CN211774581U - Connecting piece fixing insulating plug for shelter installation equipment - Google Patents
Connecting piece fixing insulating plug for shelter installation equipment Download PDFInfo
- Publication number
- CN211774581U CN211774581U CN201922361366.2U CN201922361366U CN211774581U CN 211774581 U CN211774581 U CN 211774581U CN 201922361366 U CN201922361366 U CN 201922361366U CN 211774581 U CN211774581 U CN 211774581U
- Authority
- CN
- China
- Prior art keywords
- shelter
- insulating
- mask
- insulating stopper
- filler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000009434 installation Methods 0.000 title claims description 18
- 239000000853 adhesive Substances 0.000 claims abstract description 18
- 230000001070 adhesive effect Effects 0.000 claims abstract description 18
- 239000000945 filler Substances 0.000 claims description 40
- 239000003292 glue Substances 0.000 claims description 30
- 239000007787 solid Substances 0.000 claims description 18
- 239000011229 interlayer Substances 0.000 claims description 14
- 239000004593 Epoxy Substances 0.000 claims description 12
- 230000001788 irregular Effects 0.000 claims description 9
- 238000004321 preservation Methods 0.000 abstract description 14
- 238000002347 injection Methods 0.000 abstract description 10
- 239000007924 injection Substances 0.000 abstract description 10
- 238000009413 insulation Methods 0.000 abstract description 6
- 238000004513 sizing Methods 0.000 description 5
- 238000001035 drying Methods 0.000 description 4
- 239000010410 layer Substances 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 241001391944 Commicarpus scandens Species 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000006748 scratching Methods 0.000 description 2
- 230000002393 scratching effect Effects 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 238000000844 transformation Methods 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
Images
Landscapes
- Thermal Insulation (AREA)
Abstract
The utility model discloses an insulating stopper is fixed to connecting piece for shelter erection equipment in the shelter technical field, insulating stopper transversely inlays for cylinder type and shaft middle part and is equipped with the parallels, be equipped with vertical screw hole on the parallels, the insulating stopper upper end is equipped with the vertical centre bore with the screw hole intercommunication, the insulating stopper upper end is equipped with glue-injection hole and venthole, glue-injection hole and venthole respectively with first opening and the second opening intercommunication of setting on the shaft, the shelter is enclosed by six shelter planks, the shelter planks by first mask, second mask and clamp are established at first mask, the bonding of heat preservation core between the second mask forms, insulating stopper height equals the thickness sum of first mask and heat preservation core plate, insulating stopper inlays to be established in the shelter planks and shaft and bottom all pass through normal atmospheric temperature curing adhesive with the shelter planks and is connected, the insulating stopper up end is flat with first mask upper surface. The utility model discloses an insulating stopper adopts rear-mounted mounting means, can realize installing everywhere at any time, and does not influence the heat preservation and heat insulation performance of shelter.
Description
Technical Field
The utility model relates to a shelter technical field, in particular to fixed insulating stopper of connecting piece for shelter erection equipment.
Background
The shelter is an enclosure structure which is used for installing different equipment, realizes a certain special function, can be conveniently moved and is used for equipment and personnel to work. In the prior art, a shelter is mostly of a sandwich plate structure, and a containment shell is assembled by six sandwich plates and auxiliary connecting pieces. The basic structure of each sandwich plate consists of an inner mask plate, a heat-preservation core plate and an outer mask plate. The sandwich plate structure has higher rigidity and stronger capacity of bearing distributed load, but has weaker capacity of bearing concentrated load or point load. Therefore, when the fixing equipment is installed on the shelter, the sizing block needs to be embedded in the sandwich plate in advance, and the fixing position of the installation equipment needs to be determined before the shelter is manufactured, so that the embedding position of the sizing block is accurate in the manufacturing process of the sandwich plate, and the installation position of the equipment cannot be changed at will. The manufacture of the sandwich plate puts high demands on the manufacture of the sandwich plate, and the use requirement of flexibly adjusting the position of equipment in the shelter cannot be met, so that the use of the shelter is limited.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a fixed insulating stopper of connecting piece for shelter erection equipment reduces the process that originally need place the parallels in advance when the sandwich panel suppression, improves production efficiency and equipment fixing precision, and the utility model discloses an insulating stopper adopts rear-mounted type mounting means, can set up in a flexible way according to the mounted position of equipment, realizes installing everywhere, satisfies user adjustment equipment mounted position's demand.
The purpose of the utility model is realized like this: the utility model provides a fixed insulating stopper of connecting piece for shelter erection equipment, insulating stopper is the cylinder type and the shaft middle part transversely inlays and is equipped with the parallels, be equipped with vertical screw hole on the parallels, the insulating stopper upper end is equipped with the vertical centre bore with screw hole intercommunication, the insulating stopper upper end is equipped with notes rubber hole and venthole, notes rubber hole and venthole communicate with first opening and the second opening that sets up on the shaft respectively, the shelter is enclosed by six shelter planks, the shelter planks are formed by first mask, the bonding of second mask and the heat preservation core board of clamp between first mask, the second mask, insulating stopper height equals the sum of first mask and heat preservation core plate, insulating stopper inlays and establishes in the shelter planks and shaft and bottom all pass through the normal temperature curing adhesive with the shelter planks and be connected, insulating stopper up end is level with first mask upper surface.
The utility model discloses a fixed insulating stopper of connecting piece for shelter erection equipment can be used for the fixed of shelter inside or external connecting piece. According to the characteristic that the sandwich plate structure of the shelter large plate has good load dispersing capacity, the insulating plugs are arranged, the sizing blocks are preset in the insulating plugs, the diameter of the epoxy plugs is selected according to the required point load dispersing capacity, the local rigidity of the connecting points is improved, and therefore the bearing capacity of the sandwich plate is improved. When the insulating plug is used, the diameter of the insulating plug is selected according to the tensile force and the torque which need to be borne by the connecting point. Namely, the insulation plug with larger diameter is installed at the connecting point which needs to bear larger tension and torque. The utility model discloses an insulating stopper adopts rear-mounted mounting means, can realize carrying out the field installation everywhere in non-factory environment according to equipment fixing's needs, and is nimble convenient. And the insulating plug forms a heat-bridge-free structure on the large plate of the shelter, and does not affect the heat-insulating performance of the shelter.
As a further improvement of the utility model, a filler interlayer is arranged between the column body and the heat preservation core plate, the outer side surface of the filler interlayer is an irregular surface, and the filler interlayer is filled with solid fillers with glue. The connection area of the insulating plug and the shelter large plate is increased by arranging the filler interlayer, the connection strength is favorably improved, and the anti-torsion capacity of the insulating plug after glue injection is fixed is improved because the outer side surface of the filler interlayer is an irregular surface. And because the shrinkage of the normal-temperature curing adhesive is large, the cured adhesive is easy to be insufficient and brittle and easy to break after being dried, and the filling of the solid filler can also increase the flexibility of the whole structure, thereby avoiding the occurrence of the above conditions. In addition, through the interbedded setting of filler, can choose for use the insulating stopper that the diameter is littleer, improve the bearing capacity of insulating stopper through setting up great filler intermediate layer to can reduce on the shelter large sheet naked insulating stopper trompil size, improve the pleasing to the eye degree of shelter.
As the utility model discloses a further improvement, the solid filler is heat preservation core residue, and the heat preservation core residue that produces when beating the insulating plug mounting hole on the shelter large plate that can make full use of is gathered materials on the spot, reduce cost.
As the utility model discloses a further improvement, the solid filler is filiform or net twine form solid filler, and shear strength is great, glues futilely toughness better, can further avoid gluing the not full and easy brittle fracture's the condition after doing that the shrinkage is great to lead to because of normal temperature solidification.
As a further improvement, the normal temperature curing glue is added with powdered filler, improves the flexibility of glue dry back overall structure, avoids brittle fracture.
As a further improvement, the insulating stopper is the epoxy stopper, and normal atmospheric temperature curing glue is the epoxy normal atmospheric temperature curing glue to make the insulating stopper have insulating good, the thermal conductivity is low, advantage that intensity is high, and because epoxy material's affinity is strong, use epoxy normal atmospheric temperature curing glue also make the joint strength of insulating stopper and shelter large plate higher, connect more reliably.
Drawings
Fig. 1 is the installation schematic diagram of the connecting piece fixing insulating plug for the shelter installation equipment of the present invention.
The insulation core board comprises an insulation plug 1, a sizing block 2, a threaded hole 3, a glue injection hole 4, an air outlet hole 5, a first mask 6, a second mask 7, a heat preservation core board 8 and a filler interlayer 9.
Detailed Description
A fixed insulating stopper 1 of connecting piece for shelter erection equipment as shown in figure 1 wholly is the cylinder type, and the column body middle part transversely inlays and is equipped with parallels 2, is equipped with vertical screw hole 3 on the parallels 2, and the insulating stopper 1 upper end is equipped with the vertical centre bore with screw hole 3 intercommunication. The shelter is enclosed by six shelter large plates, the shelter large plates are formed by bonding a first mask 6, a second mask 7 and a heat-preservation core plate 8 clamped between the first mask 6 and the second mask 7, the height of an insulating plug 1 is equal to the sum of the thicknesses of the first mask 6 and the heat-preservation core plate 8, the insulating plug 1 is embedded in the shelter large plates, a column body and the bottom of the insulating plug are connected with the shelter large plates through normal-temperature curing glue, and the upper end face of the insulating plug 1 is level with the upper surface of the first mask 6. In order to facilitate the connection of the insulating plug 1 and the shelter large plate, the upper end of the insulating plug 1 is provided with a glue injection hole 4 and an air outlet hole 5, and the glue injection hole 4 and the air outlet hole 5 are respectively communicated with a first opening and a second opening which are arranged on the column body. Powdered fillers are added into the normal-temperature curing glue, so that the flexibility of the whole structure after the glue is dried is improved, and brittle fracture is avoided. In this embodiment, the insulating plug 1 is an epoxy plug, and the normal temperature curing adhesive is an epoxy normal temperature curing adhesive, so that the insulating plug 1 has the advantages of good insulating property, low thermal conductivity and high strength, and the epoxy normal temperature curing adhesive has strong affinity, so that the insulating plug 1 and the shelter large plate are higher in connection strength and more reliable in connection.
The connector fixing insulating plug 1 for the shelter installation equipment of the present embodiment can be used for fixing the connectors inside or outside the shelter. When the fixing device is used for fixing the connecting piece in the shelter, the first mask 6 is an inner mask, and the second mask 7 is an outer mask; when the fixing device is used for fixing the connecting piece outside the shelter, the reverse is carried out.
As shown in the figure, a filler interlayer 9 is arranged between the column body of the insulating plug 1 and the heat-insulating core plate 8, the outer side surface of the filler interlayer 9 is an irregular surface, and solid fillers with glue are filled in the filler interlayer 9. The connection area of the insulating plug 1 and the shelter large plate is increased by arranging the filler interlayer 9, the connection strength is favorably improved, and the torsion resistance of the insulating plug 1 after glue injection is fixed is improved because the outer side surface of the filler interlayer 9 is an irregular surface. And because the shrinkage of the normal-temperature curing adhesive is large, the cured adhesive is easy to be insufficient and brittle and easy to break after being dried, and the filling of the solid filler can also increase the flexibility of the whole structure, thereby avoiding the occurrence of the above conditions. In addition, through the setting of filler intermediate layer 9, can choose for use the insulating stopper 1 that the diameter is littleer, improve insulating stopper 1's bearing capacity through setting up great filler intermediate layer 9 to can reduce on the shelter large panel naked insulating stopper 1 trompil size, improve the pleasing to the eye degree of shelter. The solid filler can be selected from residues of the heat-insulating core plate 8 generated when the installation hole of the insulating plug 1 is drilled on the large plate of the shelter, local materials are used, and the cost is reduced. The solid filler can also be selected to be filiform or net-wire-shaped, so that the shearing strength is high, the toughness is high after the glue is dried, and the conditions of incompetence after drying and easy brittle fracture caused by high shrinkage of the normal-temperature curing glue can be further avoided.
According to the characteristic that the sandwich plate structure of the shelter large plate has good load dispersing capacity, the insulating plug 1 is arranged, the sizing block 2 is preset in the insulating plug 1, the diameter of the epoxy plug is selected according to the required point load dispersing capacity, the local rigidity of a connecting point is improved, and therefore the bearing capacity of the sandwich plate is improved. And because the insulation plug 1 of this embodiment adopts the postposition type mounting means, can carry out the field installation at any time everywhere as required, it is nimble convenient. And this insulating plug 1 has formed the structure of no heat bridge on the big board of shelter, does not cause any influence to the heat preservation heat-proof quality of shelter.
The installation method of the connecting piece fixing insulation plug 1 for the shelter installation equipment comprises the following steps:
(1) drilling a round hole on the large shelter plate by using a flat drill, wherein the aperture of the round hole is equal to the diameter of the insulating plug 1, and the depth of the round hole is the same as the height of the insulating plug 1, so that the inner surface of the second mask 7 is exposed;
(2) cleaning residues of the heat preservation core plate 8 on the inner surface of the second mask 7;
(3) extending tools such as a pick-up knife into the round hole and picking and scratching the heat-insulating core plate 8 on the side wall of the round hole to enlarge the inner diameter of the round hole and form an irregular surface on the inner wall, and cleaning residues falling on the inner surface of the second mask 7;
(4) coating normal-temperature curing glue on the inner surface of the second mask 7, filling the irregular surface with a solid filler mixed with the normal-temperature curing glue, and then plugging the insulating plug 1 into the round hole;
(5) normal temperature curing glue is injected inwards through the glue injection holes 4, and the glue can be used after the normal temperature curing glue is dried for a certain time.
In the step (1) of the installation method, in order to prevent the flat drill from opening the second mask 7, a limit sleeve can be additionally arranged on the flat drill. And (3) cleaning the residues of the heat-insulating core plate 8 in the step (2), so that the bottommost side can be expanded when the picking knife is used for picking and reaming the hole in the next step, and the residues of the heat-insulating core plate 8 are cleaned, so that the insulating plug 1 is fixed on the second mask 7 instead of the residues of the heat-insulating core plate 8 after the normal-temperature curing adhesive is injected subsequently, and the connection strength is ensured. In the step (3), the inner diameter of the round hole of the 8 layers of the heat-insulating core plate is further enlarged through picking and scratching by a pick knife and the like, the connecting area of the insulating plug 1 and the shelter large plate is increased, the connecting strength is favorably improved, and the anti-torsion capability of the insulating plug 1 after glue injection fixation is improved because the inner wall of the round hole is an irregular surface. And (4) filling the periphery of the round hole with the solid filler mixed with the normal-temperature curing adhesive, so that the round hole can be conveniently attached to an irregular surface, the subsequent adhesive injection amount can be reduced, the cost is saved, the shrinkage of the normal-temperature curing adhesive is large, the round hole is easy to be not full and brittle and easy to break after being dried, the solid filler can increase the flexibility of the whole structure, and the occurrence of the above conditions is avoided. The waiting time in the step (5) is determined according to the selected varieties of the normal temperature curing adhesive, such as epoxy normal temperature curing adhesive, and the adhesive can be used after being dried for 72 hours. In this embodiment, the solid filler is the residue or filiform or mesh-line solid filler scraped in step (3) to improve the toughness of the glue after drying, and the room temperature curing glue is added with the powdered filler, so as to avoid the situation of incomplete drying and brittle fracture caused by large shrinkage of the room temperature curing glue, and improve the flexibility of the whole structure after drying.
The present invention is not limited to the above embodiments, and based on the technical solutions disclosed in the present invention, those skilled in the art can make some replacements and transformations for some technical features without creative labor according to the disclosed technical contents, and these replacements and transformations are all within the protection scope of the present invention.
Claims (6)
1. The utility model provides a fixed insulating stopper of connecting piece for shelter erection equipment which characterized in that: the utility model discloses a square cabin, including insulating stopper, column body, base, cover, base, cover, base.
2. The connector-securing insulating plug for shelter installation equipment as claimed in claim 1, wherein: and a filler interlayer is arranged between the column body and the heat-insulating core plate, the outer side surface of the filler interlayer is an irregular surface, and a solid filler with glue is filled in the filler interlayer.
3. The connector-securing insulating plug for shelter installation equipment as claimed in claim 2, wherein: the solid filler is heat-insulating core board residue.
4. The connector-securing insulating plug for shelter installation equipment as claimed in claim 2, wherein: the solid filler is a filiform or net-wire solid filler.
5. The connector-securing insulating plug for shelter installation equipment as claimed in claim 1, wherein: the normal temperature curing glue is added with a powdery filler.
6. The connector-securing insulating plug for shelter installation equipment as claimed in any one of claims 1 to 5, wherein: the insulating plug is an epoxy plug, and the normal-temperature curing adhesive is an epoxy normal-temperature curing adhesive.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922361366.2U CN211774581U (en) | 2019-12-25 | 2019-12-25 | Connecting piece fixing insulating plug for shelter installation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922361366.2U CN211774581U (en) | 2019-12-25 | 2019-12-25 | Connecting piece fixing insulating plug for shelter installation equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211774581U true CN211774581U (en) | 2020-10-27 |
Family
ID=72979208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922361366.2U Withdrawn - After Issue CN211774581U (en) | 2019-12-25 | 2019-12-25 | Connecting piece fixing insulating plug for shelter installation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211774581U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984390A (en) * | 2019-12-25 | 2020-04-10 | 扬州泰利特种装备有限公司 | Connecting piece fixing insulating plug for shelter installation equipment and installation method thereof |
-
2019
- 2019-12-25 CN CN201922361366.2U patent/CN211774581U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984390A (en) * | 2019-12-25 | 2020-04-10 | 扬州泰利特种装备有限公司 | Connecting piece fixing insulating plug for shelter installation equipment and installation method thereof |
CN110984390B (en) * | 2019-12-25 | 2024-05-03 | 扬州泰利特种装备有限公司 | Connecting piece fixing insulating plug for shelter installation equipment and installation method of connecting piece fixing insulating plug |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211774581U (en) | Connecting piece fixing insulating plug for shelter installation equipment | |
CN104507273A (en) | PCB (printed circuit board) stepped hole plugging process and jig | |
CN110984390A (en) | Connecting piece fixing insulating plug for shelter installation equipment and installation method thereof | |
CN107818972A (en) | A kind of LED circuit board and preparation method of band COB package substrates | |
CN206806088U (en) | A kind of high-strength communications cable with protection moisture-proof function | |
EP2190032A1 (en) | Photovoltaic fibre reinforced cement panel | |
CN209964366U (en) | Enhanced composite circuit board | |
DE202010005210U1 (en) | photovoltaic module | |
CN210238924U (en) | Assembled integrated wallboard and system for modular steel structure building | |
CN211258317U (en) | Wood-plastic sliding door batten reinforcing device | |
CN206175400U (en) | But increase strength's building board connection structure | |
CN211662162U (en) | Fixture tool for cutting reserved process edge of PCB | |
CN211396372U (en) | Imitated marble composite energy-saving wallboard for green energy-saving building | |
CN214165727U (en) | Transfer device is used in production of wooden skylight | |
CN211286359U (en) | Mounting structure of soft package of wall for indoor engineering | |
CN207974434U (en) | Wallboard clip assembly and wallboard | |
CN212979443U (en) | Multifunctional bamboo-wood fiberboard | |
CN217630787U (en) | Impact-resistant energy-saving aerated concrete block | |
CN217283543U (en) | Flexible circuit board based on COP material | |
CN210421609U (en) | Novel hollow brick | |
CN217782425U (en) | Heat insulation board convenient to fix and install | |
CN210337162U (en) | Novel building board | |
CN216478239U (en) | High-strength spliced aluminum-based copper-clad plate | |
CN210283534U (en) | Building waterproof composite board | |
CN206487114U (en) | A kind of strong environmental friendly regenerated type restructuring bamboo flooring of structural stability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20201027 Effective date of abandoning: 20240503 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20201027 Effective date of abandoning: 20240503 |