CN211769531U - Yellow river water conservancy construction pipe laying pay-off - Google Patents

Yellow river water conservancy construction pipe laying pay-off Download PDF

Info

Publication number
CN211769531U
CN211769531U CN202020184986.3U CN202020184986U CN211769531U CN 211769531 U CN211769531 U CN 211769531U CN 202020184986 U CN202020184986 U CN 202020184986U CN 211769531 U CN211769531 U CN 211769531U
Authority
CN
China
Prior art keywords
base
pay
pipe laying
water conservancy
conservancy construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020184986.3U
Other languages
Chinese (zh)
Inventor
杨军
郭伟
尹逊利
李召
姜坤
李广波
赵辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020184986.3U priority Critical patent/CN211769531U/en
Application granted granted Critical
Publication of CN211769531U publication Critical patent/CN211769531U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a yellow river water conservancy construction pipe laying pay-off relates to water conservancy construction technical field, the on-line screen storage device comprises a base, the both sides of base all are provided with the removal subassembly, and the top of base is provided with the handrail, the last surface mounting of base has the unwrapping wire subassembly, and the upper surface of base is located the front side position department of unwrapping wire subassembly and installs fixed subassembly, fixed subassembly includes the fixing base, the upper end fixed mounting of fixing base has solid fixed ring. The utility model has the advantages of being scientific and reasonable in structure, convenient operation through the removal subassembly that sets up, is convenient for carry out the removal and the fixed work of pipe laying pay-off, improves its practicality, through the unwrapping wire subassembly that sets up, can realize pipe laying pay-off's automatic unwrapping wire work, effectively improves work efficiency, through the fixed subassembly that sets up, can carry out certain direction to the pipeline fixed, guarantees the stability of pipeline unwrapping wire in-process, is convenient for go on of pipe laying work.

Description

Yellow river water conservancy construction pipe laying pay-off
Technical Field
The utility model relates to a water conservancy construction technical field specifically is a yellow river water conservancy construction pipe laying pay-off.
Background
The water conservancy project is a project constructed for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting benefit, and in the water conservancy construction process, a buried pipe is often required to be paid off and pulled to facilitate the laying of a pipeline.
However, the yellow river water conservancy construction pipe laying pay-off on the existing market is not only complicated in structure, but also single in function, and is relatively inconvenient to move and fix due to the large volume, and the existing pipe laying pay-off device is mostly manual and manual to perform the pay-off work, so that manpower is wasted, the pay-off speed is not easy to adjust, and meanwhile, the existing pipeline pay-off process cannot be guided and fixed, so that the phenomena of shaking and displacement are easy to occur, and the effect of laying the buried pipe is influenced. Therefore, the technical personnel in the field provide a pipeline burying and paying off device for water conservancy construction of the yellow river to solve the problems in the background technology.
Disclosure of Invention
An object of the utility model is to provide a yellow river water conservancy construction pipe laying pay-off to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a yellow river water conservancy construction pipe laying pay-off, includes the base, the both sides of base all are provided with the removal subassembly, and the top of base is provided with the handrail, the last surface mounting of base has the unwrapping wire subassembly, and the upper surface of base is located the front side position department of unwrapping wire subassembly and installs fixed subassembly, fixed subassembly includes the fixing base, the upper end fixed mounting of fixing base has solid fixed ring, gu fixed ring's upper end embedding installs adjusting screw, and solid fixed ring's bottom is seted up flutedly, adjusting screw's bottom is provided with the arc, the axis of rotation is installed in the inside rotation of recess, the outside cover of axis of rotation is equipped with the pulley.
As a further aspect of the present invention: the fixing assembly is fixedly connected with the base through a fixing seat, the arc plate is fixedly connected with the fixing ring through an adjusting screw rod, and the pulley is rotatably connected with the groove through a rotating shaft.
As a further aspect of the present invention: the paying-off assembly comprises a driving motor, a paying-off shaft wheel is rotatably mounted at the output end of the driving motor, a motor mounting seat is mounted at the lower end of the driving motor, baffles are arranged on two sides of the paying-off shaft wheel, and baffle mounting seats are mounted at the bottom ends of the baffles.
As a further aspect of the present invention: the driving motor is fixedly connected with the base through the motor mounting seat, and the paying-off shaft wheel is fixedly connected with the base through the baffle mounting seat.
As a further aspect of the present invention: the movable assembly comprises an upper fixed plate, a lower fixed plate is arranged below the upper fixed plate, a telescopic cylinder is installed at the joint of the upper fixed plate and the lower fixed plate, and a roller is fixedly installed at the lower end of the lower fixed plate.
As a further aspect of the present invention: the movable assembly is fixedly connected with the base through an upper fixing plate.
As a further aspect of the present invention: the upper fixing plate is fixedly connected with the lower fixing plate through a telescopic cylinder.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a removal subassembly that sets up, be convenient for carry out pipe laying pay-off's removal and fixed work, overcome the great inconvenient defect of removal of traditional pipe laying pay-off volume, improve its practicality, when needs remove pipe laying pay-off, through the telescopic cylinder action, make the piston rod stretch out to drive the bottom plate and move down, and then drive the gyro wheel and move down and support ground, through the handrail promote the device can, when needs carry out pipe laying pay-off's fixed, it can to shift up and break away from ground through the telescopic cylinder shrink drive gyro wheel.
2. The utility model discloses a unwrapping wire subassembly that sets up can realize buried pipe pay-off's automatic unwrapping wire work, overcomes the defect of the manual unwrapping wire of traditional buried pipe pay-off, effectively improves work efficiency, and can realize the adjustment of unwrapping wire speed through adjustment driving motor's rotation rate, facilitates for buried pipe unwrapping wire work.
3. The utility model discloses a fixed subassembly that sets up, can carry out certain direction to the pipeline and fix, overcome traditional pipe laying pay-off unwrapping wire in-process and easily appear the pipeline displacement, the phenomenon of laying is influenced, guarantee the stability of pipeline unwrapping wire in-process, the going on of pipe laying work of being convenient for, and this design can be applicable to the direction fixed work of different diameter pipelines, in the use, penetrate the pipeline of paying out reel surface winding in the retaining ring, then rotatory adjusting screw drives the arc and moves down and carry on spacingly to the pipeline, and simultaneously, can reduce the frictional force between pipeline and the solid fixed ring through the pulley, prevent that the pipeline from pulling the in-process and appearing the damage phenomenon.
Drawings
FIG. 1 is a schematic structural view of a pipeline laying and paying-off device for water conservancy construction of a yellow river;
FIG. 2 is a schematic structural diagram of a wire laying assembly in the yellow river water conservancy construction pipe laying and paying off device;
FIG. 3 is a schematic structural diagram of a fixing component in a pipeline laying and paying-off device for water conservancy construction of the yellow river;
FIG. 4 is a schematic structural diagram of a moving assembly in a pipeline laying and paying-off device for water conservancy construction of the yellow river.
In the figure: 10. a base; 20. a moving assembly; 21. an upper fixing plate; 22. a lower fixing plate; 23. a telescopic cylinder; 24. a roller; 30. a handrail; 40. a pay-off assembly; 41. a drive motor; 42. paying off a shaft wheel; 43. a motor mount; 44. a baffle plate; 45. a baffle mounting seat; 50. a fixing assembly; 51. a fixed seat; 52. a fixing ring; 53. adjusting the screw rod; 54. a groove; 55. an arc-shaped plate; 56. a rotating shaft; 57. a pulley.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, in an embodiment of the present invention, a submerged pipe paying-off device for yellow river water conservancy construction includes a base 10, moving assemblies 20 are disposed on both sides of the base 10, a handrail 30 is disposed above the base 10, the moving assemblies 20 include an upper fixing plate 21, a lower fixing plate 22 is disposed below the upper fixing plate 21, a telescopic cylinder 23 is disposed at a connection portion between the upper fixing plate 21 and the lower fixing plate 22, a roller 24 is fixedly disposed at a lower end of the lower fixing plate 22, the moving assemblies 20 are fixedly connected to the base 10 through the upper fixing plate 21, the upper fixing plate 21 is fixedly connected to the lower fixing plate 22 through the telescopic cylinder 23, the movement and fixing work of the submerged pipe paying-off device is facilitated through the moving assemblies 20, the defect that the conventional submerged pipe paying-off device has a large volume and is inconvenient to move is overcome, the practicability of the submerged pipe paying-off device is improved, when the submerged, the piston rod extends out to drive the lower fixing plate 22 to move downwards, further drive the roller 24 to move downwards to support the ground, the device is pushed by the handrail 30, and when the pipe laying and paying off device needs to be fixed, the telescopic cylinder 23 contracts to drive the roller 24 to move upwards to be separated from the ground.
Further, the last surface mounting of base 10 has unwrapping wire subassembly 40, unwrapping wire subassembly 40 includes driving motor 41, driving motor 41's output is rotated and is installed unwrapping wire arbor wheel 42, and motor mount 43 is installed to driving motor 41's lower extreme, the both sides of unwrapping wire arbor wheel 42 all are provided with baffle 44, baffle mount 45 is installed to the bottom of baffle 44, driving motor 41 passes through motor mount 43 fixed connection with base 10, unwrapping wire arbor wheel 42 passes through baffle mount 45 fixed connection with base 10, the automatic unwrapping wire work of buried pipe pay-off can be realized through the unwrapping wire subassembly 40 that sets up, overcome the defect of the manual unwrapping wire of traditional buried pipe pay-off, effectively improve work efficiency, and can realize the adjustment of unwrapping wire speed through the rotation rate of adjustment driving motor 41, facilitate for buried pipe unwrapping wire work.
Still further, the upper surface of the base 10 is located at the front side position of the pay-off assembly 40 and is provided with a fixing assembly 50, the fixing assembly 50 comprises a fixing seat 51, the upper end of the fixing seat 51 is fixedly provided with a fixing ring 52, the upper end of the fixing ring 52 is embedded with an adjusting screw 53, the bottom of the fixing ring 52 is provided with a groove 54, the bottom end of the adjusting screw 53 is provided with an arc-shaped plate 55, the inside of the groove 54 is rotatably provided with a rotating shaft 56, the outer side of the rotating shaft 56 is sleeved with a pulley 57, the fixing assembly 50 is fixedly connected with the base 10 through the fixing seat 51, the arc-shaped plate 55 is fixedly connected with the fixing ring 52 through the adjusting screw 53, the pulley 57 is rotatably connected with the groove 54 through the rotating shaft 56, the pipeline can be guided and fixed to a certain extent through the arranged fixing assembly 50, the phenomenon, guarantee the stability of pipeline unwrapping wire in-process, going on of the pipe laying work of being convenient for, and this design can be applicable to the direction fixed work of different diameter pipelines, in the use, penetrate solid fixed ring 52 with unwrapping wire arbor wheel 42 winding pipeline on the surface in, then rotatory adjusting screw 53 drives arc 55 and moves down and carry on spacingly to the pipeline, simultaneously, can reduce the frictional force between pipeline and solid fixed ring 52 through pulley 57, prevent that the pipeline from pulling the in-process and appearing damaging the phenomenon.
The utility model discloses a theory of operation is: in the actual use process, firstly, the fixing of the pipe laying and paying off device is carried out, the moving assembly 20 is arranged to facilitate the moving and fixing work of the pipe laying and paying off device, when the pipe laying and paying off device needs to be moved, the telescopic cylinder 23 acts to enable the piston rod to extend out to drive the lower fixing plate 22 to move downwards, further, the roller 24 is driven to move downwards to support the ground, the device is pushed by the handrail 30, when the pipe laying and paying off device needs to be fixed, the telescopic cylinder 23 contracts to drive the roller 24 to move upwards to be separated from the ground, then, a pipeline wound on the surface of the paying off shaft wheel 42 penetrates into the fixing ring 52 to be connected to the traction device, the arc-shaped plate 55 is driven by the rotating adjusting screw 53 to move downwards to limit the pipeline, meanwhile, the friction force between the pipeline and the fixing ring 52 can be reduced through the pulley 57, the damage phenomenon in the pipeline traction, pay off work is carried out through driving motor 41 work, and the adjustment of unwrapping wire speed can be realized through the slew rate of adjusting driving motor 41 in the unwrapping wire in-process, facilitates for pipe laying unwrapping wire work.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The submerged pipe pay-off device for the water conservancy construction of the yellow river comprises a base (10) and is characterized in that moving assemblies (20) are arranged on two sides of the base (10), a handrail (30) is arranged above the base (10), a pay-off assembly (40) is mounted on the upper surface of the base (10), and a fixing assembly (50) is mounted at the position, located on the front side of the pay-off assembly (40), of the upper surface of the base (10);
fixed subassembly (50) are including fixing base (51), the upper end fixed mounting of fixing base (51) has solid fixed ring (52), adjusting screw (53) are installed in the upper end embedding of solid fixed ring (52), and the bottom of solid fixed ring (52) is seted up flutedly (54), the bottom of adjusting screw (53) is provided with arc (55), axis of rotation (56) are installed in the inside rotation of recess (54), the outside cover of axis of rotation (56) is equipped with pulley (57).
2. The Huanghe river water conservancy construction pipe laying and paying-off device is characterized in that the fixing component (50) is fixedly connected with the base (10) through a fixing seat (51), the arc-shaped plate (55) is fixedly connected with the fixing ring (52) through an adjusting screw rod (53), and the pulley (57) is rotatably connected with the groove (54) through a rotating shaft (56).
3. The yellow river water conservancy construction pipe laying pay-off device of claim 1, wherein the pay-off assembly (40) comprises a driving motor (41), a pay-off shaft wheel (42) is rotatably mounted at the output end of the driving motor (41), a motor mounting seat (43) is mounted at the lower end of the driving motor (41), baffles (44) are arranged on two sides of the pay-off shaft wheel (42), and a baffle mounting seat (45) is mounted at the bottom end of each baffle (44).
4. The pipe laying and paying off device for the yellow river water conservancy construction according to claim 3, wherein the driving motor (41) is fixedly connected with the base (10) through a motor mounting seat (43), and the paying off shaft wheel (42) is fixedly connected with the base (10) through a baffle mounting seat (45).
5. The Huanghe river water conservancy construction pipe laying pay-off device is characterized in that the moving assembly (20) comprises an upper fixing plate (21), a lower fixing plate (22) is arranged below the upper fixing plate (21), a telescopic cylinder (23) is installed at the joint of the upper fixing plate (21) and the lower fixing plate (22), and a roller (24) is fixedly installed at the lower end of the lower fixing plate (22).
6. The yellow river water conservancy construction pipe laying and paying-off device is characterized in that the moving assembly (20) is fixedly connected with the base (10) through an upper fixing plate (21).
7. The yellow river water conservancy construction pipe laying and paying-off device is characterized in that the upper fixing plate (21) and the lower fixing plate (22) are fixedly connected through a telescopic cylinder (23).
CN202020184986.3U 2020-02-19 2020-02-19 Yellow river water conservancy construction pipe laying pay-off Expired - Fee Related CN211769531U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020184986.3U CN211769531U (en) 2020-02-19 2020-02-19 Yellow river water conservancy construction pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020184986.3U CN211769531U (en) 2020-02-19 2020-02-19 Yellow river water conservancy construction pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN211769531U true CN211769531U (en) 2020-10-27

Family

ID=72908198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020184986.3U Expired - Fee Related CN211769531U (en) 2020-02-19 2020-02-19 Yellow river water conservancy construction pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN211769531U (en)

Similar Documents

Publication Publication Date Title
CN216686876U (en) Hydraulic engineering construction pipe laying pay-off
CN110797804B (en) Cable pipe port multidirectional pulley auxiliary tool
CN211769531U (en) Yellow river water conservancy construction pipe laying pay-off
CN103910252B (en) A kind of reeling device and filling car
CN107658793B (en) Laying device with cable protection function
CN111573430B (en) Depth finder winding and unwinding devices for oceanographic engineering survey and drawing
CN217522480U (en) Quick laying device of electric wire
CN211310401U (en) Automatic wire arranging device suitable for cable production
CN114314179A (en) Well cable conductor winding and unwinding devices
CN218783471U (en) Auxiliary frame body structure for cable laying
CN214217696U (en) Pipe laying and paying-off device for hydraulic engineering
CN220182372U (en) Water conservancy construction pipeline buries puts device
CN216006811U (en) Water conservancy construction pipe laying pay-off
CN111552047A (en) Wall pipeline optical cable laying method
CN216971584U (en) Pay-off for construction
CN213864868U (en) Pipe laying and paying-off device for hydraulic engineering construction
CN216941308U (en) Movable, liftable and safe rapid wall body grooving device
CN212863645U (en) Cable winding device with guiding function for electric power construction
CN218712972U (en) Improved generation hammering stake pore-forming equipment
CN110695454A (en) Underwater internal cutting system and cutting method thereof
CN217201293U (en) Hydraulic engineering construction pipe laying pay-off
CN218778507U (en) Cable wire barrow
CN221165335U (en) Be used for tow chain cable processing pay-off
CN220364143U (en) Cable laying auxiliary device for power engineering
CN220358693U (en) Water conservancy and hydropower engineering is with burying line device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027

Termination date: 20210219