CN215110914U - Water conservancy and hydropower engineering construction is with leading water pipe laying device - Google Patents

Water conservancy and hydropower engineering construction is with leading water pipe laying device Download PDF

Info

Publication number
CN215110914U
CN215110914U CN202121040814.XU CN202121040814U CN215110914U CN 215110914 U CN215110914 U CN 215110914U CN 202121040814 U CN202121040814 U CN 202121040814U CN 215110914 U CN215110914 U CN 215110914U
Authority
CN
China
Prior art keywords
fixed block
fixed
engineering construction
laying device
iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121040814.XU
Other languages
Chinese (zh)
Inventor
史娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121040814.XU priority Critical patent/CN215110914U/en
Application granted granted Critical
Publication of CN215110914U publication Critical patent/CN215110914U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The utility model discloses a leading water pipe laying device is used in hydraulic and hydroelectric engineering construction, including the roof, the equal fixed mounting in four corners of roof bottom surface has the supporting leg, and damping spring is connected to the lower tip of supporting leg, and damping spring keeps away from the one end installation gyro wheel of supporting leg, and the upper surface of roof is equipped with the work box, and the bottom of work box is fixed with the upper end contact of roof, and the rear end portion of work box is equipped with driving motor, and the inside of work box transversely is provided with the pivot, and the middle part of pivot is equipped with the shaft coupling. This drinking water pipe laying device is used in hydraulic and hydroelectric engineering construction, driving motor can drive the pivot through the shaft coupling and rotate to make the reel rotate and carry out the rolling to the lifting rope, the couple pulling is laid the mechanism and is raised, can lay the drinking water pipe, workman's labour has been reduced, work efficiency has been improved, circular bolt can be with fixed block and iron set fixed engagement, convenient dismantlement and installation, the drinking water pipe that different thickness was adapted to the fixed block of being convenient for change not unidimensional, improve device's practicality.

Description

Water conservancy and hydropower engineering construction is with leading water pipe laying device
Technical Field
The utility model relates to a leading water pipe laying device technical field specifically is a leading water pipe laying device is used in hydraulic and hydroelectric engineering construction.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. Hydraulic engineering needs to build various types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like so as to achieve the aims. The hydraulic engineering is an indispensable part in modern city construction, and plays an important role in meeting the requirements of city flood control, irrigation, power generation and the like and improving the living standard and quality of people.
In the diversion pipe laying work progress, because the length of diversion pipe laying operation is longer for the laying face that the diversion pipe was located when laying can't guarantee all on a horizontal plane, often can meet the circumstances such as pipeline bracket and the trench of the horizontal plane height of installing in the time, when the great pipeline of ground pipe diameter is buried in the installation, often can not carry out stable fixed, installs improper danger that still can lead to the water pipe to burst.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a leading water pipe laying device is used in hydraulic and hydroelectric engineering construction, it can drive the pivot through the shaft coupling and rotate to have driving motor, thereby make the reel rotate and carry out the rolling to the lifting rope, make the couple pulling lay the mechanism and rise, can lay the leading water pipe, workman's labour has been reduced, work efficiency has been improved, circular bolt can be with fixed block and iron set fixed meshing, convenient dismantlement and installation, the fixed block of being convenient for to change not unidimensional adapts to the leading water pipe of different thicknesses, the practicality of the high-speed joint installation, the slide can effectually hold up and remove the leading water pipe, avoided the leading water pipe when connecting, because of connecting the condition that appears bursting in the wrong day, the advantage of the effect of correcting the leading water union coupling has been played, the problem among the prior art has been solved.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a water conservancy and hydropower engineering construction is with leading water pipe laying device, including the roof, the equal fixed mounting in four corners of roof bottom surface has the supporting leg, damping spring is connected to the lower tip of supporting leg, damping spring keeps away from the one end installation gyro wheel of supporting leg, the upper surface of roof is equipped with the work box, the bottom of work box and the upper end contact of roof are fixed, the rear end of work box is equipped with driving motor, the inside of work box transversely is provided with the pivot, the middle part of pivot is equipped with the shaft coupling, driving motor's output shaft extends to the internal connection shaft coupling of work box, the reel has all been cup jointed to the axle body both sides of pivot, the whole body winding of reel has the lifting rope, the one end fixedly connected with couple that the winding rope kept away from the reel, the below of roof sets up lays the mechanism, lay the mechanism and include iron set, fixed end group, slide and hoop, the both ends of iron set up fixed end group respectively, fixed end group includes first fixed block, First semicircle groove, the second fixed block, the second semicircle groove, the screw hole, circular bolt, lead to groove and bolt, first semicircle groove is seted up to one side of first fixed block, the right side of first fixed block sets up the second fixed block, one side of second fixed block sets up the second semicircle groove, the second semicircle groove corresponds the setting with first semicircle groove, set up the screw hole on the apex angle of first fixed block and second fixed block, insert in the screw hole and connect circular bolt, logical groove is seted up with the side of second fixed block to first fixed block, insert the bolt in the logical groove, pass through bolted connection between first fixed block and the second fixed block, the both ends of iron set are fixed on fixed end group, swing joint has the slide on the iron set, the hoop has been cup jointed on the iron set of upper end.
Preferably, mounting plates are arranged at two ends of the rotating shaft and fixed at two ends of the inner wall of the working box, and two ends of the rotating shaft are movably connected with the mounting plates through pin shafts.
Preferably, one end of the lifting rope is fixed on the winding wheel, and the other end of the lifting rope penetrates through the working box to be connected with the hook.
Preferably, the hooks are provided with two hooks, and the two hooks are connected with the corresponding lifting ropes and the corresponding reels.
Preferably, four iron rods are arranged and respectively correspond to the grooves in the fixing block, and the end portions of the iron rods are inserted into the grooves in the fixing block.
Preferably, the iron ring is arranged at a corresponding position below the hook, and the hook head of the hook is hooked with the iron ring.
Preferably, the number of the sliding plates is two, the sliding plates are arranged in parallel, and the middle of each sliding plate is provided with a circular groove.
Compared with the prior art, the beneficial effects of the utility model are as follows:
this leading water pipe laying device is used in hydraulic and hydroelectric engineering construction, driving motor can drive the pivot through the shaft coupling and rotate, thereby make the reel rotate and carry out the rolling to the lifting rope, make the couple pulling laying mechanism rise, can lay the leading water pipe, workman's labour has been reduced, work efficiency has been improved, circular bolt can be with fixed block and iron set fixed engagement, convenient dismantlement and installation, the not unidimensional fixed block of being convenient for to change adapts to the leading water pipe of different thicknesses, the practicality of improving the device, the slide can effectually hold up and remove the leading water pipe, avoided the leading water pipe when connecting, because of connecting the condition that appears bursting in the improper day, the effect of correcting the leading water piping connection has been played.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a plan view of the internal structure of the present invention;
FIG. 3 is a schematic structural view of the laying mechanism of the present invention;
fig. 4 is a schematic structural diagram of the fixed end group of the present invention.
In the figure: 1. a top plate; 2. supporting legs; 3. a damping spring; 4. a roller; 5. a work box; 6. a drive motor; 7. a rotating shaft; 8. a coupling; 9. a reel; 10. a lifting rope; 11. hooking; 12. a laying mechanism; 121. an iron rod; 122. a fixed end group; 1221. a first fixed block; 1222. a first semicircular groove; 1223. a second fixed block; 1224. a second semi-circular groove; 1225. a screw hole; 1226. a round bolt; 1227. a through groove; 1228. a bolt; 123. a slide plate; 124. and (4) an iron ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a water conduit laying device for water conservancy and hydropower engineering construction comprises a top plate 1, wherein supporting legs 2 are fixedly arranged at four corners of the bottom surface of the top plate 1, the lower end parts of the supporting legs 2 are connected with damping springs 3, the damping springs 3 have good damping effect, collapse of the device caused by overweight of a laying mechanism 12 is avoided when the water conduit is laid, rollers 4 are arranged at one ends of the damping springs 3, which are far away from the supporting legs 2, and are used for displacing the device, the action is flexible, so that different sections of the laying mechanism 12 can be conveniently fixed, a working box 5 is arranged on the upper surface of the top plate 1, the bottom of the working box 5 is fixedly contacted with the upper end part of the top plate 1, a driving motor 6 is arranged at the rear end part of the working box 5, a rotating shaft 7 is transversely arranged in the working box 5, mounting plates are arranged at two ends of the rotating shaft 7 and are fixed at two ends of the inner wall of the working box 5, the two ends of a rotating shaft 7 are movably connected with a mounting plate through a pin shaft, the middle part of the rotating shaft 7 is provided with a coupler 8, an output shaft of a driving motor 6 extends to the inner connecting coupler 8 of a working box 5, two sides of the shaft body of the rotating shaft 7 are respectively sleeved with a reel 9, hoisting ropes 10 are wound around the reels 9, one ends, far away from the reels 9, of the hoisting ropes 10 are fixedly connected with hooks 11, one ends of the hoisting ropes 10 are fixed on the reels 9, the other ends of the hoisting ropes 10 penetrate through the working box 5 to be connected with the hooks 11, the two hooks 11 are respectively connected with the corresponding hoisting ropes 10 and the corresponding reels 9, the driving motor 6 can drive the rotating shaft 7 to rotate through the coupler 8, so that the reels 9 rotate and wind the hoisting ropes 10, the hooks 11 pull a laying mechanism 12 to rise, thereby laying a water diversion pipe, the labor force of workers is reduced, the working efficiency is improved, the laying mechanism 12 is arranged below a top plate 1, the laying mechanism 12 comprises an iron rod 121, a fixed end group 122, a sliding plate 123 and an iron ring 124, wherein four iron rods 121 are arranged and respectively correspond to grooves on the fixed blocks, the end parts of the iron rods 121 are inserted into the grooves of the fixed blocks, the fixed end group 122 is respectively arranged at two ends of each iron rod 121, each fixed end group 122 comprises a first fixed block 1221, a first semicircular groove 1222, a second fixed block 1223, a second semicircular groove 1224, a screw hole 1225, a circular bolt 1226, a through groove 1227 and a bolt 1228, a first semicircular groove 1222 is formed in one side of each first fixed block 1221, a second fixed block 1223 is arranged on the right side of each first fixed block 1221, a second semicircular groove 1224 is formed in one side of each second fixed block 1223, the second semicircular groove 1224 corresponds to the first semicircular groove 1222 and plays a role of fixing a water conduit, screw holes 1225 are formed in the vertex angles of the first fixed block 1221 and the second fixed block 1223, a connecting circular bolt 1226 is inserted into the screw hole 1225, and the fixed block 1226 can be fixedly engaged with the iron rods 121, the side edges of the first fixing block 1221 and the second fixing block 1223 are provided with through grooves 1227, the pins 1228 are inserted into the through grooves 1227, the first fixing block 1221 and the second fixing block 1223 are connected through the pins 1228, the stability of connection between the fixing blocks is improved, the two end parts of the iron rod 121 are fixed on the fixing end group 122, the iron rod 121 is movably connected with sliding plates 123, the two sliding plates 123 are arranged in parallel, the middle part of the sliding plate 123 is provided with a circular groove, the sliding plate 123 can effectively support and move the water guide pipe, the phenomenon that the water guide pipe bursts due to improper connection in the future is avoided when the water guide pipe is connected, the effect of correcting the connection of the water guide pipe is achieved, the iron rod 121 at the upper end is sleeved with the iron ring 124, the iron ring 124 is arranged at the corresponding position below the hook 11, and the hook head of the hook 11 is connected with the iron ring 124, two iron rings 124 are arranged to play a balancing role, so that the laying mechanism 12 can be conveniently and evenly placed in the dug pit.
In conclusion, this diversion pipe laying device is used in hydraulic and hydroelectric engineering construction, driving motor 6 can drive pivot 7 through shaft coupling 8 and rotate, thereby make reel 9 rotate and carry out the rolling to lifting rope 10, make couple 11 pulling laying mechanism 12 rise, can lay the diversion pipe, workman's labour has been reduced, work efficiency has been improved, circular bolt 1226 can be with fixed block and iron set 121 fixed engagement, convenient dismantlement and installation, be convenient for change not unidimensional fixed block and adapt to the diversion pipe of different thicknesses, the practicality of the device is improved, slide 123 can effectually hold up and remove the diversion pipe, avoided the diversion pipe when connecting, because of connecting the condition that appears bursting in the future improperly, the effect of correcting the diversion pipe connection has been played.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a water conservancy and hydropower engineering construction is with leading water pipe laying device, includes roof (1), its characterized in that: the four corners of the bottom surface of the top plate (1) are fixedly provided with supporting legs (2), the lower end parts of the supporting legs (2) are connected with damping springs (3), one ends, far away from the supporting legs (2), of the damping springs (3) are provided with idler wheels (4), the upper surface of the top plate (1) is provided with a working box (5), the bottom of the working box (5) is fixedly contacted with the upper end part of the top plate (1), the rear end part of the working box (5) is provided with a driving motor (6), a rotating shaft (7) is transversely arranged inside the working box (5), the middle part of the rotating shaft (7) is provided with a coupler (8), an output shaft of the driving motor (6) extends to an internal connecting coupler (8) of the working box (5), two sides of a shaft body of the rotating shaft (7) are respectively sleeved with a reel (9), hanging ropes (10) are wound around the reel (9), one end, far away from the reel (9), of each hanging rope (10) is fixedly connected with a hook (11), the laying mechanism (12) is arranged below the top plate (1), the laying mechanism (12) comprises an iron rod (121), a fixed end group (122), a sliding plate (123) and an iron ring (124), the fixed end group (122) is arranged at each of two ends of the iron rod (121), the fixed end group (122) comprises a first fixed block (1221), a first semicircular groove (1222), a second fixed block (1223), a second semicircular groove (1224), a screw hole (1225), a circular bolt (1226), a through groove (1227) and a bolt (1228), the first semicircular groove (1222) is formed in one side of the first fixed block (1221), the second fixed block (1223) is arranged on the right side of the first fixed block (1221), the second semicircular groove (1224) is arranged on one side of the second fixed block (1223), the second semicircular groove (1224) is arranged corresponding to the first semicircular groove (1222), and the screw holes (1225) are formed in vertex angles of the first fixed block (1221) and the second fixed block (1223), insert in screw hole (1225) and connect circular bolt (1226), logical groove (1227) are seted up with the side of second fixed block (1223) in first fixed block (1221), insert bolt (1228) in leading to groove (1227), be connected through bolt (1228) between first fixed block (1221) and second fixed block (1223), the both ends of iron pole (121) are fixed on fixed end group (122), swing joint has slide (123) on iron pole (121), iron ring (124) have been cup jointed on iron pole (121) of upper end.
2. The water conduit laying device for the water conservancy and hydropower engineering construction according to claim 1, which is characterized in that: the mounting plates are arranged at two ends of the rotating shaft (7) and fixed at two ends of the inner wall of the working box (5), and two ends of the rotating shaft (7) are movably connected with the mounting plates through pin shafts.
3. The water conduit laying device for the water conservancy and hydropower engineering construction according to claim 1, which is characterized in that: one end of the lifting rope (10) is fixed on the reel (9), and the other end of the lifting rope (10) penetrates through the working box (5) to be connected with the hook (11).
4. The water conduit laying device for the water conservancy and hydropower engineering construction according to claim 1, which is characterized in that: the two hooks (11) are connected with corresponding lifting ropes (10) and reels (9).
5. The water conduit laying device for the water conservancy and hydropower engineering construction according to claim 1, which is characterized in that: four iron rods (121) are arranged and respectively correspond to the grooves in the fixing block, and the end parts of the iron rods (121) are inserted into the grooves in the fixing block.
6. The water conduit laying device for the water conservancy and hydropower engineering construction according to claim 1, which is characterized in that: the iron ring (124) is arranged at the corresponding position below the hook (11), and the hook head of the hook (11) is hooked with the iron ring (124).
7. The water conduit laying device for the water conservancy and hydropower engineering construction according to claim 1, which is characterized in that: the number of the sliding plates (123) is two, the sliding plates are arranged in parallel, and a circular groove is formed in the middle of each sliding plate (123).
CN202121040814.XU 2021-05-13 2021-05-13 Water conservancy and hydropower engineering construction is with leading water pipe laying device Expired - Fee Related CN215110914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121040814.XU CN215110914U (en) 2021-05-13 2021-05-13 Water conservancy and hydropower engineering construction is with leading water pipe laying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121040814.XU CN215110914U (en) 2021-05-13 2021-05-13 Water conservancy and hydropower engineering construction is with leading water pipe laying device

Publications (1)

Publication Number Publication Date
CN215110914U true CN215110914U (en) 2021-12-10

Family

ID=79297064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121040814.XU Expired - Fee Related CN215110914U (en) 2021-05-13 2021-05-13 Water conservancy and hydropower engineering construction is with leading water pipe laying device

Country Status (1)

Country Link
CN (1) CN215110914U (en)

Similar Documents

Publication Publication Date Title
US11242664B2 (en) Portable mechanically assembled ground fixation stake device
CN215110914U (en) Water conservancy and hydropower engineering construction is with leading water pipe laying device
CN104776268A (en) Mechanical construction method for mounting large-caliber reinforced concrete drainage pipe
CN208251113U (en) A kind of anti-collapse device of building foundation pit
CN205224120U (en) Prevent osmosis membrane's laying device perpendicularly
CN205557520U (en) Novel pile -drawing machine
CN205062771U (en) Hawser pulls herringbone water -stop dam
CN214329178U (en) Mounting structure for rainwater circulation pipeline
CN105089016A (en) Cable traction reversed-V-shaped water retaining dam
CN210857941U (en) Lifting device for housing construction
CN112431961B (en) Pipeline laying device for pipeline construction
CN212928978U (en) Municipal administration pipeline laying device
CN111823416B (en) Prestressed pipe pile cutting equipment
CN207361593U (en) The provision for disengagement of power station guide vane arm
CN216382825U (en) Hydraulic pipeline supporting device for hydraulic engineering
CN207127021U (en) A kind of tune circle device of steel cylinder
CN221027311U (en) Pipe burying device for hydraulic and hydroelectric engineering
CN110778789A (en) Pipeline installation equipment for hydraulic engineering
CN221051342U (en) Quick balance adjustment installation device of pipeline
CN207846511U (en) Lifting row's dredging tube
CN206237750U (en) A kind of pipe-laying trencher for burying salt-soda soil salt discharge pipeline
CN208617274U (en) A kind of construction of hydro project pipe of concrete placing device
CN220727321U (en) Socket tool for two large-caliber concrete socket pipes
CN220182372U (en) Water conservancy construction pipeline buries puts device
CN219860186U (en) Building pipe installation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211210

CF01 Termination of patent right due to non-payment of annual fee