CN211762267U - Reusable water heating sleeve one-time reservation forming die - Google Patents

Reusable water heating sleeve one-time reservation forming die Download PDF

Info

Publication number
CN211762267U
CN211762267U CN201921594083.6U CN201921594083U CN211762267U CN 211762267 U CN211762267 U CN 211762267U CN 201921594083 U CN201921594083 U CN 201921594083U CN 211762267 U CN211762267 U CN 211762267U
Authority
CN
China
Prior art keywords
clamping block
cross
fixed
clamp splice
water heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921594083.6U
Other languages
Chinese (zh)
Inventor
姜伟
吴志刚
张伟
韩旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201921594083.6U priority Critical patent/CN211762267U/en
Application granted granted Critical
Publication of CN211762267U publication Critical patent/CN211762267U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Automatic Assembly (AREA)

Abstract

The utility model relates to the relevant technical field of forming die, in particular to a reusable water heating sleeve one-step reserved forming die, which comprises a base outer edge and a cross fixed support fixedly arranged on the base outer edge, wherein the edge of the cross fixed support is fixedly welded on the inner wall of a pipe body on the base outer edge, four mounting notches are uniformly arranged on the plate body of the cross fixed support, an inner fixed clamping block and an outer fixed clamping block are arranged above the mounting notches, an inner fixed clamping block through hole is arranged above the inner fixed clamping block, and an outer fixed clamping block through hole is arranged above the outer fixed clamping block; the cross-shaped fixed support is provided with the long circular notch, the inner fixed clamping block and the outer fixed clamping block are arranged above the long circular notch, and the long circular notch and the outer fixed clamping block are fixedly arranged on the cross-shaped fixed support through the bolts and the nuts, so that a worker can embed the diameter of the water heating sleeve according to the diameter required; the position of the sleeve is adjusted, so that the sleeve is more stably fixed, and the sleeve is prevented from shifting and deviating due to infirm fixation to influence subsequent installation work.

Description

Reusable water heating sleeve one-time reservation forming die
Technical Field
The utility model relates to a forming die correlation technique field specifically is a repeatedly usable's hot-water heating sleeve pipe once reserves forming die.
Background
The sleeve is usually used in basement of building and is an iron ring for protecting the pipeline or facilitating the installation of the pipeline. The sheathed tube classification has the rigidity sleeve pipe, flexible waterproof sleeve pipe, steel pipe sleeve pipe and iron sheet sleeve pipe etc, and wherein the hot-water heating supplies to use sheathed tube application comparatively extensively, and present hot-water heating pipe well casing installation is the hole of reserving sleeve pipe installation mode, however on the pre-buried base of using of sleeve pipe at present stage, and comparatively perfect fixed knot constructs, its fixed mode causes the sleeve pipe because of fixed insecure large tracts of land production aversion extremely easily at concrete placement in-process, thereby often cause the unable normal installation of later stage pipeline, and adopt the aluminium membrane project, the fixed cavity of using same position repeatedly, lead to the fact very big destruction to the aluminium membrane, for this, the utility model provides a repeatedly usable's hot-water heating sleeve pipe once reserves forming die is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a forming die is once reserved to repeatedly usable's hot-water heating sleeve pipe to solve the problem that provides among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a forming die is once reserved to repeatedly usable's hot-water heating sleeve pipe, includes that the base is outer along with the cross fixed stay on the base is outer along, the base is outer along being a short pipe structure, the cross fixed stay is a cross panel, the edge fixed welding of its panel is on the body inner wall on the base outer edge, four installation notches have evenly been seted up on the plate body of cross fixed stay, the top of installation notch is provided with interior fixed clamp splice and outer fixed clamp splice, interior fixed clamp splice is the rectangle block structure, and it is provided with four altogether, and its top has seted up interior fixed clamp splice through-hole, outer fixed clamp splice is provided with four altogether, and its top has seted up outer fixed clamp splice through-hole, be provided with the sleeve pipe between interior fixed clamp splice and the outer fixed clamp splice.
Preferably, the outer edge of the base is a waste casing pipe head with similar size selected from a waste pool, and the waste casing pipe head is sleeved inside a reserved finished steel casing pipe after being cut and welded to form a fixing device.
Preferably, the central position of the lower surface of the cross-shaped fixed support is fixedly welded with a mounting seat, the mounting seat is of a cylindrical structure, the central position of a cylinder body of the mounting seat is provided with a threaded hole, the threaded hole completely penetrates through the mounting seat and the cross-shaped fixed support, and a harness cord screw is fixedly mounted in the threaded hole.
Preferably, one end of the inner fixing clamping block facing the outer fixing clamping block is provided with a convex arc surface.
Preferably, one end of the outer fixing clamping block facing the inner fixing clamping block is provided with a concave arc surface.
Preferably, the mounting notch is a long round notch, and the inner fixing clamping block and the outer fixing clamping block are fixedly mounted in the notch through a hexagon bolt and a hexagon nut.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the cross-shaped fixed support is provided with the long circular notch, the inner fixed clamping block and the outer fixed clamping block are arranged above the long circular notch, and the long circular notch and the outer fixed clamping block are fixedly arranged on the cross-shaped fixed support through the bolts and the nuts, so that a worker can embed the diameter of the water heating sleeve according to the diameter required; the position of the sleeve is adjusted, so that the sleeve is more stably fixed, and the sleeve is prevented from shifting and deviating due to infirm fixation to influence subsequent installation work.
2. Through the bottom fixed weld mount pad at cross fixed stay to set up the screw hole on it, through the length of extension screw hole, thereby let the stability more firm of being connected between harness cord screw rod and the cross fixed stay.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a lower side view of the present invention;
FIG. 3 is a schematic view of the cross-shaped fixing and supporting structure of the present invention;
FIG. 4 is a schematic structural view of the internal fixing clamp block of the present invention;
FIG. 5 is a schematic structural view of the external fixing clamp block of the present invention;
fig. 6 is the installation schematic diagram of the sleeve and the harness cord screw of the present invention.
In the figure: the base is outer along 1, cross fixed bolster 2, mount pad 3, screw hole 4, installation notch 5, interior fixed clamp splice 6, interior fixed clamp splice through-hole 7, outer fixed clamp splice 8, outer fixed clamp splice through-hole 9, harness cord screw rod 10, sleeve pipe 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: the utility model provides a forming die is once reserved to repeatedly usable's hot-water heating sleeve pipe, include that the base is outer along 1 and the cross fixed bolster 2 on 1 of fixed mounting edge outside the base, the base is outer along 1 to be a short pipe structure, cross fixed bolster 2 is a cross panel, the edge fixed welding of its panel is on the outer body inner wall of 1 of base edge, four installation notch 5 have evenly been seted up on cross fixed bolster 2's the plate body, the top of installation notch 5 is provided with interior fixed clamp splice 6 and outer fixed clamp splice 8, interior fixed clamp splice 6 is the rectangular block structure, it is provided with four altogether, and its top has seted up interior fixed clamp splice through-hole 7, outer fixed clamp splice 8 is provided with four altogether, outer fixed clamp splice through-hole 9 has been seted up above it, be provided with sleeve pipe 11 between interior fixed clamp splice 6 and the outer fixed clamp splice 8.
Further, the outer edge 1 of the base is a fixing device which is formed by selecting waste casing pipe heads with similar sizes from a waste pool, cutting the waste casing pipe heads, sleeving the cut waste casing pipe heads in a reserved finished steel casing pipe and welding the cut waste casing pipe heads to form a fixing device;
furthermore, a mounting seat 3 is fixedly welded at the central position of the lower surface of the cross-shaped fixed support 2, the mounting seat 3 is of a cylindrical structure, a threaded hole 4 is formed in the central position of the cylinder, the threaded hole 4 completely penetrates through the mounting seat 3 and the cross-shaped fixed support 2, a harness cord screw 10 is fixedly installed in the threaded hole 4, the mounting seat 3 is fixedly welded at the bottom end of the cross-shaped fixed support 2, the threaded hole 4 is formed in the mounting seat, and the length of the threaded hole 4 is prolonged, so that the harness cord screw 10 and the cross-shaped fixed support 2 are connected more stably and firmly;
furthermore, one end of the inner fixing clamping block 6 facing the outer fixing clamping block 8 is provided with a convex arc surface, so that the arc surface of the outer fixing clamping block 8 can be attached to the inner wall of the sleeve 11;
furthermore, one end of the outer fixing clamping block 8 facing the inner fixing clamping block 6 is provided with a concave arc surface, and the arc surface of the outer fixing clamping block 8 is attached to the outer wall of the sleeve 11, so that the position of the sleeve above the outer fixing clamping block is better limited;
further, the mounting notch 5 is a long circular notch, the inner fixing clamping block 6 and the outer fixing clamping block 8 are both fixedly mounted in the notch through a hexagon bolt and a hexagon nut, the long circular notch is formed in the cross-shaped fixing support 2, the inner fixing clamping block 6 and the outer fixing clamping block 8 are arranged above the long circular notch and fixedly mounted on the cross-shaped fixing support 2 through a bolt and a nut, and therefore a worker can fix the diameter of the pre-buried water heating sleeve 11 according to the requirement; the position of the sleeve is adjusted, so that the sleeve 11 is more stably fixed, and the sleeve 11 is prevented from shifting and deviating due to infirm fixation to influence subsequent installation work;
the working principle is as follows: during the in-service use, the staff is earlier according to required pre-buried sleeve pipe diameter, choose the sleeve pipe of suitable diameter, then place sleeve pipe 11 in the top of cross fixed stay 2, and guarantee that sleeve pipe 11 and base coincide outward along 1 circular mutually, then loosen hexagon nut, with the inner wall of the circular arc surface laminating sleeve pipe 11 of internal fixation clamp splice 6, let the outer wall of the circular arc surface laminating sleeve pipe 11 of external fixation clamp splice 8, then it is fixed with it by the nut, install in threaded hole 4 on cross fixed stay 2 through its threaded structure who takes on it with harness cord screw rod 10, and guarantee that the tip of harness cord screw rod 10 stretches out the lower surface of mount pad 3, in order to guarantee its stability of connecting between the two, it can to set up whole mechanism at the place that needs pre-buried sleeve pipe cement through harness cord screw rod 10 at last.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a repeatedly usable's hot-water heating sleeve pipe once reserves forming die, includes that the base is outer along (1) and fixed mounting the cross fixed stay (2) on the base is outer along (1), its characterized in that: the base is outer along (1) being a short pipe structure, cross fixed stay (2) are a cross panel, and the edge fixity welding of its panel is on the body inner wall of base outer edge (1), evenly seted up four installation notches (5) on the plate body of cross fixed stay (2), the top of installation notch (5) is provided with interior fixed clamp splice (6) and outer fixed clamp splice (8), interior fixed clamp splice (6) are the rectangular block structure, and it is provided with four altogether, and its top has seted up interior fixed clamp splice through-hole (7), outer fixed clamp splice (8) are provided with four altogether, and outer fixed clamp splice through-hole (9) have been seted up to its top, be provided with sleeve pipe (11) between interior fixed clamp splice (6) and outer fixed clamp splice (8).
2. The one-step reserved forming die for the reusable water heating sleeve pipe as claimed in claim 1, wherein: the center position department fixed welding of the lower surface of cross fixed stay (2) has mount pad (3), mount pad (3) are a cylinder structure, and the central point department of putting of its cylinder sets up screw hole (4), screw hole (4) run through mount pad (3) and cross fixed stay (2) completely, and fixed mounting has harness cord screw rod (10) in this screw hole (4).
3. The one-step reserved forming die for the reusable water heating sleeve pipe as claimed in claim 1, wherein: one end of the inner fixing clamping block (6) facing to the outer fixing clamping block (8) is arranged into a convex arc surface.
4. The one-step reserved forming die for the reusable water heating sleeve pipe as claimed in claim 1, wherein: one end of the outer fixing clamping block (8) facing the inner fixing clamping block (6) is set to be a concave arc surface.
5. The one-step reserved forming die for the reusable water heating sleeve pipe as claimed in claim 1, wherein: the mounting notch (5) is a long round notch, and the inner fixing clamping block (6) and the outer fixing clamping block (8) are fixedly mounted in the notches through hexagon bolts and hexagon nuts.
CN201921594083.6U 2019-09-24 2019-09-24 Reusable water heating sleeve one-time reservation forming die Active CN211762267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921594083.6U CN211762267U (en) 2019-09-24 2019-09-24 Reusable water heating sleeve one-time reservation forming die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921594083.6U CN211762267U (en) 2019-09-24 2019-09-24 Reusable water heating sleeve one-time reservation forming die

Publications (1)

Publication Number Publication Date
CN211762267U true CN211762267U (en) 2020-10-27

Family

ID=72934668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921594083.6U Active CN211762267U (en) 2019-09-24 2019-09-24 Reusable water heating sleeve one-time reservation forming die

Country Status (1)

Country Link
CN (1) CN211762267U (en)

Similar Documents

Publication Publication Date Title
CN101892738B (en) Embedded scaffold connecting tube and construction method thereof
CN211728877U (en) Clamp convenient to adjust
CN211762267U (en) Reusable water heating sleeve one-time reservation forming die
CN212716026U (en) Clamping mechanism for repairing crack of wooden component of historic building
CN215630092U (en) Foundation bolt positioning and fixing tool
CN211398151U (en) Anchoring embedded part fixing device of suspender hanger based on aluminum mould
CN210256645U (en) Prefabricated wallboard stores pylon preformed hole concurrently hangs and uses device
CN105507584A (en) Waterproof casing fixing bracket
CN210439661U (en) Tool type wall connecting piece for wall construction scaffold
CN210598151U (en) Civil engineering concrete cast-in-place side form drawing die instrument
CN210947708U (en) Wall form strutting arrangement
CN112343336A (en) Concrete wall column template positioning device and construction method thereof
CN218176183U (en) Stagnant water steel sheet mounting
CN217439560U (en) Additional fixing position device for thin-layer concrete template
CN210685404U (en) Anti-leakage turnover eccentric sleeve applied to construction of concrete shear wall
CN215926755U (en) Wall-through fixing device
CN209881062U (en) A butt fusion frock for cable intermediate head
CN215107304U (en) Hang mould strutting arrangement
CN210530330U (en) Construction quality control tool for mounting engineering casing
CN216108608U (en) Embedded part fixing and combining device
CN212715939U (en) Avoid aluminum alloy template because of climbing fixing device that frame embedded bushing trompil destroyed
CN220203371U (en) Scaffold tie device under full cast-in-situ mode of outer wall
CN210195208U (en) Adjustable tool type wall connecting piece
CN221195125U (en) Tunnel longitudinal drain pipe fixing device
CN211714555U (en) Scaffold frame is wall spare even suitable for roofing parapet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant