CN220182372U - Water conservancy construction pipeline buries puts device - Google Patents

Water conservancy construction pipeline buries puts device Download PDF

Info

Publication number
CN220182372U
CN220182372U CN202321108461.1U CN202321108461U CN220182372U CN 220182372 U CN220182372 U CN 220182372U CN 202321108461 U CN202321108461 U CN 202321108461U CN 220182372 U CN220182372 U CN 220182372U
Authority
CN
China
Prior art keywords
water conservancy
conservancy construction
construction pipeline
placing
burying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321108461.1U
Other languages
Chinese (zh)
Inventor
李高鹏
鲁照鑫
张晓航
樊志晗
刘畅
畅子昊
李志胜
李东伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321108461.1U priority Critical patent/CN220182372U/en
Application granted granted Critical
Publication of CN220182372U publication Critical patent/CN220182372U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model relates to the technical field of pipeline burying and placing, in particular to a water conservancy construction pipeline burying and placing device which comprises a shell component, wherein a cavity is formed in the shell component, a rotating rod is arranged on two walls of the cavity through bearings, cams are arranged at two ends of the outer part of the rotating rod, the improved water conservancy construction pipeline burying and placing device is used for realizing quick line placing operation of pipelines during the period of burying and placing of a yellow river water conservancy construction pipeline through the cooperation of a servo motor, a rolling shaft and a line placing wheel, the control effect on the pipeline burying and placing is greatly facilitated, the labor intensity of workers is reduced, the burying and placing efficiency of the yellow river water conservancy construction pipeline is improved, the fixation of the line placing wheel is realized during the period of non-use by utilizing the cooperation of the rotating rod, the cams and a clamping block, the condition that the line placing wheel rotates during the period of non-use is avoided, the stability of the line placing wheel during the period of non-use is increased, and the requirement of burying and placing of the yellow river water conservancy construction pipeline is met.

