CN211775518U CN202020267434.9U CN202020267434U CN211775518U CN 211775518 U CN211775518 U CN 211775518U CN 202020267434 U CN202020267434 U CN 202020267434U CN 211775518 U CN211775518 U CN 211775518U
Authority
CN
China
Prior art keywords
flat board
flat plate
cylinder piece
board
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020267434.9U
Other languages
Chinese (zh)
Inventor
吴凯
刘敏
温国岩
贾会春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Guopeng Engineering Management Co ltd
Original Assignee
Henan Guopeng Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Guopeng Engineering Management Co ltd filed Critical Henan Guopeng Engineering Management Co ltd
Priority to CN202020267434.9U priority Critical patent/CN211775518U/en
Application granted granted Critical
Publication of CN211775518U publication Critical patent/CN211775518U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a building wall plastering device, which effectively solves the problems that in the prior art, the ash cake in wall plastering is relatively complicated to manufacture, has human error, the manufacturing quality is greatly influenced by human factors, and the efficiency is low; the technical scheme of its solution is, including first flat board, first flat board upside has rather than parallel second flat board, it is gapped between first flat board and the second flat board, be in the same place through a plurality of connecting blocks between first flat board and the second flat board, first flat board left side has along placing around and vertical rectangular board, be in the same place through a plurality of connecting rods between rectangular board and the first flat board, there is a plurality of screws that are circumference equipartition on the first flat board, pass through threaded connection between screw and the first flat board, the second flat board is run through to the screw upper end, clearance fit between screw and the second flat board, it has vertical cylinder piece to run through on the second flat board, cylinder piece lower extreme runs through first flat board, cylinder piece lower extreme has the pit that holds cement, there is annular arch cylinder piece upper end.

Description

Building wall plastering device
Technical Field
The utility model relates to a building wall plastering technical field, especially a building wall plastering unit.
Background
The ash cake is a cement block used for controlling building elevation and wall surface flatness and verticality when a mud worker brushes or pours a terrace. The ash cake is needed before the floor is painted or poured. The size in the ash cake preparation also has corresponding requirement, current ash cake is that the manual work is paintd on the wall with cement or other building material scene one by one, the top surface of ash cake is also the artificial determination, current more advanced construction team adopts the ash cake appearance, the ash cake appearance can distribute the laser that the one deck is parallel with the wall on the plane of elevation, then the workman makes the ash cake on the wall according to this layer of laser, but often can appear great in the practical application, and the process of manufacture is comparatively loaded down with trivial details, need repeatedly floating, efficiency needs further to improve.
SUMMERY OF THE UTILITY MODEL
To the above situation, for overcoming prior art's defect, the utility model provides a building wall plastering unit, among the effectual prior art of having solved, the muffin preparation in the wall plastering is comparatively loaded down with trivial details, has human error, and the preparation quality receives the human influence great, the problem of inefficiency.
The technical scheme of its solution is, including first flat board, first flat board upside has rather than parallel second flat board, it is gapped between first flat board and the second flat board, be in the same place through a plurality of connecting blocks between first flat board and the second flat board, first flat board left side has along placing around and vertical rectangular board, be in the same place through a plurality of connecting rods between rectangular board and the first flat board, there is a plurality of screws that are circumference equipartition on the first flat board, pass through threaded connection between screw and the first flat board, the second flat board is run through to the screw upper end, clearance fit between screw and the second flat board, it has vertical cylinder piece to run through on the second flat board, cylinder piece lower extreme runs through first flat board, cylinder piece lower extreme has the pit that holds cement, there is annular arch cylinder piece upper end.
The utility model discloses the structure is ingenious, and the wall of the various condition of adaptation that effectual ability is fine can be quick and accurate produce the ash cake that meets the requirements, reduces the process of floating repeatedly, improves the preparation efficiency of ash cake greatly.
Drawings
Fig. 1 is a front sectional view of the present invention.
Fig. 2 is a sectional view taken along line a-a of fig. 1.
Fig. 3 is a schematic structural diagram of the core component of the present invention.
Fig. 4 is a schematic diagram of the structure of the middle cylindrical block of the present invention.
Fig. 5 is a state diagram of the present invention in use.
Detailed Description
The following detailed description of embodiments of the present invention is made with reference to the accompanying drawings.
By figure 1 to 5 provide, the utility model discloses a first flat board 1, 1 upside of first flat board has second flat board 2 rather than parallel, it is gapped between first flat board 1 and the second flat board 2, it is together fixed through a plurality of connecting blocks between first flat board 1 and the second flat board 2, place and vertical rectangular plate 3 around having along in first flat board 1 left side, fix together through a plurality of connecting rods 4 between rectangular plate 3 and the first flat board 1, there are a plurality of screws 5 that are the circumference equipartition on the first flat board 1, through threaded connection between screw 5 and the first flat board 1, second flat board 2 is run through to screw 5 upper end, clearance fit between screw 5 and the second flat board 2, run through on the second flat board 2 and have vertical cylinder piece 6, cylinder piece 6 lower extreme runs through first flat board 1, 6 lower extreme has pit 7 that holds cement, cylinder piece 6 upper end has annular bulge.
It is noted that when the annular projection at the upper end of the cylindrical block 6 is engaged with the upper end face of the second plate 2, the bottom surfaces of the concave pits 7 are in the same plane with the upper end face of the first plate 1.
When the device is used, the ash cake instrument is fixed and opened as required, the first plate 1 is placed at a place on a wall where ash cakes need to be made, the strip plate 3 is placed at one side far away from the ash cake instrument, each screw 5 is screwed, laser penetrates through a gap between the first plate 1 and the second plate 2 and irradiates on the strip plate 3, cement or building materials are filled in the pit 7, the cylindrical block 6 is pressed on the wall, the annular bulge at the upper end of the cylindrical block 6 is tightly attached to the first plate 1, the cement or the building materials are adhered to the wall, the device is removed, and at the moment, one ash cake is made.
In the process, the plastic film can be laid in the concave pit 7, so that the demoulding is convenient.
The utility model discloses the structure is ingenious, the wall of the various condition of adaptation that effectual ability is fine, and the ash cake that can be fast and accurate production meet the requirements reduces the process of floating repeatedly, improves the preparation efficiency of ash cake greatly, easy operation, easy standardized management.

Claims (1)

1. A building wall plastering device is characterized by comprising a first flat plate (1), wherein a second flat plate (2) parallel to the first flat plate (1) is arranged on the upper side of the first flat plate (1), a gap is reserved between the first flat plate (1) and the second flat plate (2), the first flat plate (1) and the second flat plate (2) are fixed together through a plurality of connecting blocks, a long strip plate (3) which is placed front and back and vertical is arranged on the left side of the first flat plate (1), the long strip plate (3) and the first flat plate (1) are fixed together through a plurality of connecting rods (4), a plurality of screws (5) which are uniformly distributed on the circumference are arranged on the first flat plate (1), the screws (5) are connected with the first flat plate (1) through threads, the upper end of each screw (5) penetrates through the second flat plate (2), the screws (5) are in clearance fit with the second flat plate (2), and vertical cylindrical blocks (6) penetrate through the second flat plate (2), the lower end of the cylindrical block (6) penetrates through the first flat plate (1), a pit (7) for containing cement is formed in the lower end of the cylindrical block (6), and an annular bulge is formed in the upper end of the cylindrical block (6).
CN202020267434.9U 2020-03-06 2020-03-06 Building wall plastering device Active CN211775518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020267434.9U CN211775518U (en) 2020-03-06 2020-03-06 Building wall plastering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020267434.9U CN211775518U (en) 2020-03-06 2020-03-06 Building wall plastering device

Publications (1)

Publication Number Publication Date
CN211775518U true CN211775518U (en) 2020-10-27

Family

ID=72938207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020267434.9U Active CN211775518U (en) 2020-03-06 2020-03-06 Building wall plastering device

Country Status (1)

Country Link
CN (1) CN211775518U (en)

Similar Documents

Publication Publication Date Title
CN206397093U (en) Cement plant on a kind of floor tile
CN211775518U (en) Building wall plastering device
CN103790334B (en) Combined splicing floor tile and laying technology of combined splicing floor tile
CN212288126U (en) Mould is used in production of toper cement pipe
CN206493414U (en) A kind of novel ceramic tile compacting tool set
CN203145459U (en) Building template connecting structure
CN102146728B (en) Construction method of plastering anti-crack thin layer on interior wall
CN218493149U (en) Mortar laying device for construction
CN210180776U (en) Simple material scraping device capable of controlling material thickness
CN215150188U (en) Evaporate and press aerated concrete block forming device
CN211037504U (en) Concatenation formula building backup pad for building
CN103759990A (en) Mold for preparing sample for walling non-standard brick strength test and use method thereof
CN209478471U (en) Waterproofness slab thickness control block makes mold
CN203401571U (en) Prefabricated capping mould
CN206489031U (en) It is a kind of to test putty application property and the device of water-retaining property
CN113136983A (en) Assembled slip casting wall piece
CN215212386U (en) A template fixing device for building
CN218061449U (en) Composite template system for clear water finish concrete construction
CN217581074U (en) Construction tool for floor tile thin-pasting process
CN215856468U (en) Chip pasting tool
CN205651487U (en) Gypsum model forming device
CN208858174U (en) A kind of double-layer brick is laid bricks device
CN219528307U (en) Wall brick leveling device for decoration engineering
CN210659161U (en) Mortar scraping device for external wall insulating brick
CN203441098U (en) Building formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant