallboard construction equipment of shaped steel post
CN105155552B (en) The retracting device of foundation ditch interim cable bolting steel strand wires and recovery method
CN217173009U (en) Gantry crane guide rail fixing device
CN214786129U (en) Interim fixing tool in block terminal secondary masonry work progress

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant