Concrete formwork structure for floor-penetrating pipeline Download PDF

Info

Publication number
CN211775778U
CN211775778U CN202020240488.6U CN202020240488U CN211775778U CN 211775778 U CN211775778 U CN 211775778U CN 202020240488 U CN202020240488 U CN 202020240488U CN 211775778 U CN211775778 U CN 211775778U
Authority
CN
China
Prior art keywords
polystyrene plastic
concrete formwork
iron
floor
formwork structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020240488.6U
Other languages
Chinese (zh)
Inventor
魏东
魏庆贵
蓝涵恋
黄军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huachuan Construction Group Co ltd
Original Assignee
Huachuan Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huachuan Construction Group Co ltd filed Critical Huachuan Construction Group Co ltd
Priority to CN202020240488.6U priority Critical patent/CN211775778U/en
Application granted granted Critical
Publication of CN211775778U publication Critical patent/CN211775778U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a building field, more specifically say, it relates to a wear floor pipeline concrete formwork structure, including polystyrene plastic board and bearing structure, bearing structure includes iron stand, under bracing piece and iron wire, the iron stand includes iron ring and supporting legs, be provided with a plurality of screw holes on the iron ring, every the equal threaded connection of screw hole has a screw thread spare, the screw thread spare includes the screw thread section and hangs the circle, the fixed setting of iron wire one end is on hanging the circle, and the other end passes polystyrene plastic board and under bracing piece fixed connection. The utility model discloses can make things convenient for, adjust the tight power of support between polystyrene plastic slab and the floor lower surface safely to make a polystyrene plastic slab can use many times, and need not all tear the polystyrene plastic slab after concrete pouring finishes at every turn, practiced thrift the plastic products use, protected the environment.

Description

Concrete formwork structure for floor-penetrating pipeline
Technical Field
The utility model relates to a building field, more specifically say, it relates to a wear floor pipeline concrete formwork structure.
Background
In the building construction process, some pipelines, such as water pipes, exhaust pipes and the like, need to be laid frequently, some holes need to be reserved in the floor slab at this time for the pipelines to pass through, and after the pipelines pass through, a formwork structure needs to be used for pouring concrete for sealing.
The most common method in the prior art is to adopt two semicircular wood templates to be lapped together for mold hanging construction to form a cavity for pouring, and then the wood template is dismantled after pouring is finished. The technical scheme is simple and feasible, but the concrete surface obtained by pouring has poor compactness and is easy to leak, and a large amount of cement paste is lost in the pouring process. The main reason for such a phenomenon is that there is a gap between two wood formers, and the reason for such a gap is various, for example: the gap is generated between the wood mould and the pipeline due to non-matching roundness or vibration displacement of the two templates during pouring, the gap is generated between the two templates due to lapping, the gap is generated between the wood mould and the concrete floor due to poor floor flatness or the deformation of the template caused by excessive force during mould hanging, and the gap is generated between an iron wire for hanging the mould and the templates.
In order to solve the problem of the gap in the prior art, the chinese utility model patent with patent grant number CN203499250U discloses a concrete formwork structure for floor-penetrating pipeline, such a structure adopts polystyrene plastic plate as supporting tight seal structure, can utilize the sufficient characteristics of elasticity of polystyrene plastic plate well, can greatly reduce the existence of template gap. Among this technical scheme, use on the floor to hang the steel bar and hang the overall structure of formwork, and polystyrene plastic slab bottom then adopts the support steel bar to support, and such bearing structure has certain defect: it is difficult to adjust the abutting force between the polystyrene plastic board and the lower surface of the floor slab. This is because in this technical scheme, when iron wire upper portion and hanging reinforcing bar are fixed, need the manual certain pretension that adds of people, such operation process is comparatively laborious, to unskilled operation workman, needs to consume more time to operate, and the process of drawing iron wire still easily scratches the hand.
Compared with the prior art, the formwork structure has certain improvement space.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a wear floor pipeline concrete formwork structure, can conveniently, safely adjust the tight power of supporting between polystyrene plastic slab and the floor lower surface.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme: the utility model provides a wear floor pipeline concrete formwork structure, includes polystyrene plastic slab and bearing structure, set up the centre bore that supplies the pipeline to pass on the polystyrene plastic slab, bearing structure is used for making the polystyrene plastic slab paste the lower surface of tight floor, bearing structure includes iron stand, under bracing piece and iron wire, the iron stand includes iron ring and supporting legs, be provided with a plurality of screw holes on the iron ring, every the equal threaded connection of screw hole has a screw thread spare, the screw thread spare includes the screw thread section and hangs the circle, the fixed setting of iron wire one end is on hanging the circle, and the other end passes polystyrene plastic slab and under bracing piece fixed connection.
By adopting the technical scheme, when the upper part of the iron wire is fixed with the iron frame, an operator does not need to manually increase a pretension force, only needs to adjust the threaded part to a proper position, then ties the iron wire at the hanging ring, then supports the polystyrene plastic plate to the lower surface of the floor slab, and screws the threaded part.
The present invention may be further configured in a preferred embodiment as: the lower supporting piece is plate-shaped, and the center of the lower supporting piece is provided with a yielding hole for the gathering pipeline to pass through.
Through adopting above-mentioned technical scheme, platelike lower support piece can give polystyrene plastic slab a bigger lifting surface area for the polystyrene plastic slab atress is more even. The support piece that prior art adopted a rod form provides the support for the polystyrene plastic slab, causes the polystyrene plastic slab atress uneven easily to cause the polystyrene board to take place the phenomenon of slope at the in-process of pouring, and then lead to pouring the concrete body surface that obtains not level enough. And the utility model discloses a technical scheme then can avoid such unevenness.
The present invention may be further configured in a preferred embodiment as: the lower supporting piece is provided with a plurality of hangers.
By adopting the technical scheme, the hanging lugs are used for enabling the iron wires to penetrate through and be bound on the hanging lugs, and then the iron wires are fixedly connected with the lower supporting piece.
The present invention may be further configured in a preferred embodiment as: the lower supporting piece is provided with an accommodating groove for accommodating the hanging lug.
Through adopting above-mentioned technical scheme, in order to avoid hangers and polystyrene plastic slab direct conflict, so set up the holding tank.
The present invention may be further configured in a preferred embodiment as: the upper surface of the polystyrene plastic plate is coated with mineral oil.
Through adopting above-mentioned technical scheme, mineral oil's effect lies in for the fashioned in-process of concrete body, and the concrete body can not bond together with polystyrene plastic slab, and such technical scheme is favorable to this polystyrene plastic slab of used repeatedly many times.
The present invention may be further configured in a preferred embodiment as: the iron ring is provided with a notch, and the notch can be used for the pipeline to transversely pass through.
Through adopting above-mentioned technical scheme, the operation workman can be convenient for take away the iron stand after the concrete that waters finishes, need not lift the iron stand to the eminence again from the pipeline top slippage and go out.
The present invention may be further configured in a preferred embodiment as: and a vice is hung at the iron ring.
Through adopting above-mentioned technical scheme, the effect of vice lies in being convenient for the operation workman to carry out operations such as coiling iron wire, cutting off the iron wire.
The present invention may be further configured in a preferred embodiment as: and a vice is hung at the lower supporting piece.
Through adopting above-mentioned technical scheme, the effect of vice lies in being convenient for the operation workman to carry out operations such as coiling iron wire, cutting off the iron wire.
The present invention may be further configured in a preferred embodiment as: the screw is provided with a rotating portion.
Through adopting above-mentioned technical scheme, the rotating part can make things convenient for the rotation of screw.
To sum up, the utility model discloses a following at least one useful technological effect:
firstly, when the upper part of the iron wire is fixed with the iron frame, an operator does not need to manually increase a pretension force, only needs to adjust the threaded part to a proper position, then ties the iron wire at the hanging ring, then supports the polystyrene plastic plate to the lower surface of the floor slab, and screws the threaded part.
Secondly, one polystyrene plastic plate can be used for multiple times without tearing the polystyrene plastic plate after concrete pouring is finished every time, so that materials are saved, and the environment is protected.
And thirdly, the operation worker can perform construction operation well, and the construction process is simpler and safer.
Drawings
FIG. 1 is a schematic view of the overall structure of embodiment 1;
FIG. 2 is a schematic structural view of a screw member in embodiment 1;
FIG. 3 is a schematic sectional view of a part of a front view in example 1;
fig. 4 is an enlarged schematic view at a in fig. 3.
In the figure: 1. a pipeline; 2. an iron frame; 2a, an iron ring; 2b, supporting legs; 3. a polystyrene plastic plate; 4. a lower support; 4a, accommodating grooves; 4b, hanging a lug; 5. a threaded member; 5a, a rotating part; 5b, a thread section; 5c, hanging a ring; 6. and (7) a floor slab.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples.
In which like parts are designated by like reference numerals. It should be noted that the following description uses terms of orientation such as "front and back end," "left and right sides," "above," "below," and the like to refer to directions in the drawings, and the terms "bottom" and "top," "inner" and "outer" to refer to directions toward and away from, respectively, the geometric center of a particular component. In addition, the descriptions of "mounted on … …", "disposed on … …" and the like refer to two components having a certain connection and positional relationship, and do not refer to one component being on the upper surface of the other component. In the present invention, unless otherwise expressly specified or limited, the terms "assembled", "connected", and "connected", if any, are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally connected; or may be a mechanical connection; the two elements can be directly connected or connected through an intermediate medium, and the two elements can be communicated with each other. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art according to specific situations.
Example 1
Referring to fig. 1 and 2, a concrete formwork structure for a pipeline penetrating a floor slab comprises a polystyrene plastic plate 3 and a supporting structure, wherein a central hole for a pipeline 1 to penetrate is formed in the polystyrene plastic plate 3, the supporting structure is used for enabling the polystyrene plastic plate 3 to be attached to the lower surface of the floor slab 6, the supporting structure comprises an iron frame 2, a lower supporting piece 4 and iron wires, the iron frame 2 comprises an iron ring 2a and supporting legs 2b, the iron ring 2a is provided with a notch, and the notch can enable the pipeline 1 to penetrate in the transverse direction. Be provided with a plurality of screw holes on the iron ring 2a, the equal threaded connection of every screw hole has a screw 5, and screw 5 includes rotating part 5a, screw thread section 5b and the circle of hanging 5c that from top to bottom sets gradually, and rotating part 5a in this embodiment is swivel nut, and in other embodiments, rotating part 5a can be rotatory handle or other patterns. Iron wire one end is fixed to be set up on hanging circle 5c, and the other end passes polystyrene plastic board 3 and lower supporter 4 fixed connection. When iron wire upper portion and iron stand 2 are fixed, the operation workman need not increase a pretension by hand, only need adjust screw member 5 to suitable position, then with the iron wire system in suspension circle 5c department, support polystyrene plastic board 3 tight to floor 6 lower surface department again, screw member 5 can, such operation process, greatly reduced operation workman's intensity of labour to the risk that the operation workman is by the iron wire fish tail has been reduced.
Referring to fig. 3 and 4, the lower supporter 4 has a plate shape, and a concession hole through which the collecting pipe 1 passes is formed at the center thereof. The plate-shaped lower support 4 can provide a larger stress area for the polystyrene plastic plate 3, so that the stress of the polystyrene plastic plate 3 is more uniform. The support piece that prior art adopted a rod form provides the support for polystyrene plastic slab 3, causes polystyrene plastic slab 3 atress uneven easily to cause the polystyrene board to take place the phenomenon of slope at the in-process of pouring, and then lead to pouring the concrete body surface that obtains and not smooth enough. And the utility model discloses a technical scheme then can avoid such unevenness.
Referring to fig. 3 and 4, a plurality of hangers 4b are provided on the lower support 4. The hanging lug 4b is used for allowing an iron wire to pass through and be bound on the hanging lug, so that the iron wire is fixedly connected with the lower support 4. The lower support 4 is provided with a receiving groove 4a that receives the hanging lug 4 b. The accommodating groove 4a can avoid the hanging lug 4b from directly abutting against the polystyrene plastic plate 3.
The mineral oil is coated on the upper surface of the polystyrene plastic plate 3, and the mineral oil is coated on the upper surface of the polystyrene plastic plate 3, so that the concrete body is not bonded with the polystyrene plastic plate 3 in the forming process of the concrete body, and the technical scheme is favorable for repeatedly using the polystyrene plastic plate 3. The mineral oil is coated on the joint of the polystyrene plastic plate 3 and the pipeline 1, and the mineral oil is coated on the joint, so that the polystyrene plastic plate 3 can better slide relative to the pipeline 1, and the polystyrene plastic plate 3 can be more conveniently installed and taken out.
The use principle of the embodiment is as follows: firstly, cutting a central hole in a polystyrene plastic plate 3, and sleeving the polystyrene plastic plate 3 on a pipeline 1; fixing one end of a wire to the hanging lug 4b of the lower support 4 and penetrating the wire through the polystyrene plastic plate 3, and repeating the steps so that each hanging lug 4b of the lower support 4 is fixed with a wire; attaching a polystyrene plastic plate 3 to the lower surface of a floor slab 6, and attaching a lower support piece 4 to the lower surface of the polystyrene plastic plate 3; placing an iron frame 2 above a floor slab 6, correspondingly and fixedly arranging the other end of each iron wire on a suspension ring 5c, and rotating a threaded piece 5 to tension the iron wires; and (5) performing concrete pouring operation.
Example 2
This embodiment is substantially the same as embodiment 1 except that a vice is hung at both the iron ring 2a and the lower support 4. The vice has the function of facilitating the operation of operators to wind and cut iron wires and the like.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (9)

1. The utility model provides a wear floor pipeline concrete formwork structure, includes polystyrene plastic slab (3) and bearing structure, set up the centre bore that supplies pipeline (1) to pass on polystyrene plastic slab (3), bearing structure is used for making polystyrene plastic slab (3) paste the lower surface of tight floor (6), its characterized in that: the utility model discloses a support structure, including iron stand (2), under bracing piece (4) and iron wire, iron stand (2) are including iron ring (2a) and supporting legs (2b), be provided with a plurality of screw holes on iron ring (2a), every the equal threaded connection of screw hole has a screw thread spare (5), screw thread spare (5) are including screw thread section (5b) and suspension circle (5c), iron wire one end is fixed to be set up on suspension circle (5c), and polystyrene plastic board (3) and under bracing piece (4) fixed connection are passed to the other end.
2. The through-floor duct concrete formwork structure of claim 1, wherein: the lower supporting piece (4) is plate-shaped, and a yielding hole for the gathering pipeline (1) to penetrate through is formed in the center of the lower supporting piece.
3. A through-floor duct concrete formwork structure as claimed in claim 2, wherein: the lower supporting piece (4) is provided with a plurality of hangers (4 b).
4. A through-floor duct concrete formwork structure as claimed in claim 3, wherein: the lower support piece (4) is provided with a containing groove (4a) containing a hanging lug (4 b).
5. The through-floor duct concrete formwork structure of claim 1, wherein: the upper surface of the polystyrene plastic plate (3) is coated with mineral oil.
6. The through-floor duct concrete formwork structure of claim 1, wherein: the iron ring (2a) is provided with a notch, and the notch can be used for the pipeline (1) to transversely pass through.
7. The through-floor duct concrete formwork structure of claim 1, wherein: and a vice is hung at the position of the iron ring (2 a).
8. The through-floor duct concrete formwork structure of claim 1, wherein: and a vice is hung at the lower support piece (4).
9. The through-floor duct concrete formwork structure of claim 1, wherein: the screw (5) is provided with a rotating portion (5 a).
CN202020240488.6U 2020-03-02 2020-03-02 Concrete formwork structure for floor-penetrating pipeline Active CN211775778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020240488.6U CN211775778U (en) 2020-03-02 2020-03-02 Concrete formwork structure for floor-penetrating pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020240488.6U CN211775778U (en) 2020-03-02 2020-03-02 Concrete formwork structure for floor-penetrating pipeline

Publications (1)

Publication Number Publication Date
CN211775778U true CN211775778U (en) 2020-10-27

Family

ID=72902766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020240488.6U Active CN211775778U (en) 2020-03-02 2020-03-02 Concrete formwork structure for floor-penetrating pipeline

Country Status (1)

Country Link
CN (1) CN211775778U (en)

Similar Documents

Publication Publication Date Title
CN104695608B (en) Floor construction between architecture pipe and construction method thereof
CN107152092A (en) The installation method of buried water stop and its fixed mount used at a kind of construction joint
CN211775778U (en) Concrete formwork structure for floor-penetrating pipeline
CN109732773B (en) Mounting node and mounting method of support hinged concrete prefabricated part
CN218292915U (en) Floor hangs hole reinforcing apparatus
CN103225394A (en) Big wood template construction method of indoor constructional engineering shear wall
CN203248841U (en) Supporting device for pipeline surface anticorrosion treatment
CN204491953U (en) Floor slab structure between architecture pipe
CN108277993A (en) A kind of steel bar truss floor support plate hanging brace device and its assembling production method
CN203531387U (en) Glass fiber reinforced plastic fish-bellied arc-shaped beam formwork
CN212078774U (en) Load-bearing tripod
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN206635725U (en) A kind of ditch template quickly installed
CN207846825U (en) A kind of construction and decoration indoor suspended ceiling adjustable tension device
CN207658955U (en) A kind of adjustable steel wire rope of windlass conversion support
CN210713787U (en) A building steel form for strutting wall body and pour
CN106346393B (en) A kind of diesel engine flywheel fixture
CN217759867U (en) Novel concrete placement manual operation platform
CN209040542U (en) Die worker's tool is hung in a kind of concrete construction
CN211817894U (en) Construction complementary unit with adjustable scaffold frame installation
CN104912209A (en) Plugging device for pipeline reserved hole of cast-in-situ slab and machining and plugging construction method
CN211817901U (en) Overhanging type scaffold fixing device
CN219387183U (en) Construction hole hanging die device
CN212535133U (en) Supporting and positioning device for assembly type building
CN207277829U (en) For forming the positioner of drop plate or faulting of slab ends

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant