CN211665964U - Building waterproof board for sponge city planning construction - Google Patents

Building waterproof board for sponge city planning construction Download PDF

Info

Publication number
CN211665964U
CN211665964U CN201922015327.7U CN201922015327U CN211665964U CN 211665964 U CN211665964 U CN 211665964U CN 201922015327 U CN201922015327 U CN 201922015327U CN 211665964 U CN211665964 U CN 211665964U
Authority
CN
China
Prior art keywords
waterproof board
fixedly connected
shell
sponge city
board shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922015327.7U
Other languages
Chinese (zh)
Inventor
牟芙蓉
蒋临涌
薛继杰
洪华
戴雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuhuan Architectural Design Institute Co ltd
Original Assignee
Yuhuan Architectural Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuhuan Architectural Design Institute Co ltd filed Critical Yuhuan Architectural Design Institute Co ltd
Priority to CN201922015327.7U priority Critical patent/CN211665964U/en
Application granted granted Critical
Publication of CN211665964U publication Critical patent/CN211665964U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a building waterproof board towards planning construction in sponge city, including the waterproof board shell, the last fixed surface of waterproof board shell is connected with the thickening plate, the first waterproof board of interior roof fixedly connected with of waterproof board shell, the interior bottom wall fixedly connected with second waterproof board of waterproof board shell, the inside fixedly connected with H type mount of waterproof board shell. This towards building waterproof board of sponge city planning construction, setting through the thickening plate, when the object strikes the thickening plate, the object can touch buffer rubber earlier, because buffer rubber's elasticity, can reduce partly impact force then, strike with the thickening plate, arrive the waterproof board shell again, first waterproof board and H type mount have been set up in the inside of waterproof board shell, can make first waterproof board and H type mount warp under the circumstances of assaulting, the phenomenon of incident appears in the job site has been reduced.

Description

Building waterproof board for sponge city planning construction
Technical Field
The utility model relates to a waterproof technical field of building specifically is a waterproof board of building towards sponge city planning construction.
Background
At present, in houses or construction sites and construction facilities, a simple waterproof device is generally adopted, waterproof paint is generally used for coating a plate, after the waterproof device is used, the situation of water seepage of a wall can be caused along with the lapse of time, and the service life and the use comfort of a building can be prolonged.
Current waterproof construction is single, and the shock resistance is low, and causes the phenomenon that the waterproof board damaged easily, influences the safety of building site construction.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building waterproof board towards sponge city planning construction has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a building waterproof board towards planning construction in sponge city, includes the waterproof board shell, the last fixed surface of waterproof board shell is connected with the thickening board, the first waterproof board of interior roof fixedly connected with of waterproof board shell, the interior diapire fixedly connected with second waterproof board of waterproof board shell, the inside fixedly connected with H type mount of waterproof board shell, the upper surface and the equal fixedly connected with cotton that absorbs water of lower surface of H type mount.
Optionally, the both sides of waterproof board shell all fixedly connected with fixed block, the inside of fixed block sets up threaded hole, the cover block has been cup jointed on the surface of fixed block, the threaded hole is seted up on the surface of cover block.
Optionally, the internal thread of the threaded hole is connected with a threaded rod, and the upper surface of the threaded rod is fixedly connected with a crank.
Optionally, one side of the sleeve block is fixedly connected with a second waterproof board shell.
Optionally, both sides of the waterproof plate shell are fixedly connected with supporting blocks, and nuts are arranged on the surfaces of the supporting blocks.
Optionally, the absorbent cotton is made of pure cotton, and the upper surface of the thickening plate is fixedly connected with buffer rubber.
(III) advantageous effects
The utility model provides a building waterproof board towards planning construction in sponge city possesses following beneficial effect:
this towards building waterproof board of sponge city planning construction, setting through the thickening plate, when the object strikes the thickening plate, the object can touch buffer rubber earlier, because buffer rubber's elasticity, can reduce partly impact force then, strike with the thickening plate, arrive the waterproof board shell again, inside at the waterproof board shell has set up first waterproof board and H type mount, also can make first waterproof board and H type mount warp under the circumstances of assaulting, the phenomenon of incident appears in the job site has been reduced, through the cotton setting that absorbs water, first waterproof board can separate water, when the water of seepage can flow into the cotton that absorbs water of first waterproof board and second waterproof board inboard, because the cotton effect that absorbs water, thereby avoid appearing the phenomenon of infiltration.
Drawings
FIG. 1 is a structural elevation view of the present invention;
fig. 2 is a schematic view of the cross-sectional structure of the present invention.
In the figure: 1. a waterproof sheet housing; 2. thickening the plate; 3. a first waterproof sheet; 4. a second waterproof sheet; 5. an H-shaped fixing frame; 6. absorbent cotton; 7. a cushion rubber; 8. a fixed block; 9. sleeving blocks; 10. a threaded rod; 11. a crank; 12. a second waterproof sheet housing; 13. and (7) a supporting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a building waterproof board for planning and building sponge city comprises a waterproof board shell 1, wherein the upper surface of the waterproof board shell 1 is fixedly connected with a thickened board 2, through the arrangement of the thickened board 2, when an object collides with the thickened board 2, the object can touch a buffer rubber 7 firstly, due to the elasticity of the buffer rubber 7, part of impact force can be reduced and impacts with the thickened board 2 and then reaches the waterproof board shell 1, a first waterproof board 3 and an H-shaped fixing frame 5 are arranged in the waterproof board shell 1, the first waterproof board 3 and the H-shaped fixing frame 5 can be deformed under the impact condition, the safety accident phenomenon in a construction site is reduced, the inner top wall of the waterproof board shell 1 is fixedly connected with the first waterproof board 3, the inner bottom wall of the waterproof board shell 1 is fixedly connected with a second waterproof board 4, the inner part of the waterproof board shell 1 is fixedly connected with the H-shaped fixing frame 5, the upper surface and the lower surface of the H-shaped fixing frame 5 are fixedly connected with absorbent cotton 6, the first waterproof board 3 can separate water through the absorbent cotton 6, when leaked water can flow into the absorbent cotton 6 on the inner sides of the first waterproof board 3 and the second waterproof board 4, the absorbent cotton 6 absorbs water under the action of water absorption, so that the phenomenon of water seepage is avoided, both sides of the waterproof board shell 1 are fixedly connected with the fixing blocks 8, the inner parts of the fixing blocks 8 are provided with threaded holes, the surface of the fixing blocks 8 is sleeved with the sleeve block 9, the surface of the sleeve block 9 is provided with the threaded holes, the inner threads of the threaded holes are connected with the threaded rods 10, the upper surface of the threaded rods 10 is fixedly connected with the crank 11, one side of the sleeve block 9 is fixedly connected with the second waterproof board shell 12, both sides of the waterproof board shell 1 are fixedly connected with the supporting blocks 13, the surface of the supporting blocks 13 is provided with nuts, the absorbent cotton 6 is made, the upper surface of the thickened plate 2 is fixedly connected with a buffer rubber 7.
In summary, when the building waterproof board for sponge city planning and construction is used, through the arrangement of the thickened board 2, when an object impacts the thickened board 2, the object will touch the buffer rubber 7 first, due to the elasticity of the buffer rubber 7, a part of impact force is reduced, and then the part of impact force impacts the thickened plate 2 and reaches the waterproof plate shell 1, the first waterproof board 3 and the H-shaped fixing frame 5 are arranged in the waterproof board shell 1, the first waterproof board 3 and the H-shaped fixing frame 5 can be deformed under the impact condition, the safety accident phenomenon in a construction site is reduced, the first waterproof board 3 can separate water through the arrangement of the water absorption cotton 6, when the leaked water flows into the absorbent cotton 6 on the inner sides of the first waterproof board 3 and the second waterproof board 4, the absorbent cotton 6 absorbs water under the water absorption effect, so that the water seepage phenomenon is avoided.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building waterproof board towards sponge city planning construction, includes waterproof board shell (1), its characterized in that: the waterproof board comprises a waterproof board shell (1), and is characterized in that the upper surface of the waterproof board shell (1) is fixedly connected with a thickening plate (2), the inner top wall of the waterproof board shell (1) is fixedly connected with a first waterproof board (3), the inner bottom wall of the waterproof board shell (1) is fixedly connected with a second waterproof board (4), the inner portion of the waterproof board shell (1) is fixedly connected with an H-shaped fixing frame (5), and the upper surface and the lower surface of the H-shaped fixing frame (5) are fixedly connected with water absorption cotton (6).
2. The building waterproof board for planning and constructing sponge city according to claim 1, wherein: the waterproof board is characterized in that fixed blocks (8) are fixedly connected to the two sides of the waterproof board shell (1), threaded holes are formed in the fixed blocks (8), sleeve blocks (9) are sleeved on the surfaces of the fixed blocks (8), and threaded holes are formed in the surfaces of the sleeve blocks (9).
3. The building waterproof board for planning and constructing sponge city according to claim 2, wherein: the internal thread of screw hole is connected with threaded rod (10), the last fixed surface of threaded rod (10) is connected with crank (11).
4. The building waterproof board for planning and constructing sponge city according to claim 2, wherein: one side of the sleeve block (9) is fixedly connected with a second waterproof board shell (12).
5. The building waterproof board for planning and constructing sponge city according to claim 1, wherein: both sides of the waterproof board shell (1) are fixedly connected with supporting blocks (13), and nuts are arranged on the surfaces of the supporting blocks (13).
6. The building waterproof board for planning and constructing sponge city according to claim 1, wherein: the water absorption cotton (6) is made of pure cotton, and the upper surface of the thickening plate (2) is fixedly connected with buffer rubber (7).
CN201922015327.7U 2019-11-20 2019-11-20 Building waterproof board for sponge city planning construction Expired - Fee Related CN211665964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922015327.7U CN211665964U (en) 2019-11-20 2019-11-20 Building waterproof board for sponge city planning construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922015327.7U CN211665964U (en) 2019-11-20 2019-11-20 Building waterproof board for sponge city planning construction

Publications (1)

Publication Number Publication Date
CN211665964U true CN211665964U (en) 2020-10-13

Family

ID=72732410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922015327.7U Expired - Fee Related CN211665964U (en) 2019-11-20 2019-11-20 Building waterproof board for sponge city planning construction

Country Status (1)

Country Link
CN (1) CN211665964U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627364A (en) * 2020-12-02 2021-04-09 山东水利职业学院 Waterproof building net for sponge city planning and construction
CN115182465A (en) * 2022-08-22 2022-10-14 青岛锐鹏新材料科技有限公司 Sponge city waterproof sheet, sponge city waterproof system and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627364A (en) * 2020-12-02 2021-04-09 山东水利职业学院 Waterproof building net for sponge city planning and construction
CN115182465A (en) * 2022-08-22 2022-10-14 青岛锐鹏新材料科技有限公司 Sponge city waterproof sheet, sponge city waterproof system and construction method thereof
CN115182465B (en) * 2022-08-22 2024-03-12 青岛锐鹏新材料科技有限公司 Sponge city waterproof board, sponge city waterproof system and construction method thereof

Similar Documents

Publication Publication Date Title
CN211665964U (en) Building waterproof board for sponge city planning construction
CN208996546U (en) A kind of construction steel structure fixed installation connecting support
CN210194918U (en) Anti-collision device of shockproof building structure
CN208202246U (en) Water droplet escutcheon spends aluminium sheet
CN211520304U (en) Steel construction base with buffer function
CN210326630U (en) Shockproof power distribution cabinet
CN210459569U (en) Intermediate connecting piece of prefabricated building
CN211196527U (en) Environmental monitoring buoy
CN206396655U (en) The bottom decoupler of railway metal sound barrier
CN211284939U (en) Lifting rib of washing machine
CN209907999U (en) Air bag for sticking carbon fiber cloth on concrete structure
CN220954071U (en) Double-layer sound insulation curtain wall
CN215003812U (en) Monitoring device of road well
CN211034112U (en) Vertical rail transport logistics electrified rail
CN209653314U (en) A kind of high residential building electric shaft structure
CN214143457U (en) Guard bar
CN211697867U (en) Multifunctional nixie tube electric quantity tester
CN214367501U (en) Capacitor aging charging oven protection device
CN214618459U (en) Sewage detector for chemical plant sewage discharge detection
CN214302961U (en) Be used for integral anticollision guard plate of green building
CN211255284U (en) Water environment treatment blocks dirty flotation pontoon of using
CN209739856U (en) Anti-leakage type double-layer oil tank with impact resistance
CN209991380U (en) Wind-proof solar high-pole lamp with reinforcing support inside
CN210373309U (en) LED street lamp sealing and fixing assembly
CN219365204U (en) Water conservancy building waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201013

Termination date: 20211120