Description

Water conservancy construction pipeline buries puts device
Technical Field
The utility model relates to the technical field of pipeline burying, in particular to a pipeline burying device for water conservancy construction.
Background
The hydraulic engineering is a general term of various engineering construction constructed for controlling, utilizing and protecting water resources and environments on the earth surface and underground, is a project constructed for eliminating water damage and developing and utilizing water resources, and is classified into flood control engineering, farmland hydraulic engineering, hydroelectric power engineering, channel and port engineering, water supply and drainage engineering, environmental hydraulic engineering, sea reclamation engineering and the like according to the service objects thereof, and is a hydraulic engineering capable of simultaneously serving various targets such as flood control, water supply, irrigation, power generation and the like, and is called comprehensive utilization hydraulic engineering.
The hydraulic engineering is used for controlling and preparing surface water and underground water in nature, achieves the purpose of removing harm and benefiting, and in the hydraulic construction process, paying-off traction is often required to be carried out on buried pipes so as to facilitate the laying of pipelines, so that the pipeline burying device is an indispensable auxiliary device.
The prior patent (publication number: CN 211254723U) discloses a hydraulic engineering construction pipeline burying device, which comprises a mounting base, wherein a first support frame is arranged on one side of the top surface of the mounting base, a second support frame is arranged on the opposite side of the first support frame, a first rotating disc is fixedly arranged at the top end of a piston rod of a hydraulic rod, a second rotating disc is fixedly arranged at the top end of a rotating shaft of a first motor, an electric lifting table is arranged between the first support frame and the second support frame, an arc-shaped supporting plate is arranged on the top surface of the electric lifting table, a first rotating roller is clamped between the first support plate and the second support plate, a second rotating roller is arranged at the top end of the first rotating roller, and a second motor is arranged on the side edge of the second support plate. According to the utility model, the electric lifting platform supports the wire cylinder, so that the wire cylinder can be replaced more easily, meanwhile, the pipeline can be automatically paid off in the paying-off process, manual wire drawing is not needed, and the working efficiency is effectively improved. The inventors found that the following problems exist in the prior art in the process of implementing the present utility model: 1. most of the existing pipeline burying devices manually carry out paying-off work, the paying-off speed is not easy to adjust by manual operation, and the labor intensity of workers is greatly increased, so that the working efficiency is greatly reduced; 2. traditional spool buries puts device and can't fix the unwrapping wire arbor wheel during not using, leads to unwrapping wire arbor wheel to advance to rotate under self gravity to lead to the pipeline to be in disorder, bad reason.
Disclosure of Invention
The utility model aims to provide a water conservancy construction pipeline burying device, which aims to solve the problems that in the prior art, the existing pipeline burying device is mainly used for manually paying off, the paying off speed is not easy to adjust by manual operation, the labor intensity of workers is greatly increased, the working efficiency is greatly reduced, and the paying off reel cannot be fixed during the non-use period of the traditional line pipe burying device, so that the paying off reel rotates under the gravity of the paying off reel, and the pipeline is disordered and is not easy to manage.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a water conservancy construction pipeline buries device, includes housing assembly, housing assembly's inside has been seted up the cavity, the inside both walls of cavity are provided with the bull stick through the bearing, the outside both ends of bull stick are provided with the cam, the fluting has been seted up on the top both sides of cavity, two the inside both ends of fluting all are provided with the guide bar, two the outside of guide bar is provided with the slider, the top middle part of slider is provided with the fixture block, the top outside of slider is provided with the spring, housing assembly's top both sides are provided with erects version, two be provided with the roller through the bearing between the erectting version, the outside of roller is provided with the unwrapping wire wheel, one side of erectting version is provided with the second extension board, the top of second extension board is provided with servo motor, the one end of erecting version is kept away from on housing assembly's top is provided with the support, the top of support is provided with the spacing ring, the top of spacing ring is provided with the control rod, the bottom of control rod is provided with the arc stopper through the bearing.
Preferably, the shell assembly comprises a base, a mounting seat is arranged at the top end of the base, a first support plate is arranged on one side of the mounting seat, and a motor is arranged at the top end of the first support plate.
Preferably, the central axis of the motor is consistent with the central axis of the rotating rod.
Preferably, the central axis of the servo motor is consistent with the central axis of the roll shaft.
Preferably, a plurality of clamping grooves are formed in the paying-off wheel, and clamping structures are arranged between the clamping grooves and the clamping blocks.
Preferably, the control rod is in threaded connection with the limiting ring.
Preferably, a plurality of rollers are embedded in the bottom end of the limit ring.
Compared with the prior art, the utility model has the beneficial effects that:
through the cooperation of the servo motor, the rolling shaft and the paying-off wheel, the quick paying-off work of the pipeline is realized during the burying period of the water conservancy construction pipeline, the control effect on the burying of the pipeline is greatly facilitated, the labor intensity of workers is reduced, and the burying efficiency of the water conservancy construction pipeline is improved;
through the cooperation of bull stick, cam and fixture block, make the water conservancy construction pipeline bury and put the device in not using the period, realize the fixed to the unwrapping wire wheel, avoided the unwrapping wire wheel to appear autogenously and lead to the condition that the pipeline is disordered during not using to increase the unwrapping wire wheel stability during not using, and then accord with the water conservancy construction pipeline and bury and put the demand.
Drawings
FIG. 1 is a schematic diagram of the front internal structure of the present utility model;
FIG. 2 is an enlarged schematic view of the structure of FIG. 1A according to the present utility model;
FIG. 3 is a schematic side cross-sectional view of the present utility model;
FIG. 4 is a schematic elevational view of the present utility model;
FIG. 5 is an enlarged view of the inner structure of the stop collar of the present utility model.
In the figure: 1. a housing assembly; 101. a base; 102. a mounting base; 103. a first support plate; 104. a motor; 2. a cavity; 3. a rotating rod; 4. a cam; 5. slotting; 6. a guide rod; 7. a slide block; 8. a clamping block; 9. a spring; 10. erecting a plate; 11. a roll shaft; 12. a paying-off wheel; 13. a second support plate; 14. a servo motor; 15. a bracket; 16. a limiting ring; 17. a control lever; 18. an arc-shaped limiting block.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which are obtained by a worker of ordinary skill in the art without creative efforts, are within the protection scope of the present utility model based on the embodiments of the present utility model.
Referring to fig. 1 to 5, the present utility model provides a technical solution: the utility model provides a water conservancy construction pipeline buries device, including housing assembly 1, housing assembly 1's inside has been seted up cavity 2, cavity 2's inside both walls are provided with bull stick 3 through the bearing, bull stick 3's outside both ends are provided with cam 4, fluting 5 has been seted up to cavity 2's top both sides, two fluting 5's inside both ends all are provided with guide bar 6, two guide bar 6's outside is provided with slider 7, slider 7's top middle part is provided with fixture block 8, slider 7's top outside is provided with spring 9, housing assembly 1's top both sides are provided with perpendicular version 10, be provided with roller 11 through the bearing between two perpendicular version 10, roller 11's outside is provided with paying off wheel 12, perpendicular version 10's one side is provided with second extension board 13, second extension board 13's top is provided with servo motor 14, housing assembly 1's top is kept away from perpendicular version 10's one end is provided with support 15, support 15's top is provided with spacing ring 16, spacing ring 16's top is provided with control bar 17, control bar 17's bottom is provided with arc stopper 18 through the bearing.
In this embodiment, as shown in fig. 1, the housing assembly 1 includes a base 101, a mounting seat 102 is provided at a top end of the base 101, a first support plate 103 is provided at one side of the mounting seat 102, and a motor 104 is provided at a top end of the first support plate 103.
In this embodiment, as shown in fig. 1, the central axis of the motor 104 is consistent with the central axis of the rotating rod 3; realize the joint between fixture block 8 and the draw-in groove, convenient to have greatly buried the operability of putting the device to the pipeline, reduce the operation degree of difficulty.
In this embodiment, as shown in fig. 4, the central axis of the servo motor 14 is consistent with the central axis of the roll shaft 11, so that the quick paying-off work of the pipeline is realized during the burying period of the hydraulic construction pipeline, the control effect on the burying of the pipeline is greatly facilitated, the labor intensity of workers is reduced, and the burying efficiency of the hydraulic construction pipeline is improved.
In this embodiment, as shown in fig. 1 and 3, a plurality of clamping grooves are respectively formed at two ends of the paying-off wheel 12, and a clamping structure is arranged between the clamping grooves and the clamping blocks 8, so as to fix the paying-off wheel 12, and avoid the condition that the paying-off wheel 12 rotates automatically during non-use to cause disorder of pipelines, thereby increasing the stability of the paying-off wheel 12 during non-use, and further meeting the burying requirement of water conservancy construction pipelines.
In this embodiment, as shown in fig. 5, the control rod 17 and the limiting ring 16 are connected by threads, so that the height of the arc-shaped limiting block 18 is adjusted according to the sizes of different pipelines, and the stability of the pipelines during burying is improved.
In this embodiment, as shown in fig. 5, a plurality of rollers are embedded in the bottom end of the inner portion of the limiting ring 16; the contact area between the pipeline and the limiting ring 16 is reduced, so that the pipeline can move more smoothly in the limiting ring 16.
The application method and the advantages of the utility model are as follows: when the water conservancy construction pipeline burying device is used, the working process is as follows:
as shown in fig. 1, 2, 3, 4 and 5, when a hydraulic engineering pipeline is needed to be buried, one end of the pipeline outside the paying-off wheel 12 is stretched and penetrates through the inside of the limiting ring 16, then the arc limiting block 18 is driven to downwards carry out one end by rotating the control rod 17, the bottom end edge of the arc limiting block 18 is attached to the outer edge of the pipeline, limiting the pipeline is realized, the condition that the pipeline is misplaced during the burying period is avoided, the contact area between the pipeline and the limiting ring 16 is reduced by using the rolling shaft, so that the pipeline moves inside the limiting ring 16 more smoothly, then the extending end of the pipeline is connected with external burying traction equipment, the servo motor 14 is started to drive the roller shaft 11 and the paying-off wheel 12 to rotate, and the quick paying-off operation of the pipeline is realized during the burying period of the hydraulic engineering pipeline, the control effect when burying the pipeline is greatly convenient, reduce staff's intensity of labour, thereby promote the water conservancy construction pipeline and bury and put efficiency, when pipeline buries and put the device and stop unwrapping wire or not use, the starter motor 104 drives bull stick 3 and rotates, bull stick 3 drives cam 4 synchronous revolution, cam 4 drives slider 7 and fixture block 8 and carries out the jacking under the spacing of guide bar 6, and compress spring 9 simultaneously, the fixture block 8 joint that makes is inside the draw-in groove, make and form the joint structure between fixture block 8 and the draw-in groove, and then realize the fixed of object unwrapping wire wheel 12, make the water conservancy construction pipeline bury and put the device in the non-use period, realize the fixed to unwrapping wire wheel 12, avoid unwrapping wire wheel 12 to appear autogenously and lead to the circumstances of pipeline disorder during non-use, thereby increase the stability of unwrapping wire wheel 12 in non-use period, and then accord with the water conservancy construction pipeline buries and put the demand.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the above-described embodiments, and that the above-described embodiments and descriptions are only preferred embodiments of the present utility model, and are not intended to limit the utility model, and that various changes and modifications may be made therein without departing from the spirit and scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. Water conservancy construction pipeline buries puts device, including shell subassembly (1), its characterized in that: the utility model discloses a novel automatic control device for the wire unwinding of the shell assembly, which comprises a shell assembly and is characterized in that a cavity (2) is arranged in the shell assembly (1), a rotating rod (3) is arranged on two inner walls of the cavity (2) through bearings, a cam (4) is arranged at two outer ends of the rotating rod (3), a slot (5) is arranged at two top ends of the cavity (2), guide rods (6) are arranged at two inner ends of the slot (5), a sliding block (7) is arranged at two outer ends of the guide rods (6), a clamping block (8) is arranged in the middle of the top end of the sliding block (7), a spring (9) is arranged at the outer side of the top end of the sliding block (7), a vertical plate (10) is arranged at two top ends of the shell assembly (1), a roller shaft (11) is arranged between the vertical plates (10) through bearings, a paying-off wheel (12) is arranged at the outer ends of the roller shaft (11), a second support plate (13) is arranged at one side of the vertical plate (10), a servo motor (14) is arranged at the top end of the second support plate (13), a clamping block (8) is arranged at the top end of the shell assembly (1), a limit stop ring (16) is arranged at one end of the vertical plate (10) far away from the vertical plate (10), the bottom of the control rod (17) is provided with an arc-shaped limiting block (18) through a bearing.
2. The water conservancy construction pipeline burying device according to claim 1, wherein: the shell assembly (1) comprises a base (101), a mounting seat (102) is arranged at the top end of the base (101), a first support plate (103) is arranged on one side of the mounting seat (102), and a motor (104) is arranged at the top end of the first support plate (103).
3. The water conservancy construction pipeline burying device according to claim 2, wherein: the central axis of the motor (104) is consistent with the central axis of the rotating rod (3).
4. The water conservancy construction pipeline burying device according to claim 1, wherein: the central axis of the servo motor (14) is consistent with the central axis of the roll shaft (11).
5. The water conservancy construction pipeline burying device according to claim 1, wherein: a plurality of clamping grooves are formed in the paying-off wheel (12), and clamping structures are arranged between the clamping grooves and the clamping blocks (8).
6. The water conservancy construction pipeline burying device according to claim 1, wherein: the control rod (17) is in threaded connection with the limiting ring (16).
7. The water conservancy construction pipeline burying device according to claim 1, wherein: the inner bottom end of the limiting ring (16) is embedded with a plurality of rolling shafts.
CN202321108461.1U 2023-05-10 2023-05-10 Water conservancy construction pipeline buries puts device Active CN220182372U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321108461.1U CN220182372U (en) 2023-05-10 2023-05-10 Water conservancy construction pipeline buries puts device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321108461.1U CN220182372U (en) 2023-05-10 2023-05-10 Water conservancy construction pipeline buries puts device

Publications (1)

Publication Number Publication Date
CN220182372U true CN220182372U (en) 2023-12-15

Family

ID=89112577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321108461.1U Active CN220182372U (en) 2023-05-10 2023-05-10 Water conservancy construction pipeline buries puts device

Country Status (1)

Country Link
CN (1) CN220182372U (en)

Similar Documents

Publication Publication Date Title
CN220182372U (en) Water conservancy construction pipeline buries puts device
CN214365318U (en) Novel all-in-one is right in pole setting of digging pit
CN213585109U (en) Pipeline supporting mechanism for weak current engineering
CN210849262U (en) Auxiliary tool for pipeline cutting
CN210103196U (en) Drip irrigation pipe coiling mechanism
CN111823416B (en) Prestressed pipe pile cutting equipment
CN214061515U (en) Canal lining board protection film laying device
CN213802638U (en) A hoist device for utility tunnel
CN213461027U (en) Simple cable trench support structure
CN210830777U (en) Pipeline fixed mounting device for water conservancy construction
CN210710107U (en) A intraductal electric wire tractive device for building intelligent installation engineering
CN211846933U (en) Pipeline embedding device for hydraulic engineering
CN211366521U (en) Cable recovery unit among ocean engineering
CN216329052U (en) Concrete curing means is used in road bridge engineering concrete preparation
CN216598750U (en) Auxiliary device for cable laying
CN219054235U (en) Pipeline fixing device for water conservancy and hydropower construction
CN213732691U (en) Cutting device is used in drain pipe processing
CN216413885U (en) A pipeline positioner for communication construction
CN220318579U (en) Retaining wall reinforcing apparatus for hydraulic engineering
CN218664668U (en) Auxiliary pay-off device for power construction
CN213745218U (en) Pipeline laying positioning device
CN214399374U (en) Optical cable pay-off
CN215110914U (en) Water conservancy and hydropower engineering construction is with leading water pipe laying device
CN112499364B (en) Pay-off is used in construction of power transmission and distribution power consumption electric engineering
CN210480730U (en) Temporary transfer device for tap water pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant